Claim for damage after neighbouring demolition and excavation declined as not a listed insured event
Summary
The complainants claimed for cracking and other damage to their home after demolition and excavation at a neighbouring property, and the insurer declined the claim. AFCA accepted the works caused some new damage but found the cause was not a listed insured event, so the insurer was entitled to refuse payment.
The complainants must establish on the balance of probabilities that the damage arose from a listed insured event, and vibration and ground movement are not listed events under the policy.
Subjects and remedies
home or building damageno remedy
Text of the determination
Determination | Case number: 527391 Page 1 of 14
Determination
Case number: 527391 8 January 2019
1 Determination overview
1.1 Complaint
The complainants hold a home insurance policy with the financial firm (insurer).
The complainants lodged a claim with the insurer for cracking and other damage
sustained to their home after demolition and excavation works were undertaken at a
neighbouring property.
The insurer denied the claim on the basis the claimed damage was not caused by an
event insured under the policy. The insurer also says that even if it were shown to be
an event insured by the policy, the damage is excluded under the policy.
The complainants dispute the insurer ’s decision and seek acceptance of their claim.
1.2 Issues and key findings
Have the complainants established a valid claim under the policy?
The complainants have not established a valid claim as the available material
suggests the property damage did not result from one of the covered insurable
events. The insurer was entitled to decline the claim on this basis.
1.3 Determination
This determination is in favour of the insurer.
The insurer is not required to take any further action on the complainants ’ claim.
Determination | Case number: 527391 Page 2 of 14
2 Reasons for determination
2.1 Have the complainants established a valid claim under the policy?
Complainants must show the damage was caused by an insured event
The complainants are required to show that, on the balance of probabilities, they have
suffered a loss caused by a risk insured against under the policy. This is known as a
valid (or prima facie ) claim.
If the complainants can establish a valid claim, then the onus shifts to the insurer to
show that, on the balance of probabilities, it is entitled to rely on an exclusion under
the policy or is otherwise entitled to deny the claim.
The complainants ’ policy covers loss or damage arising from insured events as listed
in the policy, subject to conditions and exclusions.
The policy also provides optional cover for Accidental Damage; however, the
complainants did not purchase this cover.
Parties disagree on cause of damage
The insurer says that while there is some evidence showing the excavation work in
the neighbouring property could have potentially contributed to the damage, it also
observed defects and pre-existing damage of a long-term nature.
The insurer relies on its expert reports to say:
damage is consistent with vibration from machinery, faulty design and pre-existing
cracks have simply worsened due to the demolition
The insurer also says vibration and ground movement are not listed events under the
policy and the complainants have failed to substantiate the damage resulted from an
incident to which the policy responds. It therefore concludes it is not liable to
indemnify the complainants for any related costs.
The complainants rely on their expert report to say:
the damage sustained was caused by the demolition and excavation works in the
neighbouring property including to the following areas:
o front driveway which previously had only a small crack
o new cracks in the retaining wall
o tiles between the pool and dwelling including a dropped section of
cement
o a drop in the water level of the pool and damage to tiles in pool area
o cracks in the garage and dwelling.
Determination | Case number: 527391 Page 3 of 14
The insurer is only liable for damage to the complainants ’ property if the proximate
cause of the damage (that is, the real, effective or dominant cause) was one of the
events insured under the policy and is not otherwise excluded.
A loss can have more than one cause. When deciding whether a loss is covered
under a policy, and/or whether it is excluded, we consider what the ‘proximate cause’
was.
This is a question of fact depending on the circumstances in each dispute. It is not
necessarily the first or last or the sole cause of the loss. Instead, the proximate cause
is the effective, dominant or operative cause of the loss.
Available information shows damage in some areas pre-existed the loss
The dilapidation report provided by CSD for the insured property (before the relevant
works commenced), noted that while the structures were in satisfactory condition, it
found the following on exterior surfaces:
settlement and hairline cracks in the concrete slab in the car space
separation between the concrete slab and retaining wall
cracking in the masonry retaining wall
hairline crack in the tiles in the pool area
cracking on retaining wall and settled tiles in pool area
cracking in concrete pool shell through visible parts of shell
separated brick under concrete pool shell
balustrade on rear path leaning away from boundary
chipped tile under balustrade on rear path.
CSD’s repor t and accompanying photographs, show that some of the damage cannot
be attributed to the works at the neighbouring property as it existed before the works
commenced.
The insurer ’s engineer’s (TB) report supports CSD’s findings that some damage in the
affected areas were of a long-term nature and pre-existed the works (see section 3.1).
TB further noted defects on the property such as:
absence of tile expansion joints in the balcony
absence of flexible joint detail in garage and dwelling wall to allow expected
movement between the two brick structures resulting in predictable cracking
absence of pool tile expansion joints on the pool coping
absence of expansion joints in the interior tiling as required by the relevant
Australian standard
a damaged swimming pool return pipe which allowed water to escape from the
pool and facilitated soil loss from the surrounding areas.
Determination | Case number: 527391 Page 4 of 14
Having carefully reviewed the information submitted, I am satisfied that the reported
damage was in part caused by defects and pre-existing damage.
Available material shows demolition & excavation work contributed to damage
The complainants obtained a structural report from their expert (BS), which provided a
comparison of its observations with those in CSD’s dilapidation report. While BS
found there was no change to the majority of items recorded in CSD’s report, it
observed the following new/worsened damage:
increased width and severity of pre -existing cracks
subsidence of paved areas of the driveway
appearance of new cracks in the pool surrounds
new cracks in the tiling of the front patio to house
new cracks in the north-eastern corner of entry portico to right of garage
various new cracks internally to tiled areas
more obvious cracks and further subsidence in the concrete slab on car space
more severe cracking in the stairs and masonry retaining wall
more severe cracking between the concrete slab and masonry wall
more severe cracking in the masonry retaining wall and loosened render
marked drop in the water level of the swimming pool
new cracks and widened existing cracks on the retaining wall and settled tiles in
the pool area
new cracks and substantial settlement in the area adjacent to the swimming pool.
The insurer ’s expert reports from TB, support some of the findings above. This is
because while TB identified building defects and pre -existing damage, it also found
that it is feasible and probable that some additional cracking and damage has
occurred as a result of the adjacent demolition and excavation works.
Further, the complainants obtained a geotechnical assessment from their expert (AG),
who supported other expert findings. Relevantly, AG stated that the rock excavation
carried out at the neighbouring property caused structural damage to the insured
property. He says this is because:
excavation was carried out by two hydraulic excavators equipped with hydraulic
hammers which weigh at least 600-900kg
there was new damage in some areas of the property when compared with the
damage recorded on the dilapidation report
the damage that existed at the time of the dilapidation report had worsened
the water level of the pool had dropped significantly since the dilapidation report,
but neither CSD nor AG noted any obvious leak points from the pool or shell
the site photos showed stronger bands within the sandstone with iron staining
which is much harder to excavate than the surrounding rock mass
Determination | Case number: 527391 Page 5 of 14
AG disagrees with insurer’ s expert that the lack of obvious soil saturation issues
around the pool necessarily indicates the pool had a significant leak because of
damage to the pool shell. He says this is because it is possible that a leak in the
shell could find its way to a drainage pipe or service trench and not into the
surrounding soil.
AG further submits that the Australian Standard (AS2187) re fers to the British
Standard for evaluation and measurement for vibration in buildings (BS7385), which it
says is applicable to Australian conditions. He says that according to the relevant
standard and based on the degree of pre-existing damage, a vibration limit of 3mm-
5mm is appropriate to reduce the risk of damage to an acceptable level.
According to AG, the excavation methods that should have been adopted is those
which limit ground vibrations at adjoining developments to not more than 3mm/s. The
method of rock excavation reported to have occurred at the neighbouring property,
however, would have resulted in the observed damage. He further says the
excavation of soil and rock results in stress changes in the remaining material, and
some ground movement is inevitable.
While I accept the evidence shows the insured property had some pre-existing
damage and defects in the insured property, I am satisfied that the demolition and
excavation works at the adjacent property caused some new damage to the property
and made existing damage worse.
Complainant has not established a valid claim under the terms of the policy
Having carefully reviewed the submissions and reports provided by the parties, I am
not satisfied that the information as provided is sufficient to establish a claim that falls
within the terms of the policy.
I accept that the available material shows that the demolition and excavation work in
the neighbouring property is likely to have caused some of the damage in the
complainants ’ property. I considered whether the damage was as the result of impact.
I am satisfied however, that the cause of damage does not fall within the list of
insured events covered within the policy.
The complainants bear the onus to establish on the balance of probabilities that the
damage arose as a result of an insured event. For the reasons set out above, I am
not satisfied the complainants have established the damage was caused by an event
to which the policy responds.
In the circumstances, the insurer is entitled to refuse payment of the claim.
Determination | Case number: 527391 Page 6 of 14
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Relevant policy provisions
Section Relevant wording
Listed events
Page 10
…
The listed events we cover under your policy are shown in
Table 3. 1 on page 22.
The events we cover
Page 22
We cover your home or contents when certain things happen.
These are known as 'listed events'. You can make a claim if a
listed event takes place and causes loss or damage to your
home or contents during the policy period.
In this section, we tell you what events you’re covered for and
any specific exclusions and conditions that apply to the event.
General exclusions may also apply — see Section 5.
Listed events:
Storm
Flood
Water and oil leaks
Lightning
Fire
Earthquake
Theft or attempt ed theft
Vandalism or malicious act
Broken glass – buildings
Impact damage
Determination | Case number: 527391 Page 7 of 14
Section Relevant wording
Animal damage
Explosion
Riots or civil commotion
Exclusions for all cover
Page 53
These exclusions apply to all cover under your policy.
What we don’t cover
Loss, damage, injury or death arising from:
Rust, corrosion, gradual deterioration, depreciation, wear and
tear
…
Subsidence or landslide unless it happens immediately as a
result of an earthquake or explosion
…
The settling, shrinkage or expansion in buildings, foundations,
walls or pavements
Maintaining and occupying your home
We don’t cover loss, damage, injury or death arising from:
faulty design or workmanship
previous damage that has not been rep aired
…
3.3 Supporting documents
Record Key points
Insurer ’s expert
(CSD)
Dilapidation report
14 - 12 - 16
The inspected structures were in satisfactory condition although
a number of defects were present on the exterior surfaces.
The following defects were photographed :
Hairline to 1mm wide crack in concrete slab on car space,
common throughout slab.
Settlement and 2 - 3mm wide cracks in concrete slab on car
space, common throughout slab.
Separation up to 5mm wide between slab and retaining wall.
Cracking up to 10mm wide in stairs and masonry retaining wall.
Separation up to 30mm wide bet ween concrete slab and
masonry wall.
Cracking up to 5mm wide in masonry retaining wall.
Construction joint in blockwork retaining wall on boundary with
[neighbouring property]
Hairline to 1mm wide crack in tiles in pool area.
1 - 2mm wide cracking on retaining wall and settled tiles in pool
area.
Cracking in concret e pool shell, common throughout visible parts
of shell.
Rear pat h behind pool as it stands, balustrade leaning away
from boundary.
Separated brick under conc rete pool shell.
Determination | Case number: 527391 Page 8 of 14
Chipped tile under balustrade on rear path.
Cracking in concret e pool shell, common throughout visible parts
of shell.
Insurer ’s expert (TB)
Engineer’s report 1
06 - 07 - 2017
Balcony tile cracks
appearance of cracks is generally aged and the extent prior to
the demolition and excavation (DE) cannot be clearly identified in
all locations.
The balcony was tiled over 10 years ago and no tile expansion
joints at intermediate or edge locations evident on over a 20m
long northern balcony and in excess of 15m west facing balcony
and deck.
Additional cracking to tile cracks that predated DE in some areas
is feasible and probably but cannot be quantified.
Most of the cracks examined were of a long - term natu re and
additional cracking in some areas is feasible and probable but
cannot be quantified.
Garage & dwelling wall crack
This joint area should include a flexible joint detail to allow
expected movement between these two separate brick
structures.
No flexi ble joint material is present and cracking of this joint area
is predictable.
The damage present is cosmetic and is as a result of a pre - DE
building defect.
Front driveway and hardstand paving
Pre - DE photos and current appearance show long term
settlement and cracking present.
Ingress of storm wat er runoff to the slab foundation will continue
to destabilise this section of the paving.
Adjacent paving slabs display no obvious damage – this would
indicate factors other than vibration have caus ed the localized
paving damage.
It is feasible and probable that DE vibration has contributed to
some additional settlement and paving cracking of this unstable
area.
Retaining wall below hardstand paving north end
Owner photos pre - DE show this area of brick retaining has
additional crack damage present.
This area is immediately adjacent to the excavation site and
vibration damage is highly likely to have caused the additional
crack damage sighted.
Masonry boundary wall
No structural damage is evident.
The wall damage as stated by the insured was verified and is
attributed to the building works within [neighbouring property].
Paving bet ween pool and house
A settlement gap of up to 40mm where the paving abuts the
seawall and tiled damage that is of a long - term nat ure.
A rev iew of photos of the area pre - DE noted similar settlement
Determination | Case number: 527391 Page 9 of 14
and tile cracking to that observed.
Damage sighted is unrelated to the DE works and related
vibrations.
Damage is of an aged appearance and pre - DE photos display a
similar condition.
Pool
A pool ret urn pipe is near the northern boundary where major DE
has been undertaken. This appears to be the most likely
element that has been damaged and testing is required.
Alternative leak causes may be present.
Numerous aged cracks in the retaining wall to th e east of the
pool that predate the DE. Some additional cracking over the
northern end of the wall.
It is feasible and probable that the DE is responsible for some of
this additional wall damage.
The pool coping tiles at the nort h - eastern corner of the po ol
display long term movement and cracking and more recent
damage is evident. It is feasible and probable that the DE is
responsible for this additional coping tile damage.
I observed ot her cracked and drummy coping pavers around the
pool. No prescribed po ol tile expansion joints were present on
this pool coping. I do not consider the current condition of the
pool coping in these areas to be related to the DE.
Dwelling interior tiling
The tiled areas viewed did not include expansion joints as
prescribed in the Australian Standard, AS 3958.1 Guide to the
installation of ceramic tiles .
Based on the location and isolat ed nat ure of the hairline cracks
to these tiles I consider installation met hods and lack of
expansion joints to be responsible for the tile dama ge sighted
rather than any vibration activity from the DE.
Insurer ’s expert (RB)
Building report
29 - 07 - 2017
Cracking to retaining walls and tiling in various locations.
Dipping to concrete slab.
Maintenance issues or defects: N/A
Conclusion: unsure – requires specialist. An engineer is required
to determine cause of damage.
Complainant’ s
expert (BS)
Structural report
24 - 10 - 2017
Evidence of movement to various areas around the property in
the form of:
> increased width and severity of pre - existing crack s
> subsidence of paved areas of the driveway
> pool surrounds and the appearance of new cracks.
The area affected totals approximately 30m ³ .
The cause of water loss from the swimming pool is likely due to
damage to the plumbing that was exposed during the
ex cavations and subsequent spraying of concrete along the
boundary with the adjoining property.
New damage:
New cracks in tiling of front patio to house.
New crack in north - eastern corner of entry portico to right of
Determination | Case number: 527391 Page 10 of 14
garage.
Various new cracks internally to tiled areas.
Comparison of CSD observations and BS observations:
CSD Reference (photographic
record)
BS Observations
Hairline to 1mm wide crack in
concrete slab on car space,
common throughout slab.
No change
Retaining wall along the
boundary with [neighbouring
property] as it stands.
No change
Settlement and 2 - 3mm wide
cracks in concrete slab on car
space, common throughout
slab.
Crack is more obvious.
Slab appears to have
suffered further subsidence.
Separation up to 5mm wide
between slab and retaining
wall.
No change
Cracking up to 10mm wide in
stairs and masonry retaining
wall.
Cracking is more severe up
to 15mm wide.
Separation up to 30mm wide
between concrete slab and
masonry wall.
Cracking is more severe.
Crack width is
approximately 35mm.
Separation up to 30mm wide
between concrete slab and
masonry wall.
Cracking appears more
severe.
Cracking up to 5mm wide in
masonry retaining wall.
Cracking is more severe.
Render has loos ened.
Construction joint in blockwork
retaining wall on boundary with
[neighbouring property].
No change
Blockwork retaining wall on
boundary with [neighbouring
property] as it stands.
No change
Pool as it stands. Water level has dropped
markedly.
Hairline to 1mm wide crack in
tiles in pool area.
No change
1 - 2mm wide cracking on
retaining wall and settled tiles
Cracks have widened to
5mm. New cracks have
Determination | Case number: 527391 Page 11 of 14
in pool area. appeared.
Cracking in concret e pool shell,
common throughout visible
parts of shell.
No change to pool shell,
however new cracks and
substantial settlement of up
to 40mm has occurred in
adjacent paved area
Rear pat h behind pool as it
stands, balustrade leaning
away from boundary.
No change
Separated brick under conc rete
pool shell.
No change
Chipped tile under balustrade
on rear path.
No change
Rear wall as it stands. No change
Rear wall as it stands No change
Cracking in concret e pool shell,
common throughout visible
parts of shell.
No change
Insurer ’s expert (TB)
Engineer’s report 2
29 - 06 - 2018
Response to structural report from BS:
Front driveway and hardstand paving:
Further subsidence & slab cracking: response unchanged from
previous report.
Retaining wall adjoining driveway :
Most of the damage res ults from the slap and step concrete
movement where no adequate slip joint has been provided.
It is feasible some additional crack damage to the brick and
render wall has occurred as a result of the adjacent demolition
works. This damage is at the northern end of the wall.
Pathway paving
Clay bricks t o the path from the driveway to the pool have
subsided.
These pavers are laid on a flexible base and no damage can be
attributed to the demolition works.
Poolside paving
Refer to earlier report and to adjacent damaged retaining wall
that is related to this damage.
Poolside retaining wall
The upper ret aining wall along the eastern side of the pool has
suffered significant subsidence and cracking at numerous
locations.
Numerous aged cracks are wit hin this wall that predate the DE.
Some additional settlement a nd cracking is present over the
northern end of the wall (up to 4m long).
It is feasible and probable that DE is responsible for some of this
additional wall damage.
Determination | Case number: 527391 Page 12 of 14
Swimming pool plumbing
Investigations have determined the swimming pool ret urn pipe is
dam aged, allowing water to escape from the pool as well as
facilitating soil loss/wash away from around the pipe and
surrounding areas.
Front entry veranda
See previous report under ‘Balcony tile cracks’.
Lower poolside paved area
The tiled paving area at the south - western corner of the pool has
cracked and subsided significantly.
Observed a settlement gap of up to 40mm where the paving
abuts the seawall and tiled damage that is of a long - term nature.
Photos of the area pre - DE noted similar settlement and tile
cracking to that observed.
The damage sighted is unrelated to the DE works and related
vibrations.
The settlement gap was measured again at 40mm and no
additional settlement is noticeable since last inspection.
Masonry boundary wall (not det ailed in BS re port)
No structural damage is evident although minor movement may
have occurred and the insured has concerns about the footings
of the section of wall to the west of the car parking slab.
Dwelling interior tiling (not detailed in BS report)
See previous re port.
Damage :
The following items could feasibly have been affected (even
where pre - event but stable damage was present) by the
demolition and excavation vibration or impact at the adjacent
property:
Retaining wall adjacent driveway (item 2 above)
Poolsid e paving
Poolside retaining wall
Pool pipe damage and relat ed water loss
Front entry veranda
Complainant ’s
expert (AG)
Geotechnical
assessment
29 - 04 - 2018
The rock excavation carried out at the [neighbouring property],
has caused structural damage to [insured property].
Approximately 400m ³ of rock was removed from [neighbouring
property] as part of additional excavation to construct the lower
ground floor area and noticeable vibrations were felt at the
insured property during rock excavation.
Rock exca vation was carried out by two hy draulic excavators
equipped with hy draulic hammers and a rock saw. The hammer
sizes as per photos provided appear to be relatively large and
estimated to be at least 600 - 900kg in weight.
A dilapidation report on the existin g residence at [insured
property] was prepared by [CSD] on 14 - 12 - 16, prior to the
commencement of rock excavation at [neighbouring property].
The report noted several existing defects on the property.
Subsequent inspection of reported damage to [insured pr operty]
Determination | Case number: 527391 Page 13 of 14
was carried out by [CSD] on 13 - 7 - 17 & noted the existing defects
noted in the previous dilapidation report were not visibly different
but did note there was some new damage in the following areas:
> Some of the header capping on the existing boundary block
wall common to [insured property] and [neighbouring property]
has become dislodged horiz ontally from its original position
> Cracking in the floor tiles and mortar bed in the tiled areas near
the rear boundary of [neighbouring property].
Some of the o bs erved damage could be compared with previous
photographs taken during the dilapidation assessment by [CSD],
illustrating that pre - existing damage has worsened since the
original dilapidation assessment.
[Applicant] advis ed the water level in the pool dro ps periodically
and significantly since the initial dilapidation survey by [CSD].
Report by [BS] noted cracking in the concrete pool shell,
common throughout visible parts of the shell.
Neither [CSD] nor [AG] noted any obvious leak points from the
pool or shell.
The observations are inconclusive with respect to the cause of
the leak. However, I disagree that the lack of obvious soil
saturation issues around the pool area on either side of the
boundary are necessary to indic ate that the pool had a
signifi cant leak because of damage to the pool shell itself, as it is
possible that a leak in the shell is finding its way to a drainage
pipe or service trenc h and not into the surrounding soil.
Evidence of stronger bands within the sandstone were indicated
in si te photos of the excavation face showing iron staining, which
occurs when iron dissolved wit hin groundwater that is present in
the rock matrix comes out of solution and strengthens the parent
rock. These stronger bands are typically much harder to
excavate than the surrounding rock mass.
Australian Standard AS2187 recommends the frequency
dependent guideline values and assessment methods given in
BS7385 for evaluation and measurement for vibration in
buildings, as they are applicable to ‘Australian conditio ns’.
Based on the degree of pre - existing damage, a vibration limit of
3 to 5mm/s peak particle velocity is appropriate to reduce the risk
of damage to an acceptable level.
Excavation met hods should have been adopted which limit
ground vibrations at the adj oining developments to not more
than 3mm/s.
The method of rock excavation reported to have occurred at
[neighbouring property] would have caused ground vibrations
more than 10mm/s at [insured property] and would have resulted
in the observed damage that ha s occurred.
Excavation of soil and rock results in stress changes in the
remaining material, and some ground movement is inevit able.
The magnitude and extent of lateral and vertical ground
movements will depend on the design and construction or the
excava tion support system.
Determination | Case number: 527391 Page 14 of 14
For the conditions observed at the site, it is anticipated that
lateral movement of the excavation at [neighbouring property] of
up to about 10mm to 15mm could have occurred, and it could be
expected that some settlement of the ground surface at [insured
property] would have occurred, possibly up to 5mm or more.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.