Determination 527391

Claim for damage after neighbouring demolition and excavation declined as not a listed insured event

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-08
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainants claimed for cracking and other damage to their home after demolition and excavation at a neighbouring property, and the insurer declined the claim. AFCA accepted the works caused some new damage but found the cause was not a listed insured event, so the insurer was entitled to refuse payment.

The complainants must establish on the balance of probabilities that the damage arose from a listed insured event, and vibration and ground movement are not listed events under the policy.

Issues

Subjects and remedies

home or building damageno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 527391 Page 1 of 14 Determination Case number: 527391 8 January 2019 1 Determination overview 1.1 Complaint The complainants hold a home insurance policy with the financial firm (insurer). The complainants lodged a claim with the insurer for cracking and other damage sustained to their home after demolition and excavation works were undertaken at a neighbouring property. The insurer denied the claim on the basis the claimed damage was not caused by an event insured under the policy. The insurer also says that even if it were shown to be an event insured by the policy, the damage is excluded under the policy. The complainants dispute the insurer ’s decision and seek acceptance of their claim. 1.2 Issues and key findings Have the complainants established a valid claim under the policy? The complainants have not established a valid claim as the available material suggests the property damage did not result from one of the covered insurable events. The insurer was entitled to decline the claim on this basis. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action on the complainants ’ claim. Determination | Case number: 527391 Page 2 of 14 2 Reasons for determination 2.1 Have the complainants established a valid claim under the policy? Complainants must show the damage was caused by an insured event The complainants are required to show that, on the balance of probabilities, they have suffered a loss caused by a risk insured against under the policy. This is known as a valid (or prima facie ) claim. If the complainants can establish a valid claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The complainants ’ policy covers loss or damage arising from insured events as listed in the policy, subject to conditions and exclusions. The policy also provides optional cover for Accidental Damage; however, the complainants did not purchase this cover. Parties disagree on cause of damage The insurer says that while there is some evidence showing the excavation work in the neighbouring property could have potentially contributed to the damage, it also observed defects and pre-existing damage of a long-term nature. The insurer relies on its expert reports to say:  damage is consistent with vibration from machinery, faulty design and pre-existing  cracks have simply worsened due to the demolition The insurer also says vibration and ground movement are not listed events under the policy and the complainants have failed to substantiate the damage resulted from an incident to which the policy responds. It therefore concludes it is not liable to indemnify the complainants for any related costs. The complainants rely on their expert report to say:  the damage sustained was caused by the demolition and excavation works in the neighbouring property including to the following areas: o front driveway which previously had only a small crack o new cracks in the retaining wall o tiles between the pool and dwelling including a dropped section of cement o a drop in the water level of the pool and damage to tiles in pool area o cracks in the garage and dwelling. Determination | Case number: 527391 Page 3 of 14 The insurer is only liable for damage to the complainants ’ property if the proximate cause of the damage (that is, the real, effective or dominant cause) was one of the events insured under the policy and is not otherwise excluded. A loss can have more than one cause. When deciding whether a loss is covered under a policy, and/or whether it is excluded, we consider what the ‘proximate cause’ was. This is a question of fact depending on the circumstances in each dispute. It is not necessarily the first or last or the sole cause of the loss. Instead, the proximate cause is the effective, dominant or operative cause of the loss. Available information shows damage in some areas pre-existed the loss The dilapidation report provided by CSD for the insured property (before the relevant works commenced), noted that while the structures were in satisfactory condition, it found the following on exterior surfaces:  settlement and hairline cracks in the concrete slab in the car space  separation between the concrete slab and retaining wall  cracking in the masonry retaining wall  hairline crack in the tiles in the pool area  cracking on retaining wall and settled tiles in pool area  cracking in concrete pool shell through visible parts of shell  separated brick under concrete pool shell  balustrade on rear path leaning away from boundary  chipped tile under balustrade on rear path. CSD’s repor t and accompanying photographs, show that some of the damage cannot be attributed to the works at the neighbouring property as it existed before the works commenced. The insurer ’s engineer’s (TB) report supports CSD’s findings that some damage in the affected areas were of a long-term nature and pre-existed the works (see section 3.1). TB further noted defects on the property such as:  absence of tile expansion joints in the balcony  absence of flexible joint detail in garage and dwelling wall to allow expected movement between the two brick structures resulting in predictable cracking  absence of pool tile expansion joints on the pool coping  absence of expansion joints in the interior tiling as required by the relevant Australian standard  a damaged swimming pool return pipe which allowed water to escape from the pool and facilitated soil loss from the surrounding areas. Determination | Case number: 527391 Page 4 of 14 Having carefully reviewed the information submitted, I am satisfied that the reported damage was in part caused by defects and pre-existing damage. Available material shows demolition & excavation work contributed to damage The complainants obtained a structural report from their expert (BS), which provided a comparison of its observations with those in CSD’s dilapidation report. While BS found there was no change to the majority of items recorded in CSD’s report, it observed the following new/worsened damage:  increased width and severity of pre -existing cracks  subsidence of paved areas of the driveway  appearance of new cracks in the pool surrounds  new cracks in the tiling of the front patio to house  new cracks in the north-eastern corner of entry portico to right of garage  various new cracks internally to tiled areas  more obvious cracks and further subsidence in the concrete slab on car space  more severe cracking in the stairs and masonry retaining wall  more severe cracking between the concrete slab and masonry wall  more severe cracking in the masonry retaining wall and loosened render  marked drop in the water level of the swimming pool  new cracks and widened existing cracks on the retaining wall and settled tiles in the pool area  new cracks and substantial settlement in the area adjacent to the swimming pool. The insurer ’s expert reports from TB, support some of the findings above. This is because while TB identified building defects and pre -existing damage, it also found that it is feasible and probable that some additional cracking and damage has occurred as a result of the adjacent demolition and excavation works. Further, the complainants obtained a geotechnical assessment from their expert (AG), who supported other expert findings. Relevantly, AG stated that the rock excavation carried out at the neighbouring property caused structural damage to the insured property. He says this is because:  excavation was carried out by two hydraulic excavators equipped with hydraulic hammers which weigh at least 600-900kg  there was new damage in some areas of the property when compared with the damage recorded on the dilapidation report  the damage that existed at the time of the dilapidation report had worsened  the water level of the pool had dropped significantly since the dilapidation report, but neither CSD nor AG noted any obvious leak points from the pool or shell  the site photos showed stronger bands within the sandstone with iron staining which is much harder to excavate than the surrounding rock mass Determination | Case number: 527391 Page 5 of 14  AG disagrees with insurer’ s expert that the lack of obvious soil saturation issues around the pool necessarily indicates the pool had a significant leak because of damage to the pool shell. He says this is because it is possible that a leak in the shell could find its way to a drainage pipe or service trench and not into the surrounding soil. AG further submits that the Australian Standard (AS2187) re fers to the British Standard for evaluation and measurement for vibration in buildings (BS7385), which it says is applicable to Australian conditions. He says that according to the relevant standard and based on the degree of pre-existing damage, a vibration limit of 3mm- 5mm is appropriate to reduce the risk of damage to an acceptable level. According to AG, the excavation methods that should have been adopted is those which limit ground vibrations at adjoining developments to not more than 3mm/s. The method of rock excavation reported to have occurred at the neighbouring property, however, would have resulted in the observed damage. He further says the excavation of soil and rock results in stress changes in the remaining material, and some ground movement is inevitable. While I accept the evidence shows the insured property had some pre-existing damage and defects in the insured property, I am satisfied that the demolition and excavation works at the adjacent property caused some new damage to the property and made existing damage worse. Complainant has not established a valid claim under the terms of the policy Having carefully reviewed the submissions and reports provided by the parties, I am not satisfied that the information as provided is sufficient to establish a claim that falls within the terms of the policy. I accept that the available material shows that the demolition and excavation work in the neighbouring property is likely to have caused some of the damage in the complainants ’ property. I considered whether the damage was as the result of impact. I am satisfied however, that the cause of damage does not fall within the list of insured events covered within the policy. The complainants bear the onus to establish on the balance of probabilities that the damage arose as a result of an insured event. For the reasons set out above, I am not satisfied the complainants have established the damage was caused by an event to which the policy responds. In the circumstances, the insurer is entitled to refuse payment of the claim. Determination | Case number: 527391 Page 6 of 14 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Relevant policy provisions Section Relevant wording Listed events Page 10 … The listed events we cover under your policy are shown in Table 3. 1 on page 22. The events we cover Page 22 We cover your home or contents when certain things happen. These are known as 'listed events'. You can make a claim if a listed event takes place and causes loss or damage to your home or contents during the policy period. In this section, we tell you what events you’re covered for and any specific exclusions and conditions that apply to the event. General exclusions may also apply — see Section 5. Listed events: Storm Flood Water and oil leaks Lightning Fire Earthquake Theft or attempt ed theft Vandalism or malicious act Broken glass – buildings Impact damage Determination | Case number: 527391 Page 7 of 14 Section Relevant wording Animal damage Explosion Riots or civil commotion Exclusions for all cover Page 53 These exclusions apply to all cover under your policy. What we don’t cover Loss, damage, injury or death arising from: Rust, corrosion, gradual deterioration, depreciation, wear and tear … Subsidence or landslide unless it happens immediately as a result of an earthquake or explosion … The settling, shrinkage or expansion in buildings, foundations, walls or pavements Maintaining and occupying your home We don’t cover loss, damage, injury or death arising from: faulty design or workmanship previous damage that has not been rep aired … 3.3 Supporting documents Record Key points Insurer ’s expert (CSD) Dilapidation report 14 - 12 - 16  The inspected structures were in satisfactory condition although a number of defects were present on the exterior surfaces. The following defects were photographed :  Hairline to 1mm wide crack in concrete slab on car space, common throughout slab.  Settlement and 2 - 3mm wide cracks in concrete slab on car space, common throughout slab.  Separation up to 5mm wide between slab and retaining wall.  Cracking up to 10mm wide in stairs and masonry retaining wall.  Separation up to 30mm wide bet ween concrete slab and masonry wall.  Cracking up to 5mm wide in masonry retaining wall.  Construction joint in blockwork retaining wall on boundary with [neighbouring property]  Hairline to 1mm wide crack in tiles in pool area.  1 - 2mm wide cracking on retaining wall and settled tiles in pool area.  Cracking in concret e pool shell, common throughout visible parts of shell.  Rear pat h behind pool as it stands, balustrade leaning away from boundary.  Separated brick under conc rete pool shell. Determination | Case number: 527391 Page 8 of 14  Chipped tile under balustrade on rear path.  Cracking in concret e pool shell, common throughout visible parts of shell. Insurer ’s expert (TB) Engineer’s report 1 06 - 07 - 2017 Balcony tile cracks  appearance of cracks is generally aged and the extent prior to the demolition and excavation (DE) cannot be clearly identified in all locations.  The balcony was tiled over 10 years ago and no tile expansion joints at intermediate or edge locations evident on over a 20m long northern balcony and in excess of 15m west facing balcony and deck.  Additional cracking to tile cracks that predated DE in some areas is feasible and probably but cannot be quantified.  Most of the cracks examined were of a long - term natu re and additional cracking in some areas is feasible and probable but cannot be quantified. Garage & dwelling wall crack  This joint area should include a flexible joint detail to allow expected movement between these two separate brick structures.  No flexi ble joint material is present and cracking of this joint area is predictable.  The damage present is cosmetic and is as a result of a pre - DE building defect. Front driveway and hardstand paving  Pre - DE photos and current appearance show long term settlement and cracking present.  Ingress of storm wat er runoff to the slab foundation will continue to destabilise this section of the paving.  Adjacent paving slabs display no obvious damage – this would indicate factors other than vibration have caus ed the localized paving damage.  It is feasible and probable that DE vibration has contributed to some additional settlement and paving cracking of this unstable area. Retaining wall below hardstand paving north end  Owner photos pre - DE show this area of brick retaining has additional crack damage present.  This area is immediately adjacent to the excavation site and vibration damage is highly likely to have caused the additional crack damage sighted. Masonry boundary wall  No structural damage is evident.  The wall damage as stated by the insured was verified and is attributed to the building works within [neighbouring property]. Paving bet ween pool and house  A settlement gap of up to 40mm where the paving abuts the seawall and tiled damage that is of a long - term nat ure.  A rev iew of photos of the area pre - DE noted similar settlement Determination | Case number: 527391 Page 9 of 14 and tile cracking to that observed.  Damage sighted is unrelated to the DE works and related vibrations.  Damage is of an aged appearance and pre - DE photos display a similar condition. Pool  A pool ret urn pipe is near the northern boundary where major DE has been undertaken. This appears to be the most likely element that has been damaged and testing is required.  Alternative leak causes may be present.  Numerous aged cracks in the retaining wall to th e east of the pool that predate the DE. Some additional cracking over the northern end of the wall.  It is feasible and probable that the DE is responsible for some of this additional wall damage.  The pool coping tiles at the nort h - eastern corner of the po ol display long term movement and cracking and more recent damage is evident. It is feasible and probable that the DE is responsible for this additional coping tile damage.  I observed ot her cracked and drummy coping pavers around the pool. No prescribed po ol tile expansion joints were present on this pool coping. I do not consider the current condition of the pool coping in these areas to be related to the DE. Dwelling interior tiling  The tiled areas viewed did not include expansion joints as prescribed in the Australian Standard, AS 3958.1 Guide to the installation of ceramic tiles .  Based on the location and isolat ed nat ure of the hairline cracks to these tiles I consider installation met hods and lack of expansion joints to be responsible for the tile dama ge sighted rather than any vibration activity from the DE. Insurer ’s expert (RB) Building report 29 - 07 - 2017  Cracking to retaining walls and tiling in various locations.  Dipping to concrete slab.  Maintenance issues or defects: N/A  Conclusion: unsure – requires specialist. An engineer is required to determine cause of damage. Complainant’ s expert (BS) Structural report 24 - 10 - 2017  Evidence of movement to various areas around the property in the form of: > increased width and severity of pre - existing crack s > subsidence of paved areas of the driveway > pool surrounds and the appearance of new cracks.  The area affected totals approximately 30m ³ .  The cause of water loss from the swimming pool is likely due to damage to the plumbing that was exposed during the ex cavations and subsequent spraying of concrete along the boundary with the adjoining property. New damage:  New cracks in tiling of front patio to house.  New crack in north - eastern corner of entry portico to right of Determination | Case number: 527391 Page 10 of 14 garage.  Various new cracks internally to tiled areas. Comparison of CSD observations and BS observations: CSD Reference (photographic record) BS Observations Hairline to 1mm wide crack in concrete slab on car space, common throughout slab. No change Retaining wall along the boundary with [neighbouring property] as it stands. No change Settlement and 2 - 3mm wide cracks in concrete slab on car space, common throughout slab. Crack is more obvious. Slab appears to have suffered further subsidence. Separation up to 5mm wide between slab and retaining wall. No change Cracking up to 10mm wide in stairs and masonry retaining wall. Cracking is more severe up to 15mm wide. Separation up to 30mm wide between concrete slab and masonry wall. Cracking is more severe. Crack width is approximately 35mm. Separation up to 30mm wide between concrete slab and masonry wall. Cracking appears more severe. Cracking up to 5mm wide in masonry retaining wall. Cracking is more severe. Render has loos ened. Construction joint in blockwork retaining wall on boundary with [neighbouring property]. No change Blockwork retaining wall on boundary with [neighbouring property] as it stands. No change Pool as it stands. Water level has dropped markedly. Hairline to 1mm wide crack in tiles in pool area. No change 1 - 2mm wide cracking on retaining wall and settled tiles Cracks have widened to 5mm. New cracks have Determination | Case number: 527391 Page 11 of 14 in pool area. appeared. Cracking in concret e pool shell, common throughout visible parts of shell. No change to pool shell, however new cracks and substantial settlement of up to 40mm has occurred in adjacent paved area Rear pat h behind pool as it stands, balustrade leaning away from boundary. No change Separated brick under conc rete pool shell. No change Chipped tile under balustrade on rear path. No change Rear wall as it stands. No change Rear wall as it stands No change Cracking in concret e pool shell, common throughout visible parts of shell. No change Insurer ’s expert (TB) Engineer’s report 2 29 - 06 - 2018 Response to structural report from BS: Front driveway and hardstand paving:  Further subsidence & slab cracking: response unchanged from previous report. Retaining wall adjoining driveway :  Most of the damage res ults from the slap and step concrete movement where no adequate slip joint has been provided.  It is feasible some additional crack damage to the brick and render wall has occurred as a result of the adjacent demolition works. This damage is at the northern end of the wall. Pathway paving  Clay bricks t o the path from the driveway to the pool have subsided.  These pavers are laid on a flexible base and no damage can be attributed to the demolition works. Poolside paving  Refer to earlier report and to adjacent damaged retaining wall that is related to this damage. Poolside retaining wall  The upper ret aining wall along the eastern side of the pool has suffered significant subsidence and cracking at numerous locations.  Numerous aged cracks are wit hin this wall that predate the DE.  Some additional settlement a nd cracking is present over the northern end of the wall (up to 4m long).  It is feasible and probable that DE is responsible for some of this additional wall damage. Determination | Case number: 527391 Page 12 of 14 Swimming pool plumbing  Investigations have determined the swimming pool ret urn pipe is dam aged, allowing water to escape from the pool as well as facilitating soil loss/wash away from around the pipe and surrounding areas. Front entry veranda  See previous report under ‘Balcony tile cracks’. Lower poolside paved area  The tiled paving area at the south - western corner of the pool has cracked and subsided significantly.  Observed a settlement gap of up to 40mm where the paving abuts the seawall and tiled damage that is of a long - term nature.  Photos of the area pre - DE noted similar settlement and tile cracking to that observed.  The damage sighted is unrelated to the DE works and related vibrations.  The settlement gap was measured again at 40mm and no additional settlement is noticeable since last inspection. Masonry boundary wall (not det ailed in BS re port)  No structural damage is evident although minor movement may have occurred and the insured has concerns about the footings of the section of wall to the west of the car parking slab. Dwelling interior tiling (not detailed in BS report)  See previous re port. Damage :  The following items could feasibly have been affected (even where pre - event but stable damage was present) by the demolition and excavation vibration or impact at the adjacent property:  Retaining wall adjacent driveway (item 2 above)  Poolsid e paving  Poolside retaining wall  Pool pipe damage and relat ed water loss  Front entry veranda Complainant ’s expert (AG) Geotechnical assessment 29 - 04 - 2018  The rock excavation carried out at the [neighbouring property], has caused structural damage to [insured property].  Approximately 400m ³ of rock was removed from [neighbouring property] as part of additional excavation to construct the lower ground floor area and noticeable vibrations were felt at the insured property during rock excavation.  Rock exca vation was carried out by two hy draulic excavators equipped with hy draulic hammers and a rock saw. The hammer sizes as per photos provided appear to be relatively large and estimated to be at least 600 - 900kg in weight.  A dilapidation report on the existin g residence at [insured property] was prepared by [CSD] on 14 - 12 - 16, prior to the commencement of rock excavation at [neighbouring property]. The report noted several existing defects on the property.  Subsequent inspection of reported damage to [insured pr operty] Determination | Case number: 527391 Page 13 of 14 was carried out by [CSD] on 13 - 7 - 17 & noted the existing defects noted in the previous dilapidation report were not visibly different but did note there was some new damage in the following areas: > Some of the header capping on the existing boundary block wall common to [insured property] and [neighbouring property] has become dislodged horiz ontally from its original position > Cracking in the floor tiles and mortar bed in the tiled areas near the rear boundary of [neighbouring property].  Some of the o bs erved damage could be compared with previous photographs taken during the dilapidation assessment by [CSD], illustrating that pre - existing damage has worsened since the original dilapidation assessment.  [Applicant] advis ed the water level in the pool dro ps periodically and significantly since the initial dilapidation survey by [CSD].  Report by [BS] noted cracking in the concrete pool shell, common throughout visible parts of the shell.  Neither [CSD] nor [AG] noted any obvious leak points from the pool or shell.  The observations are inconclusive with respect to the cause of the leak. However, I disagree that the lack of obvious soil saturation issues around the pool area on either side of the boundary are necessary to indic ate that the pool had a signifi cant leak because of damage to the pool shell itself, as it is possible that a leak in the shell is finding its way to a drainage pipe or service trenc h and not into the surrounding soil.  Evidence of stronger bands within the sandstone were indicated in si te photos of the excavation face showing iron staining, which occurs when iron dissolved wit hin groundwater that is present in the rock matrix comes out of solution and strengthens the parent rock. These stronger bands are typically much harder to excavate than the surrounding rock mass.  Australian Standard AS2187 recommends the frequency dependent guideline values and assessment methods given in BS7385 for evaluation and measurement for vibration in buildings, as they are applicable to ‘Australian conditio ns’.  Based on the degree of pre - existing damage, a vibration limit of 3 to 5mm/s peak particle velocity is appropriate to reduce the risk of damage to an acceptable level.  Excavation met hods should have been adopted which limit ground vibrations at the adj oining developments to not more than 3mm/s.  The method of rock excavation reported to have occurred at [neighbouring property] would have caused ground vibrations more than 10mm/s at [insured property] and would have resulted in the observed damage that ha s occurred.  Excavation of soil and rock results in stress changes in the remaining material, and some ground movement is inevit able.  The magnitude and extent of lateral and vertical ground movements will depend on the design and construction or the excava tion support system. Determination | Case number: 527391 Page 14 of 14  For the conditions observed at the site, it is anticipated that lateral movement of the excavation at [neighbouring property] of up to about 10mm to 15mm could have occurred, and it could be expected that some settlement of the ground surface at [insured property] would have occurred, possibly up to 5mm or more.