Storm damage to house declined as gradual deterioration, rot and faulty repairs

FirmFinancial Firm (Unknown - Insurer)
Decided2018-10-09
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

After a storm damaged a farm house, the insurer declined the claim because rotted stumps and faulty repairs from a previous claim were the proximate cause. AFCA found the insurer entitled to rely on the exclusions and ordered no action.

The policy excludes loss where the proximate cause is rot, gradual deterioration or faulty workmanship, and the insurer established that these caused the collapse.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 526738 Determination Page 1 of 7 Case number: 526738 9 October 2018 1 Overview 1.1 Dispute The applicant holds a Farm Insurance policy with the financial services provider (FSP). It lodged a claim via its broker for damage sustained to a building on its property following a storm. The FSP declined the claim and says the proximate cause of damage was not the storm event but rather a combination of rot, gradual deterioration and faulty repairs the applicant undertook following a previous claim. The applicant disputes this and is seeking the FSP repairs its property. 1.2 Issues and key findings Has the applicant established an entitlement to cover? The applicant‟s property suffered accidental damage which is prima facie covered under the policy. Accordingly, the Panel accepts the applicant has established, subject to any policy exclusions, an entitlement to cover. Is the FSP entitled to rely on its policy exclusions to decline the claim? The proximate cause of damage was gradual deterioration and rot of timber stumps, both of which are circumstances specifically excluded from cover under the policy. As such, the FSP is entitled to rely on its exclusion to decline the claim. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to take any further action. Case No: 526738 Determination Page 2 of 7 2 Reasons for determination 2.1 Has the applicant established an entitlement to cover? Applicant settled for repairs during 2013 claim The applicant had lodged a previous claim for damage to the building on the property, the subject of this dispute, on 28 August 2013. The previous claim was for accidental damage caused to the property as a result of a storm, namely damage/movement to supporting piers underneath the property and damage to a feeder pipe connected to the water tank adjacent to the property. The FSP accepted the claim and appointed a builder to commence repairs. Due to difficulties in the builder accessing the site, an agreement was reached with the applicant to cash settle the cost of repairs. Following cash settlement, the applicant chose to undertake repair work itself. Applicant has duty to establish a prima facie claim The applicant is required to show, on the balance of probabilities, it suffered a loss caused by an event insured for under the policy. This is known as establishing a prima facie claim. If such a claim is established, the onus shifts to the FSP to show, on the balance of probabilities:  the policy does not cover the loss or damage  the FSP is otherwise entitled to deny the claim. Policy provides cover for accidental damage The product disclosure statement (PDS) outlines the circumstances under which the policy provides cover. Under the dwelling section, the policy provides cover for accidental loss. The policy defines accidental loss as: “an unintended and unforeseen happening or event.” Cause of loss was prima facie accidental damage The applicant lodged a claim via his broker on 16 September 2014. Following lodgement, the FSP appointed loss adjuster C to assess the damage. C found:  BOM records indicate the property was subjected to considerable rain and wind speeds in the high 50s km/h  house has moved down the slope by approximately one meter and has dropped off the supporting piers  house has split into three main pieces and several large timber piers have punctured the floor in the rear sunroom Case No: 526738 Determination Page 3 of 7  wall and ceiling linings have separated from the framing and large gaps have appeared at floor level. The Panel is satisfied that the applicant‟s building on its property sustained damage and that the policy responds to the circumstances of the loss. Accordingly, the Panel accepts the applicant has established a prima facie entitlement to cover, subject to policy exclusions. 2.2 Is the FSP entitled to rely on policy exclusions to decline the claim? Policy excludes faulty workmanship The PDS outlines the circumstances under which the policy does not provide cover. Under the dwelling section, the policy provides it does not cover for loss caused by normal maintenance and wear and tear, rot, rust or gradual deterioration. The policy also excludes cover for costs incurred in repairing or replacing faulty materials, putting right faulty workmanship or putting right work performed to a faulty or defective design plan or design. As previously mentioned, the onus rests on the FSP to show these exclusions apply to the circumstances of the loss. FSP says cause of loss was excluded under the policy The FSP contends that this storm event was not the proximate cause of the damage to the dwelling on the property. Rather, it was due to a combination of deterioration and faulty workmanship. Following C‟s attendance at the applicant‟s property, the FSP appointed building consultant (AN) and engineer (AL) to further review damage to the property and comment on previous repairs undertaken by the applicant. AN found:  cause of collapse is heavy rotted and deteriorated timber posts/stumps and lack of tie-down and bracing to subfloor framing supporting dwelling  posts/stumps show no visible signs of any tie-down or additional bracing having been installed after the event in 2013  subfloor posts were in poor condition and in need of replacement, as indicated by builders who provided quotes following the 2013 event  no visible signs that any of the footings or earth around the posts/stumps was compacted despite the fact the applicant says following the 2013 event foundations were backfilled and compacted around all stumps. AL found:  no evidence to support that extensive repairs to house stumps and footings as per previously settled claim have been undertaken  no visual evidence to support new footings for stumps or posts being excavated and concreted  no evidence to validate that the scope of works claimed on the invoice submitted by the applicant has in fact been implemented and completed. Case No: 526738 Determination Page 4 of 7 The FSP has relied on these findings to decline the claim. It says that while the storm event contributed to the collapse of the property, the proximate cause of the damage was the condition of the stumps (rot, deterioration) and the defective repairs/faulty workmanship carried out by the applicant following the 2013 event. Applicant says previous repairs were adequate The applicant says that it undertook its own repairs following the 2013 event using materials that were already in its possession. As a consequence, there is no proof of purchase for the materials used. The applicant says all repairs were undertaken in a workman-like manner as an owner builder and the damage sustained in this event did not affect the building where previous repairs had been undertaken. The applicant says that as there was no scope of works provided following the 2013 event, the FSP cannot establish that works were not performed in a professional manner, and therefore cannot rely on its exclusion for faulty workmanship. The applicant has provided a report from engineer (FS) to support its position. FS says:  no detailed scope of works or engineering details were provided to the building contractors following the 2013 event  because of this it is not possible to accurately determine what each builder was proposing to undertake or compare the quotes on an even basis  from the description of the works proposed by the applicant, it is unlikely that the structural capacity of the subfloor framing and connections would have been reinstated to the pre-storm event condition  had subfloor framing works been conducted in accordance with the code, it is unlikely the damage suffered in the recent storm event would have occurred. FSP is entitled to decline the claim The policy excludes cover where the proximate cause of loss is gradual deterioration and rot or faulty workmanship. The information presented evidences that the stumps were in a poor condition and suffered from heavy rot and gradual deterioration. For this reason, the FSP is entitled to decline the claim. The parties have disputed the adequacy of repairs completed by the applicant following the 2013 event. All three quotes provided by the FSP included the replacement of stumps. The Panel notes in respect to works to be performed that page 41 of the PDS provides “you must ensure that the rebuilding or repairing is carried out promptly”. The Panel is persuaded that had the applicant undertaken works in accordance with any of these quotes, the building would most probably not have collapsed. This is because the presence of new stumps would have made the structure more resistant to the effec ts of the storm. Case No: 526738 Determination Page 5 of 7 Even so, as the FSP has already established exclusions for gradual deterioration and rot apply, it is not necessary to give further consideration to the exclusion for faulty workmanship, other than to say the evidence indicates that the claim may have been excluded on this basis. Case No: 526738 Determination Page 6 of 7 3 Supporting information 3.1 FOS approach There has been a full exchange of material between the parties and each party has had the opportunity of addressing the issues that arise in this dispute. Due to the complexity of the issues the matter has been referred to a Panel for determination. The Panel consists of an ombudsman, an insurance industry representative appointed by the Financial Ombudsman Service Board, and a consumer representative appointed by the Financia l Ombudsman Service Board. This determination follows consideration of all of the information exchanged and is based on what is fair in all the circumstances, having regard to the relevant legal principles, terms of the policy, good industry practice including codes of practice and prior determinations where applicable. The parties have raised numerous issues in their submissions to FOS. For the purpose of this determination, commentary is restricted to only those issues considered relevant to the outcome. 3.2 Relevant policy sections Section Accident means an unintended and unforeseen happening or event. „ACCIDENTAL‟ has the corresponding meaning. Dwelling This is Your Dwelling section. Where the Certificate shows that You have taken this cover, this is the wording that applies. You should read it together with the General Conditions and General Exclusions. […] What you are insured for We will cover You for Accident al Loss to Your House unless the Loss happening during the Period of Insurance is excluded. What this insurance doe s not cover Your House is not covered for Loss by: […]  normal maint enance, wear and tear, erosion, corrosion, slowly developing deformation and distortion, marring or scratching  mildew, rot, rust or gradual det erioration […]  any of t he exclusions listed in the General Exclusions section of the Farm Extra policy wording. Your House i s not covered for:  the cost of repairing or replacing faulty materials  the cost of putting right faulty workmanship  the cost of putting right work performe d to a faulty or defective Case No: 526738 Determination Page 7 of 7 design plan or design  the cost of putting right faulty or defective work where the fault or defect results from an error or omission in design plan or design specification