Text of the determination
Determination | Case number: 526075 Page 1 of 11
Determination
Case number: 526075 18 December 2018
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (the insurer) after her property
was affected by a cyclone. The insurer accepted some of the damage.
The insurer says initial repairs were complete on 30 March 2016. On 8 August 2017
the complainant contacted the insurer to advise of concerns with the repairs a nd
some outstanding issues. The complainant says:
the insurer took a long time to clear the damage caused by the cyclone
her shed roof has been replaced with a metal roof rather than a tiled roof which
causes her horses to become too hot
her bath tub/spa was damaged in the cyclone, however, the insurer had declined to
accept this
her water tank was damaged in the cyclone, which has not been fixed at all
the cyclone caused rust and corrosion to the metal stumps under the house, which
the insurer is not accepting
her chook pen, duck pen and turkey pen have not been repaired properly
there is leftover debris around the property
the tree stumps from the trees damaged in the cyclone have not been removed
the bathroom lights have now started to sag and are damaged.
1.2 Issues and key findings
Is the insurer liable for further damage?
The insurer is liable to either repair or cash settle the complainant for the remaining
damage to her:
horse shed roof
water tank
aviary/three chicken pens
bathroom lights
Determination | Case number: 526075 Page 2 of 11
in addition to the cost of removing the leftover debris.
The insurer is not, however, liable for the metal posts, the bath tub/spa or removal of
the tree stumps.
Did the insurer delay in handling of the claim?
The insurer did not adequately assess or repair the cyclone related damage which
caused delays. The insurer is required to compensate the complainant $1,000 for her
non-financial loss.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 30 days of the complainant’s acceptance, the insurer is required to attend to
the repair of the:
horse shed roof
water tank
aviary/three chicken pens
bathroom lights, and
removal of leftover debris
or cash settle the complainant on the basis of a valid scope of works and quote.
If the insurer offers, and the complainant agrees to cash settle these claims, it is to
increase the sum by 15% in addition to the scoped builder ’ s margin to address
additional contingencies the complainant may face herself.
The insurer is also required to pay the complainant $1,000 for her non-financial loss
within 30 days.
Determination | Case number: 526075 Page 3 of 11
2 Reasons for determination
2.1 Is the insurer liable for further damage?
The complainant is covered for accidental damage to her home and contents
The complainant held a personal insurance policy with the insurer. The policy insures
her home and contents against accidental loss or damage at the property during the
period of insurance, including any of the listed insured events. Cover is, however,
subject to certain conditions and exclusions.
It is not in dispute a cyclone affected the property. The insurer has accepted some of
the damage at the property to be a result of that cyclone.
However, the complainant says there is more damage the insurer has either not
accepted or not considered.
The insurer queried why it took so long for the complainant to raise the further
damage when it was under the impression the repairs were complete on 30 March
2016. The complainant says she never signed anything to acknowledge repairs were
complete and she suffered from a number of medical conditions over that timeframe
which prevented her from raising the issues earlier. This is not in dispute.
This determination will address the additional issues raised by the complainant.
The insurer is liable for the horse shed roof
The horse shed roof was replaced by the insurer after it was damaged by the cyclone.
The complainant says the new horse shed roof is, however, inadequate and caused
the horses to overheat. The original roof was a tiled roof, whereas it was replaced
with galvanised corrugated sheets.
The insurer’s assessor (CL) also reported that the roof had been replaced without the
benefit of the guttering and ‘when it rains water pours off the end’.
The insurer has accepted its repairs to the horse shed roof require rectification and at
the start of this complaint it said it is exploring what sort of roof is the most suitable.
However, it is not clear whether the insurer has determined how it will rectify the
defective repairs of the horse shed roof. The complaint was lodged in May 2018. The
insurer has had adequate time to address the horse shed roof.
Therefore, within 30 days of the complainant’s acceptance , the insurer is required to
attend to the repair of the horse shed roof, or cash settle the complainant on the basis
of a valid scope of works and quote.
Determination | Case number: 526075 Page 4 of 11
The insurer is not liable for the spa bath
The complainant says the corner of the bath and some tiles were damaged from
movement during the cyclone. Throughout the claim and complaint, the insurer has
used a building consultant (SG) to assess and report on the causation of the claimed
damage.
In a report of 27 November 2015, SG stated the damage to the spa bath was caused
by defective building work, rather than storm activity. This was because SG said the
spa bath had been supported with expanding foam. SG stated the expanding foam
was unable to properly support the bath when it was filled. SG also stated:
A review of several bath manufacturers’ installation instructions revealed that the
support mediums used should consist of rigid and inflexible materials.
The bath manufacturers’ installation instructions do not appear to be specific to the
complainant’s brand of spa bath. There is a question whether the ins urer has
established that it relates to the same type of spa bath at all.
SG then provided an engineering report of 17 November 2017. In this report SG
stated the steel posts under the bathroom have been replaced with timber stumps
and that the disturbance and movement of the floor during replacement would have
caused the damage to the bath tub. This was the same conclusion drawn by another
building consultant appointed by the insurer (JL). In a report of 11 July 2018, JL
advised the damage to the bath tub is a direct result of a timber post being installed
directly under the bath tub.
The complainant has provided a copy of a text from the man who installed the timber
posts, which says he was at the complainant’s property doing work from 30 July 2017
for one week. The complainant says the whole reason the timber posts were installed
under the bathroom was because she was concerned about the structural stability
after the cyclone.
SG then provided another report dated 6 July 2018 and extracted a number of
Australian Standard building codes which state baths should be bedded on cement
mortar. The comments surrounding the expanding foam were based on SG’s earlier
sighting of expanding foam and comment that:
An attempt had been made to support the spa bath by the application of an expanding
foam material.
This alone does not establish the spa bath has not been bedded on the appropriate
bedding support, but it provides support for the insurer’s position.
It is established in law that once an insured has established a claimable loss, being
loss caused by a risk insured against under the policy, the onus passes to the insurer
to show why it is entitled to rely on an exclusion under the policy. In this instance, the
complainant has accidental damage cover. It is not in dispute there is accidental
Determination | Case number: 526075 Page 5 of 11
damage to the spa bath. It is therefore the insurer’s responsibility to establish the spa
bath is excluded from cover.
The panel is satisfied that the insurer has provided persuasive evidence that the
complainant’s spa bat h was incorrectly installed under the Australian Standard
building codes.
Accordingly, the insurer is not required to attend to the repair or replacement of the
spa bath.
The insurer is liable for the water tank
In regard to the complainant’s claim for a damaged water tank, the insurer said the
water tank was an issue that had only been raised recently and the insurer needed
time to investigate further.
The complainant provided a number of pictures of the property after the cyclone.
Some of the pictures were taken after some clean-up had occurred. One of the
pictures clearly shows the water tank damaged by a tree.
The complainant has consistently said she only noticed damage gradually as more
clean- up was done and that she trusted the insurer’s assessors to take note of all the
damage. This is a valid assumption and it is not clear why the water tank was not
picked up earlier, considering the number of attendances at the complainant’s
property.
The insurer has since accepted the damage to the water tank. The insurer has not,
however, advised what steps it intends to take to address the damaged water tank.
Therefore, within 30 days of the complainant’s acceptance, the insurer is required to
attend to the repair of the water tank, or cash settle the complainant on the basis of a
valid scope of works and quote.
The insurer is liable for all three bird pens
The complainant has three separate bird pens. One each for chooks, ducks and
turkeys. It is understood while there are three separate pens , they are all enclosed
within one large structure or aviary.
SG’s report of 27 November 2015 stated that debris from the cyclone had damaged
the pens and pushed in some parts of the wire mesh. At the time of the report the
chicken roof cladding had also been repaired.
The insurer says it has discharged its obligations in regard to the chicken pens
because its:
information and scope of works states work was conducted to the chicken aviary. The
member understands this to be one and the same thing as the chicken shed roof and
[the repairer’s] scope of works states:
Determination | Case number: 526075 Page 6 of 11
Chicken aviary
1. Remove and replace with new 3 x 3 colorbond gable roof
However, just because a scope of works mentions repairs or works it does not mean
those works were actually carried out or that the item was repaired satisfactorily.
The insurer also says its quotations only allowed for reinstatement, not replacement.
However, it is noted that CL’s report of 21 January 2016 contains a quote and extract
of scope of works for the replacement of the ‘Chook Pen & House’. The scope of
works was for:
Internal Boundary Fence Replacement - Chook Pen & House
1. Remove and replace approx 160 Ln Mtrs of 1.8h fencing with post, star droppers,
chicken wire and 4mm wire with strainers. Allposts to be concreted into the earth
and the star droppers rammed in. In addition to the fence there will be X3 access
gates installed.
CL recommended that the insurer accept this. The complainant has provided
photographs of the aviary and chicken pens, post the insurer’s alleged repairs. The
chicken wire is still damaged, and while it has been staked here and there it certainly
does not look like it has been replaced in accordance with the above recommended
scope of works.
Therefore, within 30 days of the complainant’s acceptance, the insurer is required to
attend to repair all three bird enclosures/structures in accordance with the scope of
works in CL’s report of 21 January 2016 or cash settle the complainant.
The insurer is liable for the bathroom lights
The complainant has recently raised an issue with the bathroom lights and ceiling.
The insurer asked the complainant to explain why this has not been raised earlier.
The complainant said:
I took the assessors/adjustors everywhere and they took pics. I don't know what they
have. I left it to them trusting they would help and repair all the damage. It took time
for the ceiling to deteriorate and the weight of the lights pulling on it. The ceiling had to
have been wet for this to happen. It could only have occurred then. But every time
assessors came it was their choice to photograph. I let them do "their job" in trust.
There are a few damaged things they have not responded to.
The insurer has said it will assess this matter and get back to this service in regard to
its decision. It has not done so, despite having sufficient time.
It is, however, noted that one of the insurer’s repairer’s (PB) provided an undated
scope of works constituting ‘extra repairs that we completed’. The scope of works
showed that PB had removed and replaced the entire roof over the bathroom and
laundry area. Therefore, if the bathroom ceiling and lights have water ingress after the
repair of the ceiling it suggests the repairs were defective or caused the ingress.
Determination | Case number: 526075 Page 7 of 11
The complainant has cover for accidental damage. The available information
suggests the bathroom lights have been damaged either as a result of the cyclone or
in the course of repairing the cyclone related damage. The insurer has not provided
any information to suggest otherwise.
Therefore, within 30 days of the complainant’s acceptance, the insurer is required to
attend to the repair of the bathroom lights, or cash settle the complainant on the basis
of a valid scope of works and quote.
Leftover debris
The complainant says the insurer never completed the clean-up despite the insurer
being under the impression repairs were complete on 30 March 2016.
The complainant’s photographs of the property post the insurer’s clean -up show a
large amount of debris across the property. After the complainant contacted the
insurer in August 2017 to raise concerns that the clean-up had not been completed,
CL attended the property to assess any remaining issues. CL ’s report of 3 October
2017 confirm work was done to the front of the property, however:
A large area at the rear of the land beyond the chook pen has been missed with
debris against sheds and the fence line that still needs to be removed.
The insurer has agreed to remove any leftover chicken wire which can be seen in the
complainant’s photographs, however, it is not clear if it has taken any steps to do so.
In addition, there is still the additional debris of the trees and storm leftover as
outlined in CL’ s report. The insurer has said it is not sure if this was from the same
storm, however, there is no information to suggest otherwise.
The policy provides cover for the removal of debris if the complainant’s home is
damaged by an event insured under the po licy. The insurer is therefore liable for the
complete removal of debris caused by the cyclone.
Therefore, within 30 days of the complainant’s acceptance, the insurer is required to
attend to the complete removal of debris, or cash settle the complainant on the basis
of a valid scope of works and quote.
The insurer is not liable for the metal posts
The complainant is claiming for damaged metal support posts under some sections of
her house. The complainant says there was so much debris from the cyclone trapped
under the house it also trapped the flood waters there which caused rust and
deterioration to the posts. The complainant says there is no damage where the flood
water was not trapped. She also says she regularly applied killrust to the metal posts
so they would not corrode and feels the flooding during the cyclone was the dominant
cause of the damage.
Determination | Case number: 526075 Page 8 of 11
The insurer has declined cover for the metal posts on the basis the corrosion has
been a long- term issue. The complainant’s pol icy specifically excludes loss or
damage resulting from or caused by:
inherent defects, structural defects, faulty workmanship, faulty design or any
gradual process, and
wear, tear, rust, corrosion, depreciation or gradual deterioration.
While the complainant states the posts were not corroded until after the cyclone, the
available information is overwhelmingly persuasive that the corrosion had been
occurring gradually over time, rather than only since the cyclone.
SG’s report of 17 November 2017 identified that the posts were pa inted but not
galvanised and the concrete at the base of the posts do not shed water away from the
posts and in some cases the soil was in direct contact with the posts. SG concluded
that:
It is our opinion that corrosion has been caused by a combination of inadequate
corrosion protection of the steel stumps set into the ground and the detailing around
the stumps that has allowed moisture to accumulate at the base of the stumps. It is
also our opinion that the corrosion is a long term ongoing issue and has not been
caused by a single cyclone event.
SG’s report of 23 August 2018 addressed the fact the complainant advised she had
been applying killrust and galvanising paint to the posts. SG stated that there was
surface corrosion evident beneath the blue and green painted posts and extensive
corrosion at the bases. SG stated the surface corrosion and extensively corroded
bases indicates it has developed over an extended period of time.
The available information suggests the posts had been suffering from rust and
deterioration some time before the cyclone damage. The panel is not satisfied the
metal support posts were damaged solely or predominantly from the cyclone. This
means the insurer is entitled to rely on the policy exclusion for wear, tear, rust,
corrosion, depreciation and gradual deterioration to decline cover for the metal
support posts.
The insurer is not liable for the tree stumps
There are a number of tree stumps remaining on the complainant’s property from the
trees that were either blown over or had to be removed after the cyclone. The
complainant says they are now hazards and wants them to be removed.
While the policy allows for the removal of debris it states:
We will remove a stump that formed part of the tree that caused the insured damage
only if:
a. all necessary approvals have been obtained and removal of the stump would not
result in a breach of any laws, by-laws, regulations or contractual obligations; and
Determination | Case number: 526075 Page 9 of 11
b. not removing the stump would interfere with repairing or replacing the damaged
part of your home required to settle your claim.
The insurer says the remaining tree stumps are not interfering with the repair of the
damaged part of the home and it therefore declines to cover the stump removal.
There is no information to show the stumps have interfered with the repair of the
home and on this basis the panel agrees that the insurer is not required to cover the
cost of removal of such.
If the insurer cash settles it is to pay an additional 15% of the total repair cost
As noted above, the insurer can decide whether it attends to repairs of the items it is
liable for or it can cash settle the complainant on the basis of a valid quotation and
scope of works.
The complainant has advised she does not want to be cash settled. The panel
accepts the complainant may find it difficult to organise and coordinate repairs herself.
This is because the complainant lives in a relatively remote area. It is accepted the
complainant is a pensioner who suffers from post-traumatic stress disorder (PTSD)
and chronic anxiety. The additional stress and effort of organising repairs is to be
adequately considered.
Therefore, if the insurer offers to cash settle rather than organise repairs itself and the
complainant accepts the offer, the insurer is to provide an allowance to address the
additional contingencies the complainant may face. The insurer is required to pay an
additional 15% of the overall cost of remaining repairs for which the insurer is liable.
This is on top of the scoped margins.
2.2 Did the insurer delay in its handling of the claim?
The insurer did not adequately repair the claimed damage
It is accepted there has been a long timeframe involved in this particular claim. While
some delays were encountered when the complainant was unwell and unable to
pursue the insurer further, it is evident the insurer did not adequately repair or
address the cyclone related damage from the outset.
This can be evidenced from the various reports that identified further damage and
missed debris after the complainant had raised the incomplete repairs with the insurer
in August 2017.
The complainant has advised that she trusted the insurer’s assessors to identify the
damage and assess the entire insured property when they attended, which is why not
every single issue was raised by her from the outset. The complainant has a point in
this regard and it is unclear why the insurer did not act earlier on things that were
clearly damaged, such as the water tank.
Determination | Case number: 526075 Page 10 of 11
Given the additional damage and missed items identified after further review into the
claim, the panel is satisfied the insurer did not take appropriate steps in its
management of the claim, which caused delays.
The insurer is liable for the complainant’s n on-financial loss
This service can award compensation for non-financial loss where there has been an
unusual amount of physical inconvenience, time taken to resolve a situation, or
interference with the applicant’s expecta tion of enjoyment or peace of mind.
The panel accepts the insurer’s conduct in not adequately addressing all the claim
related damage and resultant delays has caused the complainant additiona l yet
avoidable stress and frustration. The Panel finds it appropriate that the insurer
compensates the complainant $1,000 for her non-financial loss.
Determination | Case number: 526075 Page 11 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with FOS.
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. The AFCA terms in this
determination have the same meaning as the FOS term referenced and defined in the
FOS Terms of Reference.
FOS definitions AFCA Reference
applicant complainant
financial services provider financial firm
dispute complaint
3.2 FOS approach
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This dispute has been decided on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous Financial Ombudsman Service
(FOS) decisions.
3.3 Other relevant material considered and relied on
Parties’ submissions and reports .
Complainant’s photographs .
Insurer’s building assessments, engineering reports, scope of works and quotes.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.