Text of the determination
Determination | Case number: 525138 Page 1 of 16
Determination
Case number: 525138 17 December 2018
1 Determination overview
1.1 Complaint
The complainant lodged a claim against her home building and contents insurance
policy (policy) with the financial firm (insurer) for storm damage.
The insurer initially declined the claim on the basis the complainant had not shown
the damage was caused by insured event of storm under the policy terms. It
subsequently accepted a storm occurred. However, it maintains the proximate cause
of damage was defects and/or faulty workmanship in relation to the roof, not the storm
event. It says damage caused in this manner is specifically excluded from policy
cover.
1.2 Issues and key findings
Is the insurer entitled to decline the complainant ’s claim?
The insurer is not entitled to decline the claim because on the available information it
has not established on the balance of probabilities the exclusion for defect or faulty
workmanship applies to defeat the claim.
Is the complainant entitled to compensation?
The insurer is to pay to the complainant $1,000 compensation because there has
been an unusual amount of physical inconvenience, time taken to resolve the
situation, and interference with the complainant‟s expectation of enjoyment or peace
of mind.
Determination | Case number: 525138 Page 2 of 16
1.3 Determination
This determination is substantially in favour of the complainant.
If the complainant accepts this determination, then within seven days of acceptance,
the insurer is to pay to the complainant $1,000 compensation.
The insurer is also required to settle the claim within the timeframe stated as set out
in section 2.1 of this determination under the heading „ how the claim should be
settled ‟ .
Determination | Case number: 525138 Page 3 of 16
2 Reasons for determination
2.1 Is the insurer entitled to decline the complainant ’s claim?
The complainant has established a valid claim
The policy provides cover for insured events including storm damage. The
complainant lodged a claim for storm damage which occurred on 12 February 2018.
The insurer now accepts a storm occurred and the complainant ‟s property suffered
damage. Therefore, the complainant has established a valid loss (also known as a
prima facie claim).
The insurer must establish a policy exclusion applies
While acknowledging the property was impacted by strong winds, the insurer
contends the roof would have withstood the storm and the damage would not have
occurred had it been built to the correct standards.
Once a prima facie claim is established, the onus shifts to the insurer to prove on the
balance of probabilities an exclusion applies if it seeks to deny or limit its liability for
the loss.
In the context of this claim, the insurer must prove the damage was caused by
defects, structural or design faults, faulty workmanship or faulty design.
The insurer relies on opinions from its assessor and builder
The insurer appointed an assessor to attend and photograph the property and report
on the claimed loss. The insurer says the report and subsequent statement provided
by its assessor demonstrate the proximate cause of damage to the complainant ‟s
property was not storm. It says the damage was caused by poorly installed roof
sheeting, roof battens and eave linings which caused partial removal of the roof
sheeting, battens insulation and eave linings.
The assessor said the roof had not been constructed in accordance with Australian
Standards and the manufacturer‟s installation specifications. He criticised the method
of installation of the external eaves. He said the screws had been fixed poorly and
haphazardly into the sheeting. Because of this, he said this was directly responsible
for the uplift of the sheeting. He also said the roof batten spacing had been installed
too far apart. He described multiple areas of the roof with sustained indentation and
scratching consistent with the sheeting rubbing over the sheet surface.
The insurer also relied on a report from a builder after the complainant questioned the
accuracy of the assessor‟s report.
A summary of the material from the assessor and the builder is set out in supporting
section 3.3 of this determination.
Determination | Case number: 525138 Page 4 of 16
The builder attended and photographed the property about a month after the storm.
The damaged roof was covered by a tarp. He saw cracks in the eave sheets and
water marks on the living room wall. Altho ugh he indicated the inspected damage was
caused by storm he said the claim should be excluded due to the policy exclusion
relied on by the insurer. He said:
the roof was spongy underfoot indicating the roof was not screwed down properly
the battens are spaced too far apart
the roof sheets are different lengths and not finished off properly at the ridge
capping
the eaves have not been installed professionally
the roofing iron appeared secondhand and painted in sections.
Complainant has made lengthy submissions and provided material in support
The complainant disagrees with the content and conclusion in the reports. She has
made several lengthy submissions. She contends the insurer has not established
there were defects in the construction and installation of the roof. She s ubmits the
insurer ‟s experts reached conclusions following brief observations of the damage,
without taking adequate measurements and undertaking pertinent tests. She also
says there are fundamental mistakes in the factual observations made by the
insurer ‟s experts.
The complainant makes her contentions based on her training, qualifications and
experiences as an assessor, auditor and loss control advisor for various organisations
from mining to manufacturing. On this basis, she says the assessor‟s and builder‟s
investigations are inadequate.
The complainant also relies on material from the SES, her suppliers and statements
from her builder and from two others who are not builders but who are apparently a
mechanical engineer and a scientist.
The complainant has also provided material from the local council. She says the local
council confirms all outstanding matters associated with the development have been
satisfactorily completed and the house was suitable for occupation.
The complainant provided several statutory declarations including from those who
saw the damage contemporaneous with the event.
The available material shows the complainant‟s builder attended the insured property
on the day of the insured event. He says the property sustained a direct hit because
of a localised tornado. He describes the damage which included insulation littering the
property, torn sarking and several roof sheets lifted away from battens.
The builder says the damage to the house was consistent solely with a strong wind
event such as a tornado. He says the house was constructed of double brick and no
Determination | Case number: 525138 Page 5 of 16
second-hand building materials and the construction methods used were consistent
with his training and experience as a builder of many decades. He says the dents and
marking on the roof sheeting are because loose roof sheets rubbed against each
other, windborne projectiles hit the roof and tarp guy ropes fretted against the roof
sheeting.
The insurer says the statutory declaration from the builder does not provide additional
information to substantiate the claim. It also contends the builder was unlicensed from
April 2015 until April 2016. It submits this raises concerns regarding his workmanship
and certification.
The insurer submits it obtained two independent reports which both conclude the
proximate cause of the damage is because of the defective building works. However,
it acknowledges its builder could re -attend to complete an in-depth assessment and
specific measurements of the roof.
As for the material from the local council, it relies on an occupation certificate lodged
in 2015 and for which an „ unsatisfactory inspection ‟ was completed but makes no
comment on the letter from the local council provided in April 2017.
The insurer recently asked for some photographs referred to in a report from one of
the reports relied on by the complainant. The complainant is unable to provide those
specific photographs now. However, while the photographs would be useful, in view
of all the other information provided, I am satisfied the requested photographs are not
determinative of the outcome.
The insurer has not established a policy exclusion applies
After carefully reviewing the insurer ‟s reports, I am not satisfied they provide enough
information or are sufficiently detailed to support the conclusions reached about
defects in construction and installation of the roofing. Specifically:
the reports lack detail (such as measurement evidencing non-compliance with
standard) and do not include adequate analysis of the specific defects and how the
conclusion was reached that such defects (and not the storm) caused the damage
insufficient regard was paid to the strength of the storm
while the assessor provides information about standards and a copy of roofing
installation manual, he does not detail what parts of these standards were not
adhered to in the installation of the com plainant‟s roofing. A list of standards of
themselves without an explanation or evidence as to how they have not been
complied with is not sufficiently persuasive
the builder notes the complainant‟s roofing appears second hand. However, he
does not explain the basis for this assertion, or how second-hand roofing itself
equates or contributes to defects in installation or construction. Further, the
complainant disputes this assertion and has provided information which contradicts
the builder but which has not been addressed by the builder.
Determination | Case number: 525138 Page 6 of 16
Photographs provided with both reports purport to show faulty workmanship in
eaves, screw fixings etc. However, there is insufficient evidence of the specific
defect(s). Examples include photograph(s):
> provided by the builder supposedly showing roof location and distance between
battens. Detail of the distance referred to has not been provided. I am unable to
make assumptions about the distance between battens from photographs alone.
> referencing other non-related defects without an explanation of what they are
such as a relatively dark photograph the reporter says shows different size roof
sheeting used. This cannot be made out from the photograph.
> of a cracked eave. This of itself does not evidence how the eaves were installed
and the basis on which the builder considers its installation does not meet
relevant standard/code.
Having considered the available material, I am not satisfied the insurer has
established the proximate cause of the claimed damage was defects and fault y
workmanship or faulty design because of the following other factors:
I am not satisfied the insurer or its experts have taken sufficient regard of the
strength of the winds as evidenced by contemporaneous photographs and
statements.
The complainant‟s builder‟s opinion about the effect of the strong winds was
confirmed by the SES, neighbours and statements provided by a mechanical
engineer and a scientist.
The suppliers have confirmed they used quality new materials and this is not
rebutted.
The local council says all matters associated with the development have been
satisfactorily completed and the home is suitable for occupation.
While the builder was unlicensed for a period, this is explained by the complainant
as due to illness which is unrebutted by the insurer. Further, I do not accept this
contention necessarily results in the insurer ‟s conclusion.
In the circumstances, and for the reasons stated, I am not satisfied the insurer has
established that an exclusion applies to defeat the claim.
I am satisfied the available material establishes the proximate cause (or the dominant
or effective cause) of the claimed damage was the storm event on 12 February 2018.
Therefore, the insurer is required to settle the claim in accordance with the terms of
the policy.
Determination | Case number: 525138 Page 7 of 16
How the claim should be settled
There is no dispute there is damage to the roofing, eaves, insulation, guttering and
battens at the property. The insurer ‟s builder also refers to watermarks on the living
room wall.
The complainant says she has paid for emergency repairs but says outstanding
remedial work remains. She also claims for the cost to replace the satellite dish, roof
whirl vent, cooker hood vent and roof insulation. Due to the lack of roof insulation, the
complainant says the electricity bills have increased.
The complainant has provided photographs of the roof describing damages from
projectiles blown by the wind, scuffing damage caused by tarps, water ingress
causing discoloured paintwork, damage to vents and damage to the fire stack.
Having reviewed the photographs, I accept there is internal damage caused by water
ingress, storm damage to the roof caused by projectiles and scuffing damage,
damage to the satellite dish, roof whirl vent, cooker hood vent and part of the roof
insulation. In view of the damage to the roof insulation, I also accept it is probable
electricity bills have increased.
The complainant contends the insurer should cover the cost of replacing her entire
roof because she says the roof was compromised by the claim event. She refers to
assessor‟s estimate that the entire roof could be replaced for about $50,000 and
wants the insurer to pay her this amount.
The complainant says the make safe operator told her the whole roof was stressed
and needed replacing. She says several sheets of roofing materials were removed
and photographs were taken by the make safe operator. She complains the insurer
has not acted honestly as it has not provided the report or those photographs from the
make safe operator which demonstrate this contention. She believes this material
from him would demonstrate the true extent of damage and the considerable cost of
rectification.
The assessor noted the entire roof required replacement but this was due to defective
construction. As outlined above, I do not accept the available material establishes
there was a defect or faulty workmanship in the construction of the roof.
The insurer is only liable to indemnify the complainant for the damage caused by the
storm event and by any subsequent ingress of water into the insured property.
The complainant has the onus to establish on the balance of probabilities the storm
caused all the damage claimed. The complainant has not provided any material about
quantum and has provided no material which establishes the entire roof requires
replacement because of damage caused in the storm.
Determination | Case number: 525138 Page 8 of 16
I have carefully considered all the material provided which includes a significant
amount of material from the complainant. I acknowledge the insurer has not
unequivocally stated it does not have photographs or further material from the make
safe operator nor has it provided the requested information. Several reports from the
make safe operator have been provided. They do not address the specific contention
made by the complainant about the extent of damage.
Having carefully considered all the material provided, I am not persuaded the storm
damaged the entire roof. This is because several photographs have been provided
which were taken contemporaneously with the storm event. The photographs do not
demonstrate the entire roof requires replacement.
Furthermore, the only material provided about the cost of repairs is a scope of works
provided by the insurer ‟s builder which sets out costings to replace parts of the roof
and eaves damaged by storm and water stains in the living area.
In the absence of any other material about the cost of repairs and scope of works, I
accept the material provided by the insurer‟s builder about this issue.
The scope for storm related damage totals $12,149.23 which is inclusive of a 25%
builder‟s margin and GST.
If the complainant accepts this determination, the following is to occur:
the insurer is to cash settle the complainant based on the builder‟s scope of
$12,149.23 within seven days of acceptance of the determination
the insurer is to allow a further 15% on $12,149.23 for any unforeseen damage
found during repairs as noted in the scope of works.
the insurer is to pay interest at the statutory rate on the above amounts from the
date it first denied the claim until settlement
as the builder‟s scope does not include storm damage to the roof caused by
projectiles and scuffing damage, damage to guttering and insulation, replacement
of the satellite dish, roof whirl vent and cooker hood vent, the complainant is to
obtain and provide a quotation for replacement of these storm damaged items
within 14 days of acceptance of this determination
within a further seven days of the complainant providing the above information, the
insurer is to assess the quotation or quotations and propose settlement for this
storm damage in accordance with the policy terms.
The complainant says her electricity bills have increased because of the damage to
the insulation. The complainant is to provide the insurer with proof of this contention
also within 14 days of acceptance of this determination.
Determination | Case number: 525138 Page 9 of 16
The complainant says she has paid for emergency repairs. The complainant is also to
provide the insurer with proof of the cost of these emergency repairs withi n 14 days of
acceptance of this determination.
Within seven days of the complainant providing the necessary proofs, the insurer is to
assess and propose settlement for these further claims. The insurer is entitled to
consider any duplication in the cost o f emergency repairs and the builder‟s scope of
works in the sum of $12,149.23.
The parties are encouraged to work together to affect a final settlement of the
quantum of the claim.
2.2 Is the complainant entitled to compensation?
Compensation payable in some circumstances
The complainant made several complaints about the way the insurer managed the
claim. She says it did not respond to her in a timely fashion and failed to provide
reports and information upon request. She also complains about the number of
assessments and the accuracy of information in those assessments.
The complainant says the insurer and its assessors have made wild accusations, not
acted in good faith and have colluded to produce similar reports.
As a result, she says the claims process has been extremely stressful.
The complainant lodged the claim on 13 February 2018. The insurer declined the
claim and issued a decline letter on or about 15 March 2018. It declined the claim
after reviewing the report provided by its assessor because the report said the
claimed damage was not caused by storm but was due to defects or defective
work manship in the installation of the complainant‟s roof.
The insurer then appointed its builder to re-attend the property after the complainant
raised concerns about the sufficiency of information in the assessor‟s report when the
claim was declined.
At all material times, both before and after the complaint came to us, the insurer was
willing to engage a further expert to re-attend the property or send the builder back to
conduct an in-depth roof report.
The complainant says the insurer did not handle the claim appropriately and that it
was seeking to obtain information to further support its denial as demonstrated by the
builder‟s attempt to return to the property to re -assess the damage.
It is generally expected that an insurer obtains all information and makes adequate
enquiries relevant to its claim decision prior to making such decisions. The insurer
Determination | Case number: 525138 Page 10 of 16
first based its decision to decline the claim on an assessment report obtained from the
assessor. It then relied also on its builder‟s report to deny the cl aim.
However, the insurer wanted its expert return to the insured premises to gather further
information (such as measurements) which it should have considered prior to denying
the claim based on the policy exclusion relied on.
The complainant also says the insurer knowingly sold her cover which it failed to
provide, and had no intention of providing, and edited telephone conversations.
However, having carefully reviewed all available information, and listened to the call
recordings, I am not satisfied the available information establishes a failure to act in
good faith or that the telephone recordings were edited.
The complainant also complains about the lack of provision of material particularly
from the make safe provider. I acknowledge the make safe provider returned to the
premises on several occasions. It appears the tarps had to be re-secured because of
high winds. The insurer acknowledged the make safe provider might have
photographs and it would try to obtain them. The make safe reports do not indicate
the make safe provider took photographs. Whether he did or did not take
photographs, is not, in my opinion, determinative of the outcome in view of all the
other information provided, as explained above. Nonetheless, I accept the
complainant‟s conce rn about the issue.
The complainant makes numerous assertions about the conduct of the insurer ‟s
experts. While I do not accept their opinion about the cause of damage, I am not
satisfied the available material establishes either they or the insurer misrepresented
the position about policy response, acted in collusion or acted in bad faith.
It is fair the insurer pays to the complainant $1,000 compensation
The Terms of Reference allow the payment of compensation (capped at $3,000) for
non-financial loss. We may decide an insurer should compensate a complainant for
such loss only where there has been an unusual amount of physical inconvenience,
time taken to resolve a situation, or interference with the complainant‟s expectation of
enjoyment or peace of mind.
I consider best industry practice is for the insurer to ensure it had obtained adequate
information and clarification from its experts between the assessments and notifying
the complainant of the claim decline. Its failure to do has resulted in:
additional attendance at the property being required (this did not take place)
inconvenience associated with the complainant ‟s roofing remaining unrepaired
delay in the resolution of the claim
interference with the complainant ‟s peace of mind.
Determination | Case number: 525138 Page 11 of 16
I also accept there has been an unusual amount of physical inconvenience because,
as the storm damage was not repaired by the insurer, there has been further rain
ingress and the complainant was required to undertake some repairs herself. I accept
the insurer‟s claims handling, the physical inconvenience and time taken to resolve
the situation would have interfered with the complainant‟s expectation of enjoyment or
peace of mind.
We take a conservative approach to compensation for non-financial loss.
In the circumstances of this complaint, I am satisfied it is fair in the circumstances the
insurer pays to the complainant $1,000 compensation.
Determination | Case number: 525138 Page 12 of 16
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applic ant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Approach
As advised to the parties, we have considered it appropriate to expedite this
complaint in accordance with the Operational Guidelines to the FOS Terms of
Reference, due to the nature of the complaint. Accordingly, this complaint has not
been the subject of a recommendation and has proceeded directly to determination.
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All the material provided by the parties has been reviewed and
considered for the purposes of this determination.
This complaint has been decided on its merits, having regard to the relevant law,
good industry practice, codes of practice and previous decisions.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
It is an accepted principle of general insurance law that the insured bears the onus to
establish on the balance of probabilities they have suffered a loss caused by an event
to which the policy responds. This is known as a prima facie claim. Once established,
the onus shifts to the insurer to prove on the balance of probabilities that an exclusion
applies if it seeks to deny or limit its liability for the loss.
Determination | Case number: 525138 Page 13 of 16
3.3 Relevant extracts from policy and parties’ material
The relevant policy extracts are referred to in the correspondence between the parties
and in the insurer ‟s Notice of Response. Both the policy document and the Notice
have been exchanged with the complainant.
Records Key points
PDS Page 51
“ Storm
What is covered
Your building and/or contents are covered for loss or damage caused by storm .
What is not covered
…
Your building and/or contents are not covered under this Insured Event for loss or
damage as described in the General Exclusions listed on pages 75 to 78.”
Page 75
General Exclusions
The following general exclusions apply to all sections of this policy excluding:
Domestic Workers‟ Compensation Cover; and
Portable Contents Cover
Under this policy there is no cover provided for any loss, damage or liability caused
directly or indirectly by or in any way connected with:
1. defects, structural or design faults, faulty workmanship or faulty design
Insurer ’s
asse ssment
report (CC)
23 February
2018
Attend and phot ographed 23 February 2018.
During recent storm, complainant said parts of the roof came off. Complainant
claims damage in the bathroom, bedrooms, ensuite, laundry and main roof.
Building is about 41 - 50 years old maintaine d in average condition.
Observed partial removal of the roof sheeting, batons and ins ulation. Dis placement/
partial removal of the external plaster eave lining. Twisting indented gutter. Cracking
damage in laundry, bathroom, bedroom 3, ensuite and bedroom 1.
Resultant damage has been caused by poorly installed roof sheeting, roof battens
and eave lining which has caused partial removal of the roof sheeting, battens,
insulation and eave lining.
Inspection of the roof has revealed partial sheeting displac emen t.
Screws have been poorly fixed into the roof sheeting.
Polycarbonate, stitching and roofing screws have been installed haphazardly
throughout the roof.
Ridge capping screws have been installed too far apart.
Roof batten spacing has been installed too far apart with visual sag of the sheet laps
clearly evident.
Inspection of the roof battens displaced has revealed clean shaft nails used to install
the timber roof battens to the rafter. Directly responsible for the uplift of the sheeting
due to the inc or rect fixings used.
Multiple areas of the roof have sustained indentation / scratching consistent with the
sheeting rubbing over the sheet surface.
Inspection of the external eaves has revealed the lining installed is of plasterboard
material. Plaster eave lining has sustained cracking / dislodgement due the fixing
method used. No timber block out / trimmer / fixing nails have been installed with the
Determination | Case number: 525138 Page 14 of 16
Records Key points
plaster eave glued down on to the top of the soffit groove lining, at the front edge.
Inspected internal area s and saw general movement cracking consistent with
general building movement: prior patch repairs indicate cracking not fresh or recent.
Claimed damage excluded by policy exclusion.
No estimate given because no cover exists.
To facilitate the replacement roof / eave linings in accordance with current standard
and to ensure a warranty could be given on works completed would necessitate a
complete removal and replacement of the roof, battens, eave lining entire.
Estimated reserve for these works would be ap proximately $50, 000 regarding
inherent defects.
Required maintenance areas described to owner.
No specialist roofer engaged to provide a roof report.
Builder’s
report (AG)
12 April
2018
Inspected and photographed roof 12 April 2018.
Observed damage to the roof area covered by a tarp, cracks to the eave sheets,
watermarks on living room wall.
Damage caused by storm but claim should be excluded due to defects.
Because of defects, builder cannot warrant repairs.
Maintenance issues not relating to the claim are finish building to standard.
Roof is spongy underfoot indicating the roof is not screwed down properly.
Battens are spac ed too far apart.
Roof sheets are different lengths and not finished off properly at t he ridge capping.
Eaves have not been installed professionally includes the taping of joints and the
painting.
Roofing iron appears second hand and looks as if it has been painted in sections.
Owners said house construction was only recently completed in t he last 2 years so
the building should be covered by builder‟s insurance depending on the insurance
coverage by the builder.
Estimated cost repairs $12,149.23.
Scope of
Works (AG)
Remove and replace storm damaged metal roof sheets, eave sheets, seal and
repaint walls in lounge room $12,149.23 which includes 25% job margin and GST.
Any unforeseen damages found during rectification which relate to the recent event
will be noted and forwarded to the insurer as a variation for their consideration.
Email fro m
CC to
insurer
15 May
2018
Attached sheeting install reference from the manufacturer.
Maximum recommended support spacings for end and internal spans are shown in
Tables 2.12.1 and 2.13. 1. For roofs the maximum recommended support spacing is
based on dat a in accordance with AS 1562.1:1992 Design and installation of sheet
roof and wall cladding: Metal, and AS 4040.1:1992 Methods of testing sheet roof
and wall cladding — Resistance to concentrated loads.
Custom orb end spans as per the BlueScope Lysaght g uide confirms end span
supports to be no great er than 900mm & intermediate spacings no greater than
1200mm.
Section 9 of AS 1684.2 provides deemed to satisfy provisions for general fixing and
tie down details for timber roof battens and raft ers. The uplift capacity of the
connection in AS 1684. 2 - 2010 Table 9.25 must be greater than the uplift force in
Table 9. 14.
Determination | Case number: 525138 Page 15 of 16
Records Key points
Observed on various construction sites that two - plain shank machine driven 75 mm
x 3.05 mm nails are used to connect a 35 - mm thick batten to the r afters. AS 1684.2 -
2010 Section 9 Fixings and tie - down design shows that for roof battens and rafters
spaced at 900 mm centres, wind rating N1, in joint group JD5 two plain shank 75
mm long nails do not provide a compliant Edge or General area batten to raf ter
connection. Please note AS1684.2 - 2010 Table 9.25 Uplift capacity of roof batten
tie - down connections provides connection details for roof battens up to 38 mm thick.
If the battens being used are thicker than 38 mm, for example a 45mm thick batten,
the connection capacities provided in AS1684.2 - 2010 do not apply. In this case the
fixing met hod must be assessed and determined as satisfactory by an appropriately
qualified person such as a structural engineer.
Some timber suppliers/manufacturers provide fi xing details for 45mm thick battens
that may be appropriate if they have determined compliance by a suitable means.
For example, one manufacturer recommends the use of a 75 mm long No 14 Type
17 screw when fixing 45 mm thick battens to all areas of the roo f for N1 and N2 wind
zones which is the best practice construction method.
Should you require further to support the declinature recommend engagement of a
structural engineer.
Local
council
letter
7 April 2017
Re: development application and construction certificate, all outstanding matters
associated with the development have been satisfactorily completed. As a result, the
dwelling is now considered suitable for occupation.
Building
supplier MB
7 June 2018
W e only supplied new quality materials sourced from reputable well - known
companies.
Building
supplier CP
24 April
2018
All products to build your home were new and meet all Australian standards.
3.4 Matters not dealt with by this determination
Internal cracking damage
The insurer ‟s experts have referred to some internal cracking and damage observed
during their inspection of the complainant‟s property. They say this damage is not
claim related.
The complainant has not made any submission about this damage. Her submissions
have been in relation to the decline of cover for roof damage. The complainant does
not claim the internal cracking damage noted by the insurer ‟s assessor and builder
form part of her complaint. Consequently, this determination has been limited to the
complaints of damage made by the complainant being the external damage to the
Determination | Case number: 525138 Page 16 of 16
roof and water marks in the living room as identified in the builder‟s report and scope
of works.
Review of all claims denied by the insurer
The complainant asked for a review of all claims denied by the insurer to assess the
custom and practice used for denying claims. However, the scope of this
determination is to deal with the individual and specific claim and complaint brought
by the complainant against the insurer.
3.5 Other relevant material considered and relied on
Parties‟ submissions, emails, reports and scope of works.
Photographs.
Complainant‟s statutory declarations and statements.
Material from local council and Bureau of Meteorology.
Insurer ‟s claim file notes and call recordings.
Correspondence between the parties.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.