Determination 525138

Storm damage roof claim declined for defective workmanship

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-16
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$12,149
Non-financial loss$1,000
Amount claimed$50,000
SourceAFCA PDF

Summary

The complainant's home insurer declined a storm damage roof claim on the basis of defective workmanship, while she sought about $50,000 to replace the entire roof. AFCA found the insurer had not proven the exclusion, accepted the builder's storm scope of $12,149.23 and ordered $1,000 for non-financial loss.

Once a prima facie storm claim is established, the insurer must prove an exclusion for defects or faulty workmanship, and its expert reports lacked the detail needed to do so.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 525138 Page 1 of 16 Determination Case number: 525138 17 December 2018 1 Determination overview 1.1 Complaint The complainant lodged a claim against her home building and contents insurance policy (policy) with the financial firm (insurer) for storm damage. The insurer initially declined the claim on the basis the complainant had not shown the damage was caused by insured event of storm under the policy terms. It subsequently accepted a storm occurred. However, it maintains the proximate cause of damage was defects and/or faulty workmanship in relation to the roof, not the storm event. It says damage caused in this manner is specifically excluded from policy cover. 1.2 Issues and key findings Is the insurer entitled to decline the complainant ’s claim? The insurer is not entitled to decline the claim because on the available information it has not established on the balance of probabilities the exclusion for defect or faulty workmanship applies to defeat the claim. Is the complainant entitled to compensation? The insurer is to pay to the complainant $1,000 compensation because there has been an unusual amount of physical inconvenience, time taken to resolve the situation, and interference with the complainant‟s expectation of enjoyment or peace of mind. Determination | Case number: 525138 Page 2 of 16 1.3 Determination This determination is substantially in favour of the complainant. If the complainant accepts this determination, then within seven days of acceptance, the insurer is to pay to the complainant $1,000 compensation. The insurer is also required to settle the claim within the timeframe stated as set out in section 2.1 of this determination under the heading „ how the claim should be settled ‟ . Determination | Case number: 525138 Page 3 of 16 2 Reasons for determination 2.1 Is the insurer entitled to decline the complainant ’s claim? The complainant has established a valid claim The policy provides cover for insured events including storm damage. The complainant lodged a claim for storm damage which occurred on 12 February 2018. The insurer now accepts a storm occurred and the complainant ‟s property suffered damage. Therefore, the complainant has established a valid loss (also known as a prima facie claim). The insurer must establish a policy exclusion applies While acknowledging the property was impacted by strong winds, the insurer contends the roof would have withstood the storm and the damage would not have occurred had it been built to the correct standards. Once a prima facie claim is established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. In the context of this claim, the insurer must prove the damage was caused by defects, structural or design faults, faulty workmanship or faulty design. The insurer relies on opinions from its assessor and builder The insurer appointed an assessor to attend and photograph the property and report on the claimed loss. The insurer says the report and subsequent statement provided by its assessor demonstrate the proximate cause of damage to the complainant ‟s property was not storm. It says the damage was caused by poorly installed roof sheeting, roof battens and eave linings which caused partial removal of the roof sheeting, battens insulation and eave linings. The assessor said the roof had not been constructed in accordance with Australian Standards and the manufacturer‟s installation specifications. He criticised the method of installation of the external eaves. He said the screws had been fixed poorly and haphazardly into the sheeting. Because of this, he said this was directly responsible for the uplift of the sheeting. He also said the roof batten spacing had been installed too far apart. He described multiple areas of the roof with sustained indentation and scratching consistent with the sheeting rubbing over the sheet surface. The insurer also relied on a report from a builder after the complainant questioned the accuracy of the assessor‟s report. A summary of the material from the assessor and the builder is set out in supporting section 3.3 of this determination. Determination | Case number: 525138 Page 4 of 16 The builder attended and photographed the property about a month after the storm. The damaged roof was covered by a tarp. He saw cracks in the eave sheets and water marks on the living room wall. Altho ugh he indicated the inspected damage was caused by storm he said the claim should be excluded due to the policy exclusion relied on by the insurer. He said:  the roof was spongy underfoot indicating the roof was not screwed down properly  the battens are spaced too far apart  the roof sheets are different lengths and not finished off properly at the ridge capping  the eaves have not been installed professionally  the roofing iron appeared secondhand and painted in sections. Complainant has made lengthy submissions and provided material in support The complainant disagrees with the content and conclusion in the reports. She has made several lengthy submissions. She contends the insurer has not established there were defects in the construction and installation of the roof. She s ubmits the insurer ‟s experts reached conclusions following brief observations of the damage, without taking adequate measurements and undertaking pertinent tests. She also says there are fundamental mistakes in the factual observations made by the insurer ‟s experts. The complainant makes her contentions based on her training, qualifications and experiences as an assessor, auditor and loss control advisor for various organisations from mining to manufacturing. On this basis, she says the assessor‟s and builder‟s investigations are inadequate. The complainant also relies on material from the SES, her suppliers and statements from her builder and from two others who are not builders but who are apparently a mechanical engineer and a scientist. The complainant has also provided material from the local council. She says the local council confirms all outstanding matters associated with the development have been satisfactorily completed and the house was suitable for occupation. The complainant provided several statutory declarations including from those who saw the damage contemporaneous with the event. The available material shows the complainant‟s builder attended the insured property on the day of the insured event. He says the property sustained a direct hit because of a localised tornado. He describes the damage which included insulation littering the property, torn sarking and several roof sheets lifted away from battens. The builder says the damage to the house was consistent solely with a strong wind event such as a tornado. He says the house was constructed of double brick and no Determination | Case number: 525138 Page 5 of 16 second-hand building materials and the construction methods used were consistent with his training and experience as a builder of many decades. He says the dents and marking on the roof sheeting are because loose roof sheets rubbed against each other, windborne projectiles hit the roof and tarp guy ropes fretted against the roof sheeting. The insurer says the statutory declaration from the builder does not provide additional information to substantiate the claim. It also contends the builder was unlicensed from April 2015 until April 2016. It submits this raises concerns regarding his workmanship and certification. The insurer submits it obtained two independent reports which both conclude the proximate cause of the damage is because of the defective building works. However, it acknowledges its builder could re -attend to complete an in-depth assessment and specific measurements of the roof. As for the material from the local council, it relies on an occupation certificate lodged in 2015 and for which an „ unsatisfactory inspection ‟ was completed but makes no comment on the letter from the local council provided in April 2017. The insurer recently asked for some photographs referred to in a report from one of the reports relied on by the complainant. The complainant is unable to provide those specific photographs now. However, while the photographs would be useful, in view of all the other information provided, I am satisfied the requested photographs are not determinative of the outcome. The insurer has not established a policy exclusion applies After carefully reviewing the insurer ‟s reports, I am not satisfied they provide enough information or are sufficiently detailed to support the conclusions reached about defects in construction and installation of the roofing. Specifically:  the reports lack detail (such as measurement evidencing non-compliance with standard) and do not include adequate analysis of the specific defects and how the conclusion was reached that such defects (and not the storm) caused the damage  insufficient regard was paid to the strength of the storm  while the assessor provides information about standards and a copy of roofing installation manual, he does not detail what parts of these standards were not adhered to in the installation of the com plainant‟s roofing. A list of standards of themselves without an explanation or evidence as to how they have not been complied with is not sufficiently persuasive  the builder notes the complainant‟s roofing appears second hand. However, he does not explain the basis for this assertion, or how second-hand roofing itself equates or contributes to defects in installation or construction. Further, the complainant disputes this assertion and has provided information which contradicts the builder but which has not been addressed by the builder. Determination | Case number: 525138 Page 6 of 16  Photographs provided with both reports purport to show faulty workmanship in eaves, screw fixings etc. However, there is insufficient evidence of the specific defect(s). Examples include photograph(s): > provided by the builder supposedly showing roof location and distance between battens. Detail of the distance referred to has not been provided. I am unable to make assumptions about the distance between battens from photographs alone. > referencing other non-related defects without an explanation of what they are such as a relatively dark photograph the reporter says shows different size roof sheeting used. This cannot be made out from the photograph. > of a cracked eave. This of itself does not evidence how the eaves were installed and the basis on which the builder considers its installation does not meet relevant standard/code. Having considered the available material, I am not satisfied the insurer has established the proximate cause of the claimed damage was defects and fault y workmanship or faulty design because of the following other factors:  I am not satisfied the insurer or its experts have taken sufficient regard of the strength of the winds as evidenced by contemporaneous photographs and statements.  The complainant‟s builder‟s opinion about the effect of the strong winds was confirmed by the SES, neighbours and statements provided by a mechanical engineer and a scientist.  The suppliers have confirmed they used quality new materials and this is not rebutted.  The local council says all matters associated with the development have been satisfactorily completed and the home is suitable for occupation.  While the builder was unlicensed for a period, this is explained by the complainant as due to illness which is unrebutted by the insurer. Further, I do not accept this contention necessarily results in the insurer ‟s conclusion. In the circumstances, and for the reasons stated, I am not satisfied the insurer has established that an exclusion applies to defeat the claim. I am satisfied the available material establishes the proximate cause (or the dominant or effective cause) of the claimed damage was the storm event on 12 February 2018. Therefore, the insurer is required to settle the claim in accordance with the terms of the policy. Determination | Case number: 525138 Page 7 of 16 How the claim should be settled There is no dispute there is damage to the roofing, eaves, insulation, guttering and battens at the property. The insurer ‟s builder also refers to watermarks on the living room wall. The complainant says she has paid for emergency repairs but says outstanding remedial work remains. She also claims for the cost to replace the satellite dish, roof whirl vent, cooker hood vent and roof insulation. Due to the lack of roof insulation, the complainant says the electricity bills have increased. The complainant has provided photographs of the roof describing damages from projectiles blown by the wind, scuffing damage caused by tarps, water ingress causing discoloured paintwork, damage to vents and damage to the fire stack. Having reviewed the photographs, I accept there is internal damage caused by water ingress, storm damage to the roof caused by projectiles and scuffing damage, damage to the satellite dish, roof whirl vent, cooker hood vent and part of the roof insulation. In view of the damage to the roof insulation, I also accept it is probable electricity bills have increased. The complainant contends the insurer should cover the cost of replacing her entire roof because she says the roof was compromised by the claim event. She refers to assessor‟s estimate that the entire roof could be replaced for about $50,000 and wants the insurer to pay her this amount. The complainant says the make safe operator told her the whole roof was stressed and needed replacing. She says several sheets of roofing materials were removed and photographs were taken by the make safe operator. She complains the insurer has not acted honestly as it has not provided the report or those photographs from the make safe operator which demonstrate this contention. She believes this material from him would demonstrate the true extent of damage and the considerable cost of rectification. The assessor noted the entire roof required replacement but this was due to defective construction. As outlined above, I do not accept the available material establishes there was a defect or faulty workmanship in the construction of the roof. The insurer is only liable to indemnify the complainant for the damage caused by the storm event and by any subsequent ingress of water into the insured property. The complainant has the onus to establish on the balance of probabilities the storm caused all the damage claimed. The complainant has not provided any material about quantum and has provided no material which establishes the entire roof requires replacement because of damage caused in the storm. Determination | Case number: 525138 Page 8 of 16 I have carefully considered all the material provided which includes a significant amount of material from the complainant. I acknowledge the insurer has not unequivocally stated it does not have photographs or further material from the make safe operator nor has it provided the requested information. Several reports from the make safe operator have been provided. They do not address the specific contention made by the complainant about the extent of damage. Having carefully considered all the material provided, I am not persuaded the storm damaged the entire roof. This is because several photographs have been provided which were taken contemporaneously with the storm event. The photographs do not demonstrate the entire roof requires replacement. Furthermore, the only material provided about the cost of repairs is a scope of works provided by the insurer ‟s builder which sets out costings to replace parts of the roof and eaves damaged by storm and water stains in the living area. In the absence of any other material about the cost of repairs and scope of works, I accept the material provided by the insurer‟s builder about this issue. The scope for storm related damage totals $12,149.23 which is inclusive of a 25% builder‟s margin and GST. If the complainant accepts this determination, the following is to occur:  the insurer is to cash settle the complainant based on the builder‟s scope of $12,149.23 within seven days of acceptance of the determination  the insurer is to allow a further 15% on $12,149.23 for any unforeseen damage found during repairs as noted in the scope of works.  the insurer is to pay interest at the statutory rate on the above amounts from the date it first denied the claim until settlement  as the builder‟s scope does not include storm damage to the roof caused by projectiles and scuffing damage, damage to guttering and insulation, replacement of the satellite dish, roof whirl vent and cooker hood vent, the complainant is to obtain and provide a quotation for replacement of these storm damaged items within 14 days of acceptance of this determination  within a further seven days of the complainant providing the above information, the insurer is to assess the quotation or quotations and propose settlement for this storm damage in accordance with the policy terms. The complainant says her electricity bills have increased because of the damage to the insulation. The complainant is to provide the insurer with proof of this contention also within 14 days of acceptance of this determination. Determination | Case number: 525138 Page 9 of 16 The complainant says she has paid for emergency repairs. The complainant is also to provide the insurer with proof of the cost of these emergency repairs withi n 14 days of acceptance of this determination. Within seven days of the complainant providing the necessary proofs, the insurer is to assess and propose settlement for these further claims. The insurer is entitled to consider any duplication in the cost o f emergency repairs and the builder‟s scope of works in the sum of $12,149.23. The parties are encouraged to work together to affect a final settlement of the quantum of the claim. 2.2 Is the complainant entitled to compensation? Compensation payable in some circumstances The complainant made several complaints about the way the insurer managed the claim. She says it did not respond to her in a timely fashion and failed to provide reports and information upon request. She also complains about the number of assessments and the accuracy of information in those assessments. The complainant says the insurer and its assessors have made wild accusations, not acted in good faith and have colluded to produce similar reports. As a result, she says the claims process has been extremely stressful. The complainant lodged the claim on 13 February 2018. The insurer declined the claim and issued a decline letter on or about 15 March 2018. It declined the claim after reviewing the report provided by its assessor because the report said the claimed damage was not caused by storm but was due to defects or defective work manship in the installation of the complainant‟s roof. The insurer then appointed its builder to re-attend the property after the complainant raised concerns about the sufficiency of information in the assessor‟s report when the claim was declined. At all material times, both before and after the complaint came to us, the insurer was willing to engage a further expert to re-attend the property or send the builder back to conduct an in-depth roof report. The complainant says the insurer did not handle the claim appropriately and that it was seeking to obtain information to further support its denial as demonstrated by the builder‟s attempt to return to the property to re -assess the damage. It is generally expected that an insurer obtains all information and makes adequate enquiries relevant to its claim decision prior to making such decisions. The insurer Determination | Case number: 525138 Page 10 of 16 first based its decision to decline the claim on an assessment report obtained from the assessor. It then relied also on its builder‟s report to deny the cl aim. However, the insurer wanted its expert return to the insured premises to gather further information (such as measurements) which it should have considered prior to denying the claim based on the policy exclusion relied on. The complainant also says the insurer knowingly sold her cover which it failed to provide, and had no intention of providing, and edited telephone conversations. However, having carefully reviewed all available information, and listened to the call recordings, I am not satisfied the available information establishes a failure to act in good faith or that the telephone recordings were edited. The complainant also complains about the lack of provision of material particularly from the make safe provider. I acknowledge the make safe provider returned to the premises on several occasions. It appears the tarps had to be re-secured because of high winds. The insurer acknowledged the make safe provider might have photographs and it would try to obtain them. The make safe reports do not indicate the make safe provider took photographs. Whether he did or did not take photographs, is not, in my opinion, determinative of the outcome in view of all the other information provided, as explained above. Nonetheless, I accept the complainant‟s conce rn about the issue. The complainant makes numerous assertions about the conduct of the insurer ‟s experts. While I do not accept their opinion about the cause of damage, I am not satisfied the available material establishes either they or the insurer misrepresented the position about policy response, acted in collusion or acted in bad faith. It is fair the insurer pays to the complainant $1,000 compensation The Terms of Reference allow the payment of compensation (capped at $3,000) for non-financial loss. We may decide an insurer should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant‟s expectation of enjoyment or peace of mind. I consider best industry practice is for the insurer to ensure it had obtained adequate information and clarification from its experts between the assessments and notifying the complainant of the claim decline. Its failure to do has resulted in:  additional attendance at the property being required (this did not take place)  inconvenience associated with the complainant ‟s roofing remaining unrepaired  delay in the resolution of the claim  interference with the complainant ‟s peace of mind. Determination | Case number: 525138 Page 11 of 16 I also accept there has been an unusual amount of physical inconvenience because, as the storm damage was not repaired by the insurer, there has been further rain ingress and the complainant was required to undertake some repairs herself. I accept the insurer‟s claims handling, the physical inconvenience and time taken to resolve the situation would have interfered with the complainant‟s expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. In the circumstances of this complaint, I am satisfied it is fair in the circumstances the insurer pays to the complainant $1,000 compensation. Determination | Case number: 525138 Page 12 of 16 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applic ant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim 3.2 Approach As advised to the parties, we have considered it appropriate to expedite this complaint in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the complaint. Accordingly, this complaint has not been the subject of a recommendation and has proceeded directly to determination. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This complaint has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law that the insured bears the onus to establish on the balance of probabilities they have suffered a loss caused by an event to which the policy responds. This is known as a prima facie claim. Once established, the onus shifts to the insurer to prove on the balance of probabilities that an exclusion applies if it seeks to deny or limit its liability for the loss. Determination | Case number: 525138 Page 13 of 16 3.3 Relevant extracts from policy and parties’ material The relevant policy extracts are referred to in the correspondence between the parties and in the insurer ‟s Notice of Response. Both the policy document and the Notice have been exchanged with the complainant. Records Key points PDS Page 51 “ Storm What is covered Your building and/or contents are covered for loss or damage caused by storm . What is not covered … Your building and/or contents are not covered under this Insured Event for loss or damage as described in the General Exclusions listed on pages 75 to 78.” Page 75 General Exclusions The following general exclusions apply to all sections of this policy excluding:  Domestic Workers‟ Compensation Cover; and  Portable Contents Cover Under this policy there is no cover provided for any loss, damage or liability caused directly or indirectly by or in any way connected with: 1. defects, structural or design faults, faulty workmanship or faulty design Insurer ’s asse ssment report (CC) 23 February 2018  Attend and phot ographed 23 February 2018.  During recent storm, complainant said parts of the roof came off. Complainant claims damage in the bathroom, bedrooms, ensuite, laundry and main roof.  Building is about 41 - 50 years old maintaine d in average condition.  Observed partial removal of the roof sheeting, batons and ins ulation. Dis placement/ partial removal of the external plaster eave lining. Twisting indented gutter. Cracking damage in laundry, bathroom, bedroom 3, ensuite and bedroom 1.  Resultant damage has been caused by poorly installed roof sheeting, roof battens and eave lining which has caused partial removal of the roof sheeting, battens, insulation and eave lining.  Inspection of the roof has revealed partial sheeting displac emen t.  Screws have been poorly fixed into the roof sheeting.  Polycarbonate, stitching and roofing screws have been installed haphazardly throughout the roof.  Ridge capping screws have been installed too far apart.  Roof batten spacing has been installed too far apart with visual sag of the sheet laps clearly evident.  Inspection of the roof battens displaced has revealed clean shaft nails used to install the timber roof battens to the rafter. Directly responsible for the uplift of the sheeting due to the inc or rect fixings used.  Multiple areas of the roof have sustained indentation / scratching consistent with the sheeting rubbing over the sheet surface.  Inspection of the external eaves has revealed the lining installed is of plasterboard material. Plaster eave lining has sustained cracking / dislodgement due the fixing method used. No timber block out / trimmer / fixing nails have been installed with the Determination | Case number: 525138 Page 14 of 16 Records Key points plaster eave glued down on to the top of the soffit groove lining, at the front edge.  Inspected internal area s and saw general movement cracking consistent with general building movement: prior patch repairs indicate cracking not fresh or recent.  Claimed damage excluded by policy exclusion.  No estimate given because no cover exists.  To facilitate the replacement roof / eave linings in accordance with current standard and to ensure a warranty could be given on works completed would necessitate a complete removal and replacement of the roof, battens, eave lining entire.  Estimated reserve for these works would be ap proximately $50, 000 regarding inherent defects.  Required maintenance areas described to owner.  No specialist roofer engaged to provide a roof report. Builder’s report (AG) 12 April 2018  Inspected and photographed roof 12 April 2018.  Observed damage to the roof area covered by a tarp, cracks to the eave sheets, watermarks on living room wall.  Damage caused by storm but claim should be excluded due to defects.  Because of defects, builder cannot warrant repairs.  Maintenance issues not relating to the claim are finish building to standard.  Roof is spongy underfoot indicating the roof is not screwed down properly.  Battens are spac ed too far apart.  Roof sheets are different lengths and not finished off properly at t he ridge capping.  Eaves have not been installed professionally includes the taping of joints and the painting.  Roofing iron appears second hand and looks as if it has been painted in sections.  Owners said house construction was only recently completed in t he last 2 years so the building should be covered by builder‟s insurance depending on the insurance coverage by the builder.  Estimated cost repairs $12,149.23. Scope of Works (AG)  Remove and replace storm damaged metal roof sheets, eave sheets, seal and repaint walls in lounge room $12,149.23 which includes 25% job margin and GST.  Any unforeseen damages found during rectification which relate to the recent event will be noted and forwarded to the insurer as a variation for their consideration. Email fro m CC to insurer 15 May 2018  Attached sheeting install reference from the manufacturer.  Maximum recommended support spacings for end and internal spans are shown in Tables 2.12.1 and 2.13. 1. For roofs the maximum recommended support spacing is based on dat a in accordance with AS 1562.1:1992 Design and installation of sheet roof and wall cladding: Metal, and AS 4040.1:1992 Methods of testing sheet roof and wall cladding — Resistance to concentrated loads.  Custom orb end spans as per the BlueScope Lysaght g uide confirms end span supports to be no great er than 900mm & intermediate spacings no greater than 1200mm.  Section 9 of AS 1684.2 provides deemed to satisfy provisions for general fixing and tie down details for timber roof battens and raft ers. The uplift capacity of the connection in AS 1684. 2 - 2010 Table 9.25 must be greater than the uplift force in Table 9. 14. Determination | Case number: 525138 Page 15 of 16 Records Key points  Observed on various construction sites that two - plain shank machine driven 75 mm x 3.05 mm nails are used to connect a 35 - mm thick batten to the r afters. AS 1684.2 - 2010 Section 9 Fixings and tie - down design shows that for roof battens and rafters spaced at 900 mm centres, wind rating N1, in joint group JD5 two plain shank 75 mm long nails do not provide a compliant Edge or General area batten to raf ter connection. Please note AS1684.2 - 2010 Table 9.25 Uplift capacity of roof batten tie - down connections provides connection details for roof battens up to 38 mm thick. If the battens being used are thicker than 38 mm, for example a 45mm thick batten, the connection capacities provided in AS1684.2 - 2010 do not apply. In this case the fixing met hod must be assessed and determined as satisfactory by an appropriately qualified person such as a structural engineer.  Some timber suppliers/manufacturers provide fi xing details for 45mm thick battens that may be appropriate if they have determined compliance by a suitable means. For example, one manufacturer recommends the use of a 75 mm long No 14 Type 17 screw when fixing 45 mm thick battens to all areas of the roo f for N1 and N2 wind zones which is the best practice construction method.  Should you require further to support the declinature recommend engagement of a structural engineer. Local council letter 7 April 2017  Re: development application and construction certificate, all outstanding matters associated with the development have been satisfactorily completed. As a result, the dwelling is now considered suitable for occupation. Building supplier MB 7 June 2018  W e only supplied new quality materials sourced from reputable well - known companies. Building supplier CP 24 April 2018  All products to build your home were new and meet all Australian standards. 3.4 Matters not dealt with by this determination Internal cracking damage The insurer ‟s experts have referred to some internal cracking and damage observed during their inspection of the complainant‟s property. They say this damage is not claim related. The complainant has not made any submission about this damage. Her submissions have been in relation to the decline of cover for roof damage. The complainant does not claim the internal cracking damage noted by the insurer ‟s assessor and builder form part of her complaint. Consequently, this determination has been limited to the complaints of damage made by the complainant being the external damage to the Determination | Case number: 525138 Page 16 of 16 roof and water marks in the living room as identified in the builder‟s report and scope of works. Review of all claims denied by the insurer The complainant asked for a review of all claims denied by the insurer to assess the custom and practice used for denying claims. However, the scope of this determination is to deal with the individual and specific claim and complaint brought by the complainant against the insurer. 3.5 Other relevant material considered and relied on  Parties‟ submissions, emails, reports and scope of works.  Photographs.  Complainant‟s statutory declarations and statements.  Material from local council and Bureau of Meteorology.  Insurer ‟s claim file notes and call recordings.  Correspondence between the parties.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.