Determination 525098

claim_amount_dispute

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$3,500
Non-financial loss—
Amount claimed$5,500
SourceAFCA PDF

Summary

The applicant's home suffered water damage behind a shower recess, and the FSP cash settled the claim but declined bathroom tile costs. AFCA ordered the FSP to cover the $3,500 tile repair and re-sealing and refused the additional $2,000 claimed.

The insured event caused the waterproof membrane failure and calcium build-up, so the tile removal and re-sealing costs fall within the policy cover.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 525098 Determination Page 1 of 3 Case number: 525098 27 July 2018 1 Overview 1.1 Dispute The applicant held a home building and contents insurance policy (the policy) with the financial services provider (FSP). On 6 November 2017, the applicant lodged a claim for water damage in several areas of the insured property. The FSP has accepted the claim and sought to cash settle the applicant for the damage it has assessed to be consistent with the insured event. The applicant remai ns dissatisfied with the FSP’s final cash settlement offer and is seeking further cover under the claim. 1.2 Issues and key findings Is the FSP obliged to increase its final settlement offer to the applicant? The available information establishes the water leaking behind the shower recess spindles has penetrated/damaged the bathroom tiles waterproof membrane as well as caused a significant build up of calcium across the tiles grouting. Accordingly, the FSP is obliged to cover the applicant for the cost to remo ve the grout and calcium build up as well as re -sealing of the bathroom tiles in line with the invoice from consultants ‘WL’ dated 11 February 2018. 1.3 Determination This determination is in favour of the applicant. The FSP is to cover the applicant for the quoted cost to remove the grout and calcium build up as well as re-seal the bathroom tiles with epoxy in line with the invoice from WL noted above. Case No: 525098 Determination Page 2 of 3 2 Reasons for determination In lodging this dispute with the Service, the applicant had raised several concerns regarding the FSP’s assessment and management of the claim. However, I note over the course of the dispute most of the issues were resolved at the preliminary view stage of the Service’s review process. Accordingly, in providing this determination, I will limit consideration to only those matters that remain in dispute between the parties. 2.1 Is the FSP obliged to increase its final settlement offer ? The FSP is obliged to cover the applicant for the bathroom tile repairs I have considered the available i nformation and am satisfied on the balance of probabilities it establishes the following:  the applicant lodged the claim arising from concerns regarding water damage noted to be occurring at the insured property  the FSP investigated the cause and extent of the damage which found water was tracking down behind the shower recess hot and cold spindles penetrating the waterproof membrane and pooling on the bathroom floor  this resulted in water seeping up through the bathroom floor tiles as well as into areas/rooms adjoining the bathroom and the garage below  the FSP, although some of the items were initially declined, has since accepted to cash settle the applicant for the cost to repair/replace all the damaged areas excluding claimed costs associated with the bathroom tiles  the applicant has completed the maintenance works identified by the FSP’s appointed consultants, some of which were completed before the claim was lodged as precautionary measures  in the interest of clarity, the FSP has accepted to pay the applicant $3,200 towards the cost to replace the damaged bathroom vanity without the deductions which had previously been recommended. The bathroom tiles were damaged because of the insured event I acknowledge the FSP’s position it is not obliged to cover the applicant for the costs associated with the removal of grout and calcium build up as well as re-sealing of the bathroom tiles. The FSP in seeking to decline cover for these costs does not rely on a policy exclusion. Rather, the FSP says its assessor did not note any damage to this area when he attended the insured property. Having considered the available information including the FSP’s plumbers report and very helpful photographs from the applicant, I do not consider the assessor’s opinion regarding the bathroom tiles to be consistent with the available information. It may well be there was no lifting or cracking of the tiles however clearly there was a significant build up of calcium and staining of the grout. The available information also clearly establishes the waterproof membrane had been compromised due to the leaks. This resulted in water seeping under and up through the bathroom floor tiles causing the damage claimed including significant Case No: 525098 Determination Page 3 of 3 calcium build up. I note the FSP has accepted to cover the resultant water damage to the vanity in the bathroom as well as all the damage to adjoining areas (rooms) which occurred due to the very same event which has affected the bathroom tiles. I am satisfied the available information establishes on balance the insured event giving rise to the claim caused the failure of the bathroom tiles waterproof membrane as well as the significant calcium build up requiring removal and replacement of the grout. Accordingly, I determine the FSP is to cover the applicant for the quoted cost associated with the removal and replacement of the grout and epoxy re-sealing of the bathroom tiles. Other issues In the interest of completeness and clarity, the applicant has not been successful in establishing the FSP’s scope of works and associated cash settlement is short by approximately $2,000 as alleged. The FSP is not obliged to increase (other than the $3,500 covering the bathroom tiles) its claim settlement offer by the additional $2,000 claimed by the applicant. The FSP is not obliged to cover any additional costs to replace the upstairs floorboards other than those required to replace the damaged area(s) only. The policy does not extend to cover additional costs to replace undamaged areas to achieve a uniform appearance.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.