Storm claim: bathroom and toilet floor tiles declined as wear and tear
Summary
The insurer accepted a storm water claim but denied damaged bathroom and toilet floor tiles as wear and tear. AFCA found the insurer had not established the exclusion in full and ordered it to pay 25% of the tile replacement cost.
Conflicting expert evidence meant the insurer had not established the wear and tear exclusion in full, so a partial payment was fair.
Issues
- Claim denial primary · upheld“the insurer is required to pay 25% of the cost of the replacement of the claimed damaged floor tiles”
Subjects and remedies
home or building damagenatural disasterpay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 524954 Page 1 of 6
Case number: 524954 7 November 2018
1 Determination overview
1.1 Complaint
The complainant held a home and contents insurance policy with the financial firm
(insurer). She lodged a claim against the policy because a storm on 2 December
2017 had resulted in rainwater entering the house. The insurer accepted part of the
claim, however it said the damage to the tile floors in the bathroom and toilet were not
covered under the policy. The insurer said these were damaged due to wear and tear.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer. A copy of the
recommendation is attached to this determination.
The recommendation was issued by FOS. The Australian Financial Complaints
Authority (AFCA) has replaced Financial Ombudsman Service (FOS). AFCA is
responsible for managing FOS complaints lodged prior to 1 November 2018. While
this determination is issued by AFCA we have applied the FOS Terms of Reference.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Was the insurer correct in its decision about the damaged floor tiles?
There is conflicting evidence as to whether the insurer has established the application
of the policy exclusion upon which it relied. As a consequence, it is fair that the
insurer pays 25% of the replacement cost in relation to the damaged floor tiles in the
main bathroom and toilet.
Determination | Case number: 524954 Page 2 of 6
1.3 Determination
This determination is partially in favour of the insurer.
I agree with the case analyst ’s reasons for the recommendation in the main but not
the recommended outcome.
The insurer is required to pay 25% of the cost of the replacement of the claimed
damaged floor tiles.
Determination | Case number: 524954 Page 3 of 6
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied the documentation I have relied on has been provided to both parties.
I am satisfied the case analyst’s recommendatio n contains an accurate summary of
the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Was the insurer correct in its decision about the damaged floor tiles?
Insurer accepted complainant had valid claim
The complainant lodged a claim against her policy because her house suffered
damage due to water ingression during a storm on 2 December 2017. The insurer
sent an assessor (BC) to examine the damage on 21 December 2017. BC said there
was resultant damage due to rainwater ingress to the hallway, ensuite and bathroom
ceilings.
The insurer accepted the complainant had a valid claim for which the policy responds.
Complainant said there was other damage
The complainant told BC there were damaged bathroom and toilet floor tiles. She
believed the storm had damaged these tiles. However, BC concluded the damage
was due to wear and tear, which had pre -existed the storm and likely resulted from a
leaking shower recess.
The insurer asked O to carry out a leak detection test. O’s report (dated 16 March
2018) established there was no leakage detected and concluded the water damage
was consistent with the skylight having failed. However, O did not explain the reason
for this conclusion.
Insurer appointed a building consultant to examine damage
The insurer appointed a building consultant (SBC) to examine the damaged floor tiles
in the bathroom and ensuite. SBC provided a comprehensive report, including
photographs (dated 4 June 2018).
SBC concluded the cause of the cracked floor tiles in the toilet and main bathroom
were unrelated to the water ingress which had damaged the plasterboard ceiling
lining to the adjoining area. SBC considered the cracked floor tiles were maintenance
related.
Determination | Case number: 524954 Page 4 of 6
The insurer denied liability in relation to the cracked floor tiles, but accepted the
balance of the claim and cash settled the complainant.
Complainant obtained expert ’ s input
The complainant obtained input from an expert, a builder (CB). He said (undated
letter) the damage to the floor tiles in the bathroom and toilet was due to the storm.
However, he did not explain the reason for this conclusion in any detail.
CB followed up with another undated letter to explain his qualifications and
experience. CB said a water leak caused the damage to the floor join (between the
toilet and the main bathroom) under the underlay. The join was swollen and was
heaving on the floor tiles which resulted in cracks directly above the floor join.
However, CB had still not conclusively explained why he found the stormwater
ingress caused the damage.
SBC provided further report
The insurer asked SBC to comment on CB’s most recent report. SBC confirmed
(report dated 22 August 2018) the previous position, namely, there had been minor
water ingress which had occurred because of the damaged skylight. This had caused
minimal damage to the adjacent plasterboard linings.
SBC further said he did not see any swelling to the particleboard sheet flooring join
within the area adjacent to the main bedroom. SBC said the particleboard sheet
flooring substrate remained fit for purpose.
SBC concluded the cracked floor tiles in the toilet and main bathroom were not
related to structural movement. Instead, the cracking was ‘ representative of day-to-
day use over the lifetime of the respective floor tiling ’ .
Insurer’s experts suitably qualified
The insurer provided copies of the experts’ reports it had relied on to assess the
damage. The documents establish both experts are suitably qualified to make an
informed conclusion on the probable cause of damage to the floor tiles in the toilet
and bathroom.
Both BC and SBC provided full reports on the damage, together with photographs in
support. SBC provided comprehensive explanations for the conclusions made in the
reports. While CB has many years’ experience in the industry dealing with water leaks
and water damage, his reports were too brief to be of assistance. He did not provide
any conclusive reasons for his opinion the bathroom and toilet floor tiles resulted from
stormwater ingression. How I am satisfied that it is fair to take his views into account
because of his experience.
Determination | Case number: 524954 Page 5 of 6
Complainant provided further submissions
The complainant rejected the recommendation that was in the insurer’s favour and
provided further submissions. The complainant raised various issues, instead of
relying on input from an expert.
The complainant could not accept the damage to the floor tiling was due to ‘wear and
tear’. She contended it was an obvious way for an insurer to avoid having to pay a
claim. She said there was no evidence the floor tiling was 35 years old (in response to
SBC’s comment i n the initial report). She also said no shoes were worn upstairs, so
there could not be any wear and tear to the tiles in that area. Instead, the kitchen and
hallway are the main through fares in the house, where shoes are worn and there is
no sign of wear and tear in those areas.
However, the reports showed the grouting had deteriorated in numerous parts of the
bathroom and toilet. This was not dependent on whether shoes had or had not been
worn. The damage was a time related matter and had not occurred because of the
storm event. Instead, the experts described the damage in terms of a break down
over time.
The complainant has not provided any information that conclusively contradicts the
insurer’s experts’ findings but it has some probative value. Although the experts’
findings support the establishment of the application of the policy exclusion upon
which the insurer has relied, I find the complainant’s further submissions, taken with
CB’s evidence are sufficient to warrant a change in the outcome in the
recommendation.
I find that it is fair, on the basis of all the evidence that the insurer is not entitled to
deny the claim in relation to the floor tiles in the main bathroom and toilet in full.
Rather the insurer should pay 25% of the claimed cost of the replacement tiles.
Determination | Case number: 524954 Page 6 of 6
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
complaints previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Recommendation
Case No: 524954 Recommendation Page 1 of 9
Case number: 524954 3 September 2018
1 Overview
1.1 Dispute
The applicant holds home insurance with the financial services provider (FSP) and
lodged a claim for storm damage to her property.
The FSP accepted a portion of the damage, but declined the damage to the
bathroom tiles and particleboard flooring outside the bathrooms.
The applicant disputes this and seeks an independent review of the FSP’s decision.
1.2 Issues and key findings
What was the dominant cause of the damage?
The available evidence establishes the dominant cause of the tile damage was wear
and tear, not an escape of liquid, storm or rainwater.
The evidence does not establish the particleboard flooring is damaged to an extent
which would warrant repairs.
Is the FSP entitled to decline the claim?
Given the dominant cause of damage to the tiles was wear and tear, the claim is
excluded.
The claim for the flooring is not covered because no loss has been established.
1.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is not required to take any further action.
Case No: 524954 Recommendation Page 2 of 9
2 Reasons for recommendation
2.1 Does the evidence establish an insured event caused the damage?
Policy covers damage caused by insured events
This is an insured events policy. Among other things, it covers damage due to storm,
rainwater and an escape of liquid from defined sources. The applicant has the onus
of proving the insured event caused the damage.
If she can establish this, the burden then shifts to the FSP to establish the damage is
not covered or falls within one of the exclusions.
Applicant says storm damaged bathroom tiles and particleboard flooring
The applicant says the storm caused water ingress to the bathrooms via:
the hall area skylight and ceiling
the adjacent walls
the doors and floor of the hall area.
She says the water:
discolored the grouted floor tile joints to both the toilet and main bathroom
entered the particleboard sheet flooring outside the bathrooms
which caused floor tiles to lift and crack in both bathrooms.
Applicant has established a valid claim
The report of (O) establishes the damage was not caused by a leaking pipe. The
question is whether the insured event of storm caused the damage in dispute.
The parties agree the storm occurred and damaged the property. The parties also
agree storm water entered the bathrooms as the applicant claims.
The reports of O and (CB) say it is plausible the storm water caused the damage. O’s
report is less persuasive than the other reports because it lacks detailed reasons for
its conclusion. I also consider the other assessors to be more suitably qualified than
O in this regard.
CB’s report is persuasive.
Record Key points
CB report
Applicant’s expert
July 2018
The damage to the tiles is connected to the water damage caused
by the storms.
The join in the yellow tongue flooring is directly below the tiles
where cracking and grout moving is located. No other area in the
bathroom or toilet displays these signs of damage.
We believe water penetrated the yellow tongue at the join and has
swollen the seam causing some heaving at the seam and in turn
Case No: 524954 Recommendation Page 3 of 9
causing the damage to the tiles.
This is reinforced by the fact the floor join outside the bathroom
displays signs of heaving.
In my view this is sufficient for the applicant to establish a valid claim. The FSP does
not dispute this in its response, but rather relies on the policy exclusions.
The FSP now has the onus to establish the damage is not covered or one of the
exclusions applies.
2.2 Is the FSP entitled to decline the claim?
Parties disagree about dominant cause of tile damage
The FSP says the dominant cause of the tile damage is wear and tear, and provides
the reports of (BC) and (SBC) in support of its position. The applicant relies on the
reports of O and CB (whose reasons are set out above).
Like O’s report, BC’s report is less compelling because it does not provide detailed
reasons for its view about the dominant cause of damage. Furthermore, its
conclusions about all resultant damage being purely maintenance-related or caused
by a shower recess leak are questionable, with the FSP accepting the storm caused
some resultant damage and O’s testing found no leak.
The more persuasive reports are those of CB and SBC.
Dominant cause of damage is wear and tear
In CB’s opinion, storm water caused the particleboard to swell and heav e which led
to the cracking of the tiles. However, in my view, SBC’s reports prove on the balance
of probabilities that the dominant cause of damage was not storm water but wear and
tear.
In comparing the reports, I found the SBC reports to be the most persuasive. There
are a number of reasons for this. First, the reports are more detailed than the other
reports.
Secondly, they provide the most plausible reasons in support of their conclusions. In
particular, SBC’s reports consider:
the degree of water ingress. They say the ingress was minimal
the causal role of the floors’ condition. They say the bathroom floor has been
used without maintenance for about 35 years
the waterproof nature of the bathroom flooring (including the particleboard
substrate). SBC says the flooring is designed to withstand moisture
the pattern of cracking, not only in terms of which tiles were cracked but also
the cracking to the tiles themselves
the degree of damage to the particleboard flooring.
Case No: 524954 Recommendation Page 4 of 9
Water ingress was minimal, floors worn from daily use
In my view these factors are not in dispute. That the water ingress was minimal is not
disputed in the other expert reports.
BC ’s and SBC’s reports say the minimal level of water ingress is proven by the
absence of swelling to the door architrave and door jamb, and the limited damage to
adjacent plasterboard linings. This is also consistent with the fact the leak was
quickly repaired the day after the storm.
CB, on the other hand, does not address the extent of water ingress.
I accept the floors were worn due to daily use over time. The applicant says her
house was in good condition generally, and this was reflected in some of the reports,
including O’s report. However, the SBC reports show the bathrooms had existing
maintenance issues:
there is evidence of long-term water staining to the ensuite ceiling and cornice
there was likely a previous leak in the shower recess (the bottom row of tiles in
the shower has been replaced)
there was pre-existing mould on the ceiling lining above the s hower, due to
normal use of the shower and inadequate ventilation over time
the floors are about 35 years old. Some of the tiles are ‘drummy’ (not properly
adhered to the substrate). The grout is worn in the areas where there is more
foot traffic, and is less blemished in areas that are used less
both bathroom doors were not installed according to required building
standards, in that there was an insufficient gap between the door and the tile
flooring. This caused scuffing on the floor.
The assessor also places these facts in the context of the nature of the bathrooms,
which were designed as wet areas to withstand moisture.
By contrast, the CB’s report does not address the causal role of wear and tear of the
flooring in causing the damage.
Pattern of cracking and particleboard damage more consistent with wear and
tear
I acknowledge the applicant’s submission the tiles only cracked after the storm event
and this cannot be a coincidence. I also acknowledge CB observed swelling and
heaving of the particleboard, and pointed out the tiles in the main bathroom are
damaged in line with the join.
However, CB does not explain why the cracking to the tile in the toilet bathroom is
likely given this is not in line with the join and does not discuss the pattern of cracki ng
to the tiles themselves. Moreover, CB does not provide photographs showing the
swelling to the heave/join of the particleboard.
I prefer the evidence of SBC in this regard. The reports address the way the water
would have interacted with the particleboard, and the pattern of cracking:
Case No: 524954 Recommendation Page 5 of 9
Record Key points
SBC reports
FSP’s expert
4 July 2018 and
22 August 2018
There is a fibrous cement sheet tile underlay secured to the
flooring.
The flooring is designed to withstand exposure to weather for up to
three months.
The minor level of water ingress would have had no detrimental
effect on it.
The particleboard flooring remains fit for purpose. There is no
deviation to the flooring substrat e.
If the particleboard join swelled and heaved as the Cerra report
state s, the tile joint would have opened up, displaying substantial
cracking and deterioration of the entire grouted joint. This was not
the case.
In relation to the main bathroom, firstly, if the flooring substrate
were significantly water - damaged, there would have been a more
uniform cracking across a series of adjoining tiles.
Secondly, one would also expect the tiles to be cracked in a
uniform way across either the width or length of the tiles, not only
to the small corners of the t wo separat e tiles.
In add ition, the crack to the tile adjacent to the doorway was less
consistent with water damage and more consistent with pressure
on the nearby drummy tile.
I n relation to the toilet , the small amount of water ingress to the
particleboard would not have cause d the corner of a single floor tile
to crack in about the centre of the room .
The pattern of cracking is more consistent with wear and tear.
Tile and grout damage is generally excluded
The water ingress was minimal. The bathrooms were wet areas designed to
withstand the effects of moisture. The tiles and grout had deteriorated over a period
of time due to wear and tear.
Even if I were to accept the tiles cracked after the water ingress, it does not follow the
water ingress was the dominant cause of damage.
The evidence shows, on balance, the dominant cause of the damage was not the
storm but rather the worn condition of the tiles. The applicant has not provided
sufficient evidence to refute SBC’s reports. The policy excludes loss or damage
arising from gradual deterioration and wear/tear.
As the FSP has established on balance that the loss was caused by gradual
deterioration and wear and tear, it is entitled to decline the claimed damage.
Particleboard flooring not sufficiently damaged to warrant repair
The CB report says the storm water likely caused the particleboard to swell and
heave. It is unclear from this report and the scope of works whether the
Case No: 524954 Recommendation Page 6 of 9
swelling/heaving is temporary and benign, or whether there is significant damage to
the flooring such that it needs to be repaired or replaced.
On the other hand, SBC reports the flooring was not damaged by the water ingress
and there is no evidence of swelling at the join.
The assessor is suitably qualified to draw this conclusion and provides plausible
reasons in support. It is consistent with the minimal water ingress. Accordingly, I
accept the particleboard was not sufficiently damaged by an insured event to warrant
repair.
Case No: 524954 Recommendation Page 7 of 9
3 Supporting information
3.1 FOS approach
There has been a full exchange of the relevant material between the parties and
each party has had the opportunity to address the issues raised.
I have reviewed and considered all the material provided by the parties. While the
parties have raised various issues in their submissions, for the purposes of this
recommendation, I have restricted its commentary to those issues which I consider
directly relevant to the outcome only.
3.2 Summary of expert reports
Record Key points
FSP’s expert (BC)
Assessment report
21 December 2017
There was water ingress to the bathrooms via the entryways and
the ceiling.
Water also ingressed to the ensuite via the ceiling.
Resultant damage to the hallway, ensuite and bat hroom ceilings
are consistent with water ingress during heavy rainfall .
The resultant internal damage was the res ult of maintenance
issues with the roof, not the storm. The roof contractors engaged to
install solar panels on the roof broke some of the tiles. If this had
not happened, the water would not have ingressed.
The storm did not damage the tiles and g rout.
The damage was likely caused by a leaking shower recess.
Evidence of this is the fact the bottom row of tiles in the shower
recess has previously been replaced.
The damage is more consistent with wear and tear.
There is no damage to the first floor c eilings and the door
architrave / door jamb were not swollen, indicating minimal water
ingress to the bathroom from the event.
The damages to the toilet and bathroom floor are pre - existing.
Applicant’s expert (O)
Leak det ection report
16 March 2018
The pr operty was in good condition.
The water entered through the skylight.
It was not possible to pressure test the bath breach and waste
pipe.
All other pipes were pressure tested and no leak was found.
In our professional opinion we believe the water damage i s
consistent with the previous skylight failure which the Insured
advis ed us of upon arrival to the property.
FSP’s expert (SBC)
Forensic report
4 June 2018
Toilet bathroom
The tile discolouration was most prevalent between the floor tiling
installed bet ween base of the toilet pan and the access doorway to
the room. The grout ed tile joints to the rear of the toilet pan, which
were not exposed to the effects of ongoing foot traffic over a
prolonged period, were noticeably unblemished.
Case No: 524954 Recommendation Page 8 of 9
T he tiles were ins talled during the original construction of the
residence, some 35 years prior to the event.
The discolouration of the tiles is due to the effects of normal day -
to - day use over the life of the tiling.
The corner of one tile is cracked.
The door to the bath room was not installed according to required
building standards, in that there was an insufficient gap bet ween
the door and the tile flooring.
In relation to the particleboard flooring and the cracked floor tile,
the small amount of water ingress would not have cause d the
corner of a single floor tile to crack in about centre of the room. The
toilet room is classed as a ‘ wet area ’ and has been constructed to
withstand the effects of water.
Several floor tiles adjacent to the southern wall elevation to the
r oom were ‘drummy’ and not properly adhered to the floor tiling
substrate.
Considering the age of the room, the condition of the tiling is
caused by normal day - to - day use over time.
Particleboard flooring
T he floor tiling has been installed to a fibrous cem ent sheet tile
underlay, which has, in turn, been secured to the particleboard
flooring.
Any serious deviation to the particleboard flooring as a result of
long - term ex posure to moisture would result in a consistent line of
cracking to the floor tiling ac ross either the length or width of the
room, dependent on the location of the sheet joins to the
particleboard flooring.
The floor is designed to withstand exposure to weather for up to
three months.
The particleboard flooring remains fit for purpose. The minor level
of water ingress would have had no det riment al effect on it.
Main bathroom
The tiles were discoloured throughout the room. This is the result
of the effects of ongoing foot traffic during day - to - day use over a
prolonged period .
The cause of cracking to the corners of the two int ernal tiles is
unrelated to any alleged deviation of the underlying floor substrate,
which would be reflected in more uniform cracking across either
the width or length of a series of adjoining tiles and not to the sma ll
corners of the two separate tiles.
It is possible pressure on the ‘drummy’ tile caused the cracking of
the tile adjacent to the doorway. There is no evidence to indicate
the crack was caused by water ingress to the adjoining transition
area.
Like the a djoining toilet, the main bathroom was constructed as a
‘ wet area ’ so that the floor area is impervious to the effects of
moisture.
The bathroom door is binding against the floor tiling, and caused a
scuff mark on the tile between two cracked tiles.
T he ca use of scuffing is a maintenance issue and unrelated to the
water ingress to the adjoining transition area.
Case No: 524954 Recommendation Page 9 of 9
The mould on the ceiling lining above the shower is due to normal
use of the shower and inadequate ventilation over time.
There is no evidence of wat er ingress from the shower recess.
Ensuite bathroom
The water damage to the ceiling lining above the corner of the spa
bath occurred over a period of time and likely pre - dat ed the storm
event.
Applicant’s expert (CB)
Assessment report
4 July 2018
The d amage to the tiles is connected to the water damage caused
by the storms.
The join in the yellow tongue flooring is directly below the tiles
where cracking and grout moving is located. No other area in the
bathroom or toilet displays these signs of damage.
We believe water penetrated the yellow tongue at the join and has
swollen the seam causing some heaving at the seam and in turn
causing the damage to the tiles.
This is reinforced by the fact the floor join outside the bathroom
displays signs of heaving.
FSP’s expert (SBC)
Supplement ary report
22 August 2018
The particleboard flooring is a very robust product designed to
withstand the effects of moisture.
The bathroom tiling has been installed over a cement sheet
underlay which has been glued and nailed to the particleboard
substrate. The adhesive is impervious to the effects of moisture.
The grout ed floor joins displayed evidence of heavy soiling
consiste nt with day - to - day use over the lifetime of the floor tiling.
The tile near the door was most likely cracked due to impact
because the cracking did not extend to the adjoining tile.
The other two cracked tiles were ‘drummy’ (not properly adhered to
the underlay), which is consistent with wear and tear over time.
If the particleboard join swelled and heaved as the Cerra report
states, the tile joint would have opened up, displaying substantial
cracking and deterioration of the entire grouted joint. This w as not
the case.
There is no structural damage to the particleboard, which remains
fit for purpos e.
The crack to the corner of the toilet bathroom tile was only in the
corner and did not extend to the adjoining tiles, which suggests it is
unrelated to str uctural movement.
The particleboard flooring did not show evidence of swelling in its
join.