The complainant's home suffered storm water damage and the insurer had accepted only partial floor replacement and disputed the pantry cabinet. AFCA ordered the insurer to cash settle $25,000 inclusive of interest, covering full upstairs flooring replacement and 50% of the pantry cabinet, plus temporary accommodation if needed.
A partial floor replacement would not restore the complainant to his pre-loss position because it would create a tripping hazard, and the cabinet damage was a combination of construction fault and water damage.
Issues
- Claim denial primary · upheld
“The insurer is liable to meet the costs of replacing the entire upstairs timber flooring to avoid creating a significant tripping hazard.”
- Claim amount dispute secondary · upheld
“It is fair in the circumstances that the insurer pays 50% of the cost of replacing the kitchen pantry cabinet.”
Subjects and remedies
home or building damagepay claimpay compensationpay interest
Text of the determination
Case number: 524600 13 March 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim on 5 December 2017 on his home and contents
insurance policy held with the financial firm (insurer) for damage caused by storm
water to his property.
The claim was accepted although initially damage to the dining, living rooms, ceiling,
flooring and kitchen cabinetry was disputed. Following conciliation and discussion
between the parties, an agreement has now been reached over much of the damage
with the insurer cash settling the claim.
The remaining dispute is about the insurers liability to replace the floor in the upstairs
area and damage to a kitchen pantry cabinet.
1.2 Issues and key findings
Is the insurer entitled to limit liability for the upstairs flooring?
The insurer is liable to meet the costs of replacing the entire upstairs timber flooring to
avoid creating a significant tripping hazard. The insurer can cash settle this aspect of
the claim as set out under section 2.1 of this determination.
Is the insurer liable for the cost of replacing the kitchen cabinet?
It is fair in the circumstances that the insurer pays 50% of the cost of replacing the
kitchen pantry cabinet as set out under section 2.2 of this determination.
1.3 Determination
This determination is substantially in favour of the complainant.
The insurer is required to cash settle the claim for damage to the upstairs flooring and
pantry cabinets as set out under sections 2.1 and 2.2 of this determination for
$25,000 inclusive of interest. The insurer must attend to payment of the claim within
14 days of the complainant’s acceptance of this determination.
In addition to this, the insurer should, if required, pay for the cost of any temporary
accommodation needed whilst the reinstatement works to the upstairs flooring are
being undertaken.
Determination | Case number: 524600 Page 2 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination follows consideration of all the information provided and is based
on what is fair in all the circumstances having regard to the relevant legal principles,
terms of the policy, good industry practice including codes of practice and prior
determinations where applicable.
2.1 Is the insurer entitled to limit liability for the upstairs flooring?
Policy provides cover for insured events subject to conditions and exclusions
The complainant’s policy provides cover for damage caused by insured eve nts
including damage from storm water subject to conditions and exclusions as set out in
the policy.
The complainant has established that the bamboo floating floor in the master
bedroom and walk in robe of the property was damaged during the storm event.
The insurer has accepted liability for the replacement of the floor in the damaged
areas (master bed room and walk in robe) only, which it says is in accordance with
the policy’s terms and conditions.
Complainant’s report indicates entire floor should be replaced
The complainant has a quote and report from BFX, a flooring specialist, indicating that
part replacement of a floating floor will result in an uneven floor and cause a tripping
hazard.
The complainant has an elderly relative and young child residing in his residence and
believes that the safety of these residents will be severely compromised if only part of
the floating floor is replaced.
The floor is not secured by adhesive. Partial replacement is likely to create an uneven
floor even if the floor is packed out. BFX says the only way to avoid the tripping
hazard is to replace all the upstairs flooring.
The insurer states that the partial replacement of the floating floor would meet the
nece ssary building codes. The insurer also states that it’s building expert JL confirms
that the work is compliant as per their scope of work. It has not addressed the safety
or tripping hazard.
While the insurer says the replaced sections of flooring and proposed joins meet
building codes, it has not forwarded the relevant building code for review. It says its
Determination | Case number: 524600 Page 3 of 7
builder confirms the work is compliant but has not provided a response directly from
JL establishing this to be the case.
Insurer is liable for replacement of the upstairs flooring
I am not satisfied that the partial replacement of the floor would restore the
complainant to his pre-loss position. Having carefully reviewed the available
information, I accept the partial replacement would create an unacceptable tripping
hazard and risk.
Whilst I accept that the terms of the policy require that it only needs to replace the
damaged area, I consider that a limited repair would create an unacceptable tripping
hazard.
The complainant is entitled to be restored to his pre-loss position. It is not a matter of
betterment as there is no information to indicate that prior to the event there was any
unevenness in the flooring. I am satisfied that it is fair in these circumstances that the
insurer be liable for replacing the entire upstairs flooring.
Insurer to cash settle the claim for the flooring
The complainant provided quotations dated 27 February 2018 and 7 August 2018,
which include:
Item Cost
Supply and installation of 14mm bamboo
floor (upstairs) – quote ref BNT1112 A
$20, 9 50
Hous e cleaning - quote ref BNT1112A $1, 200
Total cost $ 22 , 150
No other quotations have been provided for the cost to replace the upstairs flooring.
I accept that the available quotations are fair and reasonable quotations.
Whilst the insurer can elect to either undertake the repairs or cash settle the claim, in
my view and in view of the history of this complaint it would be appropriate for the
insurer to cash settle this aspect of the complaint.
I accept that the insurer should cash settle the claim based on the quotation obtained
by the complainant and allow a further 15% ($3,322.50) to allow for:
any variations to the scope of works which may be required during repairs
the transfer of risk to the complainant and absence of a lifetime guarantee
the passage of time (including any increase in costs since BFX provided its revised
quotation).
Determination | Case number: 524600 Page 4 of 7
This brings the total settlement to approximately $25,473.
The insurer has already cash settled the complainant $31,891.30 with regards to the
flooring. The total amount relates largely to the downstairs flooring. I note included
within that payment is an amount for the upstairs bedroom.
After allowing for the margin included in the payment of $31,891.30 of 16% plus 10%
GST and a 20% increase for contingencies, the total allowance already paid for the
upstairs bedroom is approximately $4,715.13.
This should be deducted from any cash settlement made by the insurer and in doing
so I consider it fair to round out the cash settlement for the upstairs flooring to
$20,750.
In addition to this, the insurer should, if required, pay for the cost of any temporary
accommodation needed whilst the reinstatement works to the upstairs flooring are
being undertaken.
2.2 Is the insurer liable for the cost of replacing the kitchen cabinet?
The complainant says that since the incident in December 2017, he has had difficulty
with the pantry cabinet with issues opening and closing the doors. He believes this is
attributed to the water damage.
The insurer provided a report from MC. MC acknowledged water ended up on the
ground floor and that the pantry cabinet base has expanded but did not consider the
damage was caused by the incident in December 2017. MC considered the pantry
cabinet was not repairable and should be replaced.
MC considered the proximate cause , that is the dominant or effective cause of the
damage was most likely the inadequate design or construction of the cabinet.
MC concedes that the difficulty in closing the doors could be due to the distortion of
the pantry cabinet due to exposure to moisture. He considers this to be a contributing
cause but not the proximate cause. He has not referred to the complainant’s
information that he had not previously had difficulties with the pantry cabinet.
I accept that there may be some design and construction faults with the pantry
cabinet although it is not clear what they are or what impact they had on the
functioning of the cabinet prior to the water damage. Th e complainant’s history is that
there was no problem with the pantry cabinet and it was functioning as required until
the water inundation. There was no indication that any problems had arisen with the
pantry cabinet prior to this date.
The complainant provided a quotation to repair/replace the pantry cabinet from ZK.
The quote is dated 1 March 2018 and refers to the water damage insurance claim. It
Determination | Case number: 524600 Page 5 of 7
refers to water damage to the pantry, wine rack and fridge overhead cabinets . The
quote price is $6,661.64 plus $1,200 installation.
I am satisfied given the available information that most likely the damage to the pantry
cabinet is due to a combination of design/construction fault and the water damage. I
consider it fair that the complainant be compensated to the extent that the water
damage has caused damage to the pantry cabinet. In my view, based on the
information available it would be fair for the dispute to be settled on a 50/50 basis.
The insurer should cash settle the claim for 50% of the cost of replacing and installing
the pantry cabinet based on the quote from ZK . I would round this figure down to a
figure of $3,935.
Conclusions
I have determined that the insurer cash settle the complainant’s claim for the upstairs
flooring for $20,750 and cash settle the complainant’s claim for the kitchen cabinetry
for $3,935 making a total of $24,685. In addition, I consider that interest is payable.
To avoid any confusion, I determine that the insurer pay the complainant the total sum
of $25,000 (inclusive of interest) in final settlement of the complainant’s claim for
damage to the upstairs bedroom, flooring and kitchen cabinetry.
Payment should be made within 14 days of the complainant’s acceptance of this
determination.
Determination | Case number: 524600 Page 6 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
a pplicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Expert reports
Expert Key findings
C omplainant’s expert (BFX)
Quotation
7 August 2018
Supply and install 14mm bamboo on 5mm rubber underlay to
make up the difference in height to avoid tripping hazard into
master bedroom
[…]
Trims to be put in the doorway which will be higher than the floor
[…]
The only way to avoid that is to replace all upstairs floor
F inancial firm (insurer)
exchanged email
5 November 2018
Please be advised that the insurer confirms that the work is
possible to be completed and would meet the necessary building
code of Australia.
[…]
[ JL ] also confirmed this work was compliant as it provided a
comparative scope of work for liability purposes.
Financial firm’s expert (MC)
Report
14 May 2018
It appears that the base of the cabinet has expanded in width.
The kick board still fits snuggly, so either the kick board has
expanded in length, or the unit was constructed that way. The kick
board is made of compressed timber fibre such as chipboard.
They are subject to expansion when they absorb water but this is
in thickness not in length. For thi s reason, I am of the opinion that
the cabinet was constructed with the base wider that the overall
cabinet, possibly pushed out when the kick boards were installed.
[…]
The wider base may or may not be affecting the sliding
mechanism of the draw.
At the r ear of the pantry cabinet there is a wine - rack that opens to
Determination | Case number: 524600 Page 7 of 7
Expert Key findings
the side of the cabinet. There is a gap between the wine rack and
the wall. The gap is consistent in width over the height of the unit.
The skirting board at the base covers some of the gap and t he
floor cover - bead covers the entire gap. I believe that the gap pre -
existed the leak event.
The cabinet draw is a heavy unit and I am not convinc ed that the
cabinet was constructed wit h enough rigidity and strength to
support the draw. It may well be tha t the difficulty in opening the
draw is due to poor design of the cabinet. The distortion of the
cabinet due to expos ure to moisture may be a contributing cause
but, in my opinion, not the proximate cause of the issue of the
draw opening.
[…]
The proximate caus e of the damage to the pantry cabinet in the
kitchen, in my opinion, is inadequate design/construction of the
cabinet. Two of the defects noted are considered to be
constructed defects. The cause of the difficulty in opening the
pantry draw is not dir ectly c aused by the recent leak event.
3.3 Relevant policy wording
Record Key points
Cover for insured events –
( page 22 )
we cover l oss or damage caused by a storm.
G eneral exclusions
( page 92 )
Dealing with defects
If a known defect is the cause of the damage
We do not pay for loss or damage caus ed by a defect, structural
fault or design fault at your home that you knew about (or should
reasonably have known about) and did not fix before the loss or
damage occurred .
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.