Text of the determination
Determination
Case No: 524317 Determination Page 1 of 8
Case number: 524317 17 October 2018
1 Overview
1.1 Dispute
The applicant lodged claims with the financial services provider (FSP) after her home
was damaged by a hailstorm on 8 June 2007. The FSP accepted the claims and
authorised repairs. The applicant was dissatisfied with the FSP‟s handling of the
claims, and lodged a dispute with FOS.
FOS issued Determination 208628 on 25 October 2011. The applicant accepted the
Determination. The applicant did not comply with the terms of the Determination. The
parties now disagree on how the Determination should be implemented.
The FSP offers to settle the matter by paying $275,971.11.
The applicant does not accept the FSP‟s offer, and says the FSP should settle the
matter by paying $673,073.05 plus legal costs.
1.2 Issues and key findings
How should the applicant’s claims be settled?
Determination 208628 should be implemented , and the applicant‟s claims settled, by
the FSP paying a cash settlement calculated as follows:
Item Sum
Quoted r epair cost $ 273,453.84
Builder‟s margin (25%) $68,363.46
Hygienist fees $8,140
TOTAL $349,957.30
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is to pay the applicant for $349,957.30 in full and final settlement of all
outstanding claims against the FSP relating to the storm of 8 June 2007.
Case No: 524317 Determination Page 2 of 8
2 Reasons for determination
2.1 How should the applicant’s claims be settled ?
Parties subject to FOS Determination
Determination 208628 said:
the applicant was to obtain a scope of works within one month
the FSP was to review the scope of works
on acceptance of the scope of works, both parties were to obtain a costing of
the works
after the parties agreed on a costing of the works, the FSP was to pay the
applicant a cash settlement.
The scope of works was to be strictly limited to damage caused by the storm or sub-
standard repairs by the FSP‟s builders.
Determination was not complied with
The applicant failed to comply with the Determination and did not obtain a scope of
works until 2017.
In December 2015 the Applicant commenced Court proceedings in relation to the
claim. According to her solicitor those proceedings were to preserve her rights prior
to expiration of the limitation period. Those proceedings were subject to mediation in
March 2018 where the applicant requested that the dispute be referred back to the
service. The FSP has agreed to this.
The parties are unable to agree on a costing of the works
The applicant has asked FOS to issue a further Determination specifying what the
FSP must do to comply with Determination 208628.
The applicant says the FSP should comply with Determination 208628 by paying the
following sums:
$502,086.05 for repairs to the home
$88,330 for repairs to the swimming pool and its surrounds
$51,571 (in addition to $40,000 already paid) for expenses incurred by the
applicant in vacating and emptying the home to allow inspections
$31,086 for expenses to be incurred in remaining away from the home to allow
repairs
legal costs.
The amounts claimed by the applicant total $673,073.05 plus legal costs.
FSP denies liability for some damage
The applicant appointed „GG‟ , building consultant, who produced a scope of works
dated 8 March 2017. The FSP had the scope of works assessed by „MB‟, building
consultant.
Case No: 524317 Determination Page 3 of 8
GG says he conducted “several” inspections of the property and “three lengthy
interviews” with the applicant. He also had on -site meetings with other contractors, a
hygienist, and MB.
GG produced a report dated 11 February 2017 detailing the damage to the
applicant‟s property. The report includes more than 100 photographs of the property.
GG‟s scope of works allows for repairs the FSP says it is not liable for („the disputed
items‟).
MB produced a schedule of works based on GG‟s scope of works, but excluding
some of the disputed items. MB says these items are not related to damage caused
by the storm or the FSP‟s builders. MB also produced a report dated 10 August 2018
explaining why he says the disputed items should be excluded.
The most significant disputed items are tabled in section 3.1 of this Determination.
FSP not liable for disputed items
The applicant says the disputed items are required to rectify damage caused by the
FSP‟s bu ilders. The FSP does not accept that its builders caused the damage.
The applicant says the FSP is liable for damage caused by a blocked sewer pipe in
2016 (seven years after the FSP‟s builders left the property). The applicant says the
FSP‟s builders drov e a peg into the sewer pipe, leaving a hole through which tree
roots entered, ultimately leading to the blockage. A report from a plumber confirms
there is a hole in the pipe. However, the applicant has not provided evidence
establishing when the hole was made, or evidence that the FSP‟s builders were
responsible.
GG‟s report says kitchen appliances (a cooktop and two ovens) were damaged by
the FSP‟s builders and need to be replaced. The report does not describe what
damage was done to the appliances, or wh at evidence establishes that the FSP‟s
builders are responsible. No photographs of the appliances have been provided.
GG‟s report says a gas heater installed by the FSP‟s builders was damaged before it
was installed, but does not describe the damage or inc lude photographs of the
damage. GG also says the inner flue pipe from the heater does not extend all the
way to the roof, a defect causing gas fumes to escape into the home. GG‟s
photograph does not show this because the inner flue pipe is surrounded by an outer
flue pipe. Other than the assertion in GG‟s report, t he applicant has not provided any
evidence that the gas heater was defective or improperly installed.
Having considered the submissions from both parties, the Panel is not satisfied that
the disputed items are necessary to repair damage caused by the storm or the FSP‟s
builders.
FSP ’s quotes should be preferred to applicant’s
MB appointed „UB‟, builder, to quote the cost of the items in GG‟s scope of works.
MB included these costs in his schedule of works. The total quoted cost of the items
(excluding the disputed items) is $251,926.25.
Case No: 524317 Determination Page 4 of 8
The FSP has provided a quote by „ JL ‟ , builder. The quote is based on MB‟s schedule
of works and includes a costing of each work item. The total quoted cost of the items
is $273,453.84.
The applicant has provided a quote by „CC‟ , builder, for $502,086.05. The quote is
said to be based on GG‟s scope of works, but there is no other explanation of how
the total was calculated. The quote is not itemised.
The Panel considers the documents produced by the FSP‟s experts (MB and JL) to
be a more reliable estimate of the cost of repairs than the quote by CC. This is
because they are itemised, and far more detailed and specific than the quote by CC.
FSP should allow builder’s margin
JL‟s quote does not include a builder‟s margin.
MB‟s schedule of works allows for a builder‟s margin of 25%. Applying this to JL‟s
quote results in a builder‟s margin of $68,363.46. The Panel considers it fair that this
sum should be adde d to JL‟s quote.
FSP should allow hygienist’s fees
JL‟s quote includes the costs of complying with a hygienist‟s instructions and
repairing damage caused by the hygienist, but does not include the hygienist‟s fee.
MB‟s schedule of works allows for hygienist fees of $8,140. The Panel considers that
it is fair in the circumstances to add this to JL‟s quote.
FSP not required to pay interest
Section 57 of the Insurance Contracts Act 1984 (Cth) provides that the FSP must pay
interest from the time when it was unreasonable for the FSP to have withheld
payment.
It has taken an extraordinarily long time to resolve this claim: it is approximately
seven years since FOS issued Determination 208628, and more than ten years since
the date of loss. However, the delay in effecting the Determination is primarily due to
factors outside the FSP‟s control.
The applicant accepted the Determination in 2011 requiring her to obtain a scope of
works within one month, but she did not appoint a building consultant until more than
three years later. It was only with the FSP‟s assistance (which the applicant
requested) that she ultimately obtained a scope of works from GG.
The FSP quote from JL is dated 8 June 2018. The figures quoted are based current
rates.
Based on the available information, the Panel is not satisfied that the FSP has
unreasonably withheld payment. The Panel considers it fair in all the circumstances
that the FSP not be required to pay interest.
Case No: 524317 Determination Page 5 of 8
Applicant not entitled to further payment for swimming pool
In addition to the cost of repairing the home, the applicant seeks $88,330 for repairs
to the swimming pool and its surrounds . This work is accounted for in JL‟s quote,
which allows $133,095.60 for removal of the swimming pool and the installation of a
new swimming pool.
The Panel is satisfied that the work included in JL‟s quote is sufficient to meet the
applicant‟s entitlements in relation to the swimming pool.
Applicant not entitled to further payment for accommodation
The applicant seeks $51,571 for the costs of vacating and emptying the home to
allow inspections, and an additional $31,086 for the anticipated costs of vacating the
home to allow repairs.
The FSP says it has already paid $177,970 for temporary accommodation for the
applicant and her family. On 21 June 2016, the FSP made an advance payment of
$40,000 to the applicant for accommodation costs to be incurred.
The available information does not establish:
how long repairs to the insured property will take
how long the home will be unlivable due to repairs to damage attributable to the
storm and the FSP‟s builders
whether the applicant will need to pay for accommodation during repairs.
On 20 June 2018, the applicant said she was incurring costs of $3,610 per month for
accommodation and storage (including $932 to rent a separate home for one of her
children). At this rate, the FSP‟s payment of $40,000 is sufficient to pay the
applicant‟s accommodation and storage costs for almost a year.
The available information does not establish that the FSP‟s pa yment of $40,000 is
insufficient to cover the applicant‟s entitlement to temporary accommodation costs.
Applicant not entitled to further reimbursement of professional costs
Paragraph 9.4 of the FOS Terms of Reference provides that FOS can require an
insurer to contribute to legal, professional, or travel costs incurred by an applicant in
the course of a dispute.
Unless exceptional circumstances apply, FOS will not require an insurer to contribute
more than $3,300 to an applicant‟s costs.
The applicant seeks a contribution from the FSP towards her legal costs, as she says
she would not have been able to deal with this dispute without legal advice. The
applicant‟s lawyer has made extensive submissions in relation to this matter.
Determination 208628 required the applicant to obtain a scope of works within one
month, but she did not do so for more than five years. In the interim, the applicant
commenced proceedings against the FSP in the District Court of New South Wales;
the applicant says she did this because the relevant statute of limitations was about
to expire. This will inevitably increase legal costs for both parties.
Case No: 524317 Determination Page 6 of 8
The Panel is not satisfied that the applicant has taken all reasonable steps to mitigate
costs and delays in resolving this matter. The FSP has assisted the applicant by
making the advance payment for accommodation, by helping the applicant appoint a
building consultant (GG), and paying the consultant‟s fees ( $15,246).
In light of the applicant‟s delay, and the assistance provided by the FSP to the
applicant, the Panel is not satisfied that it would be fair to require the FSP to
contribute to the applicant‟s legal costs.
FSP to increase settlement payment by $73,986.19
In a letter to FOS dated 10 August 2018, the FSP submitted that the applicant‟s claim
should be settled for $275,971.11. In the Panels view the FSP should also cover the
builders margin and the Hygienist fees.
Accordingly, in order to satisfy Determination 208628, and in full and final settlement
of the applicant‟s claims, the FSP must pay a cash settlement calculated as follows:
Item Sum
Repair cost quot ed by JL $ 273,453.84
Builder‟s margin (25%) $68,363.46
Hygienist fees $8,140
TOTAL $349,957.30
Acceptance of this determination by the applicant finalises the FSP‟s liability under
the terms of the policy for loss or damage arising from the storm on 8 June 2007.
Case No: 524317 Determination Page 7 of 8
3 Supporting information
3.1 Work items disputed by FSP
GG‟s scope of works allows for the repair and replacement of items the applicant
says were damaged by the FSP‟s builders.
MB‟s schedule of works excludes many of these items on the basis that there is no
evidence of damage caused by the FSP‟s builders.
The most significant disputed items are:
Item allowed by GG MB’ s asse ssment Applicant’ s re sponse
Restoring gardens to their pre -
storm condition
R equired due to lack of
maintenance since 2007
Applicant unable to garden
as area was strewn with
builders‟ rubble. Garden
now too overgrown for
applicant to maintain
Replace terracotta tiles on back
deck and pavers in the adjacent
courtyard
FSP builders installed new tiles
on front veranda. On ins pection,
MB found no damage to back
deck or adjacent courtyard that
could be attributed to the storm
or FSP‟s builders
Tiles and pavers damaged
by FSP builders throwing
heavy objects from upstairs
balcony
Repair damage caus ed by
blocked sewer pipe in 2016
No evidence blocked sewer pipe
was the fault of FSP‟s builders
Blockage caused by
vegetation entering pipe
through hole “obviously
caused by penetration by a
formwork peg”
I nstall new waterproof
membranes
Waterproof membranes installed
and certification provided in
2008. Membranes tested in 2017
and found to be functioning
correctly
Applicant accepts these
works are not necessary
Replace doors in four rooms No evidence doors damaged by
FSP builders
FSP builders damaged
doors and removed hinges
Install new sliding door in laundry This door would not have been
damaged by the storm, and there
is no record of it being repaired
by FSP builders
FSP builders replaced
sliding door w ith swing door
Install new gas room heater,
cooktop, and wall ovens
These items were installed by
FSP builders before work ceased
in 2009; no evidence installation
was defective or not done
Installation of gas room
heater was defective;
cooktop and wall ovens
damaged by FSP builder s
Case No: 524317 Determination Page 8 of 8
3.2 Applicant represented by lawyer
In this dispute, the applicant has been represented by a lawyer. For the purposes of
this determination, submissions made by the applicant‟s lawyer have been treated as
if they had been made by the applicant.