Determination 524028

Leak and mould claim: cash settlement offer for remediation and repairs held unreasonable

FirmFinancial Firm (Unknown - Insurer)
Decided2018-11-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$187,381
Non-financial loss$2,000
Amount claimed$166,141
SourceAFCA PDF

Summary

After a second cause of mould was accepted, the insurer offered a limited cash settlement based on a narrowed scope. AFCA found the offer unreasonable and ordered higher cash settlement of mould, building, air system and other costs, plus accommodation, allowances and $2,000 non-financial loss.

The insurer's limited scope conflicted with its acceptance of the claim, and its quotes and refusals were not supported by expert material.

Issues

Subjects and remedies

home or building damagepay claimpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 524028 Page 1 of 14 Case number: 524028 30 October 2018 1 Determination overview 1.1 Complaint The complainant lodged a home building insurance claim for a leak in February 2016, which the financial firm (insurer) accepted. During repairs the insurer found a second cause of mould and accepted a claim for damage caused by a leaking storm water pipe in the subfloor. The insurer offered to cash settle the complainant $31,432.85 for building repairs and $10,771.53 for mould remediation. The complainant is dissatisfied with this amount because he says it does not reflect the extent of mould or building damage. He wants the insurer to carry out remediation and repairs, or to increase the cash settlement amount based on quotes and reports he provided. He also says the insurer handled the claims poorly and wants it to:  continue paying temporary accommodation until repairs finish  reimburse the costs of mould and the loss assessment reports. 1.2 Issues and key findings Is the insurer entitled to cash settle the stormwater drain claim? Is the insurer’s cash settlement offer reasonable? The insurer’s offer is not reasonable because despite fully accepting the claim, its offers (in error) reflect a limited scope of damage. The insurer is required to cash settle the complainant’s quotes for mould remediation, building repairs, air systems and professional/expert reports, together with an allowance for contingencies and interest. Did the insurer fully settle the other claims? The insurer is entitled to cash settle the remaining laundry leak repairs based on its builder’s quote. It is to pay the complainant a further 30 weeks accommodation. Is the complainant entitled to non-financial loss compensation? The FSP is entitled to cash settle repair costs because its engineer confirmed repairs will only be effective if subfloor maintenance work is also completed by the applicant. Determination | Case number: 524028 Page 2 of 14 As the insurer refusal to provide a fair cash settlement offer, or extend the temporary accommodation caused the complainant’s family significant stress, it is to pay $2,000 compensation in non-financial loss. 1.3 Determination This determination is in favour of the complainant. Within seven days of the complainant accepting this Determination, the insurer is required to pay the amounts outlined in Section 2.2, 2.3 and 2.4. Determination | Case number: 524028 Page 3 of 14 2 Reasons for determination 2.1 Is the insurer entitled to cash settle the stormwater drain claim? The insurer accepted two water and mould damage claims The complainant lodged a claim on 19 February 2016 for water damage from a leak in the laundry, which the insurer accepted. During repairs in September 2016, the insurer’s first building contractor (JP) found mo uld under the tiles. In October 2016, the insurer’s hygienist reported a second cause of mould was likely and recommended investigation. It is unclear why no investigation, apart from confirming prior leak detection results, occurred at this time. In February 2017, the insurer ’s contractor (FR) finished remediation of mould caused by the laundry leak and provided a clearance certificate for JP to commence repairs. On 15 March 2017, the complainant notified the insurer about more mould. The insurer decided to investigate a possible second cause of mould and if this existed, whether the complainant could then lodge a separate claim. On 22 May 2017, the insurer engaged an engineer (EN), who attended the property three days later. The insurer received EN’s repo rt on 29 June 2017. EN reported mould occurred due to a leaking stormwater pipe in the subfloor and poor subfloor ventilation and the insurer accepted the claim. Its technical specialist (PD) asked the complainant to carry out subfloor-related maintenance works EN said were necessary to allow effective mould remediation works and building repairs. The complainant wants the insurer to repair building or increase settlement offer On 18 August 2017 the insurer said it would cash settle the claim due to:  the necessary maintenance works the complainant needed to do before effective repairs and remediation could start  its contractors being unable to warrant repairs, given the presence of the subfloor’s ventilation issues. Based on its second building contractor’s (AJ’s) quotes, the insurer offered the complainant $31,432.85 for building repairs and $10,771.53 for mould remediation. The complainant says AJ’s scope of works does not reflect the true restoration costs. He wants the insurer to repair the building or increase its settlement offer and says he has been unable to complete the final subfloor maintenance works due to the insurer’s inadequate settlement offer. He provided a written statement from his builder (DR) stating the (complainant ’s own) subfloor vent ilation (maintenance) works could be completed only after specific mould remediation works in the subfloor. Determination | Case number: 524028 Page 4 of 14 Subfloor ventilation issues make cash settlement reasonable The policy wording outlined in the product disclosure statement (PDS) provides the insurer with the discretion to repair damage, or pay a cash settlement to the complainant (contained in Section 3.2). The Service expects an insurer to exercise this discretion fairly in all the circumstances. Given the repairs and remediation required, the panel considers it is fair for the insurer to cash settle the cost of repairs. EN stated repairs would be ineffective until either timber joists no longer blocked the subfloor ventilation, or powered ventilation was added. No expert material challenges this view. The complainant’s builder and the insurer ’s own records confirm removing wall wrap, improving drainage and stormwater pipe repairs occurred in August 2017. The parties agree the complainant had not completed the final subfloor ventilation works by the time the insurer offered cash settlement. In the above circumstances, even if the complainant is justified in deferring the final steps required, cash settlement is fair because the expert material confirms the insurer’s builders cannot warrant repa irs, due to the building’s subfloor design. Accordingly, the insurer is entitled to cash settle the claim rather than carry out repairs. However, the complainant also raised the difficulty of either:  engaging builders to undertake these works before mould remediation (given the subfloor is mouldy)  completing mould remediation before effective ventilation is arranged (potentially enabling mould regrowth). The complainant has not provided written confirmation of the extra costs to allow builders to perform the necessarily ventilation work when mould is present. Despite this, it is likely such works will incur additional costs such as, for example, builders’ protective wear. The insurer accepted the claim for damage from the leaking pipe. This damage includes mould contamination in the subfloor. A reasonable cash settlement must therefore include those costs additional to (but not including) the complainant ’s own maintenance work, required to allow builders to carry out (the maintenance) work in a mould contaminated environment. Determination | Case number: 524028 Page 5 of 14 2.2 Is the insurer’s cash settlement offer reasonable? Parties dispute insurer offered fair cash settlement for mould remediation In August 2017 the insurer arranged for scope of works assessments and quotes from:  its building contractor (AJ), for water damage to the dining/kitchen area  a hygienist, for mould remediation. The complainant disputed the insurer ’s cash settlement offer of 4 September 2017. He engaged a hygienist (VA) and provided a mould remediation quote by DR for $40,854, based on VA’s report of 7 October 2017. The complainant initially provided a builder’s (IP’s) quote for $41,931 (dated 6 February 2018). He also provided a heating and cool ing technician’s (AA’s) report and quote for $16,980, stating the property’s air systems needed replacement due to mould contamination. After lodging this complaint with the Service, the complainant provided updated mould remediation quotes by DR (for $75,317) and updated building quotes by RB (for $63,199.40 and $10,644.97). The insurer agrees to pay RB’s quote for $63,199.40, but argues the complainant ’s other quotes are not reasonable because it says  RB’s quote addresses damage beyond AJ’s scope of works  the quotes respond to damage from long-term moisture build-up and design of the vents, falling outside the scope of cover provided by the policy  AA’s report does not sufficiently link air systems’ damage to the accepted (stormwater leak) event, or define the extent of damage or necessary repairs  DR’s second quote is significantly higher than DR’s first  further, DR’s first quote is dated 2 November 2016, prior to the subfloor claim and is therefore outdated. The insurer’s mould remediation quote is too limited in scope The panel has closely reviewed the reports, scope of works and quotes the parties provided. AJ’s mould remediation scope of works is based on a property assessment undertaken on 21 July 2017. Material the insurer provided to the Service during the later course of this complaint confirms both AJ’s quotes are based on instructions by a second technical specialist (BJ). BJ requested AJ provide a limited scope of works and quote based on insured damage only. It is unclear why BJ requested limited estimates after PD accepted the stormwater claim in full, based on EN’s report. Determination | Case number: 524028 Page 6 of 14 It is also unclear whether AJ’s mould remediation scope is based on a hygienist’s opinion. The insurer provided the Service with a hygienist’s report FR provided in October 2016. It also provided subsequent scope of works estimates for mould remediation by JP, for ongoing repairs and remediation of the laundry leak water and mould damage. Undated variations for mould remediation (including building) works JP carried out reached $54,951.82. Mould continued occurring throughout the home after FR’s February 2017 clearance certificate, due to the second source (stormwater drain) the insurer ’s engineer confirmed on 29 June 20 17. The panel is therefore unable to accept JP’s mould remediation was successful. Given the ongoing cause of mould, it is unclear what AJ’s mould estimate is based on (apart from BJ’s instruction to quote for limited damage), or why it is significantly l ower than prior mould remediation works actually carried out and likely unsuccessful. In the above circumstances, the panel is persuaded that AJ’s quotes are based on instructions by BJ, which conflict with the insurer ’s claim acceptance. The complainant p rovided a hygienist’s (VA’s) report of 6 October 2017. It confirms substantial mould contamination throughout air and surfaces in the overall property. VA concluded water damage to the property’s timber flooring increased indoor humidity, causing mould growth and contamination on surfaces not touching water. The report included test results confirming:  significantly higher airborne mould counts in the dining room, laundry, bedrooms 1, 3 and 5 and subfloor when compared with an outdoor sample  visible mould on contents items. The panel accepts the complainant arranged for VA’s report reasonably quickly after the insurer’s cash settlement offer. The complainant provided the insurer with DR’s mould remediation quote for $40,854, which states it is based on VA’s report. The panel accepts DR’s quote is dated 2 November 2017 (not 2016 as listed or relied upon by the insurer in declining the claim for mould remediation works), given VA’s report is from October 2017. In contrast, AJ’s scope of works states it addresses mould ‘in the subfloor [which] looks like it goes up into the wall cavity in the dining room’. The panel therefore is not satisfied AJ’s mould remediation quote is sufficient to address the contamination confirmed by VA’s report. The result is that the panel is not persuaded the insurer ’s cash settlement offer for mould remediation is reasonable. Determination | Case number: 524028 Page 7 of 14 DR’s 2018 mould remediation quote fair in all the circumstances DR’s (first) quote states it ‘only applies to the kitchen lounge end of the house and exclude s the newly renovated area’. The panel accepts the newly renovated area references the laundry/garage area the insurer’s previous building contractor (JP) partially repaired, before the insurer discovered the subfloor leak. Although it is not itemised, on balance, the panel considers DR’s July 2018 quote likely most closely reflects costs to remediate the property’s current mould, because:  levels may have increased while the complainant needed to dispute the unreasonable cash settlement offer  DR’s earlier (itemised) quote therefore may not capture all current damage  DR’s earlier quote did not include the garage/laundry areas, where mould has likely recurred after the insurer said it was cleared (February 2017). On balance, the panel is persuaded the complainant took steps to mitigate the extent of damage. The complainant’s partner told the insurer on 8 December 2017, three of four subfloor (tree stump, drainage and pipe repair) ventilation works were complete. The insurer questions whether this occurred, but its claim records repeatedly reference drainage and pipe repairs its contractors and representatives recorded the complainant completed. The complainant ’s builder (IP) confirmed he removed wall wrap (sisolation) in Aug ust 2017, during an inspection to advise on the necessary subfloor works. The complainant also argues, when seeking a quote for subfloor mechanical ventilation, contractors advised it: would be helpful for the installers to install when the flooring has been removed. Also suggested that by installing mechanical ventilation before mould remediation issue had been resolved could cause more mould damage to the rest of the house. The complainant’s restorer (DR) provided persuasive comments supporting mould remediation occur before installing the final ventilation (maintenance) works. Given the above information and the extensive evidence of previous unsuccessful remediation attempts in the claim, the panel accepts it was likely complications would arise if the complainant attempted to commence repairs to the subfloor before addressing the mould, or vice versa. This is due to the nature of mould damage and the insurer ’s substantially insufficient cash settlement offer. In these circumstances, the panel is persuaded it was reasonable for the complainant to dispute the offer and await a suitable settlement before completing the final subfloor maintenance steps. Determination | Case number: 524028 Page 8 of 14 As a result, the panel does not accept the insurer’s assertion the complainant caused further mould or building damage by delaying repairs or settlement. The insurer had sufficient time to arrange an accurate mould remediation quote and did not do so. The insurer is therefore required to cash settle the mould remediation works based on DR’s 2018 quote. The insurer is liable for heating and cooling quote The panel does not accept the insurer ’s arguments it is entitled to decline the claim for AA’s quote. This is because VA’s report confirms extensive mould contamination and:  AA reported the mould contaminatio n infiltrated the property’s heating and cooling systems  AA stated the contamination renders them unsafe and they require replacement  the insurer provided no expert material refuting these views  the insurer had sufficient time to arrange its own heating/cooling quote and did not do so. Accordingly, the insurer is required to cash settle the complainant the cost of AA’s quote. RB’s butler’s pantry quote is based on a loss adjustor’s review of damage As the insurer accepts RB’s quote for $63,199.40, it is req uired to pay this amount (if it has not already done so). Regarding the butler’s pantry quote, the panel accepts the complainant has established a claim for this damage which the insurer’s submissions do not sufficiently challenge. This is because, although AJ provided a scope of works for the kitchen from August 2017:  AJ’s repair quote, which the insurer relies on, does not itemise the works  it is therefore unclear what this quote is based on  the panel accepts the butler’s pantry repairs are located near the kitchen, a site of significant water damage to timber flooring and benches  regardless, RB’s scope of works and quote was arranged by an independent loss adjustor and therefore sufficie ntly challenges AJ’s. Further, documents the insurer provided late in the course of this complaint confirm AJ considered the ‘walk in pantry’ sustained tile and (timber) subfloor damage. Accordingly, the insurer is required to pay RB’s repair quote for $10 ,644.97. Determination | Case number: 524028 Page 9 of 14 The insurer is required to pay an amount allowing for interest and contingencies Unforeseen costs when the complainant carries out repairs may arise, meaning the quotations may not cover all possibilities. The panel is satisfied a fair cash settlement amount should therefore allow for a contingency fee on the complainant ’s quotes. Given the panel is also satisfied the insurer should not have refused the quotes by RB, DR and AA, the amount is to allow for interest on these quotes. For the above allowances, the panel considers it fair in these circumstances for the insurer to increase its cash settlement by $20,000. The complainant also incurred professional fees in correctly disputing the insurer’s scope of works and repair quotes. If the complainant has already paid the fees incurred by AK, the insurer is to reimburse this amount. If not, the insurer is required to pay AK directly. In addition, the insurer is also required to:  reimburse the complainant the cost of VA’s report in l ine with its agreement to do so on 15 August 2018  cash settle the complainant an equivalent amount for the post-remediation clearance testing VA stated is necessary after the complainant finishes repairs. 2.3 Did the insurer fully settle the other claims? The insurer is to cash settle remaining laundry/garage works for $1,239.65 When bringing this complaint before the Service, the complainant also argued JP did not complete repairs for the laundry/garage damage the insurer accepted (before the stormwater pipe leak was discovered). The complainant says JP did not finish plastering walls and left live wires hanging from the wall. The insurer says JP removed the garage wall sheeting as part of the mould remediation and the garage roof issues pre -dated the first claim, which the insurer’s claim records confirm. The panel accepts when the stormwater pipe leak was discovered and the insurer accepted this claim on 29 June 2017, there was no purpose in JP completing garage wall repairs from that point onwards. The insurer now agrees to cash settle the complainant $1,239.65, for the remaining plastering and painting, based on JP’s quote of 13 April 2018. The complainant provided a quote and scope of works by RB for $4,946.15, which included these repairs. However, the panel accepts the insurer’s assertion it is not required to cash settle the cost of carpets (as contained in RB’s quotes) because: Determination | Case number: 524028 Page 10 of 14  claim records confirm it cash settled the complainant the contents sum insured in December 2017  per the wording in Section 3.1, carpet are contents items under the insurer’s policy. RB’s quote is not itemised by price. Accordingly, the insurer is entitled to cash settle JP’s remaining repairs for $1,239.65. The insurer is required to cash settle further accommodation The insurer’s policy includes an accommodation benefit costs for up to 12 months from when an accepted event occurred. The complainant wants a further 14 weeks accommodation costs based on DR’s and RB’s remediation and repair period estimates, plus the 24 week s drying-out period the insurer previously agreed to, based on its engineer’s view. The insurer says no further accommodation is payable because it already cash settled or covered in total 50 weeks of the accommodation benefit (after 3 July 2017) and the complainant delayed repairs. The insurer is required to cash settle the complainant’s costs for further accommodation because the panel is satisfied the accommodation benefit has been used after 4 September 2017 substantially due to errors in the insurer’s assessments or decisions. This is because:  the insurer’s remediation and repair offers were based on BJ’s unsupported decision to limit the scope of damage they addressed  further, the insurer’s remediation and repair quote costings were not fair and reasonable  the insurer erred in refusing AA’s air system costs  the complainant was required to dispute these decisions, starting from 4 September 2017  the complainant provided sufficiently challenging information in a reasonable time. At 4 September 2017, the date when the insurer provided a substantially unreasonable settlement offer the complainant needed to (accurately) dispute, 43 weeks of the policy’s twelve -month accommodation benefit remained. Whilst the complainant has not yet installed the powered vents in the subfloor or changed the joists behind the vents, the panel does not consider this caused unreasonable delays because:  the complainant provided plausible explanations why  he otherwise completed necessary maintenance Determination | Case number: 524028 Page 11 of 14  as stated, the panel considers the insurer ’s decisions and assessments caused the delays. Further, claim records confirm the insurer’s own building repair estimates were for a similar period (13 weeks). They also note a drying out period of 24 weeks, which the complainant’s expert does not include. However, given the passage of time, the full period may no longer be required. Considering all matters, the panel is of the view that it is fair that the insurer pay for a further 30 weeks of temporary accommodation. As the complainant has contents in storage, the insurer is to cash settle the continuing costs of storage for the same period. 2.4 Did the insurer handle the claim reasonably? We take conservative approach to non-financial loss compensation Under the FOS Terms of Reference, we allow the payment of compensation (capped at $3,000) for non-financial loss. We may decide an insurer should compensate a complainant for such loss only where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with the complainant’s expectation of enjoyment or peace of mind. We take a conservative approach to compensation for non-financial loss. The insurer ’s errors caused stress and inconvenience to complainant’s family The complainant says the complainant’s family have been out of their home since October 2016, causing stress for his partner and seven children. Claim records confirm JP, the complainant and the insurer’s assessor all contributed to various delays before 29 June 2017. However, the insurer provided temporary accommodation under the policy’s benefit from October 2016, under the laundry claim, until 3 July 2017. It then covered accommodation costs until 24 November 2017 and cash settled the complainant the equivalent of 24 weeks accommodation. On balance, the panel accepts the complainant’s assertion accommodation uncertainty then:  arose as the settlement amount approached exhaustion  caused his large family stress. Claim records also confirm the complainant works away from home. His partner, who looks after seven children while he works away, also needed to follow up accommodation and other claim actions trying to understand or resolve the claim. Determination | Case number: 524028 Page 12 of 14 In the above circumstances, the panel is persuaded the complainant experienced an unusual degree of stress and inconvenience because the insurer after 4 September 2017 refused to:  extend accommodation  provide a cash settlement sufficient to remediate and repair the property. Accordingly, the insurer is required to compensate the complainant $2,000 compensation in non-financial loss. Determination | Case number: 524028 Page 13 of 14 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim 3.2 Policy How we settle your buildings claim We will choose to settle your claim for loss or damage to your home or 'other cover' in one of the following ways: 1. Arrange for repairers, builders or suppliers to repair or rebuild your home. If you agree, we can arrange for our preferred repairers, suppliers or builders to repair or rebuild your home. 2. Pay you the reasonable cost to repair or rebuild your home. We can choose to: pay you, pay your nominated repairer, supplier or builder, or provide you with store credits from one of our nominated suppliers. The types of contents we insure … (if you are an owner who lives in your home, your carpets are included as part of your General Contents). Other cover We may also provide 'other cover' for your home or contents during the policy period. Determination | Case number: 524028 Page 14 of 14 When you can claim for other cover – In most cases, you can make a claim for other cover when a listed event causes loss or damage to your home or contents and we agree to pay for that loss or damage. Other cover and your sum insured – … for these items, we’ll pay on top of your sum insured: Temporary accommodation for home owners. Temporary accommodation for home owners If a listed event causes loss or damage to your home and we agree you c an’t live in it and you need to move out so it can be repaired or rebuilt. Covered under Buildings Insurance – costs for temporary accommodation that we agree are reasonable and appropriate for you, your family and your pets that you normally keep at your site any additional living expenses that we agree are appropriate costs to remove and store your contents and then return them to your home. We pay these costs for the reasonable time we agree it should take to repair or rebuild your home for up to 12 months from when the listed event took place. We pay this on top of the Buildings sum insured. Conditions – … we won’t cover costs caused by unreasonable delays in repairing or rebuilding your home.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.