Home / Financial Firm (Unknown - Insurer) / Determination 522552
Determination 522552
Flood damage to business contents claim declined
Summary
A motor trade business claimed for contents damaged by water inundation during a 2017 weather event. The FSP denied the claim as flood damage, which is excluded because the optional flood cover was not selected, and AFCA found in favour of the FSP.
Once rainwater mixes with flood water it is all flood water, and the policy excludes flood without the optional flood cover.
Issues
- Claim denial primary · not upheld“The policy specifically excludes loss or damage caused by flood unless flood cover is selected as an option.”
- Delay secondary · not upheld“The Panel does not consider these timeframes to be unreasonable.”
Subjects and remedies
natural disastersmall businessno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 522552 Determination Page 1 of 8
Case number: 522552 16 October 2018
1 Overview
1.1 Dispute
The applicant has a motor trades pack policy with the financial services provider
(FSP).
A claim was lodged under the policy after the insured premises was inundated with
water following heavy rain from Cyclone Debbie.
The FSP maintains the inundation was caused by flood which is excluded from cover
under the terms of the insurance policy.
1.2 Issues and key findings
Is the damage covered under the terms of the policy?
Based on the available material, the FSP is entitled to deny the claim as the claimed
loss is excluded from cover because:
the policy specifically excludes loss or damage caused by flood
on balance, the water that caused the loss was flood water
Did the FSP mishandle the claim?
There is insufficient basis to conclude the FSP is liable to pay compensation for the
applicant’s claim or dispute experience.
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to rely upon the terms and conditions of the policy to deny the
applicant’s claim.
Case No: 522552 Determination Page 2 of 8
2 Reasons for determination
2.1 Is the damage covered under the terms of the policy?
The applicant does not have flood cover
The applicant’s policy is a motor trade s pack policy which provides cover for loss or
damage caused by defined events, including wind and/or water.
However, the policy specifically excludes loss or damage caused by flood unless
flood cover is selected as an option.
Flood is defined in the product disclosure statement (PDS) as:
“ “Flood” means the covering of normally dry land by water that has escaped or been
released from the normal confines of any of the following:
a. lake (whether or not it has been altered or modified);
b. a river (whether or not it has been altered or modified);
c. a creek (whether or not it has been altered or modified);
d. another natural watercourse (whether or not it has been altered or modified);
e. a reservoir;
f. a canal; or
g. a dam.”
The policy schedule evidences that the applicant did not take up the optional benefit
for flood. The applicant confirms he was aware he did not have flood cover.
Circumstances of the loss
The insured property is a vehicle smash repair business housing a workshop and an
office. The exchanged material confirms there was a significant weather event across
Australia and in particular in the area of the insured property during the latter part of
March 2017. A substantial amount of rain fell during this time.
The applicant says the insured property was inundated by stormwater at
approximately 11pm on 30 March 2017, approximately three hours prior to M Creek
breaking its banks. However, the applicant also says that M Creek did not break its
banks until the early hours of 31 March 2017 at approximately 12.40am.
The applicant says that stormwater entered the insured property through the gutters
and downpipes which overflowed due to the volume of rain, as well as the
stormwater inlet which was unable to cope with the run-off from W Place. The
appl icant’s claimed loss is for contents only.
In support of his position, the applicant has provided the following information:
a report from an engineer (SC) dated 9 October 2017
a signed witness statement indicating that he was at the insured property until
10.30/10.45 pm on 30 March 2017 and observed that water had receded back
to the junction of W Street and B Road. At this time, he did not believe that the
Case No: 522552 Determination Page 3 of 8
insured property was in any danger of water inundation and went home. He
then received a telephone call from one of his workers around 11.30pm to say
that water was inundating the shop. After driving back and parking nearby at the
junction of W Street and P Highway, he stated that “water was visible to have
come out of the storm drain to the south of the shop and was about 3-4 foot in
height”
four signed witness statements from neighbouring properties
an email from an alternate insurer to a loss adjuster dated 7 February 2018.
In order to assess whether stormwater runoff or flood waters inundated the insured
property, SC set up a two-dimensional flood model to understand the flood behaviour
at the site during the March 2017 storm event.
Based on the results of the modelling, SC concluded that stormwater runoff
inundated the insured property to a depth of approximately 86mm at about 12.40am
on 31 March 2017, prior to backwater flooding from M Creek. SC stated that flood
waters from M Creek subsequently reached the insured property at about 1am, which
then exacerbated flooding at the property, increasing the flood depth to 126mm at
that time, and eventually reaching a depth of 451 mm at about 1.20am.
The applicant says that an alternate insurer is dealing with a claim for loss of profits
for the insured property. The email from the alternate insurer to a loss adjuster
states:
“The hydrologist’s report that we obtained from [hydrologist] back on 27/11 did state
the insured premises did suffer rainwater run off due to the very deluge of the 30
March. The flooding occurred from 31/3/2017. Are you able to calculate a possible loss
of profits claim based on the .1m rainwater ingress to the insured shop[?]”
The applicant says that despite several requests for a copy of this hydrology report,
the alternate insurer has not provided it.
The FSP has provided two assessment reports, together with a report from its
hydrologist, WR, dated 12 May 2017 following a site inspection on 3 May 2017.
The FSP also provided a supplementary report dated 1 June 2017 in response to a
report provided by the applicant from NE. The app licant has confirmed he is no
longer relying on the report from NE, and accordingly any references to this report
have been disregarded.
A further report from WR dated 18 April 2018 was provided in response to the report
provided by the applicant from SC.
WR concluded:
the floor levels of both the office and workshop are similar to the adjoining
ground levels
the office and workshop were inundated to a maximum depth of about 1.2m
above floor level
the rainfall in the vicinity of the applicant’s property w as most intense between
midnight and 1.00am on 31 March 2017
Case No: 522552 Determination Page 4 of 8
the closest M Creek water level gauge to the insured property recorded a peak
water level of 4.47 mGH at 2.30am on 31 March 2017, and the water level at
the insured property would have peaked a short time later
initial and maximum inundation of the building at the insured property was
caused by flood water from M Creek
stormwater runoff from the insured property is collected in an inlet pit at the
corner of M Place and W Street and discharges to the open channel system
along W Street. During flood events in M Creek, flood water could back up
along the open channel system and flow back through the pipe system to
inundate the subject property
the modelling undertaken by SC appears to be based on some questionable
assumptions that would overestimate the initial stormwater depth, and the
modelled peak depth of inundation by M Creek is significantly underestimated
In addition, the FSP provided a signed statutory declaration from its loss adjuster
(RR) who attended the insured property initially on 10 April 2017. RR stated:
at the time of attendance he noticed water marks on the walls approximately
900-1000mm from ground height
a number of photographs were taken at the time of attendance which identified
a number of smaller items at ground level. It would be difficult to identify which
items were in situ since the event and which items may have been
placed/disbursed by the insured's staff to assist with drying out prior to the site
meeting
damage below the height of 86mm (less than shoe height), to the insured's
stock and contents would appear to be minimum with motors, circuit boards,
electronic componentry and switching gear to larger plant and machinery items
generally located well above the height of 86mm
based on his initial inspection of the property and other properties in the area
assessed at that time, the vast majority of damage sustained was due to flood
and water levels significantly above 86mm.
The loss was caused by flood
Having reviewed the exchanged material, the Panel is more persuaded by the
conclusions of WR that the initial and maximum depth of inundation of the applicant’s
property was caused by flood water from M Creek.
In reaching this determination, the Panel considers that:
there is a significant difference between the peak flood depths reported by SC
and WR, being 451mm as opposed to 1200mm. The reported maximum depth
by WR is more consistent with the observed watermarks by RR at
approximately 1000mm
the insured property could not have been inundated by stormwater
approximately three hours prior to M Creek breaking its banks (at 12.40am on
31 March 2017) noting the applicant did not observe any water at 10.30pm on
30 March 2017 when he left the property
there is insufficient evidence that the gutters and downpipes overflowed to
cause damage to the insured property before flood water arrived
Case No: 522552 Determination Page 5 of 8
the applicant’s observation of water visibly coming out of the storm drain to the
south of the insured property shortly after 11.30pm on 30 March 2017 is
consistent with WR’s findings that the initial inundation of the property would
have been caused by backflow from the W Street open channel through the
pipe drainage system under W Street.
In the circumstances, the Panel is satisfied on balance that the inundation of the
applicant’s property was caused by flood and not stormwater runoff.
T he FSP is entitled to rely upon its policy exclusion to deny the applicant’s claim.
2.2 Did the FSP mishandle the claim?
Evidence does not show FSP mishandled the claim
The applicant says the FSP has failed to act in a timely manner in an attempt to have
the matter resolved.
The claim was lodged with the FSP on 4 April 2017. Between this and 27 July 2017
the FSP assessed the claim and provided a decision to deny liability.
The applicant requested the claim be reviewed by the FSP through its internal
dispute resolution (IDR) procedures on 8 February 2018.
The FSP provided its IDR response in a letter dated 30 April 2018.
The Panel does not consider these timeframes to be unreasonable, particularly given
it would be within the timeframes set out in the General Insurance Code of Practice.
Further, the FSP’s position on this dispute has been substantively established.
Given all this, the Panel does not accept there is sufficient basis to conclude the FSP
is liable to pay compensation for the applicant’s claim or dispute experience.
Case No: 522552 Determination Page 6 of 8
3 Supporting information
3.1 FOS approach to this dispute
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise in this dispute.
This decision has been made by a Panel consisting of an ombudsman, an insurance
industry representative appointed by the Financial Ombudsman Service Board, and a
consumer representative appointed by the Financial Ombudsman Service Board.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations where applicable.
The parties have raised numerous issues in their submissions to FOS. For the
purpose of this determination, commentary is restricted to only those issues
considered relevant to the outcome.
3.2 Applicant represented by a broker
During the course of this dispute, the applicant has been represented by a broker.
For the purposes of this determination, submissions made by the applicant’s broker
have been treated as if they had been made by the applicant.
3.3 Rainwater that mixes with flood water is flood
The Courts have established that once rainwater mixes with flood water, it is all
considered flood water. Where rainwater mixes with flood water and causes damage,
a flood exclusion will usually apply to defeat the claim.
Accordingly, when deciding disputes, consideration has been given to whether there
was any rainwater runoff damage before the flood water arrived at the insured
property.
3.4 Relevant expert reports
Record Key point s
FSP’s expert ( WR )
Hydrology Re port
12 May 2017
The subject property is located on the western side of M
Place north of its intersection with W Street. The building is
constructed of concrete blocks with a concret e floor. A vehicle
smash repair business, with a building housing a workshop
and an office, is located on the subject property.
The office and workshop were inundated to a maximum depth
of about 1.2 m above floor level. The floor levels of bot h the
office and the workshop are similar to the adjoining ground
levels.
Case No: 522552 Determination Page 7 of 8
Peak rainfall occurred in the hour to 0100 hours on Friday 31
March.
The water level recorded at the B gauge peaked at 4.47 mGH at
0230 hours on Friday 31 March 2017. The water level at the
subject property would have peaked a short time later.
Site observations and discussions wit h other witnesses in the
area indicate that inundation in B was widespread with many
other properties in M Place and surrounding streets
inundated above floor level.
Rising flood levels in M Creek would have overflowed into W
Street and the local catchmen t to the sout h of W Street via
the flow path, as well as backing up along the open channel
along W Street near the subject property. This floodwater
would have combined with flow in the local catchment. The
initial inundation of the property would have bee n caused by
backflow from the W Street open channel through the pipe
drainage system under W Street. Later during the event,
floodwater overtopped W Street, M Place and the railway line
west of the property.
Based on published flood modelling results, wat er from the M
Creek would inundate the subject property during a major
flood event. This is consistent with what occurred during the
March 2017 flood event.
Initial and maximum inundation of the building at the subject
property was caused by floodwater fr om M Creek.
Applicant’s expert (SC )
Report
9 October 2017
In order to assess whether stormwater runoff or M Creek
flooding inundat ed the property, and to what extent, a two -
dimensional (2D) flood model was set up to better understand
the flood behaviour at the site during the March 2017 storm
event.
Based on the results of the modelling, it is concluded that
flooding at the property was initially due to stormwater runoff.
This resulted in a flood depth of up to about 86 mm at the
property at about 12. 40 a m on the 31 March 2017 prior to
backwater flooding from M Creek impacting on the property.
Floodwat ers from M Creek subsequently reac hed the
property at about 1 am, which then exacerbated flooding at
the property, increasing the flood depth to 126 mm at th at
time, and eventually reaching a depth of 451 mm at about
1.20 am.
FSP’s expert (WR)
Further Hydrology Report
18 April 2018
The SC report is consistent with the WR report in finding that
the peak depth of inundation of the subject property was
caused by floodwat er overflowing from M Creek.
The modelling undertaken by SC indicates shallow (86 mm
above floor level) inundation by stormwater prior to inundation
by floodwater. However, based on the information that is
provided, the modelling undertaken by SC appears to be
based on some questionable assumptions that would
overestimate the initial stormwater depth. In addition, the
mo delled peak depth of inundation by M Creek is significantly
Case No: 522552 Determination Page 8 of 8
underestimated.
For these reasons, I remain of the opinion that the initial and
maximum depth of inundation of the subject property above
floor level was caused by floodwater overflowing from M
C reek.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.