Text of the determination
Determination | Case number: 522541 Page 1 of 12
Determination
Case number: 522541 5 November 2018
1 Determination overview
1.1 Complaint
On 15 January 2015 the complainant lodged a claim with the financial firm (insurer)
for water damage to her investment property. On 3 September 2015 the insurer
declined the claim because it said the damage was caused by gradual deterioration.
However, the insurer agreed to cover the compla inant‟s loss of rent up to the policy
limit.
The complainant says she provided the insurer with further information in November
2015 and January 2016 which confirmed a water leak caused damage to her
property.
In May 2016 the insurer partially accepted the claim for damage caused by the water
leak, but declined cover for damage it says was caused by rising damp. The
complainant and insurer eventually came to an agreement in November 2016 which
resulted in cash settlement for the claim.
The complainant is now seeking $150,000 compensation for additional loss of rent.
The complainant says her loss was caused by the insurer ‟s delay and handling of the
claim.
1.2 Issues and key findings
Did the insurer make an error in its claims handling and cause delays?
The panel is satisfied the insurer made an error in its handling of the claim and it
caused unreasonable delays.
There was not enough information to decline the claim in its entirety on 3 September
2015. In addition, the insurer refused to review its decision despite the complainant
being entitled to such, and despite the complainant establishing an insured event long
before 11 April 2016.
Determination | Case number: 522541 Page 2 of 12
Is the complainant entitled to compensation for loss of rent?
The complainant is entitled to compensation for loss of rent from 3 September 2015 to
27 May 2016 when the insurer accepted the claim related damage.
1.3 Determination
This determination is substantially in favour of the complainant.
Within 14 days of the complainant ‟s acceptance the insurer is to pay the complainant
loss of rent from 3 September 2015 to 27 May 2016, based on the rate of $4 ,779.76
per month; and $2,000 in non-financial loss compensation.
Determination | Case number: 522541 Page 3 of 12
2 Reasons for determination
2.1 Did the insurer make an error in its claims handling and cause delays?
The complainant says the insurer caused unreasonable delays
The complainant held landlord insurance with the insurer. The complainant is
dissatisfied with the insurer‟s management of the claim and the fact she had to follow
up the insurer and organise reports herself. The insurer reimbursed the complainant
the cost of reports used in making its decision and cash settled her for the claim
related damage. The complaint therefore relates solely to the complainant ‟s loss of
rent during the insurer ‟s management of the claim.
The complainant says:
the insurer caused unreasonable delays and would not assist her
the insurer would not re-open her claim when asked to do so
the insurer only re-opened her claim after she lodged a complaint with this service
it was obvious the leak was coming from the neighbour‟s property, and
in November 2015 she provided the insurer with a report from a plumber
confirming a water leak coming from the n eighbour‟s property.
The insurer says any delays were outside its control
The insurer accepts there were delays involved in finalising the claim. The insurer
says this was outside its control due to:
the complexity of the claim
the damage was occurring fr om the neighbour‟s property which required the
cooperation of the neighbour
the insurer required the opinion of engineers to determine the extent of its liability
the complainant did not satisfy her responsibility to establish an insured event
occurred until 11 April 2016 when she submitted her own expert report.
The insurer initially agreed to cover the damage but then declined the claim
The claim was lodged in January 2015. The insurer initially agreed to cover the
damage to the flooring and authorised repairs. After an issue with the nominated
repairer, a new repairer (JC) was authorised. On 17 June 2015 JC advised repairs
could not proceed because there were still issues with water ingress. The insurer then
appointed an engineer to determine the cause of the ongoing water ingress.
On 14 August 2015 the engineer (MC) attended the complainant ‟s property. On 3
September 2015 the insurer declined the claim on the basis the damage to the
insured property was not caused by a single insured event but by “maint enance
related issues, having occurred over a period of time”.
Determination | Case number: 522541 Page 4 of 12
The insurer‟s claim file notes show the insurer‟s assessor did accept damage to the
staircase and southern party wall, however this did not eventuate. Instead the insurer
settled the complainant for resultant loss of rent up to the policy limit of $25,000 in
addition to some exploratory costs.
Insurer ’s engineering report confirmed damage that may be covered
While the insurer is entitled to take reasonable time to investigate the cause of the
damage and determine whether the policy responds, the panel is not satisfied the
insurer had sufficient information to decline the claim in its entirety on 3 September
2018.
The p anel is of the view MC‟s report did identify covered damage.
The engineering report did not establish the exclusion of timber flooring
MC reported on six different areas of the complainant ‟s property: the veranda
concrete slab, brick retaining wall, external paving, timber flooring, staircase and the
southern party wall.
In regard to the timber flooring, MC stated:
The observed damage across the timber flooring is a result of the
experienced escaping water ingress from the neighbouring subfloor by
seeping through the party wall and NOT from gradual/continual rising
damp.
In saying this, in my opinion, the escaping water from the neighbour‟s
alleged leaking pipe has permeated through the party wall and saturated
the floor boards as experienced as a one-time event.
While MC states some water damage was from seepage through the subfloor, MC‟s
comments also suggest the timber flooring was water damaged from the leaking pipe.
MC noted an absence of mould growth and rotting within the floor boards, suggesting
the damage was not gradual.
In addition, there was not enough information to rely on the policy exclusion for
„Seepage of water‟. The policy states the exclusion only applies to water seeping or
running:
through the earth (hydrostatic water seepage);
down the sides of earth or earth fill that is up against the building;
down the sides or underneath swimming pools or spas causing them to move,
change shape or lift or leak through their hydrostatic valves;
against or through retaining walls and forcing them to move or crack;
from agricultural pipes.
MC confirmed the water was entering through the party wall, not a retaining wall. The
insurer has not established the water ingress was predominantly hydrostatic water
seepage, or that at all. In addition, MC confirms it was not from gradual rising damp
Determination | Case number: 522541 Page 5 of 12
and an external event of a leaking pipe had caused water ingress. MC‟s report
suggests the cause of the seepage through the subfloor should have been
investigated further.
The panel is not satisfied the insurer had sufficient information to establish the
damage to the flooring was excluded when it declined the claim on 3 September
2015.
The engineering report did not establish exclusion of staircase and party wall
MC stated the damage to the staircase was caused by long term water ingress
through the party wall. MC also said the southern party wall had seepage of water
from the fill against the wall. That is, despite previously saying water ingress via the
party wall was also caused by the leaking pipe.
As noted above, the pa nel is not satisfied there is enough information on MC‟s report
alone to establish the policy exclusion for seepage of water.
MC also identified plaint blistering at the bottom of the party wall. The paint blisters
were filled with water. The moisture rea ding of the party wall was “in the vicinity of
85%”. Without investigation of the water table and soil type, this alone suggests there
was more than hydrostatic seepage at play.
MC also said the complainant would not have been aware of such water ingress. This
means in this instance, the specific policy exclusion for the escape of liquid occurring
as a result of a gradual process, would not apply.
The general policy exclusion for gradual deterioration would not apply as MC already
confirmed an external one-time event of water ingress had affected the party wall and
flooring. While the extent of the damage caused from that event was unknown at that
time, it does suggest the deterioration and „seepage‟ was a result of a possible
insured event, not necessarily the cause of damage itself.
The panel is not satisfied the insurer had sufficient information to establish damage to
the staircase and party wall was excluded when it declined the claim on 3 September
2018. At the very least, the contradictions in MC‟s r eport should have been
investigated further.
The complainant repeatedly requested the insurer review the claim decision
The complainant says in November 2015 she informed the insurer the neighbour‟s
plumber had confirmed water had been escaping from a broken pipe from early 2015
up until September 2015 when it was fixed. The insurer‟ s claim file notes do not show
any activity from 16 October 2015 to 28 January 2016 and the insurer denies being
informed of this in November 2015.
However, the insurer‟s claim file notes show on 28 January 2016 the complainant told
the insurer her neighbour had admitted the water was leaking from a pipe on their
property. The complainant requested the claim be re-opened and reviewed. The
insurer did not re-open the claim for review.
Determination | Case number: 522541 Page 6 of 12
On 22 February 2016, the complainant called the insurer again advising she sent a
plumber‟s report confirming the water leak was coming from the neighbour‟s property
and she wanted the claim reviewed. The insurer refused to re-open the claim until it
had received the report.
On 31 March 2016 the complainant called the insurer again requesting an update.
The insurer confirmed receipt of the plumber‟s report but advised it would not review
the claim until it had received the complainant ‟s builders report. The complainant had
mentioned in a previous discussion with the insurer that she also had a builder‟s
report.
On 11 April 2016 the insurer called the complainant and advised it had received the
builders report. On 27 May 2016 the insurer sent the complainant a message advising
it was reviewing the claim.
The decline letter sent to the complainant on 3 September 2015 advised she was
entitled to a have the decision reviewed. The complainant repeatedly requested a
review.
While it is an insured‟s responsibility to establish an insured event occurred,
considering the lack of supporting information the insurer based its decline on, the
panel is not satisfied the insurer should have waited for the complainant to provide
her own reports. At the very least, the insurer should have reviewed its decision upon
receipt of the neighbour‟s plumber‟s letter dated 22 October 2015. This letter
established an insured event had occurred and was the possible cause of the
damage.
The complainant was cash settled on 11 November 2016
The insurer agreed to accept the damage caused by the water leak from the
neighbour‟s property on 27 May 2016.
The complainant and insurer were both involved in getting their own scope of works
and quotes from preferred builders and eventually the insurer agreed to cash settle
the complainant $53,839.11 on 11 November 2016.
Insurer made an error in its claims handling and caused delays
The insurer says the complainant did not establish an insured event until 11 April
2016 which contributed to the delays. However, the p anel disagrees with this. MC‟s
report indicated an insured event had caused some damage and this was not
investigated further.
The panel is satisfied the insurer made an error in its claims handling. The insurer
also unreasonably delayed undertaking an appropriate review of its decision, despite
the conflicting information it based its decision on and the letter from the neighb our‟s
plumber.
Determination | Case number: 522541 Page 7 of 12
2.2 Is the complainant entitled to compensation for loss of rent?
The insurer says it is only liable for loss of rent up to the policy limit
The insurer says it is entitled to rely on the terms of the policy when considering its
position and liability for the complainant ‟s loss of rent.
The policy provides cover for loss of rent following an insured event. However, the
policy limits the insurer ‟s liability for loss of rent as follows:
The longest period we will pay for one event is 52 weeks and the most we
will pay in total is:
$25,000 if you have building cover; or
the lesser of $25,000 or your landlord contents sum insured if you
do not have building cover.
The insurer has settled the complainant $25,000 for loss of rent. On this basis, the
insurer says it is not required to compensate the complainant for any further loss of
rent. The insurer says it is the complainant ‟s responsibility to read and understand the
terms of the policy and ensure it is appropriate for her needs.
It is not in dispute the insurer paid the policy limit of $25,000 for loss of rent. The
complainant says the insurer should compensate her further for its management of
the claim.
The insurer is liable for any financial loss caused by its own actions
The policy limits only apply to loss caused by an insured event. Where loss or
damage is caused by the insurer‟s conduct, such as its handling or management of
the claim, the policy limits and exclusions will not apply.
The policy does exclude consequential loss following a covered event. However, if the
panel is satisfied the insurer caused an error in its claims handling or unreasonable
delays, which then caused the complainant to suffer a loss, any terms of the policy
which limit liability do not apply to that particular loss.
The insurer was concerned the complainant ‟s neighbour‟s insurer had already offered
an amount for loss of rent. However, the neighbour‟s liability for the complainant ‟s
loss of rent as a result of an insured event covered under the neighbour‟s policy is a
separate matter and has no bearing on the insurer‟s liability for its own conduct.
The insurer is not liable for delays after its acceptance on 27 May 2018
The panel accepts there were delays from acceptance on 27 May 2016 to settlement
on 11 November 2016. However, in this instance, it appears those delays were
outside both parties‟ control. The insurer‟s claim file notes show there was
disagreement between the parties in relation to the scope of works and quote for
repairs. The complainant says there was also some disagreement about whether
there was rising damp.
Determination | Case number: 522541 Page 8 of 12
From acceptance of the claim related damage, the insurer and complainant are both
entitled to question the scope of works and quote and organise their own in an effort
to reach settlement. The panel does not consider the insurer directly liable for the
delay from acceptance to settlement.
The insurer is liable for loss of rent from 3 September 2015 to 27 May 2016
The insurer is required to compensate the complainant for her loss of rent from its
decline on 3 September 2015 to it acceptance on 27 May 2016.
The panel is satisfied the insurer is liable for the complainant ‟s financial loss during
this time for the reasons outlined above.
Within 14 days of the complainant ‟s acceptance the insurer is to compensate the
complainant loss of rent from 3 September 2015 to 27 May 2016 based on the
complainant ‟s rental agreement that was in place at the date of the loss, being
$4,779.76 per month.
Insurer should pay the complainant $2,000 non-financial loss compensation
We can award compensation for non-financial loss where there has been an unusual
amount of physical inconvenience, time taken to resolve a situation, or interference
with the complainant ‟s expectation of enjoyment or peace of mind.
In assessing whether to award compensation for non-financial loss, we expect
complainants to be moderately robust, bear the normal degree of inconvenience
experienced when a problem occurs, and take reasonable steps to minimise the
inconvenience suffered.
In this instance, the complainant was reasonably entitled to expect the insurer would
investigate and assess her claim appropriately. The insurer ‟s claim file notes show the
complainant repeatedly contacted the insurer for updates and was in a distressed
state. The complainant also took proactive steps to question the insurer‟s decision
and establish an insured event occurred.
In this instance the panel finds it appropriate for the insurer to compensate the
complainant $2,000 for her non-financial loss.
Determination | Case number: 522541 Page 9 of 12
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this complaint
There has been a full exchange of the relevant material between the parties and each
party has had the opportunity to address the issues raised.
All material provided has been read and considered. For the purpose of this
determination, commentary is restricted to only the materials considered relevant to
the outcome.
3.3 Relevant policy wording
Product Disclosure Statement
Pages Extract
24 Escape of liquid
We cover
Loss or damage caused by liquid leaking, overflowing or bursting from any of the
following:
refrigerators, freezers, dishwas hers and washing machines;
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage
and sewage systems;
fixed tanks;
swimming pools or spas;
waterbeds;
baths, sinks, toilets and basins;
Determination | Case number: 522541 Page 10 of 12
Pages Extract
fixed heating or cooling system;
water main, fire hydrant or water supply pipe;
an aquarium.
We do not cover
loss or damage caus ed by flood or storm surge;
wear and tear, or loss or damage by the escape of liquid occurring as a result of a
gradual proc ess of leaking, splashing, dripping or overflowing over a period of time
when you could reasonably be expected to be aware of this condition;
the cost of repairing or replacing the item from which the liquid escaped;
fixing leaks that have not caused permanent damage to the building;
leaks from agricultural pipes ;
l oss or damage caus ed by liquid from a portable container, such as a plant pot, vas e,
terrarium, fis hbowl, beverage container, saucepan, bucket or watering can;
loss or damage caus ed by liquid from a watering system or hose;
loss or damage to retaining w alls;
loss or damage to, or caused by, a leaking shower floor or base, shower cubicle walls,
shower glass screening or doors;
costs if you repair or renovate a damaged area of the building before we can inspect it
and find the cause;
broken, worn or aged t iles or grouting in walls in bathrooms, kitchens or laundries
unless the damage is caused by liquid leaking from pipes in walls or floors (not
forming part of a shower cubicle wall, floor or base);
loss or damage caus ed by wear, tear, rust, fading, rising damp, mould, mildew,
corrosion, rot.
28 Additional Features
…
Loss of rent following an insured event
We cover
When you have building cover
If we accept your claim for loss or damage to the building due to an insured event
occurring during the period of insurance and we agree it cannot be lived in, we will pay
the weekly rental amount for the reasonable amount of time we decide it should take to
repair or rebuild the building so it can be liv ed in again.
…
Limit
The longest period we will pay for one event is 52 weeks and the most we will pay in
total is:
$25,000 if you have building cover; or
the lesser of $25,000 or your landlord contents sum insured if you do not have
building cover.
42 - 4 7 What we do not cover – general exclusions
You are not covered under any section of the policy for damage, loss, cost or legal
liability that is caused by, arises from or involves:
…
Seepage of water
water seeping or running:
through the eart h (hydrostatic water seepage);
Determination | Case number: 522541 Page 11 of 12
Pages Extract
down the sides of earth or eart h fill that is up against the building;
down the sides or underneath swimming pools or spas causing them to move, change
shape or lift or leak through their hy drostatic valves;
against or through retaining walls and forcing them to move or crack;
from agricultural pipes.
…
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light,
atmospheric or climatic conditions or gradual det erior ation such as but not limited to:
tiles and their adhesives or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.
3.4 Expert reports
Report Key points
Insurer ’s engineer MC
17 August 2015
the cause of the damage to the veranda concrete slab is a result of
earth movement.
the cause of the earth movement may have been triggered by the
excavation undertaken by the neighbour
brick retaining wall, the wat er seepage issue is a direct result of the
neighbouring irrigation system used which now has been
rectified/mitigated by the Ins ured‟s notification to the neighbour.
external paving, the observed movement and uplift in localis ed
sections of the pavers within the backyard is consistent with
upheave from tree root pressure and growth.
timber flooring, the observed damage across the timber flooring is a
result of the experienced water ingress from the neighbouring
subfloor by seep ing through the party wall and NOT from
gradual/continual rising damp in the absence of supportive evidence
such mould growth and rotting within the floor boards
the escaping wat er from neighbour‟s alleged leaking pipe has
permeated through the party wall and saturated the floor boards as
experienced as a one - time event.
staircase, the cause of observed vertical displacement within the
subject staircase is a result of movement within the supportive
strutting member at the base of the staircase which has sus tained
long - term rotting and deterioration from water ingress through the
party wall compromising its structural load capacity.
the Insured would not be expected to be aware of such water
ingress issue until the cladding has been removed.
southern party wall, observed paint blistering over the bottom
portion of the southern party wall is caused by permeation of wat er
from the fill behind the party wall.
C omplainant ’s plumber’s
report the plumber that completed renovations at neighbouring property in
mid - 2014
Determination | Case number: 522541 Page 12 of 12
Report Key points
22 October 2015 a water leak was detected under the concrete floor of the lower
bathroom in early 2015, it was fixed soon after
notified in September 2015 that the insured property was still having
water concerns
immediat e inspections noticed the s ame plumbing fitting was faulty
and dripping and was therefore replaced.
3.5 Additional information relied upon
The parties‟ submissions
The complainant ‟s certificate of insurance
The complainant ‟s builders report confirming the leak had stopped
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.