Home / Financial Firm (Unknown - Insurer) / Determination 522339
Determination 522339
claim_amount_dispute
Summary
After a vehicle impact damaged a commercial property, the insurer accepted the claim but limited it for pre-existing damage and offered $4,000. AFCA found the insurer must pay $25,000 plus s57 interest from 20 June 2017.
The engineering reports were equally persuasive, so the fair outcome was that the insurer pays 50 per cent of the repair costs incurred, with interest under section 57 of the Insurance Contracts Act.
Issues
- Claim amount dispute primary · upheld“The insurer is to pay the complainant $25,000 inclusive of GST in settlement of the claim for impact damage.”
Subjects and remedies
pay claimpay interest
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination | Case number: 522339 Page 1 of 7
Determination
Case number: 522339 20 December 2018
1 Determination overview
1.1 Complaint
This complaint arises under a building and contents policy held by the complainant
with the financial firm (insurer).
The complainant lodged a claim in July 2015 for impact damage to the property. The
insurer partially accepted the claim but limited its liability as it considered most of the
damage was pre-existing.
The complainant acknowledges there was pre-existing damage but says the offer is
inadequate.
This matter has been the subject of a recommendation. The recommendation was
substantially in favour of the insurer. The complainant has disputed the
recommendation.
1.2 Issues and key findings
Has the complainant established a valid claim under the terms of the policy?
I am satisfied the complainant has established a valid claim under the terms of the
policy for impact damage to the property.
Is the insurer entitled to limit its liability?
I am satisfied the insurer is entitled to limit its liability as the property had substantial
pre-existing damage. I am satisfied it is fair that the insurer pays the complainant
$25,000 being 50% of the complainant’s claimed cost of repairs inclusive of GST.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is to pay the complainant $25,000 inclusive of GST in settlement of the
claim for impact damage sustained to the property.
Determination | Case number: 522339 Page 2 of 7
The insurer must pay interest on the settlement sum in accordance with Section 57 of
the Insurance Contracts Act 1984 (the Act) from 20 June 2017 (the date of the final
decision letter) until date of payment of the claim.
Determination | Case number: 522339 Page 3 of 7
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
This determination is based on what is fair in the circumstances, having regard to the
relevant legal principles, terms of the policy, good industry practice including codes of
practice and prior determinations where applicable.
All information exchanged both before and after the recommendation is being taken
into account in reaching this determination.
2.1 Has the complainant established a claim under the terms of the policy?
Complainant has established a claim for impact damage
The complainant took out the commercial policy on 26 March 2015 after purchasing
the property at auction on 19 February 2015. The purchase was settled around 19
May 2015.
The policy provides cover for physical loss destruction damage to property that occurs
during the period of insurance subject to a number of exclusions. There is no dispute
that the policy extends to cover loss or damage caused by impact that occurs during
the period of insurance.
The complainant first observed impact damage on or about 8 July 2015 when he tried
to open the rear door to the property. He found the steel door frame had been bent
and concrete blocks impacted. He also found there was damage to the north west
corner of the property.
The complainant was served with a show cause notice by the local council on 13
August 2015 after an inspection of the property on 7 August 2015 identified that the
existing concrete block façade wall had sustained significant impact damage along
the side (northern) and rear (western) walls and may be in danger of future collapse
into the adjoining property and the right of way.
The insurer does not dispute that there is damage to the property caused by impact
most likely from the vehicle.
2.2 Is the insurer entitled to limit its liability?
Engineering reports differ as to the extent of damage caused by impact after
inception of the policy
The complainant advised at the conciliation of his property that he had spent $50,000
in repairing the impact damage. The insurer says it is not responsible for the entire
Determination | Case number: 522339 Page 4 of 7
cost of repairs and offered the complainant $4,000 towards the cost. The complainant
seeks 70% of the costs incurred or a fair and reasonable figure.
The insurer obtained a detailed report from an engineer CD. CD inspected the
property on 9 September 2015 and obtained Google images of the property from
December 2009 and September 2014.
The Google images from September 2014 show significant damage to the north-east
corner of the building as well as the southwest corner of the building. The December
2009 photos show impact from pallets stacked against the side wall causing a ‘dent’.
The complainants engineer BS inspected the property on 14 December 2016. BS had
the opportunity of viewing not only the insurer’s engineers report and scope of works
but also the quotation for repairs. BS identified damage to the southeast corner and
the rear door frame which he noted was significantly twisted. Significantly he found
that the twist was not present in the Google photos that had been relied upon by CD.
He believed this confirmed that this corner of the property had been a hit again with
significant additional damage. He observed the northeast corner of the property and
believed that the damage had increased significantly when compared with the Google
photos.
I have looked at both photos and acknowledge that there appears to be additional
damage identified in this photo.
BS also observed hair line cracks on the west wall which he noted was not in the CD
report or visible in the photos provided. He also considered the north wall and
confirmed that there were pallets stacked against this wall. He believed the diagonal
crack that was visible in the September 2014 Google photo was significantly larger.
BS concluded that although there was pre -purchase damage to the external areas of
the property the damage had noticeably increased in all three areas and considers
the structural integrity of the wall after September 2015 would have been
compromised.
In a supplementary report CD confirmed his earlier views. In a later email he indicated
that at best 10 to 15% of the damage could be contributed to impact after the
inception of the policy.
The property had only recently been purchased but there is no information of a pre-
inspection report and no suggestion of any previous show cause notices having been
served. The case analyst considered that the report from CD was more thorough and
conclusive. In my view reports from both engineers are equally detailed and
persuasive in their findings.
The insurer obtained a quote from BB based on a full scope of works for the repairs
required. BB quoted $79,597.52 to complete all repairs. The complainant advised
Determination | Case number: 522339 Page 5 of 7
during the conciliation that he had spent approximately $50,000 to complete the
repairs.
In my view, given the engineering reports provided are equally persuasive , it is fair in
the circumstances the insurer pays the complainant 50% of the costs incurred in
repairing the property. As the complainant has claimed $50,000 as the cost of repairs
then I determine that the insurer should pay the complainant $25,000 to settle the
claim. Interest is payable on the cash settlement in accordance with Section 57 of the
Act from 20 June 2017 to date of payment of the claim.
Determination | Case number: 522339 Page 6 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Expert reports
Record Key points
FF ’s expert (CD)
Engineer Report
11 September 2015
Site inspection on 09 September 2015.
The damage to the subject building had occurred as a result of at
least five separate instance s of impact.
The majority of impact damage had occurre d prior to September
2014.
Punching damage to several units of lower level concrete
masonry at the north elevation were not being able to be
establi shed as they were obscured within Streetview images.
Complainant’s expert (B)
Engineer Report
22 December 2 016
The south side of the rear door frame, was significantl y twisted.
Damage to all 3 locations had increased.
The additional damage to the north wall is now a structural
concern, which should be addressed as soon a s possi ble.
The damage that was observed at thi s building and surrounding
buildings, i s indicative of the level of incompetency of vehicle
operators in thi s area.
FF ’s expert (CD)
Supplementary Engineer
Report
25 January 2017
There is no evidence to substantiate new impact damage with
respect to the south west corner of the subject building.
There is evidence of worsening of pre - existing damage to the
north - western corner of the subject building – due to the walling
being compromised by the initial impact events and not being
adequately support ed/repaired/isolated from further impacts;
Determination | Case number: 522339 Page 7 of 7
Record Key points
and subsequently being subjected to further impacts that appear
to have been caused by ongoing forklift operations – including
but not nece ssarily limited to pushing/ stacking loaded/unloaded
pallets against the af fected walling.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.