Text of the determination
Determination | Case number: 521837 Page 1 of 7
Case number: 521837 13 November 2018
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). He lodged a claim against his policy after water leaked for two days from a
flexible pipe under the bathroom basin. The insurer said the floor tiles were not
damaged due to the water leakage, but had pre-existed that event.
The insurer also assessed the resultant mould within the house and carried out some
remediation, but said other mould areas had not resulted from the water leakage. The
complainant contended the insurer deliberately delayed the claims process and he is
also claiming the cost of alternative accommodation.
The case manager provided the parties with a recommendation on the issues in
complaint. The recommendation was partially in favour of the complainant. A copy of
the recommendation is attached to this determination.
The recommendation was issued by FOS. The Australian Financial Complaints
Authority (AFCA) has replaced Financial Ombudsman Service (FOS). AFCA is
responsible for managing FOS complaints lodged prior to 1 November 2018. While
this determination is issued by AFCA we have applied the FOS Terms of Reference.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct (except for a minor
amendment) and are adopted in this determination. Further submissions provided
after the recommendation have been considered.
Was the insurer entitled to deny the claim for damaged floor tiles?
The insurer has established the application of a policy exclusion with respect to the
damaged floor tiles and i s entitled to deny this part of the complainant’s claim.
Is the insurer required to carry out additional mould remediation?
The insurer is not required to carry out additional mould remediation. The complainant
is required to complete roof repairs before the insurer can commence mould
remediation.
Determination | Case number: 521837 Page 2 of 7
Is the complainant entitled to compensation for non-financial loss?
The complainant has established an entitlement to compensation for non-financial
loss and the insurer is required to pay him $500.
Is the insurer required to pay any additional amount?
The insurer is required to base the carpet replacement on the sample the complainant
supplied. The insurer is not required to pay for the complainant’s alternative
accommodation beyond 30 August 2018.
1.3 Determination
This determination is partially in favour of the complainant.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome (with a minor amendment).
The insurer is to carry out mould remediation in accordance with the scope of works
identified in this determination.
The insurer is also required to base the carpet replacement on the sample the
complainant provided.
The insurer is required to pay $500 compensation to the complainant.
Determination | Case number: 521837 Page 3 of 7
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous AFCA decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied the documentation I have relied on has been provided to both parties.
I am satisfied the case manager’s recommendation contains an accurate summary of
the complaint, the issues to be determined, any applicable paragraphs of the Rules
and any relevant law.
2.2 Was the insurer entitled to deny the claim for damaged floor tiles?
Complainant has established a valid claim
The complainant claimed against his policy for damage to floor tiles after water leaked
throughout his house from a flexible pipe under the bathroom basin. The complainant
said floor tiles in various rooms had become ‘drummy’ as a result of the water
leakage.
The complainant bears the onus of establishing a valid or prima facie claim for which
the policy responds. The complainant has established a valid claim because his policy
covers loss or damage due to liquid leaking, bursting, discharging or overflowing from
certain items or devices.
Since the insurer has denied this part of the claim, it bears the onus of establishing
the application of at least one of the policy exclusions upon which it has relied.
Insurer has established application of policy exclusion
The insurer arranged SP, an experienced tiler to assess the damaged floor tiling. SP’s
report (dated 23 February 2018) contained a comprehensive analysis of the damaged
floor tiles and included a mud map, along with photographs.
SP said the failure of the floor tiles (becoming ‘drummy’) had pre -existed the water
leakage event. SP said the damage was due to the original installer not achieving the
correct adhesive coverage / distribution. In addition, SP said the installer had failed to
adhere to Australian standards by installing the correct type and amount of movement
joints to ensure the longevity of the tiling system.
The complainant provided two very brief reports , in addition to another slightly longer
report from tilers. The two very brief reports lack sufficient detail and are too general
in natur e to challenge SP’s findings. The longer report indicated the flooding
contributed to the damage, however the report added nothing further of substance.
Determination | Case number: 521837 Page 4 of 7
The insurer applied general policy exclusions such as the loss not being linked to any
identifiable ev ent and ‘wear and tear’ through normal use. The insurer relied on SP’s
findings when applying the exclusions. SP has the appropriate qualifications,
knowledge and experience to assess the effective cause of damage to the floor tiling.
SP’s findings indicate the damage did not result from the water leakage and had
occurred over time. As such, the insurer has established the application of the policy
exclusions and is not required to cover the complainant for the damaged floor tiles.
2.3 Is the insurer required to carry out additional mould remediation?
Issue of mould remediation to be resolved
The issue of mould remediation remai ns unresolved. The insurer rejected part of the
recommendation that was substantially in the complainant’s favour a nd provided
submissions in support. These submissions mainly related to the issue of mould
remediation.
The insurer has already carried out some mould remediation work to the house and
indicated it was still committed to that task. The insurer said it wo uld be carrying out
mould remediation to those areas affected by the water leakage. The insurer referred
to its restoration contractor’s (W’s) scope of works (dated 12 September 2018) , which
was based on AD’s ( a hygienist) analysis of the mould remediation works required at
the house.
W had carried out the drying process in late January 2018, which included removing
the remaining damaged carpet and disposing it.
Insurer obtained hygienist input
AD carried out various tests on the extent of mould in the house on 7, 16 February
2018, 13 April 2018 and 4 July 2018. On the last visit to the property, AD said the
issues with the roof affected the moisture levels within the house:
Due to the length of time between the initial assessment and this
assessment/testing (6 mths) it is more difficult to assess what would have been as
a consequence of the initial event, we can however, certainly say that the kitchen
had been effected in the initial event …
AD said mould will send out spores which can spread further throughout the house
through transference and air movement. AD also said the areas showing
unacceptable results may have some areas that started through the roof issue (wall
openings) and have now been affected further by the kitchen.
Insurer obtained roofer input
B, a roofer, attended the complainant’s property on 20 March 2018. There was an
issue about water ingress above the main living room and hallway. B said the roof
was in a ‘fair’ condition and mentioned broken roof tiles, which caused water ingress,
Determination | Case number: 521837 Page 5 of 7
had been replaced at an earlier date. However, B found broken tiles amongst the
remainder of the roof. B recommended the complainant replace these tiles
immediately and reopen the weep holes.
B reattended the property on 9 May 2018 and noted there were still two or three roof
tiles that needed replacing. There was also a broken valley above the entrance. B
also said the weep holes had not been reopened to the ridge capping above the roof.
B said the tiles needed replacing and the weep holes reopened to ensure the roof
was water tight.
Complainant required to repair roof
The complainant does not see the relevance of the roof issue and indicated he had
carried out repairs to the roof. However, the information AD and B provided indicates
there is still an issue with the roof. B said there were repairs to be carried out to make
the roof water tight. AD said the roof issues had an impact on the extent of mould in
the house, which could not be solely attributable to the water leakage event.
The complainant provided a report from a mould cleaning company (undated).
However, this report did not challenge the comments from AD and B. The report did
not indicate the probable origin of the mould. The email between the mould cleaning
company and the complainant indicates an ame ndment was made to the report.
However, it does not identify what the amendment was, when it was made or why it
was made. That report is of no assistance to the complainant in this matter.
The available information indicates it is necessary for the complainant to complete the
roof repairs to ensure the mould remediation can commence and be effective.
Extent of insurer’s responsibility for mould remediation
However, the extent to which the insurer is required to perform the mould remediation
is limited to W’s scop e of works. The remainder is due to the roof issue and is the
complainant’s responsibility. Any mould remediation can only commence once the
roof has been properly repaired to make it water tight by the complainant.
2.4 Is complainant entitled to compensation for non-financial loss?
Complainant entitled to compensation
The complainant raised various matters as to why he thought the insurer had handled
his claim poorly. The recommendation fully outlined his reasons and outlined the
approach to awarding compensation for non-financial loss.
The recommendation accepted the claim was not straight forward. However, it
identified aspects of the claims process that could have been better handled from a
time span perspective.
Determination | Case number: 521837 Page 6 of 7
The recommendation considered $500 as an appropriate amount of compensation.
There were no submissions from either party with respect to this issue. As such, the
insurer is required to pay the complainant $500 compensation for non-financial loss.
2.5 Is the insurer required to pay any additional amount?
Insurer to replace carpet based on samples of old carpet
The complainant said the insurer wanted to replace the damaged carpet based on the
cheapest carpet replacement. The complainant provided a sample of the damaged
carpet, upon which the insurer is required to base the replacement carpet.
Temporary accommodation
The complainant informed the insurer on 24 April 2018 he had completed the roof
repairs, although a subsequent report from the insurer’s roof tiler suggested
otherwise. The insurer was not required to pay the complainant any further
accommodation costs beyond the date of the recommendation (30 August 2018).
This was because the complainant had sufficient time to carry out the roof repairs.
This would have allowed the mould remediation work to commence and the
complainant would have been back in his house.
There is nothing in the complainant’s submissions that warrant a change to this (the
complainant had indicated he wants the insurer to pay for his six-month lease, but
provided no reason why).
Complainant provided further submissions
Although the complainant accepted the recommendation, he provided additional
submissions. He made various comments about what should be included in the scope
of works: mould remediation (presumably for the entire house, as the insurer is still
agreeable to remedying the water leakage related mould); painting all rooms; all
skirtings; removing and re-installing insulation; yard and pool maintenance; provision
of a skip to remove mould affected items.
The insurer has provided compelling reasons for the extent to which it is responsible
for mould remediation. Certain items in the complainant’s list are his responsibility.
The reasons for this were outlined above. The complainant has provided no reasons
why those items should be included in the scope of works.
As such, the complainant’s further submissions do not warrant a change in the scope
of works.
Determination | Case number: 521837 Page 7 of 7
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Recommendation
Case No: 521837 Recommendation Page 1 of 11
Case number: 521837 30 August 2018
1 Overview
1.1 Dispute
The applicant lodged a building and contents claim after a leak. The financial services
provider (FSP) remediated water damage. It declined part of the claim because it
says the floor tiles were not damaged by the leak, but fro m excluded events.
The applicant disagrees with this decision and say the FSP refuses to remediate
mould the leak caused. He wants the FSP to cover some of the cost to repair the tiles
and carry out further mould remediation. He says the FSP handled the claim poorly.
1.2 Issues and key findings
Is the FSP entitled to decline the tile claim?
The FSP is entitled to decline the tile claim because its expert’s report convincingly
explains why its initial installation method, and not the leak, caused the tiles to lift.
Is the FSP required to carry out further mould remediation?
The FSP is required to carry out further mould remediation for the entire property if
the applicant provides sufficient confirmation of roof maintenance completion. If this
does not occur, the FSP is to cash settle these costs.
Is the applicant entitled to non-financial loss compensation?
The FSP erred in its mould evaluations, which caused the applicant stress and
inconvenience. It is to compensate the applicant $500 in non-financial loss.
1.3 Recommendation
This recommendation is substantially in favour of the applicant.
If both parties accept this recommendation, the parties are to carry out the steps
outlined in Sections 2.
Case No: 521837 Recommendation Page 2 of 11
2 Reasons for recommendation
2.1 Is the FSP entitled to decline the tile claim?
Onus on FSP to establish policy exclusion defeats claim
All insurance policies provide cover for loss or damage subject to various conditions
and exclusions. These are outlined in the policy’s product disclosure statement
(PDS).
In this dispute the applicant has cover for damage caused by leaks, which the PDS
defines as damage caused by liquid that are leaking, bursting, discharging or
overflowing from certain items or devices. The parties agree the applicant established
a prima facie (valid) leak claim.
When an insured person establishes a valid claim, the onus shifts to the insurer to
show whether the policy excludes the claimed damage. The insurer is required to
establish this upon the balance of probabilities.
Parties disagree on cause of damage
The applicant claimed for water damage to building and contents on 24 January 2018
after a vanity unit hose burst, flooding his home. The FSP accepted the applicant’s
claim and arranged contractors to assess the property’s water damage and begin
restoration works.
The FSP then partially declined the claim. On 7 March 2018 the FSP told the
applicant it refused liability for the floor tiles. The FSP said its tiler’s (SP’s) report
confirmed tile damage occurred due to insufficient installation methods, rather than
the leak. The FSP based its partial decline on a policy exclusion for damage not
linked to an insured event, contained in full in Section 3.1.
The applicant denies the policy exclusion applies and says the tiles only started to lift
after the leak flooded them. He maintains the leak damaged the tiles and wants the
FSP to accept liability for all or some repairs, or arrange for an expert building report.
The applicant provided reports by NS and GC, tilers who concluded moisture from the
leak affected the tiles’ adhesive bond and caused the damage.
As the experts dispute how tile damage occurred, the proximate cause of the damage
needs to be considered.
Policy coverage depends on proximate cause
The proximate cause of damage is a question of fact depending on the circumstances
in each dispute. It is not necessarily the first or last or the sole cause of the loss.
Case No: 521837 Recommendation Page 3 of 11
Proximate cause is the effective, dominant or operative cause of the loss. If there are
several causes operating at the same time, FOS will consider each one to determine
which cause set the train of events in motion.
Courts have said if one cause would have resulted in the harm in any case and the
other would not have done so in the absence of the first, then the first is the proximate
cause.
Reports suggest tiles failure not related to claimed event
I closely reviewed the reports and accept SP’s report establishes, on balance, the
damaged tiles become drummy and de-bonded before the leak, due to their
installation methods. SP’s comments are contained in Section 3.2.
These highlight the tile s’ adhesive delaminated from the inside -out. SP views this as
inconsistent with the usual effects of water ingress, which he says in almost all cases
de-bonds the adhesive from the outside in. Based on this and other observations
captured in his report, including the grouting style, lack of movement joints and
location of cracks relative to damaged tiles, SP concluded the leak did not cause the
damage.
I find SP’s reasons persuasive because they are supported by explanations and
photographs of the observations and/or tests on which SP based his conclusions. The
report also shows consideration of the impact of the substantial, lengthy leak flooding
the tiles, but other causes of tile damage SP observed sufficiently refute it was the
proximate cause. Based on his attached curriculum vitae, I am also satisfied SP’s
analysis is based on significant expertise in tiling, waterproofing and repair methods.
While I am also satisfied NS is a licensed tiler, his report does not indicate whether he
inspected the property. GC is also a tiler who attended the property, however neither
his nor NS’s report explains how they reached the conclusion tile delamination
occurred due to the leak. They do not mention or challenge several other convincing
causes of damage SP raised and contain only conclusions
For these reasons, I am more convinced by SP’s report.
As I find SP’s conclusions comprehensively support by the contents of his report, the
FSP is not required to obtain a further building report as requested by the app licant.
Given the above, I accept SP’s view the leak was not the proximate cause of the
claimed tile damage.
FSP is entitled to rely on policy exclusion
For all these reasons, I accept the FSP’s expert established the leak did not cause
the damage.
Accordingly, I satisfied that the FSP has established on the balance of probabilities it
is entitled to rely upon the policy exclusion for damage not linked to the leak.
Case No: 521837 Recommendation Page 4 of 11
The FSP is therefore entitled to decline liability for tile repairs.
However, SP’s report did not deny the leak caused some paint covering the grout to
flake off, as GC explained. If it has not already done so, the FSP is to include the cost
of re-painting flaked or missing paint over the grouting in its cash settlement. This is to
occur within 14 days of both parties’ acceptance of this recommendation.
2.2 Is the FSP required to carry out further mould remediation?
Parties dispute FSP liable for further mould remediation
The FSP confirmed the presence of mould in the wall cavity and roof in Februar y
2018, which the applicant claims was caused by the leak. The applicant says the FSP
did not complete mould remediation works. He wants the FSP to provide:
carry out further mould remediation at the property, including within the walls,
roof and flooring
provide a scope of works and timeline for work completion
reimburse accommodation expenses incurred while he awaited remediation.
The FSP also says it is entitled to refuse remediation works to the roof and ceiling
areas because it says the leak event did not cause mould to these areas.
Regarding the walls, the FSP refuses to carry out further mould remediation or testing
at present. It says the applicant needs to carry out maintenance works to the roof, or
any mould treatment will be ineffective.
The FSP says it asked the applicant to provide invoices confirming the repairs it
requested are complete, but he has not yet done so. The FSP says once the
applicant provides confirmation, it will engage a builder and then hygienist to attend to
any remaining roof or (accepted) mould issues.
FSP did not establish it remediated mould following leak
I closely reviewed the FSP’s reports and claim records. After lodgement, the FSP’s
disaster restoration contractor (WR) carried out mould remediation works for several
days. Based on these, I am satisfied the substantial works took several days and
included removing all carpets and skirting boards to dry, dehumidifying and sanitising
the property’s floor and then carrying out moisture tests.
On 31 January 2018 the FSP’s assessor (CL) inspected the property and decided no
mould was present, based on WR’s verbal advice and his own visual observation the
wall cavities lacked mould. However at the applicant’s request, CL arranged mould air
testing, which occurred on 7 February 2018.
CL reported on 20 February 2018 mould test results by AD, a hygienist, confirmed the
presence of mould. AD completed mould swab testing on 16 February 2018. These
results found unacceptable mould levels in the wall cavity and ceiling.
Case No: 521837 Recommendation Page 5 of 11
AD’s report of 6 April 2018 referenced a discussion with a builder about their
preferred approach to treating the property’s mould. The FSP did not provide this
Service with a copy of the builder’s report. However overall I accept AD’s views
establish the FSP is unable to warrant mould remediation works until the applicant
completes (unrelated) roof maintenance works necessary to enable effective
remediation.
The FSP based its refusal to cover wall/ceiling mould on CL’s view, which is
contained in Section 3.2. CL con cluded AD’s preferred approach to treating the mould
(by first addressing maintenance issues to enable effective remediation), along with
the property being dry at 20 February 2018 with a lack of visible or airborne mould at
7 February 2018, confirmed the leak did not cause the mould and stated ‘t here is no
logical reason why we have increased mould levels ’ .
I do not agree with CL’s conclusion or consider it supported by the mould test results
or claim circumstances. This is because the applicant’s property experienced
substantial water inundation for up to 48 hours followed by sustained attempts to dry
the property. WR’s report confirmed visible mould occurred in the carpets by 29
January 2018. Air testing performed on 7 February 2018 confirmed mould, as di d
swab testing performed on 16 February 2018.
The other comments in AD’s report contained in Section 3.2 on balance do not
establish maintenance issues (cracked tiles in the roof or insulation type) as the
proximate cause of the ceiling, wall or other mould.
Given this, the parties’ materials do not establish the FSP is entitled to limit its liability
for mould at the property. The FSP is therefore liable for further mould remediation.
Applicant did not confirm roof maintenance completed
The applicant says the roof is repaired and regardless is of no relevance to mould
issues within the walls.
He disagrees with AD’s view maintenance works to the ceiling is required by the
applicant before the FSP can warrant repairs. He says:
these repairs included only two tiles with minor cracks
they are not related to walls or flooring
he believes his roof is watertight.
I give greater weight to AD’s views on the steps required to enable appropriate mould
remediation works. I am not convinced the appli cant’s photographs and his belief
about the adequacy of repairs establish mould remediation works will now be
effective.
The applicant wants the FSP to remediate the property rather than cash settle repairs.
However since April 2018, he has had sufficient time to arrange for these repairs and
provide confirmation to the FSP.
Case No: 521837 Recommendation Page 6 of 11
FSP is required to remediate the mould or cash settle these costs
I note it is possible for mould damage to increase if both parties do not take the steps
outlined to allow for mould remediation works.
Given this, if both parties accept this recommendation, I consider it fair in all the
circumstances for the:
applicant, within 21 days, to provide the FSP with a builder’s invoice confirming
the requested roof maintenance works are complete
within 7 days of receipt, the FSP is to commence mould remediation works.
If the applicant elects not to do so, then the FSP is to cash settle the claim within 14
days of the 21 days expiring.
The cash settlement is to be based on a quote and scope of works for mould
remediation of the entire property, allowing for final mould clearance (including swab
and air) testing.
In confirming roof maintenance is complete, the applicant is not required to install new
insulation, given I accepted the FSP is liab le for the property’s mould. This includes
mould the FSP noted likely exists within the insulation material itself. Regardless I am
satisfied new insulation should be installed after, and not before, mould treatment.
Other claims
The FSP reimbursed the app licant’s accommodation costs until 25 April 2018. Claim
records confirm the applicant told the FSP on 24 April 2018 he finished the requested
roof repairs. However he has not yet provided sufficient confirmation the requested
repairs occurred, so remediation has not yet commenced.
Given this, the FSP is not liable for accommodation from the date of this
recommendation until the date the applicant provides the FSP with such confirmation.
The applicant also says the FSP requested the cheapest carpet replacement, which
he says is unreasonable as he provided matching carpet samples.
The policy states the FSP will pay the cost to repair the applicant’s home using the
same materials if they are readily available in Australia. Accordingly if it has not
already done so, the FSP is to base the carpet settlement on the (old) carpet samples
the applicant said he provided its agents.
2.3 Is the applicant entitled to non-financial loss compensation?
Applicant argues the FSP handled the claim poorly
The applicant says the claim experience was stressful and confusing. He says:
the FSP’s assessor incorrectly advised of no mould on initial assessment and
based on this his family returned to an unsafe home environment
Case No: 521837 Recommendation Page 7 of 11
AC did not investigate mould until prompted by the applicant
the tests confirmed the property contained mould and was therefore unsafe
the FSP and its contractors failed to respond in an adequate manner, generally
he needed to repeatedly seek information before to receive any claim updates
The applicant also says the requirement to seek reimbursement from the FSP for
accommodation payments causes him financial stress, due to exiting financial
commitments for the insured property’s mortgage and other bills. He argues the
FSP’s lack of repair timeframe prevents him from mitigating accommodation costs by
arranging, for example, a short-term rental.
Applicant is entitled to $500 non-financial loss compensation
FOS’s Terms of Reference allow the payment of compensation (capped at $3,000) for
non-financial loss. FOS may decide an FSP should compensate an applicant for such
loss only where there has been an unusual amount of physical inconvenience, time
taken to resolve a situation, or interference with the applicant’s expectation of
enjoyment or peace of mind.
FOS takes a conservative approach to compensation for non-financial loss.
The parties’ materials confirm the FSP arranged for disaster restoration specialists to
attend to the property’s flooding almost immediately and it appears the FSP continues
to reimburse the applicant’s accommodation. The FSP did not cause the leak or
mould, the complex situation involving the roof is beyond the FSP’s control and it
agreed to further mould inspection (after roof maintenance) from 24 April 2018.
However, the applicant needed to raise concerns about mould before the FSP agreed
to initial testing. CL’s initial view on the absence of mould and his later conclusion on
AD’s view of the cause of mould is unsupported by the claim materials. Although the
AD further tested for mould on 16 February 2018, the FSP did not tell the applicant
about necessary roof maintenance until 24 April 2018. I accept these decisions
caused the applicant physical inconvenience and stress.
In all these circumstances the FSP is to pay the applicant $500 i n non-financial loss
compensation. This is to occur within 14 days of the date both parties accept this
recommendation.
Case No: 521837 Recommendation Page 8 of 11
3 Supporting information
3.1 Policy
Your cover
Insured events
We cover loss or damage to your home or contents that is caused by
certain events. We call them insured events. For us to cover you for loss or
damage caused by an insured event, the event must happen … during the
period of insurance.
Leak
Liquids that are leaking, bursting, discharging or overflowing from certain
items or devices.
General exclusions
What we don’t cover
We don’t cover you under your policy for loss or damage to your home or
contents or for legal liability which is caused by or arises in connection with
any of the following items, events or circumstances:
Loss not linked to event
Loss to your home or contents which can’t be linked to any identifiable
event …
Settling your claim
Options to settle your claim
We may choose, at our option, one or more of the following ways to settle
your claim:
1. Pay the cost to have your home rebuilt or repaired as new – that is, pay
to rebuild or repair it using the same materials if they are readily available
in Australia or equivalent materials in terms of quality, purpose and
specifications.
Temporary accommodation
We pay your reasonable temporary accommodation costs after an insured
event happens. If we agree to pay your claim for an insured event and you
need to move out of your home because the event makes your home unfit
to live in, then we pay (or reimburse you for) your:
Case No: 521837 Recommendation Page 9 of 11
- ongoing accommodation costs while your home is being rebuilt or repaired
for up to 12 months from when the insured event happened until your home
is fit to live in.
3.2 Reports
Record Key points
FSP’s expert ( SP )
Licensed tiler
Report
23 - 02 - 2018
Below are my findings through a visual ins pection and resonance
testing of the floor tiling system
The tiles have been installed directly onto the concrete sub - strate
with an approximate grout joint size of 10 - 15mm to the main floor
areas and with a 3mm grout joint size in the remaining wet areas
using an unknown type of adhesive (As no tile removal was
conducted) and grouted using proprietary blended floor grout. In m y
professional opinion this main floor has not been installed by a
professional tiler, but instead has been a D.I.Y install.
I had been informed there had been a water ingress suffered from a
burst flexible water feed hos e located in the vanity cupboard wi thin
the bathroom. This water ingress has been reported to have
potentially flowed for a period of 48 hours and covered up to 90%
plus of the dwellings foot print within the internal areas.
As stated earlier all of the drummy/de - bonded tiles have occurred
w ithin the main floor area as listed: Entry 1 Tile; Office/Dining 34
Tiles ; Kitchen 12 Tiles .
With close analysis of the drummy/de - bonded tiles through both a
close - up visual inspection and the resonating sounds that are
emitting from particular tiles, in m y expert opinion all of the currently
drummy/de - bonded tiles where pre - existing to the water ingress
event.
As an example, the tiles in particular within the kitchen area are
mainly emitting the drummy sound from the centre of the tile and
are consistently solid/sound to the majority of the tile. This is
inconsistent with what is considered usual for tiles that have been
directly affected by a water ingress event, water ingress events
cause the tiles in 99% of cases to de - bond from the perimeter
inwards not from the centre out wards.
Some of these tiles are emitting a very ‘High Pitched’ sound that
indicates to me from our past vast experience of repairing tiles that
the original installer has failed to achieve the correct adhesive
coverage/bond with the til es.
I have als o witnessed within the office/dining area that where the
owner has identified (and marked majority) drummy tiles that there
has been movement that has occurred previously to the water
ingress event occurring. This movement has been evidenced by 2 x
crack lines to the grout joints … This crack - line in some places has
actual sections of grout missing from within the grout joint itself, to
which is a direct indication to me that this has occurred at least 12
months or more prior. The majority of tiles that are currently
drummy within the lounge/bar area are loc ated directly against the
Case No: 521837 Recommendation Page 10 of 11
area of the crack - line …
The tiles that are loc ated against the sliding door track have been
subjected to thermal expansion occurring to the dark coloured door
trac k being heated by the direct sunlight that hits it at some point in
the day. As there are no movement joints located within the entire
floor tiling system, that is no perimeter or intermediated movement
joints installed at all, then the thermal expansion a nd movement
that will occur within any floor tiling system has no ability to be
absorbed and as in this case and many others res ults in the tiles
becoming drummy/de - bonded over time.
In conclusion the failure that has occurred within this dwelling to the
f loor tiling system has been a pre - existing condition that has been
caused by the original installer not achieving the correct adhesive
coverage/distribution … [and installing] the correct type and amount
of movement joints to ensure the longengevity of the tiling system.
Applicant’s expert (NS )
Licensed tiler
Report
04 - 04 - 2018
The e xisting floor tiles … have taken significant damage due to
flooding/wat er damage.
Moisture has affected the bond of old adhesive to the point of
delamination.
The tiles should be removed and replaced as soon as possible.
Applicant’s expert (GC )
Tiler
Report
Undated
I recently visited … to inspect the flooded tiled area due to a burst
pipe in the bathroom.
I have been a tiler for 10 years now … with my experience I have
come a cross cases like this one where water damage has caused
tiles to become 'drummy ', discolour cosmetically and grout to lift.
As the tiles in this property were laid thirty (30) plus years ago, it is
hard to determine what adhesive was used to lay the tiles etc., and
in my opinion the flooding that occurred was a contributing factor to
the tiles becoming 'drummy'.
The tile grout has clearly discoloured, and lifted in areas, and in my
opinion the water that flooded this area would have contributed to
the discolouration and lifting grout as it covered the tiled area for a
substantial period of time.
FSP’s expert (AD )
Hygienist
Rep ort
06 - 04 - 2018
Recommendations: t he continued entrance of moisture in the roof
cavity via broken roof tiles and the removal of the cellulos e
insulation needs to be addressed and rectified as a start point in the
remediation of the dwelling, then the ceilin g/roof cavity can then be
inspected for any mould or moisture issues.
This is the best at this stage and cheapest way forward in the
remediation of the dwelling.
Initially post remediation environmental testing was conducted on
07 Feb 18 for the degree of viable (live) mould within the dwelling
… all samples at the time were of an acceptable level, noting that
the outside air sample was quit e high … it appeared tha t all the
majority of remediation action had been completed except the
removal of the damaged kitchen cabinetry. I noticed no visible
mould and the dwelling had no obvious smells associated with
mould issues. On the 16 Feb further internal wall testing was
Case No: 521837 Recommendation Page 11 of 11
requested … to determine the levels of viable mould Colony
Forming Units (CFU’s) within the wall cavities … as the owner had
further concerns of mould within the dwelling due to his child.
Six of the seven mould samples were classed as not acceptable at
t he time of testing, all six samples were taken from wall cavities.
Other comments: all internal walls/studs etc had a moisture reading
of 11 to 13% which is considered dry ; Water damage is noted
within the kitchen dining room area whether the damage is old or
new it points to concurrent issues within the roof cavity; Water will
wick up a wall to approximately 60cm, all internal walls opened up
had no sign of wicking or water damage whatsoever; The expens e
of removing internal walls may indeed out way the co st of fixing the
roof and investigating the roof cavity as if the moisture issues are
not addressed first mould issues will continue to appear within the
dwelling .
FSP’s expert (CL )
Loss assessor
Assessment update
20 - 02 - 2018
The areas tested and which are not accept able are – Inside wall
near the main bedroom; Inside wall near the front door; Inside wall
near the dining room; Kitchen kick panel; C eiling in the dining room
where there is unrelated water damage .
[AD] have stated they are of the opinion the r eason for the high
readings is due to ongoing water issues within the roof space .
Therefore, if the property is dry as per the report dated 20th
February 2018 and the readings not ed on the 12th February stating
all areas were noted as either Acceptable or Good, why have the
walls tested as Not Acceptable now when the property has been
dried and also the Insured has fixed the leak. There is no logical
reason why we have increase mould levels.
However the internals of the walls were NOT swab tested on the
12t h February only air sampling was tested .