Home / Financial Firm (Unknown - Insurer) / Determination 521814

Determination 521814

Cash settlement for storm damage to pool disputed; pool replacement sought

FirmFinancial Firm (Unknown - Insurer)
Decided2018-12-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$28,801
SourceAFCA PDF

Summary

A fallen tree branch damaged the complainant's above-ground pool, and the insurer cash settled $13,302 for the dome and repairs. AFCA found the settlement covered all storm damage, the remaining pool damage was pre-existing earth movement, and no further payment or replacement was ordered.

The insurer's engineer evidence was preferred, as the complainant gave no written engineering report to refute it, and the earth-movement exclusion applied to the pre-existing damage.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 521814 Page 1 of 6 Determination Case number: 521814 13 December 2018 1 Determination overview 1.1 Complaint The complainant lodged a claim under her home insurance policy with the financial firm (insurer) after a fallen tree branch damaged her above ground swimming pool during a storm in July 2016. The insurer accepted the claim and cash settled the complainant for a total of $13,302 for the cost of repairing the damage to the swimming pool and replacing the domed structure over the pool. However, the complainant says the cash settlement does not cover the cost of repairing all of the damage to the pool. She says the tree branch damaged the structural integrity of the pool and it needs to be replaced. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. A copy of the recommendation is attached to this determination. The recommendation was issued by the Financial Ombudsman Service (FOS) Australia. The Australian Financial Complaints Authority (AFCA) has replaced FOS. AFCA is responsible for managing FOS complaints lodged prior to 1 November 2018. While this determination is issued by AFCA we have applied the FOS Terms of Reference. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered, but have not changed the outcome. Determination | Case number: 521814 Page 2 of 6 Is the insurer required to increase the cash settlement amount? The cash settlement amount is sufficient to repair all of the damage to the pool caused by the tree branch. Accordingly, the insurer is not required to increase this amount. 1.3 Determination This determination is in favour of the insurer. The insurer is not required to take any further action. Determination | Case number: 521814 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case analyst ’s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.2 Is insurer required to increase the cash settlement amount? Dispute concerns extent of damage caused by tree branch The insurer accepts that the complainant’s above ground swi mming pool was damaged by a tree branch that fell on the pool during a storm in July 2016. The insurer cash settled the claim for a total of $13,302, comprising:  $6,988 for the cost of replacing the domed pool cover, which was directly impacted by the fallen tree branch, and  $6,314 for the cost of repairing the additional damage to the pool, as identified by the insurer’s engineer (PS) in a report dated 15 December 2016. The complainant says that the repairs to the pool outlined in PS’s report do not address all of the damage caused by the fallen tree branch. In particular, the complainant says the impact of the tree branch caused many of the upright support posts surrounding the pool shell to lean outwards, with the result that the pool is no longer safe and needs to be replaced (at an estimated cost of $28,801). Engineer advised only unbraced posts were damaged by tree branch In his report, PS advised that the impact of the pool branch to the domed cover had pushed some of the support posts away from the vertical, resulting in movement of the top rail joints. The cash settlement amount paid by the insurer includes the cost of repairing this damage. However, PS concluded that the impact of the tree branch had only damaged the unbraced vertical support posts. While the eight braced support posts (four on each side of the pool) were also leaning, PS considered this damage pre -existed the storm and had not been caused by the impact of the tree branch. Determination | Case number: 521814 Page 4 of 6 PS’s findings were based on the fact that the braces wer e rigidly connected to the support posts and there was no evidence of movement of the braces relative to the concrete path surrounding the pool. PS concluded that the excessive outwards leaning of the posts on the west side of the pool had been caused by gradual settlement of the fill material under the concrete on that side of the pool. He noted that a level base for the pool had been installed by cutting and filling into the steep bank leading down to the river on the western side. Available information s upports engineer’s findings I am satisfied that, as a structural engineer, PS is appropriately qualified to determine the extent of the damage to the pool caused by the fallen tree branch. PS’s report provides a logical explanation for his findings, supported by close up, colour photographs taken during his inspection of the pool. The complainant says her engineer (RG) advised that all of the structural damage to the pool was caused by the fallen tree branch. She says the insurer’s notes of its discussions with RG (which reflect a contrary view) misinterpreted his comments. However, the complainant has not provided a written report from RG which refutes PS’s findings about the cause of the damage to the braced posts. I acknowledge that the complainant disa grees with PS’s conclusions. Among other things, she says the impact of the branch caused the tops of the braced posts to move. In support of her position, the complainant has provided photographs of the pool taken before the storm. However, in the absence of a report from RG (or an equivalently qualified engineer), I consider that the available information supports PS’s findings. The photographs provided by the complainant provide only a brief view of the vertical support posts and therefore do not establish that there was no pre-existing damage (particularly to the braced support posts on the western side). Further, while the complainant says there has been no earth movement (including settlement) for over 14 years, this is not consistent with the photographs included in PS’s earlier report which shows cracking and movement damage to the concrete around the pool. Insurer is not required to replace swimming pool For the reasons outlined above, I am satisfied that the damage to the braced posts was not caused by the impact of the tree branch in July 2016 but by pre -existing earth movement. The policy excludes cover for damage caused in this manner. Determination | Case number: 521814 Page 5 of 6 While PS concluded that the pool was not safe to be used, the issues which caused the pool to be unsafe where not caused by the fallen tree branch. Accordingly, the insurer is not required to replace the pool. Determination | Case number: 521814 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced man aging disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim Recommendation Case No: 521814 Recommendation Page 1 of 5 Case number: 521814 12 October 2018 1 Overview 1.1 Dispute A claim was lodged by the applicant under her home building policy with the financial services provider (FSP) following damage caused by a falling tree limb onto an above ground pool. The FSP accepted the claim and settled the applicant for the cost to replace the dome and to repair the pool. The applicant does not consider the pool to be safe and has requested that the FSP replace the pool, not repair it. 1.2 Issues and key findings Has the FSP settled the claim appropriately? The FSP has settled the claim appropriately because:  the fallen tree limb has not compromised the structural integrity of the pool  ground movement and corrosion are contributing to the overall failure of the pool  loss or damage arising from ground movement and corrosion is excluded from cover  evidence shows the pool itself can be repaired. 1.3 Recommendation This recommendation is in favour of the FSP. The FSP is not required to take any further action in relation to the dispute . Case No: 521814 Recommendation Page 2 of 5 2 Reasons for recommendation 2.1 Has the FSP settled the claim appropriately? Valid claim established There is no dispute a tree limb has fallen on the applicant’s above ground pool. The FSP has accepted liability for the applicant’s claim. The applicant has been settled $6,988 to replace the dome and $6,314 to repair the above ground pool. The applicant does not accept that the pool can be repaired and seeks the additional cost to replace the pool. A quote of $21,813 has been provided to replace the pool. FSP experts say the pool can be repaired The FSP engaged the services of ‘PS’ engineers to determine the extent of the damage to the structure of the above ground pool. PS confirmed the dome requires replacement, however does not consider the damage caused by the fallen tree limb necessitates the replacement of the pool. PS viewed the pool and found no damage to the pool wall structure or surrounding pavement caused by the tree limb. The only visible damage was to the dome and the top rail of the pool. The applicant accepts the dome requires replacement, however is concerned over the safety of the pool structure and seeks replacement of the pool. The applicant engaged her own expert engineer to determine whether the pool required replacement. No written correspondence has been submitted, however I acknowledge the FSP has spoken with the applicant’s engineer to confirm his findings. The applicant says her appointed engineer believed there was structural damage to the pool from the fallen tree limb that would require replacement of the pool. The FSP spoke with the engineer who acknowledged and identified the damage as reported by PS. There is no information to suggest the pool required replacement. Further inspection The FSP had PS attend the applicant’s insured property for a further review of the pool. This report again acknowledged damage to the top rail where the tree limb landed. Case No: 521814 Recommendation Page 3 of 5 Other issues identified by PS are:  braced pool posts appear to not have been affected by the fallen tree limb  the unbraced pool posts appear to moved off-vertical by the impact  bowing of the lining is pre-existing and is normal for this type of pool  advanced corrosion of the lining will lead to eventual failure. From this inspection, PS confirmed the pool can be repaired from the damage caused by the fallen tree limb. Contributing factors When reviewing the information provided by the parties, it is accepted the dome is required to be replaced. This has been settled by the FSP. However, the expert reports provided by the FSP have established the structural integrity of the pool has not been compromised by the fallen tree limb. It is acknowledged the influence of ground movement is causing the concrete surrounding the pool to crack. Evidence of corrosion has also been identified. As it stands, the parties agree the pool is not considered safe to swim in. From a review of the material, the evidence suggests the pool can be repaired. The applicant has not been able to provide any supporting information to refute the findings of the FSP. Therefore, I am satisfied the FSP has settled the claim appropriately and is not required to pay additional costs associated with replacement of the pool. Case No: 521814 Recommendation Page 4 of 5 3 Supporting information 3.1 FOS approach to this dispute A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issue raised. All of the provided material has been read and considered. The parties raised numerous issues in their submission to FOS. For the purpose of this recommendation, commentary is restricted to only those issues considered relevant to the outcome. 3.2 Expert reports Record Key points FSP’s expert ( PS ) Report 8 August 2016  The surrounding concrete slab has moved in various locations  Majority of pool support posts are off vertical  P ool support bowing out between posts  The movement and cracking to the surrounds concrete slab appear to be pre - existing.  There are no ‘fresh’ cracks i n the concrete and all other gaps and cracks were filled with leaves and other matter.  The leaning posts are locat ed at various locations around the pool (not just at the location of the fallen limb). FSP’s expert ( PS ) Report 15 December 2016  The brunt of the impact appears to have been taken by the dome structure, which appears to have then caused some of the unbraced posts to be pushed off vertical.  The full extent of corrosion to the steel ling cannot be det ermined by the visual inspection. It is likely that the corrosion is more extensive to the hidden inside face of the lining.  As the lining gives the pool its strength by acting as a tension membrane, extensive corrosion would eventually lead to failure.  … the bowing of the lining was pre - existing and is normal for this type of pool.  The pool could be repaired to the pre - existing condition in our view. Relevant policy terms What is not covered under any policy 1. YOU ARE NOT COVERED UNDER ANY POLICY FOR: (a) Loss, damage liability which arises gradually over time, not as a result of a single event or occurrence. (c) Loss, damage or liability caused by, arising directly or indirectly from or in any way connected with depreciation, wear, tear, fading, mould, rising, damp, mildew, rot or corrosion. Case No: 521814 Recommendation Page 5 of 5 (n) Erosion or subsidence caused by or as a result of erosion, vibration, subsidence, landslip, mudslide, collapse, shrinkage or any other earth movement.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.