Home / Financial Firm (Unknown - Insurer) / Determination 521715

Determination 521715

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-08-10
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants' home insurance claim for a ceiling collapse was declined. AFCA found no storm event was established and that a faulty construction exclusion would apply even if one had been.

Under the insured-events wording the applicants had to show a storm (strong winds) caused the collapse, and the wind data did not meet that threshold; the defects exclusion applied in any case.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 521715 Determination Page 1 of 8 Case number: 521715 10 August 2018 1 Overview 1.1 Dispute The applicants lodged a claim under their home insurance policy held with the financial services provider (FSP) after the collapse of a ceiling at their property. The FSP denied the claim saying the applicants had not established the ceiling collapse was caused by a storm event as required for any cover to be considered under the policy. The applicants disagree with the FSP’s decision saying:  in the absence of any quantitative definition of a storm, the wind gusts (and the combined Bernoulli Effect) constitute a storm for the purpose of the policy  whilst accepting construction issues existed, they were reasonably unaware of these so the FSP cannot deny the claim on this basis. 1.2 Issue and key findings Was the FSP entitled to deny the claim? The FSP was entitled to deny the claim because:  the initial onus lay with the applicants to establish the damage claimed resulted from an insured event, in this instance a storm (strong winds)  the available evidence does not establish the winds experienced at the relevant time constituted a storm for the purpose of the policy. Even if it were accepted the winds constituted a storm for the purpose of the policy, the FSP would still be entitled to deny the claim because:  the policy excludes cover for faulty construction which both parties agree contributed to the ceiling collapse  any awareness of such construction issues only becomes relevant in instances where those issues relate to wind entering the home  in the circumstances of this dispute, the construction issues related to ceiling fixings and unrelated to the wind entering the roof cavity itself. 1.3 Determination This determination is in favour of the FSP. The FSP was entitled to deny the claim and is not required to take any further action. Case No: 521715 Determination Page 2 of 8 2 Reasons for determination 2.1 Was the FSP entitled to deny the claim? For ease of reading, the relevant timeline of events is set out in Section 3.2 of this determination. Onus on applicants to establish an insured event The applicants ’ policy is commonly referred to as an ‘insured events’ policy. This means the policy will only respond to loss or damage resulting from specific events listed in the policy. Relevant to this dispute is the insured event of storm, defined in the policy to mean: Storm means a violent disturbance of the atmosphere, including strong winds. It may be accompanied by lightning, rain, hail or snow. In light of this definition and the circumstances of this dispute, the initial onus lay with the applicants to establish (on balance) the ceiling collapse was caused by strong winds. If the applicants can establish this, then the onus passes to the FSP to show why it may otherwise be entitled to deny the claim, such as the application of a policy exclusion. Both parties accept construction issues with the ceiling Setting aside the issue of an insured event for one moment, both parties agree there were construction issues with the collapsed ceiling. These issues were identified by the FSP’s assessor (MS) whose reports are summarised in Section 3.3 below. In essence, MS concludes: MS report dated 1 February 2018 In our opinion the resulting damage was caused due to a poor construction method where the ceiling sheets were fixed by an insufficient amount of screws and no adhesive was used on the section that collapsed. In contrast, the section of the ceiling that remained in place was fixed appropriately using both mechanical fixing and proper adhesive. MS follow-up email dated 14 February 2018 This is in addition to the fact that a well construction method should withstand a less than extra ordinary weather conditions like the one recorded on the 6th of January by the BOM. There is also no suggestion the applicants knew or could reasonably have known about these issues. FSP says the applicants have not established a storm event occurring The FSP says the applicants have not established the ceiling collapse was caused by the insured event of storm (strong winds) noting there was no evidence of physical disturbance or damage to the external areas of the applicants ’ roof. Case No: 521715 Determination Page 3 of 8 On this basis, it says there is no conclusive evidence to suggest that damage has occurred as a result of an insured event, rather a result of the construction issues discussed above. Applicants maintain wind gusts constitute storm for policy purposes The applicants maintain the strength of the wind gusts experienced at the relevant time constitute an insured event of storm for the purpose of the policy. They say there is a clear ‘cause and effect’ relationship between the wind occurring and the ceiling collapsing. The applicants also highlight the fact that the term ‘strong winds’ is defined in the policy, particularly in respect of any quantitative measure. Beaufort wind scale relevant to dispute In instances where a policy does not define words/terms relevant to determining a dispute, FOS will look towards the ordinary and natural meaning of the words/terms or recognised industry guides. In this instance and relied upon by FOS in the past, the ‘Beaufort wind scale’ (the scale) is applicable to the circumstances of this dispute. This scale is also recognised by the Bureau of Meteorology, and set-out in section 3.4 below. With regards to what constitutes strong winds, the scale specifies this to mean winds of 40 to 50km/h. Wind gusts experienced do not constitute a storm for policy purposes The meteorological data provided by the applicants includes both ‘wind speed in km/h ’ and ‘speed of maximum wind gust in last 10 minutes in km/h’. With regards to wind speeds from 6 to 8 January 2018, the highest recorded speed is 30km/h at 1.30PM on 6 January. With regards to wind gusts 40 km/h or over from 6 to 8 January 2018, the data confirms: Date (2018) Time Wind gust 6 January 10.43AM 46km/ h 6 January 11.00AM 41km/ h 6 January 11.02AM 50km/ h 6 January 1.30PM 42km/ h 6 January 1.56PM 41km/ h In my view, 5 recorded 40km/h wind gusts over an approximate three-hour period does not constitute a storm for the purpose of the policy. Had the overall recorded wind speed been over 40km/h during this (or any other relevant) period, I would likely come to a different conclusion on this point. Case No: 521715 Determination Page 4 of 8 I acknowledge the applicants make reference to the Bernoulli Effect and the influence this would have on airspeed within the roof cavity. However, in my view this is a secondary effect to the actual wind speed, so has no bearing when considering what a storm is for the purpose of the policy. For these reasons, I am not satisfied the applicants have established an insured event of storm occurring for the purpose of the policy, so the FSP entitled to deny the claim. However, even if I were to accept the strength of the wind experienced at the time constituted a storm for the purpose of the policy, the FSP would still be entitled to deny the claim for the reasons discussed below. Policy exclusion for faulty construction would apply even if storm established During the course of the claim, reference has been made to the following policy provision: Storm and rainwater runoff Loss or damage as a result of storm or rainwater runoff. But we will not cover you for loss or damage:  caused by … wind entering your home because of a defect, structural fault, design faul t … that you knew about or should have reasonably known about and did not fix before the loss or damage occurred. As stated above, the applicants did not know about or could not reasonably have known about the ceiling construction issues. The applicants therefore submit that even though the construction issues contributed to the collapse, the FSP would not be entitled to deny the claim (assuming a storm event). However, the available evidence suggests the construction issues related to the fixing (adhesive/screws) of the ceiling sheets themselves. They did not relate to some form of defect/design fault allowing the wind to enter the roof cavity at the home. In these circumstances, the following policy exclusion would then apply to defeat the claim: General exclusions Defects We will not cover you for loss, damage or liability caused by, or as a result of: • an inherent defect • a defective or faulty part • defective or faulty workmanship • defective or faulty design, or • defective or faulty manufacture or construction. For these reasons, even if I were to accept the applicants had established a storm event occurring, the FSP would still be entitled to deny the claim. Case No: 521715 Determination Page 5 of 8 FSP acknowledges claim handling issues Whilst the applicants do not appear to pursue this issue, I do note their initial comments relating to the FSP’s claim handling. I have considered these in light of whether the issues raised meet the FOS threshold for an award of compensation for non-financial loss. I note the FSP has acknowledged the errors made in its IDR letter and subsequent ‘Notice of Response’ to FOS, in part stating: Misplaced documents, poor communication and limited knowledge are not what [FSP] pride itself on. … It is unfortunate that the Applicants were frustrated with the claims handling experience, and it was never the intention of [F SP] to have the Applicants experience the claim process as a less than positive experience. [FSP] prides itself on the customer service provided to each of its loyal members. Feedback has been provided and will be used to help prevent other members' experience. FOS will only consider an award of compensation for non-financial loss in exceptional circumstances, such as an insured suffering an unusual degree of delay or inconvenience when dealing with a claim. Whilst in no way dismissing the applicants ’ dissatisfaction with the FSP’s claim handling, I am not satisfied this meets the FOS threshold for an award of compensation. Case No: 521715 Determination Page 6 of 8 3 Supporting information 3.1 Information exchange All relevant information has been exchanged between the parties For the sake of completeness, I note the applicants suggest some communication from the FSP to FOS has not been exchanged with them. This related to Bureau of Meteorology data pertaining to wind speeds at the local airport. However, this dat a formed part of the FSP’s ‘Notice of Response’ to FOS and was located on page 17 of the associated attachments. I am therefore satisfied there has been a full exchange of relevant information between the parties during the course of this dispute. 3.2 Timeline of events Date / time (2018) Event 7 January  At around 2AM, the applicants were woken up by the noise cause d by a piec e of cornice on the w est side wall falling off.  At around 1PM, a further piece of cornice on the w est side wall fell off. 8 January  Whilst at work, the FSP’s alarm monitoring division contacted the applicants to advise an alarm sensor had been activated. Upon ret urning home, it was discovered that around two - thirds of the ceiling had collaps ed.  The applicants conta cted the FSP to advise of the situation. They were advis ed to contact a builder and obtain a report.  At around 5PM, the applicants’ builder attended the property to undertake make - safe works. 22 January  The applicants lodge supporting information for the claim. 23 January  The FSP telephones the applicants to advise of initial claim denial. The applicants request confirmation of this in writing and a transcript of the telephone conversation that took place on 8 January. 30 January  The FSP’s assessor (MS) contacts the applicants.  The applicants query this with the FSP considering the original claim denial advice, and thereby what evidenc e the claim denial had been bas ed upon. 31 January  The FSP acknowledges the applicants’ concerns and arranges for MS to attend the following day. 1 February  Assessment takes place. 7 February  Initial claim denial letter (forwarded 9 February). 9 February  The applicants contact the FSP to follow up on the claim Case No: 521715 Determination Page 7 of 8 progress. A copy of a claim denial letter dated 7 February i s forwarded.  The applicants again request call recording transcripts and details of the complaints procedure (which they say the consultant could not provide). 12 February  Applicants send the FSP their letter of complaint. 15 February  FSP replies to the applicants’ letter of complaint and provides copies of available call recordings (noting not all calls are recorded). 8 March  IDR claim denial letter. 3.3 Assessment details Record Key points FSP’s expert MS Report 1 February 2018  Approximately two - t hirds of the ceiling and cornices had collapsed on or around 10 January 2018. The remaining ceiling lining was then removed by the applicants’ builder as it was deemed unstable.  The applicants recall that two days prior to the collapse, the cornices to the west side of the rear living area began delaminating from the wall followed by a sagging of the ceiling lining.  Upon a visual inspection, it was identified that the section of collapsed ceiling had not been properly fixed during construction. As the lining had a layer of sisalation to its back, no adhesive was used to fix the roofing sheets. By contrast, the section that remained in place had traces of adhesive material on the rafters and back of the ceiling lining thus explaining why only two - thirds of the ceil ing collapsed.  Further, the ceiling lining was fixed by screws at 600mm centres as opposed to the 300mm centres required in instances where adhesive is not used. FSP’s expert MS Follow - up email 14 February 2018  Whilst the effect of high winds and temperat ure on a building structure cannot be ruled out, the following points should be considered when det ermining the cause of damage .  V isual observations identified that the ceiling had t wo sections constructed at different times using two different constructio n methods.  The collapsed section of ceiling was the section with no adhesive and associated inadequat e screw fixings whereas the remaining section of ceiling which had been installed correctly remained in - situ.  With regards to the effect of wind pressure, the roof over the collapsed ceiling is a flat one which means the roof space is not a large area which could also reduc e the amount of pressure build up during high winds. The roof cladding was also constructed from metal sheets which can also minimize Case No: 521715 Determination Page 8 of 8 win d entry into the roof space.  For these reasons, it can be concluded that the collapse occurred due to a poor construction method. This is in addition to the fact that a well - constructed ceiling should withstand a less than extra ordinary weather conditions like the one recorded on the 6th of January by the BOM. 3.4 Beaufort wind scale (Bureau of Meteorology website) Beaufort Wind Scale The Beaufort wind scale measures wind speed according to the impact the wind has on the land and sea. Although the system is old (first developed in 1805 by Sir Francis Beaufort), it remains a widely used system to measure wind speed today. The table below describes what can be expected for each level of the scale. Please note: Beaufort scale numbers and descriptive terms such as 'near gale', 'strong gale' and 'violent storm' are not normally used in Bureau of Meteorology communications or forecasts. Beaufort scale number Descriptive term Units in km/h Units in knots Description on Land Description at Sea 6 Strong winds 40 - 50 km/h 22 - 27 knots Large branches in motion; whistling heard in telephone wires; umbrellas used with difficulty. Large waves begin to form; the white foam crests are more extensive with probably some spray

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.