Home / Financial Firm (Unknown - Insurer) / Determination 521555

Determination 521555

Cash settlement amount for water damage repairs and claim handling delays

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-29
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$102,235
Non-financial loss$3,000
Amount claimed$101,788
SourceAFCA PDF

Summary

A homeowner's water damage claim was cash settled at a figure he disputed, after the insurer changed its approach several times and repairs stalled. AFCA increased the cash settlement to $98,734.71 with interest, plus $3,500 consequential loss and $3,000 non-financial loss.

The policy covers reasonable costs of repairing damaged parts and compliant upgrades, and a cash settlement must reflect the real cost to the complainant of completing the repairs.

Issues

Subjects and remedies

home or building damagepay claimpay compensationpay interestpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 521555 Page 1 of 11 Determination Case number: 521555 25 January 2019 1 Determination overview 1.1 Complaint The complainant held a home insurance policy with the financial firm (insurer). He lodged a claim after his home was damaged by water escaping from a burst hose in September 2017. The insurer accepted the claim and authorised its builder (BB) to carry out the necessary repairs. However, the insurer then ceased repairs and decided to cash settle the claim, due to concerns about pre-existing moisture issues affecting the property. The complainant initially sought to compel the insurer to complete the repairs. However, he has since undertaken the repairs at his own expense and now seeks reimbursement. The insurer has offered to settle the claim by paying the complainant $59,438.55 for the cost of repairs, based on quotations provided by its builders . The complainant says the amount offered is not sufficient to repair all of the damage caused by the water leak. He seeks payment of $101,788.40 for the repairs, plus compensation for various losses suffered due to the insurer’s claims handling. 1.2 Issues and key findings Is the insurer required to increase the cash settlement for the repairs? The cash settlement amount for the repairs should be increased to $98,734.71 to better reflect the cost to the complainant of repairing the damage caused by the burst pipe in September 2017 . Is the complainant entitled to compensation? The complainant is entitled to compensation of $3,500 for consequential financial loss suffered in connection with the claim . The complainant is also entitled to compensation of $3,000 for non-financial loss. Determination | Case number: 521555 Page 2 of 11 1.3 Determination This determination is substantially in favour of the complainant. The insurer is required to pay the complainant the amount of $98,734.71 in full and final settlement of his claim, plus interest at the rate calculated under section 57 of the Insurance Contracts Act 1984 (Cth) for the period from 1 November 2018 until the payment date. The insurer is required to pay the complainant an additional amount of $6,500 as compensation. Determination | Case number: 521555 Page 3 of 11 2 Reasons for determination 2.1 Is the insurer required to increase the cash settlement for the repairs? Complainant says cash settlement amount is insufficient The cash settlement of $59,438.55 offered by the insurer reflected the higher of two quotations obtained from its panel builders (PB and PI) in June 2018. These quotations were based on a scope of works prepared by the builder (BB) who had initially been authorised to complete the repairs, before the insurer changed its position and decided to cash settle the claim. The complainant says the amount offered by the insurer is not sufficient to allow him to repair all of the damage to the property caused by the burst hose. Among other things, the complainant says the cash settlement amount does not provide for:  additional works required to upgrade the ducted heating system to comply with current building standards, and  the replacement of the front entry and internal doors at the property which were damaged by the escape of water and/or the subsequent actions of the insurer’s contractors. The complainant also says the quotations provided by the insurer’s builders do not reflect the cost of engaging a private builder to carry out the repairs. The complainant has provided a quotation from his builder (MF) for $121,708.40 for the claim-related repairs. However, he acknowledges that MF’s quotation also provides for some upgrades to the property. Cash settlement should include cost of roof-mounted heating unit The insurer accepts that the ducted heating system installed in the sub-floor was damaged by the escape of water from the burst pipe in September 2017. The scope of works approved by the insurer in November 2017 provided for the replacement of the damaged sub-floor ducts, at a cost of approximately $1,500. However, after starting work, the insurer’s builder (BB) advised that it would not be possible to simply reinstate the ducts in the same position, as this would not comply with current building regulations. The building regulations required greater clearance between the ducts and the sub- floor soil than was available. Accordingly, BB advised that the soil would need to be excavated (at an estimated cost of $30,000) in order to reinstate the ducts in the sub- floor. Determination | Case number: 521555 Page 4 of 11 Following discussions with the complainant in February 2018, BB proposed a variation to the scope of works to provide for the installation o f a roof-mounted heating system (as an alternative to reinstalling the ducts in the sub-floor). The policy provides cover for the reasonable costs of upgrading damaged parts of the building to comply with current building regulations (provided the relevant part was compliant when the property was constructed). The available information indicates the ducted heating system was compliant when the property was constructed in or around 2006. Accordingly, under the terms of the policy, the insurer is liable for the reasonable costs associated with reinstating the sub-floor ducts. However, the panel is satisfied that the installation of a roof-mounted ducted heating system represents an appropriate alternative to reinstating the sub-floor ducts. Further, the complainant has confirmed that this is the approach he took when he completed the repairs. Accordingly, the panel considers it is appropriate that the cash settlement include the reasonable cost of installing a roof-mounted heating system. Insurer is liable for costs of replacing doors The insurer’s assessor (CS) has confirmed that the front entry door and four of the internal doors were damaged by the escape of water in September 2017. However, the complainant says an additional eleven internal doors were damaged due to the way in which they were stacked by the insurer’ s contractors, after being removed from their hinges. The complainant’s repairer (MF) has advised that, as a result of being stacked improperly for an extended period of time, the internal doors have bowed and are unable to be reinstalled. The photographs provided support MF’s findings regarding the manner in which the doors have been stored. The insurer has not addressed this issue. In these circumstances, the panel considers it is appropriate that the cash settlement amount be increased to provide for the replacement of the front entry door and all of the internal doors. Quotations provided do not adequately reflect cost of repairs The panel is not satisfied that the quotations provided by either of the parties accurately reflect the cost of engaging a builder to complete the claim-related repairs. Determination | Case number: 521555 Page 5 of 11 The quotation of $59,438.55 provided by PB (on which the cash settlement offer was based) included the costs of a roof mounted ducted heating system, but did not include the costs of replacing the damaged doors. Further, PB ’s quotation was less than the quotation of $64,665.85 originally provided by the insurer’s builder (BB) in November 2017. A separate quotation of $83,405.30 was provided by another panel builder (RP) at this time. While the earlier quotations were based on a slightly different scope of works, the panel is not satisfied the insurer has established that it was not liable for the additional damage set out in BB’s earlier scope of works. All of the quotations obtained by the insurer were provided by panel builders and therefore are likely to include volume discounts. Further, these quotations do not allow for:  any variations required during the course of the repairs, or  the transfer of risk to the complainant due to the absence of a lifetime guarantee for the completed repairs. Accordingly, the panel considers the cash settlement amount offered by the insurer significantly underestimates the cost to the complainant of completing the repairs . As outlined above, the complainant has provided an itemised quotation from MF for the cost of the repairs. However, the complainant has declined to provide an invoice from MF for the completed repairs, showing the breakdown between the claim-related repairs and the additional upgrade works completed by his builder. Cash settlement for building repairs should be increased to $98,734.71 Having regard to the factors outlined above, the panel considers the cash settlement for the building repairs should be calculated as follows:  the cash settlement amount should be based on the quotation of $64,665.85 provided by BB, shortly before he was authorised to undertake the repairs  this amount should be increased by 25% (ie $16,166.46) to allow for the additional costs to the complainant of completing the repairs (including non-discounted rates, claim-related variations, additional supervision costs , and the lack of a lifetime guarantee)  the amount should be further increased by $5,545 to reflect the costs of installing the roof mounted ducted heating system as estimated by PB  the amount should be further increased by $12,357.40 to reflect the cost of replacing the doors, as estimated by MF. Determination | Case number: 521555 Page 6 of 11 On this basis, the insurer is required to pay the complainant the amount of $98,734.71 for the building repairs. The available information indicates the repairs were completed in or around October 2018 and the property was advertised for lease in the following months. In these circumstances, the panel considers the insurer should be required to pay interest on the cash settlement amount at the rate calculated under section 57 of the Act for the period from 1 November 2018 until the payment date. 2.2 Is the complainant entitled to compensation? AFCA may award compensation Under the FOS Terms of Reference, AFCA can award up to $3,500 in compensation for consequential financial loss suffered by a complainant in connection with their claim. AFCA can award an additional amount (of up to $3,000) as compensation for non- financial loss where there has been an unusual amount of physical inconvenience, time taken to resolve a situation, or interference with expectation of enjoyment or peace of mind. However, AFCA takes a conservative approach to assessing compensation for non- financial loss. AFCA expects complainants to be moderately robust and tolerate a normal degree of inconvenience when making a claim. Complainant is entitled to compensation for financial loss The complainant seeks compensation for additional costs and expenses incurred due to the insurer’s delay in resolving the claim. After the claim was lodged, the insurer arranged temporary accommodation for the complainant and his wife. However, in March 2018, the complainant advised that the couple would be moving into another property which they had recently purchased. The complainant says the delay in repairing the insured property meant he was unable to sell or lease it for an extended period of time. During this period, he continued to incur costs for interest, rates and utilities for both properties. Having carefully reviewed the claim records, the panel is satisfied that the insurer’s handling of the claim resulted in extended delays. While repairs were authorised in late November 2017, they did not commence until around three months later and were subsequently discontinued. The panel acknowledges that the claim was complicated by the fact that the property had previously suffered from moisture issues affecting the sub-floor area (although the extent to which these issues were ongoing is disputed). Determination | Case number: 521555 Page 7 of 11 Nevertheless, the insurer was fully aware of these issues due to the resulting damage having been the subject of previous claims, which had been denied or withdrawn. Accordingly, it was incumbent on the insurer to fully address these issues at an early stage in the claim process, to determine an appropriate scope of works and decide whether to repair the damage or cash settle the claim. It is apparent from the claim records that the insurer changed its approach to settling the claim on several occasions. Further, the insurer did not ensure clear lines of communication between itself, its contractors, and the insured, which resulted in further difficulties during the claim process. The repairs were expected to take around 6 weeks (resulting in an anticipated completion date of mid-January 2018) when BB was authorised to complete them in late November 2017. The complainant was not advised of the insurer’s decision to cash s ettle the claim until late March 2018. Due to the dispute over the cash settlement amount, it appears that none of this amount was paid. As a result, the complainant was unable to complete the repairs until October 2018. The policy does not provide cover for loss of rent or other expenses incurred in these circumstances. However, the panel is satisfied that a significant portion of the delays were directly attributable to the insurer’s claims handling. The insurer says it should not be held responsible fo r the fact that the complainant bought an additional property while the claim was in progress. However, while this is true, the complainant’s actions also resulted in a significant cost saving to the insurer, as it was no longer required to fund the cost of temporary accommodation. In these circumstances, the panel considers the complainant is entitled to compensation for consequential financial loss under the FOS Terms of Reference. The complainant has provided information about the weekly rental for comparable properties during 2018. It appears the insured property was advertised for rent at $900 per week in November 2018. Given the extent of the delays and the estimated weekly rental, the panel is satisfied that the complainant’s loss exceeds the max imum of $3,500 which it is able to award. Accordingly, the insurer is required to pay the complainant the amount of $3,500 as compensation for consequential financial loss. Determination | Case number: 521555 Page 8 of 11 Complainant is entitled to compensation for non-financial loss The panel is satisfied that the extended delay in finalising the claim has caused additional stress and inconvenience to the complainant and his wife. The stress has been compounded by the insurer’s repeated changes of position. In the circumstances, the panel considers the complainant is entitled to compensation of $3,000 for non-financial loss. Determination | Case number: 521555 Page 9 of 11 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing di sputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2, & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint 3.2 Our approach to this complaint This complaint has not been the subject of a recommendation. Due to the nature of the complaint, it has been referred directly to a panel for determination, in line with the Operational Guidelines to the FOS Terms of Reference. The panel consists of an Ombudsman and two representatives with consumer and insurance experience. The panel has decided this complaint based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice, and previous decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. The panel has reviewed and considered all of the material provided by the parties. While the parties have raised numerous issues in their submissions, for the purposes of this determination the panel has restricted its commentary to those issues that it considers directly relevant to the outcome only. 3.3 Relevant policy terms Additional features (pages 26 – 28) If we accept your claim for loss or damage to the building due to an insured event, we will also Determination | Case number: 521555 Page 10 of 11 Additional features (pages 26 – 28) provide the following additional features. The additional features and their limits are paid in addition to the cover provided under the building ins urance. Other repair/rebuilding costs We cover We do not cover When we are rebuilding or repairing damaged parts of the building, we will pay the reasonable and necessary costs: The cost of:  to make the damaged parts of the building comply with the current home building regulations and laws.  upgrading undamaged parts of the building to comply with the current home building regulations and laws;  making the building comply with home building reg ulations and laws that existed but were not complied with when the building was originally built or altered. How we settle building claims (pages 4 5 – 5 1 ) If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:  repair damage to the building;  rebuild the building;  pay you what it would cost us to repair or rebuild the building; … We will not: …  pay extra to repair or rebuild the building to a better standard, specification or quality than it was before the loss or damage occurred… … Dealing with defects … We do not rectify structural or design faults When we accept a claim, we will not pay extra to rectify a structural or design fault at the building that you knew about (or should reas onably have known about). We w ill only pay you what it would have cost us to fix the damage from the incident covered by your policy or if we agree, you can pay Determination | Case number: 521555 Page 11 of 11 How we settle building claims (pages 4 5 – 5 1 ) us the extra amount it costs to rectify the structural or design fault at the building. If undamaged defective parts of the b uilding will not support repairs If undamaged defective parts of the building you knew about (or should reasonably have known about) will not support repairing the damage caus ed by an incident covered by your policy, we will only pay what it would have cos t us to repair the damage had the building not been defective.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.