Refusal of further construction drawdowns; alleged misleading statements on interest-only period
Text of the determination
Determination | Case number: 521549 Page 1 of 12
Determination
Case number: 521549 7 February 2019
Determination overview
1.1 Complaint
On 13 January 2016, the complainant obtained a home loan from the financial firm for
$3,500,000 (loan). The purpose of the loan was to refinance an existing loan with
another financial firm and for the construction of a new home. The loan funds were to
be provided to the complainant as progress payments. On 2 February 2016, the first
drawdown on the loan was made to complete the refinance.
Several delays occurred which prevented the complainant from drawing the loan
funds for the construction. On 28 December 2017, the financial firm made the first
and, to date, the only, progress payment for the construction.
The financial firm has recently declined the complainant‟s request to drawdown the
remaining loan funds for the construction, as it says the complaina nt is in breach of
the loan terms.
This complaint is about whether the financial firm:
misled the complainant about the operation of the loan
is required to allow further drawdowns.
On 9 August 2018, the Financial Ombudsman Service (FOS) case manager provided
the parties with a recommendation on the issues in the complaint. The
recommendation was substantially in favour of the financial firm. A copy of the
recommendation is attached to this determination.
The financial firm accepted the recommendation but the complainant rejected it.
The recommendation was issued by FOS. The Australian Financial Complaints
Authority (AFCA) has replaced FOS. AFCA is responsible for managing FOS
complaints lodged before 1 November 2018. While this determination is issued by
AFCA we have applied the FOS Terms of Reference.
Determination | Case number: 521549 Page 2 of 12
1.2 Issues and key findings
Were the findings of the recommendation correct?
Based on the available information, the findings contained in the recommendation
were correct and are adopted in this determination. I have considered submissions
made before and after the recommendation. In his further submission, the
complainant claims that the financial firm‟s failure to alert him about the two -year
period to complete construction was unconscionable. As this was not previously
raised or dealt with in the recommendation, it is considered in this determination.
Did the financial firm act unconscionably in its dealings with the complainant?
For the reasons set out in section 2 below, I am satisfied the financial firm did not act
unconscionably in its dealings with the complainant.
Does the complainant’s submission change the recommendation?
The complainant rejected the recommendation for the reasons set out in section 2 .3
below. Based on all the available information, the recommendation was fair in all the
circumstances having regard to FOS‟s approach. The complainant has not provided
any information to change the outcome of this complaint.
1.3 Determination
This determination is substantially in favour of the financial firm.
I agree with the case manager‟s reasons for the recommendation, except I consider
$3,300 (rather than $2,000,) is appropriate compensation for the stress and
inconvenience caused by the financial firm‟s conduct .
If the complainant accepts this determination within 30 days, then within 7 days of
receiving his acceptance, the financial firm should credit the loan with $3,300.
The financial firm says for it to consider extending the interest only period and to allow
further drawdowns, the complainant needs to complete a new application.
To date, the complainant has not been willing to complete a new application. While
the complainant says there is no obligation on him to reapply, there is no obligation on
the financial firm to extend the interest free period and allow further drawdowns on the
loan.
If the complainant wants the financial firm to extend the interest only repayment
period and allow further drawdowns, he should submit a new application as previously
requested by the financial firm. He is also free to seek his own financial or legal
advice on his options, such as applying to refinance with another financial firm so he
can complete construction or selling.
Determination | Case number: 521549 Page 3 of 12
Reasons for determination
2.1 Were the findings in the recommendation correct?
The findings in the recommendation were correct
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and previous FOS decisions. I have considered all the
material submitted by the parties, both before and after the recommendation. I am
satisfied the documentation I have relied on has been provided to both parties.
I am satisfied the case manager‟s recommendation contains an accurate summary of
the complaint, the issues to be determined, any applicable paragraphs of the Terms
of Reference and any relevant law.
Having reviewed all the relevant information, the recommendation was fair in all the
circumstances having regard to the circumstances of the complaint and FOS‟s usual
approach. I agree with the findings of the recommendation and adopt them into this
decision.
In his rejection, the complainant raised a claim of unconscionable conduct. This was
not considered in the recommendation and is dealt with below.
2.2 Did the financial firm act unconscionably in its dealings with the
complainant?
A financial firm must not act unconscionably
At common law and under the Australian Securities and Investments Commission Act
1989 (cth) (ASIC Act) a financial firm is prohibited from engaging in unconscionable
conduct when providing a financial service.
When assessing whether a financial firm has engaged in unconscionable conduct, we
consider all the circumstances of the complaint including the criteria set out in section
12CB (1) of the ASIC Act, such as:
the relative strength of the parties‟ bargaining positions
any undue influence
any unfair tactics
the terms of the agreement and the parties‟ understanding and conduct.
Further details about what is considered in determining whether conduct is
unconscionable under the ASIC Act and common law are set out in section 3.2 below.
Determination | Case number: 521549 Page 4 of 12
The complainant has not shown the financial firm acted unconscionably
The complainant says the financial firm acted unconscionably when it did not tell him
he had two years to complete the construction when it knew the build was delayed.
The recommendation correctly found this contributed to the complainant being led to
believe the financial firm would fund the project until completion. However this does
not amount to unconscionable conduct because:
the complainant was not at any special disadvantage the financial firm was or
should have been aware of
the complainant says he had similar loans before, so could reasonably be
expected to be aware a financial firm would require construction to be completed
within a particular time frame
there is no indication the relative strength of the bargaining position of the parties
was a factor in the complainant‟s treatment
there is no indication the financial firm engaged in any undue influence or unfair
tactics against all good conscience
the loan was advanced on the financial firm‟s usual terms and conditions for home
loans with building loan conditions – i.e. the complainant was not subject to
onerous or unfair conditions that would not have applied to other customers getting
the same sort of loan.
While the complainant may believe he has been treated unfairly by the financial firm,
the financial firm‟s conduct was not unconscionable.
2.3 Does the complainant’s submission change the recommendation ?
The complainant rejected the recommendation
In rejecting the recommendation, the complainant says:
the financial firm‟s representative told him the extension of interest only
repayments would be automatic
the financial firm was aware the construction would not be completed within two
years and is bound by the terms of the building contract; as such, it should not
have made the loan offer if it intended to disregard the building timeframe
the financial firm did not tell him it would withdraw funding if the construction was
not completed within two years
he did rely on the financial firm‟s conduct or he would not be in the current situation
he is under no obligation to reapply for an interest only period
the term the financial firm relies upon saying the building must be completed within
12 months of the settlement date does not form part of the complainant‟s contract
as it was not provided to him.
Determination | Case number: 521549 Page 5 of 12
Having independently reviewed the full complaint file, I am satisfied most of the issues
above were comprehensively and adequately dealt with in the recommendation. To
the extent they require further review, they are discussed below.
The financial firm did not mislead the complainant about the interest only
period
Based on all the available information, I agree with the recommendation‟s finding t hat
the complainant has not established that, before entering into the loan contract, he
was misled into believing the financial firm would automatically extend the interest
free period under the loan.
While the complainant says he was told the interest only repayment period would
automatically be extended, as set out in the recommendation, he has not provided
any information to support this claim.
I agree with the recommendation‟s finding that the financial firm representative‟s
statement of recollection does not say or imply he told the complainant the interest
only period would automatically be extended.
In any event, even if the complainant established the financial firm misrepresented the
interest only period would automatically be extended, I do not consider it was
reasonable for the complainant to extrapolate from this that the financial firm would
allow an indefinite period for construction to be completed.
The loan terms form part of the loan contract
The recommendation correctly found the complainant is bound by the terms and
conditions of the loan.
The complainant says on 27 March 2018 when the financial firm provided a copy of
the terms and conditions, there is no clause 2.3(f)(i) and so he is not bound by this
clause.
It appears the financial firm provided an updated version of the terms and conditions
when it emailed the complainant on 27 March 2018. The provision about building time
frames is in this document, albeit at section 5.1(e)(i). It allows 24 months rather than
12 for completion.
The version of the terms and conditions applicable when the loan was provided was
given to the complainant during this complaint and contains the provision relied upon
by the financial firm at clause 2.3(f)(i).
The financial firm providing an updated version of the terms on 27 March 2018 does
not change that the complainant:
acknowledged he read the terms and conditions when he signed the “Acceptance
of the Credit and Package Offered by [financial firm]” on 13 Jan uary 2016
Determination | Case number: 521549 Page 6 of 12
does not dispute receiving the “Credit Contract Details”, which says the terms in
the terms and conditions document also apply
is bound by the acceptance he signed, whether or not he read it before signing
should have requested a copy of the terms and conditions if he did not receive
them before signing the acceptance.
Given the above, contrary to the complainant‟s claim, the financial firm has provided
enough information to show the terms and conditions form part of its loan contract
with the complainant.
Further, I do not agree with the complainant‟s position that the financial firm had an
obligation to tell him he had to complete the building within 24 months when it
provided the loan. The financial firm was not obliged to advise the complainant or
exercise judgment on his behalf. The complainant was responsible for protecting his
own interests and getting any legal or financial advice he needed on the loan contract.
The fact the financial firm‟s former representative says he was not aware of the „time
for c ompletion‟ clause is irrelevant – he was not the complainant‟s financial adviser.
I agree with the recommendation‟s finding that it is more likely than not the
complainant was provided with the terms and conditions. In the absence of
unconscionable conduct or a misrepresentation which induced him to enter into the
loan contract (neither of which he has shown), the complainant is bound by the terms
of the loan, whether or not he read and understood them.
The complainant has not made out his estoppel claim
I also agree with the recommendation‟s findings that:
the financial firm led the complainant to believe it would fund the loan beyond 12
months
the complainant did not act in reliance on the financial firm‟s conduct
therefore the complainant has not established his estoppel claim.
The complainant‟s rejection focuses on the fact the financial firm led him to believe it
would fund the loan beyond 12 months. This is accepted in the recommendation and I
agree.
I appreciate and sympathise with th e complainant‟s frustration at the financial firm‟s
failure to tell him when it was aware of delays in construction, that it would not
continue making progress payments if the build wasn‟t completed in 24 months (or at
least within the interest free period).
Determination | Case number: 521549 Page 7 of 12
The complainant did not change his position in reliance on the financial firm’s
conduct
The complainant has not shown how he relied on the financial firm‟s conduct to his
detriment. He just says he would not be in the curre nt situation (i.e. without the funds
to pay the builder to complete construction). The complainant has not established that
he acted, or abstained from acting, because he believed the financial firm would
continue to fund the project.
The complainant has not said what he would have done differently if the financial firm
had told him the build needed to be completed within a two-year timeframe, other
than he would have stayed with his previous financial firm, rather than getting the
loan.
In this regard I note that the financial firm‟s conduct which led him to believe it would
fund the loan beyond 12 then 24 months, was after the complainant entered into the
loan contract, not before. Therefore he could not have stayed with his previous
financial firm in re liance on the financial firm‟s conduct, since he had already left them
and refinanced with the financial firm. He was also committed to the terms of the
building contract by the time the financial firm‟s conduct suggested it would keep
funding the construction. This is where the complainant‟s claim fails.
As set out in the recommendation, the delays in construction were caused by issues
outside the complainant‟s control. The delays could not have reasonably been
avoided by any action by the complainant. Eve n if the financial firm told the
complainant the build needed to be completed in a two-year timeframe when the
delays occurred, the complainant could not have taken any steps to prevent the
delays. The complainant was not able to expedite the build.
The complainant says:
the building contract has a completion timeframe of one year and 21 days after the
completion of the basement
the build could never be completed within the two-year period
the financial firm was aware of this and should not have provided the loan if it
intended to disregard the timeframes.
I do not agree that the building contract supports the complainant‟s position. The
available information, including the building contract, shows:
the financial firm is not a party to the building co ntract and therefore is not bound
by its terms as the complainant claims
if construction had started immediately after the loan was funded in February 2016,
it could have been completed within two years
Determination | Case number: 521549 Page 8 of 12
the delay of one year and five months from the time the loan was funded to when
construction began was not foreseeable when the financial firm approved the loan.
The complainant has not shown the financial firm waived its reliance on the
contract terms
Whilst the complainant has not suggested the financial firm waived its right to rely on
the contract terms about when the build should be completed, it is relevant to
consider whether it has done so by its conduct.
Waiver is the unilateral abandonment of a right of claim. It may apply where a party to
a contract represents, by its conduct or inaction, that it will not enforce a right under
the contract and the other party alters its position in reliance on this.
If the complainant establishes that the financial firm waived its right to rely on clause
2.3(f)(i) the financial firm can no longer assert its right to rely on this clause. The
clause states:
Unless we agree otherwise:
(i) the building must be completed within twelve months of the settlement
date
To establish a waiver claim the complainant needs to show unequivocal words or
conduct, including a deliberate failure to assert a right up to the latest possible time.
The financial firm did not assert its right to rely on clause 2.3(f)(i) of the contract when
twelve months from the settlement date expired. By not advancing the first progress
payment until 17 December 2017, well over twelve months after the settlement date,
arguably the financial f irm‟s conduct was suggesting it:
would not assert its right to rely on that clause or any extension to the timeframe in
that clause
as concluded in the recommendation, led the complainant to believe it would keep
extending funds under the loan by not mentioning his default under the loan
contract at that time.
However, not all the elements of waiver are made out, as:
the complainant needs to show he altered his position in reliance on the financial
firm‟s failure to assert its right under clause 2.3(f)(i). For the reasons set out at
pages 4 and 5 above and in the recommendation, I am satisfied the complainant
did not alter his position in reliance on this
the complainant needs to show unequivocal words or conduct, including a
deliberate failure to assert a right. Clause 19.24 of the contract terms provides:
Determination | Case number: 521549 Page 9 of 12
If we do not exercise a right or remedy fully or at a given time, we can still
exercise it later… We will not be responsible for any loss or damage resulting
from a breach by you of any clause of this contract [Emphasis added]
The financial firm made it clear in its letter to the complainant of 23 March 2018 that it
was going to rely on its right to say he was in default because he had not completed
the build within two years – having already allowed him an extra twelve months to
finish the construction than the loan contract provided.
The complainant has not relied on any misrepresentation by silence
Whilst the complainant has not specifically raised it, arguably by not telling him it was
effectively agreeing to a 24 month deadline for construction (rather than the 12
months allowed for in the contract), it was misrepresenting by silence that it would
continue to fund the loan.
However, the remedy for misrepresentation is not to make it come true that the
financial firm would continue to advance payments under the loan. Instead I have to
consider what the complainant would have done differently if he had known the
financial firm would not do so.
The complainant could not have done anything differently as, for the same reasons as
set out for his estoppel claim (see pages 6 and 7 above) and in the recommendation,
I am satisfied he did not change his position in reliance on such a misrepresentation .
The financial firm is not required to allow further draw downs under the loan
Clause 1.1 of the loan terms provides that:
We only have to provide your home loan if…
(e) you are not in default under this contract
Clause 2.1 provides:
We agree to lend you your home loan in one or more amounts as you request
provided the conditions in clause 1 have been met
Given:
the complainant did not comply with the condition requiring the build to be
completed within 12 months (which the financial firm effectively agreed to extend to
24 months)
for the reasons at page 8 above I am satisfied the financial firm did not waive
reliance on this term (as extended)
Determination | Case number: 521549 Page 10 of 12
the financial firm is not obliged to make further advances under the loan.
The complainant is entitled to non-financial loss compensation
In the circumstances, I agree with the recommendation‟s finding that the complainant
is entitled to compensation for the stress and inconvenience he would have
experienced when he was told the financial firm would not allow further advances,
despite its conduct leading him to believe otherwise.
I consider the maximum amount FOS could award for non-financial loss of $3,300 to
be appropriate compensation for this (rather than the $2,000 awarded in the
recommendation).
The complainant has not shown he has incurred or mitigated any financial loss
I note that even if I were satisfied the complainant had changed his position in
reliance on the financial firm‟s conduct (which I am not), he has not shown that he has
incurred any financial loss as a result. He has not provided any information to show
the builder is penalising him or taking action against him.
In any event, the complainant has a duty to protect his own interests by taking
reasonable steps to mitigate (minimise) any loss caused by the financial firm‟s
conduct. The complainant could have taken steps by:
applying to the financial firm to extend the interest only period on the loan, which
he has refused to do. I accept that he does not have to do so, but as the loan
contract provided for only 2 years interest free (based on most building works
being finished in that time,) and that period has expired, the bank is not obliged to
extend it
applying to refinance the loan to another financial firm so he can complete the
build.
If the complainant has not taken such steps because he thinks the application would
be declined because his financial circumstances have changed since the loan
approval, this gives the financial firm another reason to stop further advances under
clause 1.1(a) of the contract terms which provides:
We only have to provide your home loan if …
Nothing has happened since you applied…which has led, or w hich we reasonably
believe could lead, to a significant adverse change in your financial circumstances
Clause 2.1 (see page 9 above) makes it clear the financial firm only has to advance
amounts if the above condition is satisfied. Therefore if there has been an adverse
change in the complainant‟s financial circumstances, this would be another basis on
which the financial firm could refuse to advance further amounts under the loan.
Determination | Case number: 521549 Page 11 of 12
Supporting information
3.1 The determination is made under FOS Terms of Reference
AFCA is managing complaints previously lodged with FOS.
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applic ant complainant
financial services provider financial firm
dispute complaint
3.2 Unconscionable conduct
Under the ASIC Act, a person must not engage, in connection with the supply of
financial services, in conduct that is in all the circumstances unconscionable. For the
purposes of determining whether conduct has contravened this section, a court may
have regard to:
the relative strengths and bargaining positions of the parties; and
whether a customer was required to comply with conditions that were not
reasonably necessary for the protection of the financial supplier‟s interests; and
whether the customer understood the documents relating to the supply of the
financial service; and
whether there was any undue influence or unfair tactics by the financial supplier
(although the court cannot have regard to circumstances that were not reasonably
foreseeable at the time); and
the amount for which, and circumstances under which, the customer could have
acquired equivalent services from another financial supplier.
At common law, the elements considered when assessing whether there has been
unconscionable conduct include whether:
one party (the weaker party) at the relevant time suffered from a special
disadvantage or disability;
the other party (the stronger party) must have known or should reasonably be
expected to have known of that disadvantage or disability at the time; and
acting on that knowledge, the stronger party took advantage of the weaker
Determination | Case number: 521549 Page 12 of 12
party‟s disadvantage or disability in circumstances where it is considered to be
unconscionable to have done so.
Special disadvantage may arise by reason of age, sex, need of assista nce, language
ability, illness, ignorance, inexperience, impaired faculties, or financial need.
To establish a claim, the courts have generally found there needs to be some form of
serious misconduct against good conscience or a “high level of moral obloquy”, and
not something that is merely unfair or unjust ( AG NSW v World Best); Holdings Pty
Ltd [2005] NSWCA 261 ).
Recommendation
Case No: 521549 Recommendation Page 1 of 10
Case number: 521549 9 August 2018
1 Overview
1.1 Dispute
On 13 January 2016, the applicant obtained a home loan from the FSP for
$3,500,000 (loan). The purpose of the loan was to refinance an existing loan with
another financial services provider and for the construction of a new home. The loan
funds were to be provided to the applicant as progress payments. On 2 February
2016, the first drawdown on the loan occurred to complete the refinance.
Several delays occurred which prevented the applicant from drawing the loan funds
for the construction. On 28 December 2017, the FSP made the first and, to date, the
only, progress payment for the construction.
A detailed timeline of events is set out in section 3.1 below.
The FSP has recently declined the applicant‟s request to drawdown the remaining
loan funds for the construction, as it says the applicant is in breach of the loan terms.
This dispute is about whether the FSP:
misled the applicant about the operation of the loan
is required to allow further drawdowns based on the legal principle of estoppel.
1.2 Issues and key findings
Did the FSP mislead the applicant about the interest only period?
The available information does not support the applicant‟s claim he was misled to
believe the interest only period would automatically be extended. There are no
documents to suppor t the applicant‟s claim.
Is the FSP required to allow further drawdowns on the loan?
The FSP is not required to allow further drawdowns on the loan. The applicant has
not made out his estoppel claim. While the FSP led the applicant to believe it would
allow drawdowns until the construction was completed, the applicant did not rely on
this assumption to his detriment. It is not reasonable for the applicant to believe the
FSP would allow drawdowns over an indefinite period of time. However, the applicant
is entitled to compensation of $2,000 for the stress and inconvenience experienced
Case No: 521549 Recommendation Page 2 of 10
as a result of the FSP leading him to believe it would allow drawdowns until the
construction was completed.
Is the applicant bound by the terms of the loan?
The terms and conditions form part of the agreement signed by the applicant. Based
on the available information, it is more likely than not the applicant received the terms
and conditions.
1.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is not required to advance any further progress payments under the loan.
If both parties accept this recommendation, then within 14 days of their acceptance,
the FSP should credit the loan with $2,000.
The FSP says in order for it to consider extending the interest only period and allow
further drawdowns, the applicant needs to complete a new application.
To date, the applicant has not been willing to complete a new application.
If the applicant wants the FSP to extend the interest only repayment period and allow
further drawdowns under the loan, he should submit a new application as previously
requested by the FSP.
Case No: 521549 Recommendation Page 3 of 10
2 Reasons for recommendation
2.1 Did the FSP mislead the applicant about the interest only period ?
A financial services provider must not engage in misleading conduct
A financial services provider must not engage in misleading conduct. Misleading
conduct may occur where a financial services provider makes a statement, or acts in
such a way, that is misleading or deceptive.
To establish misleading conduct, an applicant must show:
the financial services provider made a representation that was untrue
the applicant acted in reliance on the representation, and
in relying on the representation, the applicant suffered a loss.
The remedy for a misleading conduct claim is not to make the misrepresentation
come true. Rather, FOS considers what an applicant would have done differently,
had the misrepresentation not been made.
The onus is on the applicant to establish he was misled.
Further information about our approach to how we consider disputes is set out at
section 3.3 below.
The FSP did not mislead the applicant about the interest only period
The applicant says the FSP representative, Tony, who assisted with the loan
application, told him the interest only period would automatically be extended.
Further information about the applicant‟s position is set out in section 3.2 below.
The applicant has not provided any information to show the FSP made an untrue
representation about extending the interest only repayment period.
Rather, the following indicates the applicant was not misled:
the loan contract says the interest only period is for 24 months
neither the loan contract nor the terms and conditions provide for automatic
extension of the interest only period
on 2 Feb 2015, the FSP sent a letter to the applicant which said the interest
only period is 2 years and gave a date for the expiration of this period; the letter
did not say this period could or would be extended
the statement of recollection from Tony does not say or imply he told the
applicant the interest only period would be extended
the lending notes say the applicant wants the loan funds for construction
purposes during the interest only period, but do not contain any mention about
discussions surrounding possible extensions of the interest only period
the timeframe for completion in the building contract (not including unforeseen
delays) is more than one year, but not more than a two year period.
Case No: 521549 Recommendation Page 4 of 10
2.2 Is the FSP required to allow further drawdowns on the loan?
The applicant says the FSP is estopped from refusing to further fund the loan
The FSP says the applicant is in breach of the loan terms because the construction
was not completed within two years. The FSP relies on clause 2.3(f) of the terms and
conditions, which says, unless it agrees otherwise, the building must be completed
within 12 months of the settlement date. The settlement date is defined as the date of
the first drawdown.
The applicant says the FSP is estopped from refusing to further fund the loan. Details
of the applicant‟s position are set out in section 3.2 below.
Generally, estoppel occurs where:
one party leads a second party to believe they can do something different to
their contractual entitlements, and
the second party relies on this to their detriment.
The elements required to substantiate a claim of estoppel are set out in section 3.3
below.
The FSP led the applicant to believe it would fund the loan beyond 12 months
The FSP led the applicant to believe funding under the loan would be extended
beyond the 12 month contractual term to allow construction to be completed.
This view is based on the following:
despite the terms requiring construction to be completed within 12 months, the
FSP did not seek to enforce this term until 24 months had passed
there is no information to show the FSP told the applicant the construction
period was extended to 24 months, or would be capped at 24 months
the emails between the FSP and the applicant about the delays do not say what
impact, if any, the delays would have on the FSP‟s willingness to allow further
drawdowns
the letters sent from the FSP on 15 and 18 December 2017 say the loan will
change to principal and interest repayments, but do not say the FSP will not
allow further drawdowns
on 28 December 2017, the FSP made the first and only progress payment. This
was just over a month before the end of the FSP‟s two -year construction period.
The applicant did not act in reliance on the FSP’s conduct
There is no information to show the applicant either acted or refrained from acting in
reliance on his assumption the FSP would allow drawdowns until the completion of
the construction.
Rather, the available information, including the building contract, shows:
Case No: 521549 Recommendation Page 5 of 10
the time to complete the build was 360 days (excluding some additional days for
estimated delays). Accordingly, if not for the delays, the build could, and likely
would, have been completed within the 24-month period allowed by the FSP
the delays were caused by tree issues, the need for an arborist, and council
approval, and not due to any action or inaction by the applicant or the FSP.
Neither the applicant nor the FSP would reasonably have foreseen that the
construction of the property would be delayed by the length that it was. The
Applicant paid the deposit to the builder on 11 December 2015.
Further, despite the FSP‟s conduct, it is unreasonable for the applicant to believe the
FSP would allow drawdowns for an indefinite period of time.
Although the FSP led the applicant to believe it would fund the loan beyond the 12
month contractual term, the applicant did not act in reliance on this belief. As such,
he has not made out his estoppel claim.
The applicant is entitled to compensation for non-financial loss
FOS is able to award compensation for stress and inconvenience incurred as a result
of a financial services provider‟s error. Here, as set out above the FSP misled the
applicant into believing it would continue to fund the loan until the construction was
completed. When the FSP told the applicant it would not allow further progress
payments, he would have experienced considerable stress and inconvenience.
The maximum amount FOS can award for non-financial loss compensation is $3,000.
If both parties accept this recommendation, the FSP should compensate the
applicant with $2,000 in non-financial loss compensation.
2.3 Is the applicant bound by the terms of the loan?
The applicant says he did not receive the loan terms and conditions
The applicant says, notwithstanding the above, the FSP:
did not give him a copy of the loan terms before 27 March 2018
therefore cannot rely on clause 2.3(f)(i) as it does not form part of the agreed
contract.
The applicant is bound by the loan terms
On 13 January 2016, the applicant signed the “Acceptance of the Credit and
Package Offered by [FSP]” which says by signing the applicant acknowledges:
receiving a copy of the documents listed, including the terms and conditions
reading the terms and conditions.
This letter also says the terms and conditions are attached, along with the loan
contract.
Case No: 521549 Recommendation Page 6 of 10
Where a person signs a document they know contains contractual terms and which
they understand will affect their relationship with the FSP, the person is legally bound
by those terms. It is irrelevant whether or not the person read the document before
signing it.
Further, on 3 February 2016, the FSP emailed the applicant advising the loan was
set up in line with the applicant‟s instructions. This email specifically says (amongst
other things):
Your build is required to be completed within one year of the date of the first draw
down from your loan…If you are not able to meet this timeframe please ensure
you contact the team and we will discuss options available to you.
In the circumstances, it is more likely than not the applicant was provided with the
terms and conditions when he accepted the loan contract. In any event, if he did not
receive a copy of the terms and conditions, he should have requested a copy of them
before signing the acceptance letter.
The applicant is bound by the terms of the loan.
Case No: 521549 Recommendation Page 7 of 10
3 Supporting information
3.1 Timeline of events
Date What happened
11 Dec 2015 Receipt for payment to builder from applicant for $230,000 for deposit
8 Jan 2016 FSP sends applicant a letter:
advising the Loan is approved and requesting a copy of the building contract,
insurance, and plans
requesting these documents are sent with the first progressive loan claim
11 Jan 2016 Applicant signs building contract
Receipt for payment to builder from applican t for $70,000 for bas e stage
13 Jan 2016 Applicant signs loan contract
2 Feb 2016 Partial drawdown of the Loan occurs (refinance portion)
FSP sends letter to applicant which says:
it has distributed the funds as he asked
interest only repayment period is 2 years 0 months
end of interest only repayment period is 2/2/2018
3 Feb 2016 FSP sends applicant e mail saying:
loan is approved
build is required to be completed within one year of the date of the first draw
down from the loan
FSP emails the builder a nd requests documents to allow it to process fut ure claims
FSP sends builder a letter advising all required documents were executed by the
applicant and finance has been approved to assist with construction
11 Apr 2016 FSP emails applicant and asks for up date on construction as no claim received
11 Jul 2016 FSP emails applicant and says it has not yet received a progress claim for the
construction, requests update on construction and if there are any issues
Applicant res ponds to FSP and says there are no issues with the buil der and the
house is demolished; the first invoice will likely be sent in a few mont hs
12 Dec 2016 FSP emails applicant and says it still has not received a progress claim for the
construction, asks for updat e
FSP emails builder and sa ys it has not been provided wit h the previously
requested documents
14 Dec 2016 Applicant res ponds to FSP and says there has been some delay with city council
giving the final go ahead, expect final approval to be given shortly
FSP thanks applicant for the update
8 Feb 2017 FSP emails applicant and asks if there has been any progress
10 Feb 2017 Applicant emails FSP and says the house is coming along aft er a bit of a delay but it
has been sorted
Case No: 521549 Recommendation Page 8 of 10
9 Mar 2017 FSP emails applicant to follow up as no clai m received
10 Mar 2017 Applicant res ponds with same email from 14 Dec 2016
FSP thanks applicant for the update
13 June 2017 FSP emails builder and says the plans provided do not have the permit number or
the building survey or name on them and cannot be verified
14 June 2017 Builder provides plans with building permit number
July 2017 Applicant says the building started
13 Sep 2017 FSP emails applicant saying she has not heard from him
15 Sep 2017 Applicant res ponds to FSP and says the project started in July after a long delay
with city council and neighbours
15 Dec 2017 FSP sends letter to applicant saying the interest only period ends on 2 February
2018; after that his monthly principal and int erest repayments will be $7, 903. 21
18 Dec 2017 FSP sends letter to applicant and confirms the direct debit arrangement, not es “This
doesn‟t change your loan agreement.”
22 Dec 2017 FSP writes to applicant and says it received base claim, asks if it is the site prep
claim as per the payment schedule and advises as per previous email, applicant
will need to contribute $35,971.77 towards the invoice
Applicant res ponds and says he confirms the invoice for the deposit and the site
preparation as per the buil der schedule; happy to pay the $36, 000 to the builder
27 Dec 2017 Applicant sends email to FSP and says:
he received two letters in regards to the interest only period which they spoke
about
they are in the middle of building and do not want any change t o the loan
interest only is required for at least the next three years
28 Dec 2017 FSP makes first progress payment
9 Jan 2018 FSP writes to applicant and says she needs applicant‟s notice of assessment for
2016
10 Jan 2018 FSP writes to applicant and s ays:
She is escalating case to Resolutions department
Best case scenario is bypassing FSP‟s policies and extending the expiry date of
the loan
15 Jan 2018 Applicant sends letter to FSP and requests it is sent to FSP‟s dispute resolution
team. Letter says:
terms of the loan were two years interest only which can be extended if he chose
to do so
it is a system issue with the FSP that the loan cannot remain as interest only
while the house is still under construction
unforeseen delays have occurred with the c onstruction
it is unfair for the FSP to now request a new loan application especially given the
first progress payment was made
Case No: 521549 Recommendation Page 9 of 10
9 Feb 2018 Applicant emails FSP and says:
the second payment to the builder will be due soon
the FSP should find a way to over ride the system
if principle and interest repayments are required while continuing to pay the
builder until the project is completed, that is ok
23 Mar 2018 FSP writes to the applicant and says:
loan terms allow for two year interest only period
unless ag reed otherwise, building must be completed within 12 mont hs of
settlement date, which was 2 Feb 2016
applicant is in breach of the contractual obligations as the time period to complete
the construction has lapsed; no further progressive payments will be a pproved at
this time
a new loan applic ation needs to be lodged to extend the interest only period
25 Mar 2018 Applicant writes to FSP and asks for the Building Loan Conditions; says he has
never seen this document
27 Mar 2018 FSP sends applicant the terms and conditions
29 Mar 2018 FOS dispute 521549 lodged
3.2 The applicant’s position
Misleading conduct
The applicant says:
the FSP representative, Tony, who assisted with the loan application, told him
the interest only period would automatically be extended as a mere formality at
the expiration of the 24 month contractual period
all the applicant needed to do to was make the required interest only
repayments
he relied on this representation as he, and the FSP, knew the construction
would exceed two years.
Estoppel
The applicant says the FSP is estopped from refusing to further fund the loan as the
FSP:
made representations were made to the applicant that the interest only period
would be extended
approved the loan with full knowledge of the building contract
was fully aware construction of the house could not be completed within 12
months, and did not seek to enforce this provision until after 24 months
was kept up to date by the applicant about the construction delays through
various emails
Case No: 521549 Recommendation Page 10 of 10
on 15 and 18 December 2017 sent letters to the applicant which did not say
further progress payments could not be made once the loan converted to
principal and interest repayments
on 28 December 2017 made the first progress payment.
3.3 How we consider disputes
FOS gives more weight to contemporaneous documentation
FOS is not a court of law. We do not have the power to take or test evidence on oath,
or to require third parties to give evidence. If we find we need information from a third
party, and that information needs to be tested, we may not be able to consider a
dispute.
When we assess disputes, we consider available documents, the recollections of the
parties, and all relevant circumstances. We give more weight to contemporaneous
documentary information.
If there is no relevant documentation, we will decide what is most likely to have
occurred based on the information provided to us. If there are conflicting recollections
and these are evenly weighted, we may find a claim cannot be established.
Estoppel
A claim of estoppel arises where the:
applicant assumed or expected a legal relationship exists between him and the
FSP, or a legal relationship will exist between them and the FSP is not free to
withdraw from the expected legal relationship
FSP induced the applicant to adopt an assumption or expectation
applicant acted (or abstained from acting) in reliance on the assumption or
expectation
FSP knew or intended the applicant to do so
applicant‟s action or inaction has caused him detriment if the assumption or
expectation is not fulfilled by the FSP
FSP failed to act to avoid the applicant‟s detriment whether by fulfilling the
assumption or expectation or otherwise.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.