Text of the determination
Determination
Case No: 521316 Determination Page 1 of 9
Case number: 521316 10 July 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents policy underwritten by the financial
services provider (FSP) covering her home address.
On 11 October 2016, a claim was lodged under the policy for water damage to a
freestanding garage at the rear of the property, which the applicant says occurred
from a storm on 9 October 2016.
After considering the claim, the FSP accepted the claim for the resultant damage to
the ceiling linings, which had been damaged by rainwater ingress. However, it
declined to cover any damage to the garage roof on the basis that this was not
caused by the storm. The roof had been damaged due to long standing issues, no ne
of which were covered by the policy.
The applicant is dissatisfied with this decision and also with the manner in which the
FSP managed her claim.
1.2 Issues and key findings
Was the FSP entitled to limit its liability for the claim?
The FSP was entitled to limit its liability for the claim because :
the policy is an insured events policy;
the damage to the roof did not arise as a result of an insured event as defined;
the cause of the roof damage is specifically excluded from cover;
the FSP was therefore entitled to decline the claim for the roof;
the FSP‟s decision to accept the resultant damage is reasonable;
the applicant has not shown the amount offered by the FSP is inadequate to
remedy the claim related repairs; and
there is no evidence to suggest the FSP advised the applicant it would cover
the roof.
Insofar as the FSP has made an error in providing only the GST exclusive amount in
settlement of the claim, the FSP is to remedy this within 14 days of the date of this
determination.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation for the manner in which the FSP
managed her claim, as the material shows it was managed reasonably overall.
Case No: 521316 Determination Page 2 of 9
1.3 Determination
This determination is in favour of the FSP.
The FSP is entitled to exclude the roof aspect from the claim.
The FSP is not required to pay compensation to the applicant for the manner in
which it managed her claim.
Apart from remitting the GST component of the settlement (which was overlooked),
the FSP is not required to take any further action. The FSP is to do so within 14 days
of the date of this determination.
Case No: 521316 Determination Page 3 of 9
2 Reasons for determination
2.1 Was the FSP entitled to decline the claim for the roof?
Applicant has the onus to establish a claim
It is established insurance law the applicant carries the initial onus to show that the
terms and conditions of the relevant insurance policy covers the loss. This is known
as a prima facie claim. This entails showing both the cause and extent of the loss.
Once the applicant establishes a prima facie claim, the onus then shifts to the FSP to
demonstrate the loss is not covered, either by way of one of the policy exclusions or
on some other basis.
The FSP‟s policy is an insured events policy. Therefore, the policy only responds
where one or more of the listed events causes the damage, subject to any
exclusions. One of the listed events is storm.
Applicant must show roof was damaged by the storm
The applicant seeks the cost of repairing the roof to be covered under the claim. She
maintains the storm event caused damage to the roof from heavy winds blowing roof
sheets loose, allowing water to enter.
In order for the costs to remedy the roof to be brought in under the policy terms, the
proximate cause of the damage to the roof must have arisen as a result of an insured
event. That is, the roof was damaged by a storm as defined. For example, roof tiles
blown off in heavy wind or tiles cracked by hailstones.
Simply because the roof allegedly started to leak during a period of rai nfall or heavy
winds does not, of itself, satisfy this onus.
Proximate cause of the loss must be an insured event
When considering whether the exclusion applies to defeat the claim, it is appropriate
to first determine the proximate cause of the loss. What is the proximate cause of the
loss is a question of fact depending upon the circumstances in each case.
It is well established at law that a proximate cause is not necessarily the first or the
last or the sole cause of the loss. It is the effective or do minant or operative cause of
the loss. If there are several causes operating contemporaneously, then each must
be examined for the qualities of predominance and efficiency as the active, efficient
cause that sets a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Case No: 521316 Determination Page 4 of 9
FSP’s expert evidence
The FSP appointed building firm “AB” to inspect the property and report on the cause
of the loss. Full details of AB‟s reports are contained within section 3.2 of this
determination.
AB‟s reports are clear in stating that whilst there was evidence of rece nt wind lifted
roof sheets, the roof was in poor condition with the sheeting screws loose and no
longer capable of holding the sheets down. There was evidence of long term water
entry to the ceiling. The fascia was ro tted and the parapet flashings were dilapidated.
AB considered all of the issues were long term in nature and not the result of a single
storm event.
Phototrophs of the garage provided by the parties show a dilapidated structure in
need of significant maintenance. These photographs generally su pport AB‟s
conclusions that the damage was long standing and not as a result of any single
event.
I accept the staff of AB is suitably qualified and experienced to assess the cause of
the damage. In the absence of any conflicting information, the FSP is entitled to rely
on their findings.
Applicant’s evidence
In support of her position that the roof was damaged by a storm event, the applicant
has presented a report from building firm “MB”. I hav e considered this report as part
of my view.
However, in my view, MB‟s report does not assist the applicant. Rather, it is
supportive of AB‟s conclusions that the roof has experienced significant weathering
and long-term damage over its lifespan. MB specifically references ongoing and long-
term water entry, and the roof sheets now becoming fragile due to extensive weather
exposure. Whilst MB does state the situation is now to the point where it is
dangerous and the roof and ceiling require replacement, he does not attribute this to
the claimed event.
Accordingly, after considering all of the available evidence, the evidence of the FSP
is preferred.
Cause of loss specifically excluded from cover
I have not been provided with any data around the likely windspeed velocity on the
day of the loss. However, I do note AB‟s comment that the roof screws were no
longer capable of holding down the roof sheets. Therefore, the roof screws were not
capable of holding the sheets down, regardless of any storm event. Further, I accept
that, on balance, regardless of the wind on the day of the loss, the roof had not been
watertight for some time prior.
The material presented shows the proximate cause of the damage to the roof was
due to long term general wear and tear and gradual deterioration of the roof sheeting
rather than the storm, or any other event which would attract cover under the policy.
Case No: 521316 Determination Page 5 of 9
Therefore, whilst it may be the case the excessive rainfall and/or windspeeds
exacerbated the damage evident, it was not the proximate cause of the loss.
The applicant has therefore not discharged the onus on her to establish a valid claim
for the roof. Even if it were accepted a claim was established, the exclusions would
be operative in the circumstances and defeat the claim. The FSP was therefore
entitled in these circumstances to exclude the roof from the applicant ‟ s claim.
Delay in make safe does not bring claim under the policy terms
The applicant makes an allegation that because the FSP did not complete a „make
safe‟ in a timely manner, this has caused the damage to worsen considerably. She
considers the FSP is liable for the loss on this basis alone.
However, each claim is assessed on its merits and the remedy for any type of delay
is not payment of a claim which would otherwise not be covered. Instead, FOS would
look at what loss flowed from any delay, and determine the appropriate remedy.
The applicant has not presented any evidence to show that any additional damage
was caused to either the roof or ceiling by the delay. On the contrary, the material on
the file shows the roof required replacement at the time of AB‟s initial inspection as it
would not be possible to fix new sheeting to the existing. Further, AB‟s scope of
works noted the water damage plaster sheets required replacement.
Even if I were to accept the FSP had any liability for replacing the roof (and I do not),
there is insufficient evidence to show the alleged delay caused any further loss. On
this basis, the FSP has no liability as a result of the alleged delay.
Cash settlement amount is reasonable
For the sake of completeness, I have considered the cash settlement amount paid by
the FSP for the resultant damage to the ceiling.
The FSP has made its settlement offer based off the quotation prepared by AB. The
applicant has not presented any evidence to show this is insufficient to adequately
repair the claim related damage.
Therefore, the FSP‟s figures are unchallenged and I accept these reasonably reflect
the cost to remedy the claim related damages.
Howev er, I note the FSP‟s settlement amount of $2,180.81 represents the GST
exclusive amount quoted by AB. There is no suggestion the applicant is entitled to
claim any input tax credits which would entitle the FSP to withhold payment of the
GST component. In my view, this is a simply an error on the part of the FSP.
Therefore, I accept the applicant is entitled to the GST inclusive amount of $2,398.89
in settlement of her claim. The FSP is to remit the balance of $218.08 to the applicant
within 14 days of the date of this determination.
Case No: 521316 Determination Page 6 of 9
2.2 Was the applicant misled that the roof would be covered?
Onus rests with the party making the allegation of misrepresentation
The applicant maintains the FSP advised her on „numerous occasions‟ it would cover
the roof damage and it is therefore not entitled to resile from this position.
However, where it is accepted an FSP made a misrepresentation about a claim, the
remedy is not to make the promise come true. Instead, the applicant must establish
what she would have done if she was not misled, and what loss flowed from the
misrepresentation.
In making an allegation of misrepresentation, the onus normally rests with the party
seeking to rely on it.
No evidence the applicant was misled
In order for it to be accepted there was a misrepresentation, a clear and
unambiguous misleading statement must be made. In reviewing the claim notes and
various assessment reports, I can find no reference to the applicant ever being
advised that the roof would be covered.
Whilst there is discussion around the requirement for the entirety of the roof to be
replaced, I am satisfied this was only in the context of the eventual acceptance of the
claim. I do not consider this is therefore binding on the FSP.
The applicant has not produced any other objective or independent evidence in
support of her position.
Applicant has not demonstrated a loss
In this instance, the applicant has not shown she has suffered a loss from the alleged
misrepresentation. The applicant did not incur any costs as result of the alleged
misrepresentation, in fact, she has confirmed to FOS she is yet to compete any
repairs to either the roof or ceiling.
Accordingly, there is insufficient evidence to suggest the FSP misled the applicant at
any time or that she incurred a loss as a result. Therefore, the dispute is to be
assessed solely on its merits, as set out above.
Other matters
The applicant has also raised payment of the damaged content items as part of this
dispute. However, the material shows the applicant has not pursued this aspect of
the claim directly with the FSP. In the circumstances, it is not appropriate for FOS to
consider this matter before the FSP has had the opportunity to review its liability
under the policy terms for the content items.
Case No: 521316 Determination Page 7 of 9
2.3 Is the applicant entitled to compensation for the way the FSP
managed the claim?
Terms of Reference allow for compensation in limited circumstances
The Terms of Reference (the Terms) enable FOS to compensate an applicant for
non-financial loss outside of the policy terms (capped at $3,000 per claim).
Compensation for non-financial loss is limited. FOS may decide an FSP should
compensate an applicant for such a loss only where there has been:
an unusual amount of physical inconvenience
an unusual amount of time taken to resolve a situation
interference with the a pplicant‟s expectation of enjoyment or peace of mind.
FOS takes a conservative approach to compensation and expects an applicant to be
moderately robust and bear the usual degree of inconvenience when managing an
insurance claim. The simple passage of time is not a trigger for compensation.
FSP’s management of claim reasonable
The FSP‟s management of the claim was reasonable. Whilst I appreciate the
applicant was dissatisfied with the service s he received, and the FSP‟s ultimate
decision on her claim, there is nothing in the material before me to suggest there
were any undue delays or untoward behaviour on the part of the FSP.
Whilst I accept there was a delay in arranging the make safe, in the overall context of
the claim, I do not accept this was significant. Further, the material is clear in showing
the applicant was the source of some of the delays whilst the claim was on foot.
Applicant not entitled to compensation
Accordingly, taking into consideration FOS‟s conservative approach to compensation
and the degree and extent of inconvenience incurred, I consider the FSP‟s conduct of
the claim was appropriate.
Therefore, an award of compensation in in these particular circumstances is not
appropriate.
Case No: 521316 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to FOS. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.
3.2 Expert reports
Record Key points
FSP’s expert (A B )
Builder‟s Report
18 October 2016
inspection of freestanding garage showed recent damage to
super six style asbestos roof
six sheets were damaged
the roof sheeting inside the garage was water damaged
there were wear and tear and maintenance issues visible
throughout
it is not possible to replace the damaged sheeting due to
matching difficulties with the existing sheet profile
any new sheeting could not be adequat ely secured , therefore
the entire roof requires replacement
the fixing screws to the remaining sheets were lifting from
long term wear and tear
there is rotted timber fascia to the front and rear
there are leaks to other sections of the roof from maintenance
related issues, which is causing damage to the eaves lining
the parapet flashing is lifting
the surface of the asbestos roof sheets is degraded and
unsealed
the timber is sagging and significant upgrade of components
is required.
FSP’ s expert ( A B)
Builder‟s Report
17 November 2016
the garage is showing signs of long term water entry
there are two sheets damaged from excessive water entry
the roof is in poor condition which signs of long term wear
and tear evident
the roof sheets show previous attempts at sealing to prevent
water entry
the flashings to th e parapet walls are dilapidated
screws are no longer holding the roof sheets down allowing
them to flap in heavy winds
the eaves are suffering from long term water damage has had
sheets replaced along with the timber fascia
all of the above mentioned are n ot due to the recent event.
Case No: 521316 Determination Page 9 of 9
Applicant’ s expert
( M B)
Builder‟s Report
23 February 2017
water from storm/rain ingress has extensively damaged the
existing ceiling and eaves to the garage
water is entering the roof space in numerous places, for
example the ridge capping, cracks in the super 66 asbestos
sheets and even under the tarpaulin
continued long term water damage to the garage roof and
ceiling has caused deterioration to the internal lining
this needs urgent attention
the cracks in the asbestos roofing are allowing the ceiling
linings to weaken
the only way to fix the problem is to replace the existing
asbestos roof wit h new material
w eat hering has caused the asbestos sheeting to become
fragile and in this condition, it is considered dangerous.