Home / Financial Firm (Unknown - Insurer) / Determination 521173
Determination 521173
Cash settlement amount for arson-damaged building and temporary accommodation
Summary
The applicant's home was damaged by arson and a second attack, and the FSP cash settled the building claim. AFCA increased the cash settlement by $40,572.60 plus interest, refused further temporary accommodation, and barred an offset of an $8,600 overpayment from another claim.
A cash settlement must be fair and made in good faith; the Panel added a 12.5% margin for unforeseen costs and loss of the repair guarantee, and temporary accommodation is capped at 12 months.
Issues
- Claim amount dispute primary · upheld
“the FSP is required to increase the cash settlement amount for the building claim to $365,153.43”
- Delay secondary · not upheld
“the Panel is not satisfied the FSP is solely responsible for the delays”
- Other secondary · upheld
“The FSP is not entitled to make a deduction from this current claim for any amount paid to the applicant in the May 2018 claim”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 521173 Determination Page 1 of 6
Case number: 521173 26 September 2018
1 Overview
1.1 Dispute
The applicant holds a home and contents policy with the financial services provider
(FSP). An arson attack damaged the applicant’s house. The FSP accepted the claim.
It met the contents claim and cash settled the claim in respect to the house,
temporary accommodation and sundry other items.
According to the FSP, it has paid $49,082.42 for temporary accommodation, the cost
of pool cleaning and debris removal, and $324,580.83 for the cost of the rectification
of the house.
A dispute has arisen over the cash settlement amount and the temporary
accommodation benefit.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The information available shows the FSP’s cash settlement amount was generally
adequate. However, given the claim is to be cash settled, the Panel considers it
appropriate the FSP’s cash settlement be increased by $40,572.60 to $365,153.43,
to allow for any unforeseen costs incurred in the process of carrying out repairs and
the loss of the FSP’s guarantee of repairs.
Is the applicant entitled to additional temporary accommodation?
The applicant’s property has remained unrepaired for a long per iod of time. Having
reviewed the available information, the Panel finds that there were a number of
reasons for this and is not satisfied the FSP is solely responsible for the delays.
Given the FSP has already paid the temporary accommodation benefit policy limit of
12 months, the Panel is not satisfied the applicant is entitled to any additional
temporary accommodation benefit.
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is required to increase the cash settlement amount for the building claim to
$365,153.43, together with interest on the additional $40,572.60 from the date of
payment of the previous cash settlement to the date of payment in accordance with
the Insurance Contracts Act 1984 (as amended) (the Act). The FSP is not required to
pay any further amount for temporary accommodation.
Case No: 521173 Determination Page 2 of 6
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
Applicant required to establish loss
The dispute has a long and difficult history. Numerous reports, photographs,
correspondence and submissions have been provided by both parties. This included
material received during the Panel’s deliberations on the outcome of this dispute.
There was a considerable amount of correspondence together with reports o n the
extent of the damage to the applicant’s home received in this period.
Whilst all of the information exchanged has been considered, only that information
relevant to the final outcome will be referred to in this determination.
The applicant’s home and contents insurance policy provides coverage for loss and
damage to the building and contents as a result of insured events detailed in the
product disclosure statement (PDS).
It is accepted insurance law that the applicant, as the insured, carries the initial onus
to establish that he has suffered loss and damage which is covered by the terms and
conditions of the policy.
Applicant’s property was affected by separate incidents
The exchanged material confirms:
on or around 7 October 2017 an arson attack damaged the building and
contents
on or around 13 October 2017 a further malicious attack damaged the building
on or around 10 January 2018 someone flooded the pool and garden.
The FSP accepted the claims. However, the parties remain in dispute over the
appropriate cash settlement amount for the claims.
Applicant wants his builder’s quotation (OR) paid
The Panel accepts the FSP has a discretion to cash settle a claim under the terms of
the policy. That discretion must be used fairly and consistent with the principles of
good faith.
The FSP’s builder CB initially quoted the repair to cost $279,184.15 (including GST).
The parties exchanged numerous correspondence and several revised offers were
made by the FSP. The applicant says CB’s quotation is insufficient. He says:
the quote is under-quoted and not at building industry rate
some items are missing
some items do not match what was in his house.
The FSP then obtained another builder’s quotation (PI). PI quoted the repair to cost
$261,164.13.
Case No: 521173 Determination Page 3 of 6
The applicant remained dissatisfied with this and obtained his building quotation. His
builder OR quoted it would cost:
$404,034.39 to repair the damage due to the initial arson attack
$10,727.20 to repair the damage due to the second attack.
The FSP reviewed the quotation documentation and has cash settled the claim for
the rectification of the house for $324,580.83. This amount together with an
additional sum to cover other items, has been paid to the applicant.
FSP’s cash settlement based on FSP’s assessments were reasonable
As indicated, there were two attacks on the applicant’s property. In relation to the
damage due to the second attack, the FSP has already agreed and paid the
applicant $10,727.20 based on OR’s quotation. The FSP says this pa yment was
made on 13 April 2018. As full payment has been made, the Panel will not review this
further.
In relation to the cost to repair the damage in the initial arson attack, the Panel is
generally satisfied the FSP’s offer of $324,580.83 is sufficient .
The FSP’s building consultant and engineer (CR) conducted a line by line review of
OR and PI’s quotations. CR noted some of the items in OR’s quote were excessive
because:
OR quoted for the replacement of 125 square metres of new glazed terracotta
roof tiles. CR says this is excessive as only the tiles over the kitchen area are
damaged. CR estimate this to be around 20-25sqm. CR allowed for 45sqm of
new roof tiles were damaged and requires replacement.
OR quoted $11,780 to replace three new garage roller doors. CR assessed this
to cost only $6,660.
OR quoted $6,597 for the replacement of blinds throughout the house. This is
considered a contents item under the policy.
OR quoted $5,880 for four general purpose power outlets in the kitchen. CR
considered this excessive.
OR quoted $4,200 to install a new wardrobe in bedroom 2. CR assessed this to
cost $2,760.
OR quoted $4,200 to install a new wardrobe in bedroom 3. CR assessed this to
cost $2,760.
OR quoted $11,500 to install new doors to cabinet carcasses in the laundry. CR
assessed this to cost $4,600.
OR quoted $13,125 for external rendering. CR disallowed this cost. CR’s scope
of works included for the clean and treat smoke affected external render.
CR also accepted some additional items which were omitted in the original scope of
works. CR added these items into PI’s quotation.
The Panel notes that the applicant has raised issues about the quality of the FSP’s
expert evidence. Expert evidence has been provided by both parties. It is the opinion
of the experts only which must be taken into account by the Panel in reaching its
decision but it must be weighed in conjunction with all other evidence in making a
decision. The Panel notes that CR, as a building consultant and engineer, is
Case No: 521173 Determination Page 4 of 6
appropriately qualified to review and assess building repair costs. CR notes their
review is based on the Rawlinsons Australian Construction Handbook. The Panel is
entitled to take this opini on into account along with those provided by the applicant’s
consultants in respect to the rebuilding of the home.
The Panel has noted the additional documentation and opinions which have been
provided since the commencement of its deliberations, in addition to the above
documentation. The Panel has taken this into account in reaching its decision.
Cash settlement amount should be increased to $365,153.43
Whilst the applicant maintains the FSP’s cash settlement based on PI’s quotation
and CR’s review is inadequate because OR’s quotation is substantially higher, the
Panel accepts it is not uncommon for there to be significant variation between
estimates provided by different builders for the same work.
However, given the claim will be cash settled, the Panel accepts it is appropriate for
the FSP’s cash settlement to be increased to allow for some of the applicant’s
concerns, his site supervision that might reveal unforeseen costs incurred in the
process of carrying out the repairs, and for the loss of the FS P’s guarantee on the
repairs. The Panel is satisfied there should be a margin for these things to be taken
into account.
On this basis, and taking into account PI’s quotation and CR’s review, the Panel
considers it fair in all the circumstances the FSP be required to increase the cash
settlement for the building repairs by 12.5% to $365,153.43.
The FSP has previously cash settled the applicant for $324,580.83. Therefore, the
FSP is required to make a further payment of $40,572.60, together with interest on
this sum from the date of payment of the previous cash settlement to the date of
payment in accordance with the Act.
The Panel notes that the applicant has had the financial benefit of having the
$324,580.83 since its payment and will receive interest on the additional $40,572.60,
to cover any increased building costs.
2.2 Is the applicant entitled to additional temporary accommodation?
Policy provides a limited temporary accommodation benefit
The applicant’s policy provides for the payment of temporary accom modation
benefits where an insured event causes damage to their property to the extent he
cannot live in it.
The policy states this benefit is up to 12 months and subject to a maximum of 10% of
the building’s sum insured.
FSP provided for 12 months of temporary accommodation
The FSP says it is not liable for any further temporary accommodation cost as it has
paid for 12 months of temporary accommodation. The information available shows
the FSP paid:
Case No: 521173 Determination Page 5 of 6
$28,517.42 for temporary accommodation at Q Apartment and S Apartment
from 14 October 2017 to 29 April 2018
$20,300 for temporary accommodation from 30 April 2018 to 7 October 2018
(5 months at $4,300 per month). This amount was cash settled to the applicant.
The applicant says the FSP has not sufficiently paid for his temporary
accommodation cost. He says the FSP should pay him a further six to eight months
of temporary accommodation to repair the house.
FSP not liable for further temporary accommodation
Given the large loss that has occurred, the Panel accept the FSP was entitled to
complete a forensic investigation into the circumstances of the claim. The Panel
accepts this would have caused some delay.
The Panel also accepts the property has remained unrepaired for a long period of
time. However, the Panel does not consider the FSP was solely responsible for the
delays.
The information shows:
the applicant chose to obtain his own trades to repair the property
the FSP made an offer to cash settle the cl aims based on its builder’s quotation
for $221,468 on 19 February 2018
whilst the applicant disputed the FSP’s initial cash settlement offer, he did not
provide his builder’s quotation until 29 March 2018
the applicant’s own builder (OR) says it would take approximately 4-6 months to
complete the repairs
the FSP provided the applicant with a cash settlement amount of $347,048.03
on 9 April 2018 for the purposes of the applicant commencing repairs
from the information provided there is a question over what steps have been
taken by the applicant to progress the carrying out of the repairs.
Given the above, and that the policy provides for a limit of 12 months of temporary
accommodation, the Panel is not satisfied the applicant is entitled to payment for a
further period of temporary accommodation.
Case No: 521173 Determination Page 6 of 6
3 Supporting information
3.1 Other matters
A further incident occurred to the applicant’s property on or about 8 May 2018.
The parties came to a resolution on the further damage this incident caused to the
property on or about 12 July 2018. The FSP prepared a deed of release for an
amount of $162,000 for this new claim. The applicant signed this deed on 19 July
2018.
The FSP subsequently advised FOS on 25 July 2018 that it overpaid the applicant
$8,600 in this new claim. It wants to deduct this amount from this current claim in
dispute.
The Panel does not consider this appropriate. The applicant has in good faith
accepted the FSP’s offer on 19 July 2018 as a full and final settlement for the
damage incurred on 8 May 2018. The FSP had the opportunity to fully assess and
review its offer before providing it to the applicant.
Moreover, the Panel notes that the applicant has made claims for the cost of
consultant opinions in the course of this arson dispute before it. The Panel is not
satisfied that it was necessary for the applicant to incur the extent of such costs but
the retention of this $8,600 is a fair countervailing benefit.
The FSP is not entitled to make a deduction from this current claim for any amount
paid to the applicant in the May 2018 claim.
3.2 Key policy wording
Alternative temporary accommodation (including for pets)
We will cover
Costs of alternative accommodation for up to 12 months if your buildings suffer loss or
damage and you are unable to live in your home as a result.
…
The maximum amount we will pay is up to 10% of the buildings sum insured, as shown in
your schedule.
…
What happens if we decide to pay you the cost to repair or rebuild your buildings
If we decide to pay you the cost to repair or rebuild your building(s) we will:
- Pay you the cost of repairing your building(s) to a condition as close as possible to
when new, but not better
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.