Home / Financial Firm (Unknown - Insurer) / Determination 521109
Determination 521109
Shower leak claim declined as shower not a covered item; claimed link to earlier bath overflow claim not established
Summary
The applicant sought cover for a shower leak and for repairs to the waterproof membrane linked to an earlier bath overflow claim. AFCA found the shower is not a covered item and the applicant had not shown a causal link to the earlier claim, so the determination is in favour of the FSP.
A defined-events policy responds only to listed apparatus and events, and the applicant bears the onus of establishing a causal link to an earlier covered claim.
Issues
- Claim denial primary · not upheld
“The FSP was entitled to decline claim two because the policy does not respond to the loss from a shower, which is not one of the listed apparatus.”
- Product terms interpretation secondary · not upheld
“The policy provides an exhaustive list of items of which it will respond to claims from, and a leaking shower recess is not one of them.”
Subjects and remedies
no remedy
Text of the determination
Determination
Case No: 521109 Determination Page 1 of 5
Case number: 521109 19 July 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents policy underwritten by the financial
services provider (FSP) covering her home address.
On 8 May 2015, the applicant lodged a claim under the policy for liquid escaping from
her shower (claim two). The applicant believes the shower is leaking due to the
rupture of the waterproof membrane, which was caused by a previous escape of
liquid claim from the bath in 2012 (claim one). The applicant seeks the cost to
remedy the waterproof membrane and other yet to be determined repairs be covered
by the FSP.
The FSP says there is no evidence that there was damage sustained to the
waterproof membrane or any part of the bathroom from claim one. It says the two
claims are separate, standalone events and should be assessed individually. As the
policy specifically excludes loss or damage from water escaping a shower, it is
entitled to decline claim two.
1.2 Issues and key findings
Was the FSP entitled to decline the claim?
The FSP was entitled to decline claim two because:
the policy is a defined events policy;
the policy contains an exhaustive list of apparatus which it will cover an escape
of liquid claim from;
a shower is not one of the listed apparatus;
therefore, the policy does not respond to the loss.
The FSP is not liable to undertake any further repairs under claim one because:
there is insufficient evidence to show the bathroom, shower or waterproof
membrane sustained any damage from claim one;
the FSP has previously repaired the resultant damage from claim one.
1.3 Determination
This determination is in favour of the FSP.
The FSP was entitled to decline the claim and is not required to take any further
action.
Case No: 521109 Determination Page 2 of 5
2 Reasons for determination
2.1 Is the FSP entitled to deny the applicant's claim?
Onus on applicant to establish a prima facie claim
It is accepted insurance law that the applicant carries the onus of proving , on
balance, that an insurable event has occurred. This is known as a prima facie claim.
Once the applicant has established a prima facie claim, the onus shifts to the FSP to
establish, on balance, and entitlement to decline the claim on the basis of a policy
exclusion or some other basis.
The FSP's policy is a defined events policy. Therefore, the policy only responds to
loss or damage caused by one of the listed events. One of the listed events is
bursting, leaking, discharging or overflowing of liquid.
As an aside, the applicant has purchased the optional cover of accidental damage.
However, the policy is clear that this refers to accidental loss or damage from an
accident as opposed to broadform accidental damage cover. Therefore, the claim will
be assessed against the relevant insured event as set out in the relevant policy
applicable at the time of each event.
Policy covers escape of liquid only from the specified items
There is no dispute the current policy covers loss caused by an escape of liquid.
However, the policy provides an exhaustive list of items of which it will respond to
claims from.
A bath is one of the listed items.
However, a leaking shower recess or cubicle is not one of the listed items. In fact , the
policy specifically excludes loss or damage from a leaking shower floor or base,
shower cubicle walls, shower glass screening or doors. Further, the cost to repair the
item from which the liquid escaped is not covered under the terms of the policy.
There is no dispute the shower is leaking. Leak detection tests showed the shower
failed the static test to the shower base and the spray test to the screen.
Therefore, the costs to repair the shower itself are not covered as it is the leaking
item. And were it to be found that there was any resultant damage from the leaking
shower (none is evident at the time of writing), this is also not covered as the policy
does not respond to resultant damage from a leaking shower. On this basis, the FSP
was entitled to decline claim two.
2.2 Is the FSP liable for further repairs under claim one?
Claim one repairs undertaken in 2012
There is no dispute the FSP accepted claim back in 2012. This claim was due to a
bath overflowing (a covered event under the policy in place at the time), causing
damage to the nearby staircase and ceilings below. The FSP undertook the
Case No: 521109 Determination Page 3 of 5
necessary repairs to the resultant damage in 2012. There was no damage to the
bathroom recorded as a result of the event, and no repairs to the bath as it was not
leaking or otherwise malfunctioning, it simply overflowed.
Were it to be accepted that claim one did cause damage to the bathroom, waterproof
membrane and/or shower, then this would be sufficient to bring the repairs to the
shower and/or waterproof membrane in under the claim. A leaking shower would be
covered where this was resultant damage, as opposed to the source of the water
escaping or leaking.
As the party seeking the benefit of extended cover under claim one, the onus rests
with the applicant to show a clear causal link between the two.
FSP expert evidence
The FSP appointed engineering firm “JH” to inspect the bathroom and comment on if
claims one and two could reasonably be considered to be related. JH‟s reports are
quite unequivocal in stating the two events are not linked.
JH says that if claim one had caused damage to the substrate such that it was able
to crack or penetrate the waterproof membrane, then it would be expected that the
timber substrate was swollen. However, visual inspection showed it was not. Whilst
the timber floor was water stained from the bath overflow event, this does not
constitute „damage‟ as it is merely cosmetic and does not interfere with the function
or structural integrity of the floor.
JH noted there were no other signs of movement in the building such as cracked tiles
or cracks at the junction. JH also says that a waterproof membrane should be of
flexible material so as not to rupture during building movement. Any event causing
rupturing of the waterproof membrane would need to be significant.
JH noted the entire bathroom appeared to have been waterproofed at the time it was
last renovated, which is good practice. As the water escaping from the shower was
tracking through the grouting, this indicated the waterproof membrane was intact and
stopping water permeating through the floor. This was also confirmed by the subfloor
inspection which showed no water staining from this event.
Cause of the shower leak is the lack of a water stop
JH concluded the cause of the leaking shower was due to the lack of, or an
inadequate, water stop. JH noted the bathroom appeared to date from the late 1990‟s
to early 2000‟s, based on its décor.
The shower recess is classed as an enclosed shower recess as it is fully framed. The
Building Code of Australia (the Code) requires that an enclosed shower recess with
no hob or set down (as is the case with the applicant‟s shower) be fitted with a water
stop to protect the area from water damage. The Code provided this requirement
from the 1996 revision onwards.
Accordingly, JH concluded the shower did not comply with the Code at the time it
was installed. The onus to remedy this does not transfer to the FSP simply because it
insures the home.
Case No: 521109 Determination Page 4 of 5
JH also noted there was evidence of prior silicone application to the area, indicating
previous attempts to arrest water escaping from the shower. This is evident in the
photographs provided. JH outlined that the problem could be easily and cost-
effectively remedied by the installation of a water stop in the shower. Re-application
of silicone alone will not arrest the problem.
Applicant’s expert evidence
The applicant was invited to provide her own report from a suitably qualified person
in support of her position that claim one had ruptured and compromised the
waterproof membrane, thus causing the shower to leak.
In support of her position, the applicant provided reports from builder “GM”. GM‟s
initial report states that visual inspection of the bathroom subfloor revealed the ti mber
substrate had swelled and severed the waterproof membrane, allowing water to
penetrate the laundry ceiling below.
However, there is no current damage to the laundry ceiling, and photographs of the
subfloor do not depict swollen timbers. The waterproof membrane is not visible from
the subfloor, so it is unclear how GM formed the viewed this had ruptured.
GM‟s later report agrees there is a leak from the shower. He maintains this is due to
the ruptured membrane, although he later concedes it is not possible to determine for
certain whether the membrane has ruptured without invasive testing, such as pulling
up the tiled floor to investigate.
I am of the view that GM‟s conclusions are speculative at best, and he has presented
no more than a potential theory of how the shower came to be leaking. Therefore, the
FSP‟s evidence is to be preferred. Further, GM has not commented on the lack of
water stop, leaving JH‟s conclusions unchallenged.
On this basis, the applicant has not demonstrated a link between claims one and two,
so as to bring her claim for repairs to the shower within the ambit of claim one.
Therefore, the FSP is not required to indemnify her further under claim one and is
considered to have discharged its liability for this claim with the repairs previously
undertaken.
Applicant may present further evidence
However, in the event the applicant chooses to proceed with GM‟s recommendation
of stripping out the entire bathroom as opposed to JH‟s recommendation to merely
install a water stop, and it is discovered the membrane is ruptured or other damage is
present to the bathroom from claim one, then the FSP is to re-assess its liability at
that time.
Case No: 521109 Determination Page 5 of 5
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to FOS. However, commentary in this
determination is restricted only to those issues considered relevant to the outcome.