Home / Financial Firm (Unknown - Insurer) / Determination 520357
Determination 520357
Claim declined for cracking damage to commercial building
Summary
The applicant claimed for cracking to a commercial building and the FSP declined it under the gradual deterioration and related exclusions. AFCA agreed with the FSP and ordered no action.
Expert evidence showed the cracking was primarily long-term differential movement pre-dating the policy, so the wear, gradual deterioration and settling exclusions applied.
Issues
- Claim denial primary · not upheld“The FSP was entitled to deny the claim as it has established the application of policy exclusions upon which it has relied.”
Subjects and remedies
no remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 520357 Determination Page 1 of 4
Case number: 520357 6 September 2018
1 Overview
1.1 Dispute
The applicant owns a commercial investment property that is insured with the
financial services provider (FSP). The applicant lodged a claim against the policy
because she believes the extensive cracking to her building resulted from the
construction work adjacent to her property. The FSP relied on reports from experts
and referred to policy exclusions to deny the claim.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Was the FSP entitled to deny the claim?
The FSP was entitled to deny the claim as it has established the application of policy
exclusions upon which it has relied.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case analyst ‟s reasons for the recommendation and the
recommended outcome.
The FSP is not required to take any further action in relation to the claim.
Case No: 520357 Determination Page 2 of 4
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case analyst ‟s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Was the FSP entitled to deny the claim?
FSP obtained expert’s report
The applicant bears the onus of establishing a valid or a prima facie claim to which
the policy responds. The applicant‟s policy covers accidental loss or damage. She
believes the construction work that occurred adjacent to her property between May
2013 and December 2014 caused the extensive cracking to her building.
The FSP arranged a building consultant (MC) to investigate the damage to the
building. MC‟s report is comprehensive and has also drawn on information from other
sources, such as an engineer‟s dilapidation report (da ted August 2011).
The dilapidation report indicated the applicant‟s building was in reasonable condition,
although the engineer detected crack propagations at multiple locations in the
external boundary wall (adjacent to the construction site), rear pavement and
driveway, minor cracking to the shop ceiling and a wall, along with minor crack
propagations in the walls and cornices of most rooms in the building.
MC attributed the primary cause of the cracking to pre-existing long term differential
building movements. MC said moisture variations in underlying foundation soils likely
brought this about. MC also acknowledged other factors contributed to the cracking,
such as:
changes in soil mechanics due to deep excavations at construction site
lack of overland storm water drainage to paved areas adjacent to construction
site
poor grading of bitumen paving and placement of strip grated drain on that side
possible long-term leakages from repaired drainage services
Applicant commented on possible cause of damage
The applicant said the excavations in the adjacent property caused the cracking to
her building. She referred to photographs she took prior to purchasing the building
and said there were no cracks. She also referred to the real estate marketing
photographs prior to her purchase in 2015, in support of her comment.
Case No: 520357 Determination Page 3 of 4
The construction work was completed in December 2014, with her tenant first
noticing the cracking in November 2016, which was after her policy commenced with
the FSP. However, the applicant did not provide any information that supported her
contention the excavations in the adjacent property caused the damage. Although
MC said it likely contributed to the damage, it was not the effective or dominant
cause.
MC also indicated a previous owner refurbished the building in mid-2013, prior to
selling it in September 2013 (the applicant then purchased the property in 2015). MC
suggested the refurbishing also included filling the cracks and painting over the
patching.
MC‟s report is comprehens ive and has drawn on other sources of information. The
report is sufficiently compelling in finding the cause of damage occurred over time
and was consistent with the building experiencing movement due to moisture
changes in the foundation soil.
The FSP was entitled to rely on policy exclusions to deny the claim.
Applicant provided further submissions
The applicant rejected the recommendation that was in the FSP‟s favour and
provided further submissions. She refuted the findings in the recommendation. She
also said the pre-insurance policy cracking is irrelevant and the dilapidation report
indicated these were minor.
The applicant is not claiming for these cracks (that includes the cracking that had
occurred to the wall adjacent to the construction site – she referred to these cracks
as “minor settlement cracks” ). Instead, she is claiming for those cracks that
manifested in her building after the excavation on the adjacent property (such as
damage in the kitchen, living, stairwell/stairs). She referred to her tenant first noticing
cracking in November 2016, which was after the policy commenced (28 April 2016).
The applicant said MC was not appropriately qualified to provide a report on these
matters and should have included input from a geotechnical expert. She referred to a
Court of Appeal decision (Makita (Australia) Pty Limited v Sprowles) in support of her
assertion.
Despite that assertion, the applicant relied on MC‟s report where it referred to the
excavation work in the adjacent property contributed to the cracking. She also
contended section 46 of the Insurance Contracts Act 1984 (Act) should apply to her
situation.
The applicant said the FSP should provide some contribution toward repairing the
damage, in addition to refunding all insurance premiums she has paid. She also said
the FSP had the opportunity of inspecting the building prior to accepting the risk.
Submissions do not warrant change in outcome
The Court of Appeal (Makita (Australia) Pty Limited v Sprowles) decision concerned
the need for experts‟ reports to be readily understandable and being able to test the
Case No: 520357 Determination Page 4 of 4
validity of the conclusions. The court identified the requirements of experts who give
evidence before it.
MC has the appropriate level of knowledge and expertise with respect to building
problems, such as building movements, cracking issues, water proofing issues, roof
leakages, dampness, mould and the like.
The Financial Ombudsman Service (FOS) Australia, as an external dispute resolution
scheme, is required to do what in its opinion is fair in all the circumstances. In this
respect, MC is sufficiently qualified to report on damage to the applicant‟s building
due to cracking.
Section 46 of the Act does not apply in the applicant‟s situation . The recommendation
fully explained the reasons for this conclusion.
The applicant has refuted many matters within the recommendation without providing
anything which substantiates her assertions. The applicant said there were no cracks
when she inspected the building prior to purchasing it. This was an informal and
superficial inspection of the building, as the applicant is not sufficiently qualified to
assess the condition of a building. The applicant said she is only claiming for those
„new‟ cracks. However, these „new‟ cracks also appear i n areas where there are pre-
existing cracks and it would be artificial to treat them separately, which is effectively
what the applicant is suggesting.
MC ‟s report indicated the construction work may have contributed to the cracking.
However, it was only one of many factors that contributed. Nevertheless, MC
concluded differential building movements, brought about by moisture variations in
the foundation soils, was the dominant or effective cause of the damage.
The applicant‟s further submissions do not w arrant a change in the outcome, since
the cause of damage is excluded from cover under the policy. As such, the FSP was
entitled to deny the claim.
Recommendation
Case No: 520357 Recommendation Page 1 of 6
Case number: 520357 29 June 2018
3 Overview
3.1 Dispute
The applicant lodged a claim against her business insurance policy with the financial
services provider (FSP) for cracking to exterior and interior walls and the ceiling at
the insured property.
The applicant says the damage was caused by excavation and construction works at
the neighbouring property.
The FSP appointed building consultants (MC) to assess the cause of the claimed
damage. After reviewing MC‟s report, the FSP declined the claim on the basis the
damage had been occurring prior to inception of the policy and the cause of damage
is excluded under the policy.
The applicant disputes the FSP‟s decision and seeks a review.
3.2 Issue and key findings
Is the FSP liable for the claimed damage?
The applicant‟s policy covers accidental loss or damage during the period of cover.
All cover is subject to exclusions including exclusions for damage caused by wear
and tear, gradual deterioration, normal settling, shrinkage and vibration.
The available information shows on the balance of probabilities that:
the building has had ongoing cracking issues prior to the applicant purchasing
the property , and incepting the policy with the FSP
the primary cause of cracking is differential movement over time
any exacerbation of damage from the construction likely occurred before the
policy was incepted.
Consequently, the FSP is entitled to decline the claim on the basis the proximate
cause of the claimed damage is gradual deterioration and any damage from the
construction likely occurred before the inception of the policy.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is entitled to decline liability for the claim.
Case No: 520357 Recommendation Page 2 of 6
4 Reasons for recommendation
4.1 Is the FSP liable for the claimed damage?
Applicant must establish a claimable loss
The applicant is required to show, on the balance of probabilities, she has suffered a
loss caused by a risk insured against under the policy. This is known as establishing
a prima facie claim.
If the applicant can establish a claimable loss, the onus shifts to the FSP to show, on
the balance of probabilities, it is entitled to rely on an exclusion or otherwise entitled
to decline the claim under the policy terms.
The applicant‟s policy covers accidental loss or damage to the insured property
during the period of cover. Please see section 3.2 of this recommendation for the
relevant policy wording.
Accidental loss or damage is not defined in the „property‟ cover section of the policy
and therefore the ordinary meaning applies, being an accident is a happening which
is unforeseen and unintended by the applicant.
I accept on balance that the damage was unforeseen and unintended by the
applicant. The key issue is whether the cracking has been occurring prior to inception
of the policy and falls within policy exclusion for gradual deterioration.
Circumstances of loss
The applicant purchased the property in or around May 2015. Her policy with the
FSP was effective 28 April 2016 and covered a two-storey twin tenancy building.
A shop occupies the front of the lower level (L1), a living area, kitchen and laundry.
The upper level (L2) has a landing from staircase/stairwell, three bedrooms and a
bathroom. Bedrooms one and three are at the front and rear of the upper level
respectively, and the third in the middle.
Ac cording to the report provided, the applicant‟s residential tenant first noticed
cracking (to its current extent) in November 2016. As the cracking got progressively
worse the tenant communicated the issue to the applicant around mid-2017 providing
images of interior damage. The photographs show cracking to walls, ceiling, cornices
in the kitchen, stairwell, first landing, upstairs hallway, bathroom (and its entrance),
and bedrooms one and three with the bulk of the damage appearing to be in
bedroom one.
The applicant lodged a claim against the policy with the FSP on 8 October 2017. The
FSP appointed building consultant (MC) to inspect the property, and report on the
cause of cracking.
After reviewing MC‟s report, the FSP declined the claim on the basis dam age has
been occurring gradually and is caused by:
pre-existing long- term differential movement…evidenced by widespread nature of cracking at the
property
Case No: 520357 Recommendation Page 3 of 6
The applicant disputes the decision on the basis she had not noticed any cracking
when she purchased the property. The applicant says she is unsure if a pre-purchase
inspection was completed at the time, and as such has not provided one.
Evidence damage has been occurring for an extended period
MC assessed the property on 16 October 2017 and provided a report dated 27
October 2017. The report includes the following observations:
evidence of previous repairs to pre-existing cracks in external brickwork at the
front of the property, and its western wall
evidence of new cracks to areas previously repaired o n the western wall
indicative of differential movement
evidence of cracking to brickwork above and below windows outside bedrooms
one and three on L2 of the building, similar to those identified in a 2011
dilapidation report (including photographs). The report was commissioned prior
to commencement of building works in the neighbouring property (western side
of the insured building ) as part of local council requirements
recurring cracks to areas previously repaired in kitchen, living, stairwell/store,
stairwell/hall, hallway, and three bedrooms.
MC says in addition to the dilapidation report, the following information was
considered when deciding the cause of damage:
photographs from property managing agent‟s condition report in 2013
advertising photographs in 2014 prior to the applicant purchasing the property.
MC concluded the primary cause of cracking at the property is:
pre-existing long-term differential movement likely brought about by moisture variations in the
underlying foundation soil supporting the building resulting in subsequent settlement
In addition, MC notes other factors including changes in soil mechanics due to
excavation in the neighbouring site, and possible drainage and plumbing issues may
have contributed to the damage.
I am satisfied MC is suitably qualified to report on the cause of the disputed damage.
I have reviewed MC‟s report, the dilapidation report, and photographs provided and
accept they:
show cracking is spread across the property; and
support the conclusion that cracking has been a long-term, ongoing issue and
evidences building movement likely to moisture variation and building
settlement over time.
No evidence excavation at neighbouring property caused claimed damage
The applicant does not appear to dispute there may have been minor cracks to the
property that had been repaired prior to its purchase however, she says cracking was
not evident when she inspected the property.
The applicant says advertising photographs support her position that there was no
visible cracking when she purchased the property.
Case No: 520357 Recommendation Page 4 of 6
I have reviewed the photographs and note it shows some external cracking to the
building‟s front façade. However, it is difficult to see what (if any) interior cracks or
repaired cracks was present from the photographs alone, because as noted by both
parties, the property had been painted not long before the photographs were taken.
Further, the applicant considers that as the present damage manifested after
construction of a ten-storey building on the neighbouri ng property, the cracking is
likely a manifestation of the effect of excavation during the construction which has
taken time to become evident.
I have considered the applicant‟s argument and note structural work at the
neighbouring site appears to have been done in 2014, and the building completed in
2015. Significantly, this was before the inception of the policy in 2016.
The applicant has not provided any evidence that supports the assertion the
excavation completed two years before was responsible for the claimed damage.
Cracking damage likely due to ongoing site condition
The proximate cause of damage is the dominant or effective cause of the damage. It
is not necessarily the first or last or the sole cause of the loss. If one cause would
have caused the harm in any case and the other would not have done so in the
absence of the first then then first is the proximate cause.
In its report, MC identified excavation work at the neighbouring as a possible
contributing factor to the damage, not its primary cause. MC says the damage
observed is consistent with site experiencing movement due to moisture changes in
the foundation soil.
The information provided by MC shows the applicant‟s building had a history of
movement that has led to widespread cracking. Widespread cracking is identified and
pictured in the 2011 dilapidation report. Therefore, the building displayed widespread
cracking damage before the works were completed at the neighbouring property. The
photographs provided by the applicant also support a view that the cracking has
been repaired in the past.
On the available information, and in the absence of any information to the contrary, it
is my view that the proximate cause of the claimed damage is ongoing issues with
the building, which pre-date inception of the applicant‟s policy.
Section 46 of the Insurance Contracts Act 1984 (Act) does not assist
The applicant has raised section 46 of the Act in her submission to the service.
Section 46 of the Act relates to pre-existing defects. Case law relating to this section
provides it is only enlivened where the policy exclusion an insurer relies on, has a
temporal reference (for instance, it specifies that the exclusions applies to defects
from a specified time such as when the home was built, or when the policy was
entered into).
On the available information, the section 46 does not assist the applicant because
the exclusion relied on by the FSP does not have temporal references (the policy
does not refer to gradual deterioration at a specific time such as when the policy was
incepted).
Case No: 520357 Recommendation Page 5 of 6
FSP is entitled to decline claim
As previously explained, the policy covers accidental loss or damage during the
policy term, subject to exclusions under the policy.
There is no persuasive evidence excavation and building works at the neighbouring
property was the cause of the loss. The available information supports a conclusion
that widespread cracking has been occurring at the property over time, and well
before inception of the policy in 2016.
Significantly, the construction work was completed before the inception of the policy.
Therefore, based on MC‟s report it seems likely that any contribution to cracking from
the construction occurred before the inception of the policy in 2016.
I acknowledge that MC reports possible contributing factors may be:
poor grading of bitumen within the west side property
possible long-term leakages from repaired sanitary drainage services that were
subject the numbers repairs by the builders of the neighboring property
possible changes in soil due to deep excavations.
However, these are noted as possible causes. They may also ha ve been contributing
factors before the inception of the policy in 2016. Further, the report from 2011
indicates there was significant movement damage at the property before the
construction and the inception of the policy.
In the absence of any information to the contrary, I am satisfied on the balance of
probabilities that cracking at the property is primarily the result on long term, pre-
existing movement and settlement. If there was some contribution from the
construction it is likely this occurred at that time; however, this was well before the
inception of the policy and therefore the FSP would not be responsible for it.
Accordingly, the FSP is entitled to decline the claim on the basis that the damage
pre-dates inception of the policy and has been occurring gradually over an extended
period.
Case No: 520357 Recommendation Page 6 of 6
5 Supporting information
5.1 FOS approach to this dispute
There has been a full exchange of all material information relied on for the purpose of
this recommendation, and each party has had the opportunity to address any issues
raised by the other.
I have reviewed and considered all of the material provided by the parties. While the
parties have raised numerous issues in their submission, for the purpose of this
recommendation, I have restricted commentary to those issues directly relevant to
the outcome.
5.2 Relevant policy terms
Page (PDS) Wording
11 Section 1
Property
About thi s cover section
This cover section of the Policy covers physical loss of or damage to Your Property
Insured during the Period of Cover. It does not cover the theft or breakdown of Your
Property Insured.
Your insurance under this cover section
Provided „Business Property‟ is shown under „What‟s Covered‟ in the Schedule, We
will cover You up to the Sum Ins ured for accidental loss or damage to Your Property
Insured at the Premises during the Period of Cover.
17 Policy section exclusions
1. We will not cover You for loss or damage insurable under any other cover
section or of this Policy. This exclusion does not apply to any loss or damage
which would only be ins urable under any other cover section because it fell
within an additional benefit or extra cover in that cover section.
2. We will not cover You for loss or damage caused by:
a) wear and tear, gradual deteri oration, scratching, marring, developing
flaws, normal upkeep or any gradual cause
…
f) creeping, heaving, normal settling, shrinkage, seepage, vibration,
expansion in buildings, pavements, roads, car parks and the like
…
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.