Determination 520138

Storm damage claim: poor repairs, skylight and compensation

FirmFinancial Firm (Unknown - Insurer)
Decided2018-12-31
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$8,760
Non-financial loss$700
Amount claimed—
SourceAFCA PDF

Summary

After storm damage to her home and poor repairs by the insurer's contractor, the insurer cash settled the rectification costs and some expenses. AFCA ordered an additional $8,760 for the skylight replacement and $700 more non-financial loss compensation, refusing other claimed expenses.

The skylight damage was probably caused by the storm and the insurer had insufficient evidence to challenge the expert, while other claimed expenses were not linked to the poor repairs.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay non financial loss

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 520138 Page 1 of 6 Determination Case number: 520138 29 November 2018 1 Determination overview 1.1 Complaint The complainant holds a home building and contents insurance policy with the financial firm (the insurer). The complainant lodged a claim on 21 April 2015 for storm damage at her property. The insurer accepted the claim and undertook repairs at the property, including the spouting. The complainant said the repairs were poor, non-compliant and caused further water damage to the home. This resulted in the complainant incurring significant ‘ out of pocket ’ expenses. The insurer reviewe d the complainant’s concerns and cash settled her for the required rectification works, reimbursement of some ‘ out of pocket ’ expenses and compensation for non-financial loss. The complainant remained dissatisfied with the insurer’s assessment of its liability under the claim and disputed the settlement amount paid. The case analyst provided the parties with a recommendation on the issues in complaint. The recommendation was substantially in favour of the complainant. A copy of the recommendation is attached to this determination. The recommendation was issued by FOS. The Australian Financial Complaints Authority (AFCA) has replaced Financial Ombudsman Service (FOS). AFCA is responsible for managing FOS complaints lodged prior to 1 November 2018. While this determination is issued by AFCA we have applied the FOS Terms of Reference. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were largely correct (save for some amendments) and are adopted in this determination. This was done after further submissions provided after the recommendation have been considered. Determination | Case number: 520138 Page 2 of 6 What is the extent of the insurer’s liability for the poor repairs ? The insurer is required to pay the complainant an additional amount to settle the claim. The additional amount comprises the replacement of the skylight and the cost of a further report the complainant obtained. Is the complainant entitled to additional compensation? The complainant has established an entitlement to additional compensation for non- financial loss. 1.3 Determination This determination is substantially in favour of the complainant. I largely agree with the case analyst ’s reasons for the recommendation and the recommended outcome (with some amendments). The insurer is required to pay the complainant in addition to the amounts of $38,777.70 in the recommendation outcome:  $8,760 (plus GST) to replace the skylight  Further $700 compensation for non-financial loss above the $800. Determination | Case number: 520138 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous AFCA decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. I am satisfied the case analyst ’s recommendation largely contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the Rules and any relevant law. 2.2 What is the extent of the insurer’s liability for the poor repairs ? Insurer’s repairer carried out poor repairs The complainant lodged a claim on 21 April 2015 when a neighbour’s tree fell onto her house. The insurer accepted the complainant had a valid claim and arranged a contractor to repair the damage. The contractor carried out the repairs in December 2015, however the complainant subsequently raised concerns about those repairs. The contractor revisited the property and reported there were no issues with the repairs. However, the insurer has now accepted the repairs were unsatisfactory. Insurer has now paid complainant various amounts The com plainant obtained an expert’s report on the repairs which the insurer’s contractor had carried out. The expert explained why the spouting did not comply with relevant building standards. The insurer accepted the expert’s findings and agreed to pay the quoted amount of $32,994.50 required to rectify the repairs and resultant damage. The insurer paid the complainant $38,777.70 on 11 September 2018. This amount included the $32,994.50, in addition to other expenses the complainant had incurred because of the poor repairs, such as: report costs; miscellaneous maintenance items; water cartage, water tank repairs; electricity; and cleaning up fallen tree. The amount also included $800 compensation for non-financial loss. Complainant claiming for additional costs incurred The complainant did not accept the entire recommendation. She believes she is entitled to other expenses she incurred. She referred to various items: report costs; skylight repairs/replacement; miscellaneous maintenance item; professional gutter maintenance; and electricity. She also believes she is entitled to a greater amount of compensation for non-financial loss. Determination | Case number: 520138 Page 4 of 6 The complainant incurred a cost when she obtained an expert’s report with respect to the damaged skylight. Since this report assisted in this matter (see below), the insurer is required to pay the complainant $495, which was the amount she paid for the report. The complainant is also seeking reimbursement of $220 for another report she obtained (plumbing report). However, that report was not used in this matter and, as such, the complainant is to bear that cost. The complainant is seeking reimbursement of a further $300 she paid to a local school after its pupils cleared a tree and debris from her property (August 2015 and 2016). The insurer paid $300 for the clearance in August 2015. The recommendation outlined why the complainant was only entitled to $300. The complainant has provided no compelling reason why she should be reimbursed for the second occasion (2016) when pupils returned to her property to clear debris. The insurer paid the complainant $150 in relation to additional electricity costs. However, the complainant said this amount is inadequate. She provided copies of an account statement from one supplier. This only provides the invoice amounts during the period 13 July 2015 to 13 July 2018, along with payments. The other document is from another supplier for the period 27 March 2018 to 21 May 2018. Neither documents are of assistance because there is no data about electricity usage prior to the incident giving rise to the claim and after that date. The complainant has provided no compelling reasons why the amount of $150 is inadequate. The complainant had provided an invoice for $1,200 from a professional gutter maintenance company. She acknowledged she had not intended including that in her claim and has provided no information that links this with the insurer’s poor repairs. The complainant lives amongst the bush and gutter maintenance is a normal part of that lifestyle. This is a maintenance related matter. Skylight to be replaced The complainant obtained an expert’s report in relation to her damaged skylight. The expert said the skylight needs to be replaced and added: Cracks to skylight are typical of impact and consistent with damage that would be caused by the impact of tree. Although the insurer said it had no record of the skylight in the initial claim, there are entries in its claims file notes relating to the skylight. The complainant provided an extract (dated 9 September 2015) which indicated she had advised the insurer about water stains on the ceiling near the skylight. There are also entries in the insurer’s file notes (12 April 2016 and May 2016) about the skylight, although nothing further was done about the matter. The complainant’s expert’s report is sufficiently co mpelling to suggest the damage to the skylight probably occurred because of the tree falling on the house. In any event, Determination | Case number: 520138 Page 5 of 6 the complainant also has accidental damage cover and the damage would fall within that cover. The insurer has provided insufficient evidence that challenges the expert’s findings. Accordingly, the insurer is required to pay $8,760 (plus GST) to the complainant for the replacement of the skylight. 2.3 Is the complainant entitled to additional compensation? Complainant is entitled to greater amount of compensation The complainant rejected the amount of $800 awarded in the recommendation. The complainant contended she should be entitled to the full amount of $3,000, which is the compensation cap. She said the insurer had previously offered her the full amount to resolve the matter and she believes that is the appropriate amount. The insurer recognised the service provided to the complainant was unsatisfactory and it attempted to resolve the matter by offering $3,000 as a ‘goodwill gesture’. It subsequently increased the offer to $5,000. The latter amount included a portion for non-financial loss, but it was also intended to cover various other expenses the complainant had incurred. That offer also included a contribution toward the skylight issue. The recommendation fully outlined the approach taken with respect to awarding compensation for non-financial loss. It also outlined the reasons for awarding $800 in this case. The complainant again referred to the length of time taken to process the claim and the issues she and her husband had to endure. She also mentioned the issues arising from the poor spouting repairs and the impact these had on her and her husband. Although the insurer attempted to resolve the matter in more recent times, the timelines for the claim had been longer than necessary to resolve the various issues. A more appropriate amount of compensation is $1,500. As such, the insurer is required to pay the complainant an additional amount of $700 compensation for non- financial loss (as the insurer has already paid $800). Determination | Case number: 520138 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim Recommendation Case No: 520138 Recommendation Page 1 of 9 Case number: 520138 3 September 2018 1 Overview 1.1 Dispute The applicant lodged a storm damage claim in April 2015 against her residential building policy. The financial services provider (FSP) accepted the claim and attended to the identified gutter repairs. The applicant says the repairs were poor because:  the gutters did not meet building standards  they caused further water damage to the home  they caused the applicant extensive out of pocket expenses. Upon lodging this dispute, the FSP reviewed the applicant’s information and offered to cash settle the claim for: 1. the applicant’s rectification scope of works 2. reimbursement of the applicant’s out of pocket expenses 3. further compensation in consideration of the delays, stress and inconvenience, and its general claim handling process. The applicant rejected each of the FSP’s numerous settlement offers upon providing further proof of out of pocket expenses. I am progressing the dispute to a recommendation because the parties are unable to agree on a settlement amount. 1.2 Issues and key findings Did the FSP complete insufficient repairs? Based on the material available, I am satisfied the FSP’s contractor completed insufficient repairs. Is the FSP liable for additional expenses? Additional receipts provided by the applicant show relevant out of pocket expenses. The FSP is required to reimburse these costs as set out in this recommendation. Further, the applicant has a final opportunity to provide the FSP with reports showing:  what caused the damage to her skylight Case No: 520138 Recommendation Page 2 of 9  if the professional gutter maintenance in 2016 was event-related. Is the applicant entitled to compensation? I am satisfied the applicant is entitled to non-financial compensation in consideration of the overall claim experience. 1.3 Recommendation This recommendation is substantially in favour of the applicant. The FSP is required to pay the applicant the total sum of $38,777.70 in recognition of: It em Payable Roof and internal repairs $32,994.50 Report costs $495 Miscellaneous maintenance items $652 Water cartage $2,990 Water tank repairs $396.20 Electricity $150 Clean up of fallen tree $3 00 Non - financial loss compens ation $800 Additionally, within 14 days of both parties’ acceptance of this recommendation: 1. the applicant is to provide the FSP with: a. material showing the professional gutter maintenance was related to either the 2015 storm or the FSP’s poor repairs b. proof of payment of the professional gutter maintenance invoice c. information showing what caused the skylight damage 2. the FSP is to assess the applicant’s new information and confirm its decision within 7 days of receiving it. Case No: 520138 Recommendation Page 3 of 9 2 Reasons for recommendation 2.1 Did the FSP complete unsatisfactory repairs? FSP agreed to cash settle the applicant ’s rectification quote The FSP originally assessed the 2015 storm damage, accepted the claim and attended to complete the identified repairs. The repairs were completed in 2016. Following this, the applicant raised concerns directly with the FSP about poor workmanship and further property damage. The applicant proceeded to lodge a dispute with this service when she felt her concerns were not properly acknowledged. Upon being notified of this dispute, the FSP reviewed the applicant’s information and agreed to accept liability for unsatisfactory repairs. I am also of the opinion the FSP’s original repairs were unsatisfactory. The parties are unable to agree on a settlement offer Over the course of this dispute, the FSP reviewed its file, new material information and the applicant ’s submissions . It agreed there was an issue with the original repairs and agreed to accept liability. Unfortunately, a change in the FSP’s case manager resulted in len gthy delays of almost four weeks before its first offer was formalised. The FSP and applicant then entered ongoing negotiations, however were unable to reach an agreement because the applicant continued to provide additional receipts. In response, the FSP assessed the information and communicated a revised cash settlement offer. The applicant says:  the FSP has been inconsistent with its offers  the treatment she ’s receiving is extremely disturbing and unreasonable  the FSP is not offering her fair compensation. I appreciate the claim process has been stressful and inconvenient for the applicant. I also agree the FSP was lacking in their review of the applicant’s concerns prior to her lodging the dispute with this service. However, I am satisfied:  the FSP ’s approach to settle the dispute has been reasonable and considerate  the numerous offers presented by the FSP were genuine attempts to meet the applicant’s requests  the FSP demonstrated flexibility in seeking dispute resolution. I consider all the above factors and am of the view the parties will not have reached agreement between themselves. Therefore, I am satisfied it is appropriate I form this recommendation. Case No: 520138 Recommendation Page 4 of 9 Applicant is entitled to reimbursement of some receipts Because of the FSP’s initial repairs, the applicant says she incurred numerous claim-related out of pocket expenses. She incurred costs associated with:  home maintenance items  cleaning products  replacement plants  water to fill her water tanks  water tank maintenance and repairs  an expert report to substantiate her position. The applicant seeks reimbursement for: Item Expense (incl. GST) Substantiating document Roof and internal repairs $32,994.50 HTM quote 01 - 02 - 2018 Report costs $495 Provider (HTM) Professional gutter maintenance $1,280 Provider (RR) Miscellaneous maintenance items $652 Bunnings receipts Water cartage $2,990 Provider receipts Water tank repairs $396.20 Provider invoices Clean up fallen tree in 2015 and 2016 $600 ($300 each year ) Local school students Electricity 2,772. 52 Energy p rovider summaries Skylight repairs/replacement $9,636 HTM quote 12 - 07 - 2018 The FSP’s insufficient repairs did not allow the applicant’s gutters to collect rainwater as they were originally designed to do. This caused the applicant significant distress because:  she is not connected to any other source of water  she lives in a bushfire-prone area  the empty tanks caused maintenance issues  she was left with no choice but to purchase water. The applicant purchased other items because the insufficient repairs caused water overflow from the gutters and:  stained the external walls  flooded her garden and killed plants  stained and rusted other items within close proximity of the area. The FSP acknowledged the applicant’s receipts and submissio ns and agreed to compensate her. Although loss or damage to trees, grass and plants are excluded under the policy, I am satisfied this loss would not have occurred if not for the unsatisfactory repairs, and agree with the FSP’s offers to reimburse these expenses. Case No: 520138 Recommendation Page 5 of 9 However, there are documents showing some items I am not satisfied the applicant is partially of wholly entitled to be reimbursed for (see section 2.2). 2.2 Is the FSP liable for additional expenses? In rejecting to the FSP’s latest offer, the applican t provided further material showing other costs she wants to claim. These include: 1. clean up of a fallen tree in August 2015 and August 2016 2. invoice for professional gutter maintenance in June 2016 FSP is required to contribute to the tree clean-up expense A local school letter confirms students attended the applicant’s proper ty on two occasions to clean-up a storm-related fallen tree. It says the applicant paid the students $300 in total on each occasion. The policy does not exclude costs associated with the clean-up of fallen trees where it has caused damage. However, I have not identified any communication from the applicant to the FSP confirming she required this event-related clean-up. Therefore, I am satisfied it is fair to limit reimbursement because:  the FSP was not provided an opportunity to attend to the clean up  it is likely the clean- up would have required the FSP’s attendance only once  on balance, the FSP should have recognised this work may have been required. The FSP is to pay the applicant $3 00 for the student’s attendance in August 2015. FSP is not required to pay the gutter maintenance scope of works The invoice for professional gutter maintenance shows a recommended scope of works. I am not satisfied the FSP is liable for this expense because:  the applicant lives in a bushfire-prone area  the dwelling is double storey  it appears to be a general maintenance-related task  home maintenance is the home- owner’s responsibility. Without information proving otherwise, I form the opinion this is likely a maintenance-related expense which a responsible home-owner would incur on a regular basis. To allow the FSP proper consideration of the gutter maintenance scope of works, the applicant is required to provide further information showing: 1. it is directly related to the insured event or the insufficient repairs 2. she proceeded with the scope of works 3. she paid the provider to complete the scope of works. Case No: 520138 Recommendation Page 6 of 9 The applicant is to provide the information within 14 days of both parties’ acceptance of this recommendation. The FSP is required to provide its decision within 7 days of receiving the information. Applicant says she incurred excessive electricity expenses As a result of event-related internal dampness, the applicant says she required a dehumidifier and heater to run in her home. Doing so increased her energy usage which she says the FSP should reimburse her for. The FSP acknowledged the applicant’s request for consideration of her electricity usage and agreed to compensate her as part of its settlement offers. I am satisfied the applicant acted reasonably in setting up the drying equipment and is entitled to some compensation. However, I have no information showing the applicant provided the FSP an opportunity to assist her at its own cost prior to her incurring this claimed expense. Therefore, I believe it is fair to limit the amount the FSP should reimburse. The FSP is to pay the applicant $150 in consideration of additional electricity usage. FSP is required to assess the applicant’s skylight dam age The applicant says she i nformed the original assessor about the leaking skylight. For unknown reasons, the leak was not reported on by any o f the FSP’s contractors. I acknowledge:  the applicant followed up with the FSP about the skylight numerous times  the FSP is unable to provide an explanation about why the leak was not assessed and reported on. Upon reviewing all information, I am not satisfied the applicant has shown the skylight damage is storm-related. Currently, the FSP is not liable for this da mage. The FSP says it is willing to assess the skylight damage. The applicant already provided a scope of works addressing the extent and nature of the damage, however she has not provided material connecting the damage to an insured event. The applicant i s to provide information showing the cause of its’ damage within 14 days of both parties’ acceptance of this recommendation. The FSP is required to provide its decision within 7 days of receiving the information. Case No: 520138 Recommendation Page 7 of 9 2.3 Is the applicant entitled to compensation? FOS has a conservative approach to compensation Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $3,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss an applicant may incur because of pursuing a dispute or rectifying an insurer’s error. When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the dispute  the extent to which the insurer’s actions interfered with the applicant’s expectation of enjoyment or peace of mind. We will assess claims for non-financial loss in accordance with the FOS Terms of Reference. If we do award compensation, it is unlikely to be substantial. Applicant has established an entitlement to compensation I carefully considered the information provided by both parties about the service issues raised by the applicant. The applicant is critical of the FSP overlooking the fact that her property is in a fire- prone area and the insufficient repairs left her without water. She says the FSP caused her severe stress and anxiety, and placed her in a financially detrimental position. I note the FSP’s acceptance of its less than desirable claim experience provided to the applicant. It openly acknowledged the applicant’s concerns and remai ned willing to consider all information she could provide to support her view of the dispute. The FSP demonstrated prompt assessment of the applicant’s additional claim-related costs, and agreed to reimburse her in consideration of the overall situation. Regarding compensation, the FSP offered the applicant a good-will gesture payment of $5,000. The amount considered a contribution towards invoices and receipts, skylight repairs and non-financial loss compensation. The applicant rejected the offer because she says it did not consider all incurred expenses or the extent of stress and inconvenience the situation caused her. Prior to the $5,000 good will gesture, the FSP offered non-financial loss compensation in the amount of $3,000. Case No: 520138 Recommendation Page 8 of 9 This service is not bound by any offers previously made. As stated above, if FOS does award compensation, it is unlikely to be substantial. I consider both parties’ positions in relation to previous offers, and all other information and submissions relating to this dispute. I recognise:  the length of time taken for the FSP to accept liability for insufficient repairs  the financial and personal interruption the situation imposed on the applicant  the FSP’s attempts to rectify the issue  both parties’ partic ipation throughout the dispute process. I am of the opinion the FSP’s offers of non -financial loss compensation were generous. In considering all aspects of this claim, and the circumstances in which this service awards compensation, the FSP is to pay the applicant non-financial loss compensation of $800. Case No: 520138 Recommendation Page 9 of 9 3 Supporting information 3.1 FOS approach to this dispute There was a full exchange of material between the parties, and opportunities provided for each to:  address any issues that may have arisen  come to an agreement between themselves. This recommendation is based on what is fair in the circumstances, having regard to information exchanged, the policy, good industry practice and prior determinations where applicable. Should either party reject this recommendation, the dispute will be subject to Ombudsman review for a final determination.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.