Summary

A horse stud farm claimed for pumps, motors, a lawnmower and a tractor damaged when the site flooded during ex-tropical cyclone Debbie in March 2017. AFCA found on the balance of probabilities that flood water from L River caused the damage, so the flood exclusion applied and nothing was ordered.

Rainwater that mixes with flood water is treated as flood water, and the hydrologist evidence showed the disputed items were damaged by river flooding rather than local stormwater runoff.

Issues

Subjects and remedies

natural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 519157 Page 1 of 9 Determination Case number: 519157 20 December 2018 1 Determination overview 1.1 Complaint The complainant held a farm policy with the financial firm (the insurer), which provided cover for farm property, farm machinery, theft and machinery breakdown. The complainant lodged a claim under the policy, after the insured site was inundated by water on or around 30-31 March 2017, following heavy rain from ex-tropical cyclone Debbie. The insurer accepted some of the claimed items were damaged by a power surge caused by the cyclone event. It cash settled the complainant for those items. The insurer says the remainder of the claimed items were damaged by flood, which is excluded from cover under the policy. The complainant disputes this outcome and says stormwater caused damage to all the claimed items before flood waters from L River inundated the site. On that basis, it seeks settlement of the claim in full. 1.2 Issue and key findings What is the extent of the insurer’s liability? Based on the available material, the water that caused the damage to the items in dispute was flood water. The policy specifically excludes loss or damage caused by flood. Accordingly, the insurer is not required to extend its liability to any additional claimed items. 1.3 Determination This determination is in favour of the insurer. The insurer is entitled to decline the complainant’s claim for the remaining items in dispute and is not required to take any further action. Determination | Case number: 519157 Page 2 of 9 2 Reasons for determination 2.1 What is the extent of the insurer’s liability? Complainant is not covered for flood The complainant’s policy provides cover against:  accidental loss or damage of specified farm property (farm property section)  listed insured events for specified farm machinery (farm machinery section)  unforeseen and unexpected physical destruction or damage of specified machinery (machinery breakdown section). There is a general exclusion for flood applicable to the sections of the policy relevant to this complaint. Flood is defined in the policy as: … the covering of normally dry land by water that has escaped or been released from the normal confines of:  any lake, or any river, creek or other natural watercourse, whether or not altered or modified, or  any reservoir, canal or dam. Limited evidence of stormwater inundation The exchanged material confirms there was a significant weather event across Australia during the latter part of March 2017. A substantial amount of rain fell in the area local to the complainant’s premises during that time. The complainant argues the damage to the disputed items (various pumps and motors, a lawnmower and a tractor) occurred due to 450mm of storm water which it says arrived before the river overflowed. However, there is no specific information as to the time of initial inundation of the disputed items. Nor is there any information that, on balance, shows any runoff arrived before the flood water. The insurer provided a site specific report from its hydrologist BW dated 29 May 2017, following a site visit on 2 May 2017. The insured site is adjacent to L River at its western boundary. The site is bounded by agricultural farms to the north and south and by L Road to the east. S Creek is approximately 600m east of the property. There is a farm dam near the north-eastern corner of the site. The dam is close to an equipment storage shed. Determination | Case number: 519157 Page 3 of 9 The elevations at the property range between 41.5mAHD and 45.5mAHD. The top of the river bank next to the site is about 45mAHD. At the time of the site visit, water levels in L River were about 31.5mAHD. Data from the two closest gauges indicates there was constant rainfall approximately between 12 midnight on 30 March 2017 and 12 midnight on 31 March 2017. The most intense rainfall occurred at around 8pm-9pm on 30 March 2017 (40-60mm). BW’s says the site is bisected by a catchment divide, with about one third of the site draining to L River and the two other thirds (includi ng the farm dam) draining to S Creek. BW says this means the local catchment of the site is only the site itself. BW says the local catchment is too small to have generated the water flows observed. BW concludes local runoff would not have been sufficient to result in either the duration or depth of inundation that affected the site during the event. Loss was caused by flood Having reviewed the available material, including the information from the Bureau of Meteorology, BW concluded the inundation at the insured site was likely caused by flood waters overflowing from L River. Stormwater runoff is generally associated in time with intense rainfall periods. BW’s report shows the most intense local rainfall occurred at 8pm-9pm on 30 March 2017. BW’s data regarding water levels suggest L River would have broken its banks much earlier than reported by the complainant’s employee “J” (1am on 31 March 2017) . It would have occurred sometime between 12 midday and 2pm on 30 March 2017. Therefore, it is arguable that at the time of most intense rainfall, rainwater would have been mixing with flood waters from L River. As per section 3.2 below, this means all the runoff at the time of most intense rainfall would have been considered flood water. In any case, I note the catchment area is significantly small. Therefore, I consider it is unlikely this rainfall period could have generated a significant amount of runoff on its own so as to cause the reported damage , without the intervention of L River flood waters. The complainant says the farm dam overflowed before the river flooded. BW says the dam could not have caused any damage given the nearby shed had an elevation 1m higher than the dam. Even if damage had been caused by water overflowing from the dam, I note the policy definition of flood includes water escaping from the normal confines of a dam. This means water escaping from the dam would also be considered flood water. Determination | Case number: 519157 Page 4 of 9 In an email of 8 May 2018, the complainant outlines the outstanding items it seeks settlement for. The evidence provided by the parties on their cause of damage either confirms the items were damaged due to water inundation or does not provide sufficient information to establish how they were damaged during the claimed event. There is no expert mater ial in this complaint that challenges BW’s conclusions about the mechanism of inundation at the insured site. Therefore, I accept that on the balance of probabilities, the cause of damage to the disputed items was flood waters escaping from L River. On this basis, the insurer is entitled to rely upon its policy exclusion for flood to deny the complainant’s claim for the disputed items. Determination | Case number: 519157 Page 5 of 9 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. This complaint has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous decisions (which are not binding). During the course of this complaint, the complainant has been represented by its broker. For the purpose of this determination, submissions made by the broker are treated as if they had been made by the complainant itself. Rainwater that mixes with flood water if flood The courts have established that once rainwater mixes with flood water, it is all considered flood water. Where rainwater mixes with flood water and causes damage, a flood exclusion will usually apply to defeat the claim. Accordingly, when deciding complaints, consideration has been given to whether any rainwater runoff damage occurred before the flood water arrived at the insured site. 3.3 Key points on relevant material Record Key points Determination | Case number: 519157 Page 6 of 9 Record Key points Insurer’s loss asse ssor ( CL ) Report 21 April 2017  The insured explained that, following several days of heavy rain, runoff wat er was unable to escape from the eastern side of the property due to a new bypass and a new waterline.  On the night of 30 March 2017, many of the facilities were inundated. The following day, water in L River which is on the western side of the property, rose about 27m and caus ed further damage.  The insured argues damage was due to runoff water from the eastern side of the property, which caused most of the damage claimed before L River rose and caused further damage, including to fences. Insurer’s hydrologi st (B W ) Report 29 May 2017  The site is on rural land and runs as a commercial horse stud business.  The main structures at the site are a hous e, an equipment storage shed/workshop with a small residential unit, a fodder storage shed, stables, an equine training pool, a s mall open shed, an equine exercise ring, a silo and other minor ancillary structures.  The farm dam is located on the northern side of the property. The site is bounded by other agricultural farms to the north and south, L River to the west and L Road to th e east. L River generally runs in a northerly direction.  S Creek is about 400m to the east of L Road. S Creek also generally travels in a northerly direction. The B Water Supply L River intake facility is located immediately north of the adjoining northern allotment.  L River has a catchment area of about 1,401km 2 upstream of the site.  An employee of the insured “J” had been on site during the event.  J says the event started in the morning of 30 March 2017 and continued through to 31 March 2017. J noted ther e was heavy rain all day on 30 March, but he could not confirm what time the heavy rain commenced or eased off. He could not provide estimates of the amount of rainfall.  J had noted L River had reached the top of its bank adjac ent to the site at around 1am on 31 March and started moving very quickly through the property. J said the flood water from L River reached its peak some time in the morning of 31 March and then started draining back towards L River.  J noted the colour of the water was “brown/ very dir ty”. J pointed out three air conditioner units under the house, all of which had been inundated.  BW noted a lot of debris in trees, tall grasses and fences on the property directly east of the site, up to a height of about 2m above the road level.  Given th e debris was on the southern side of the trees, grasses and fence posts, it would suggest the flow came from a southerly direction.  A water/debris line was still evident on the wall in the equipment storage shed, at 960mm from ground level.  One of the door s to this shed was damaged. The water/debris line on the door was at 920mm from the ground level. As the door was leaning on an angle, the actual height reached by water may have been a little bit higher.  The door had been pushed out and was leaning to the east. This suggests flowing water would have come from a westerly direction.  Debris on equipment outside of the equipment storage shed was at a height of 1m from ground level.  The elevation between the current dam water level and the ground level of the e quipment storage shed is about 1m. There was debris in a tree on the top of the bank of the dam at about 1m above ground level. Determination | Case number: 519157 Page 7 of 9 Record Key points  There was no evidence of inundation in the small open shed. There was some limited debris observed around the base of the equipm ent adjacent to the motor at the equine ex ercise ring. The house is on poles, with the habitable floor level elevated about 2m above ground level.  The three air conditioning units under the hous e had debris in their covers. The direction of debris suggest wat er had flowed from a westerly or south westerly direction.  The western boundary of the site is L River, which falls away very steeply from the site. The water level at the time of inspection was about 12m lower than the top of the bank.  Debris was obser ved attached to a vehicle adjacent to the house to a height of about 1m above ground level.  An inspection of B intake facility was undertaken. Debris was obs erved on the western side of the security fence to a height of about 0.5m. Similarly, roadworks sec urity fencing on L Road, at the northeast corner of the site had trapped debris on the western side to a height of about 1.8m.  The location of debris would suggest L River had exceeded its channel capacity and overtopped its bank, depositing the debris whe re observed.  B water level gauge on L River is about 2km north of the site. This water level gauge is relevant to the event. BW alert was identified as the nearest gauge to the site (4.2km away ). Other rainfall gauges were analysed to determine the rainfal l across the broader L River catchment area.  The BW alert gauge recorded persistent rainfall over a 21 hour period from 1am to 10 pm on 30 March 2017, with a total of 254mm rainfall recorded during this period. On 30 March 2017, BW alert recorded a rainfa ll burst at 8pm, with 40mm of rain falling in a one hour period.  The B alert gauge recorded persistent rainfall over a 24 hour period from 12 midnight on 30 March to 12 midnight on 31 March 2017, with a total of 341mm rainfall recorded during this period. On 30 March 2017, B alert recorded a significant rainfall burst at 8pm (60mm of rain fell in a one hour period).  Rainfall recorded at BW gauge from 29 to 31 March 2017 was an event of a magnitude greater than 5% AEP for 12 – 48 hour storm durations, with a peak magnitude of about 1% AEP for storm durations between 12 and 24 hours. Shorter bursts (less than three hours) were less intense, with magnit udes less than 5% AEP.  Rainfall recorded at B alert during the same period was an event of a magnit ude greater than or equal to 2% AEP for 2 – 72 hour storm durations, with a peak magnitude exceeding 1% AEP for 6 – 48 hour storm durations. Shorter bursts (less than two hours) were less intense with magnitudes less than 5% AEP.  Significant rainfall occurred near th e site and more widely across the L River catchment from 12 midnight on 30 March to 12 midnight on 31 March 2017.  The rainfall recorded loc ally at B and BW gauges was of a greater magnitude than that recorded in the upper catchment.  BW gauge shows a rapid ris e in water level from 40.9mAHD starting at 7.03am on 30 March 2017. The stream level reached a peak of 52.5mAHD at 3.03am on 31 March 2017, after which it fell over the next 24 hours.  B gauge shows a rapid rise from a water level of 30m State Datum (SD) starting at 4.30am on 30 March 2017. It reached a peak of 44.3m SD at 3.22am on 31 March 2017. The analysis suggests a rise in the wat er level of about 14.3m at this gauge Determination | Case number: 519157 Page 8 of 9 Record Key points over a 23 hour period, after which it fell over the next 96 hours.  Based on LiDAR data, the site ranges from about 41.5mAHD to 45.5mAHD. L River directly adjoins the western boundary of the site, which includes steep banks of the river. Parts of the site therefore fall away below the elevations noted above.  LiDAR data shows the elevatio n of the water level in the river at the time the LiDAR was collected is about 31.5mAHD (assumed normal water level), while the top of the river bank next to the site is about 45mAHD.  LiDAR data suggests the site is bisected by a catchment divide, with abo ut one third of the site draining to L River and the other two thirds, including the farm dam, draining towards S Creek, which is located east of the site.  Therefore, the local catchment of the site appears to be only the site itself.  In the upstream reach es of the L River catchment, several gauges received significant rainfall. While having slightly lower magnitudes, rainfall in the upper reaches also exceeded a 1% AEP for the 24 hour duration at one gauge.  Water levels on L River ros e rapidly in response to the rainfall in the catchment. The sustained rainfall in the catchment resulted in elevat ed water levels in the L River that exceeded the available channel capacity.  This caused water to escape from the river channel and inundate the site. Water from L River flowed across the site from a south westerly direction. It is likely this floodwater overtopped the catchment divide located on the site and flowed ac ross L Road towards S Creek.  Water could also have inundated the site as the site dam filled from di rect rainfall. Given the 48 hour total rainfall recorded at the loc al rainfall gauges, the dam would likely have increased in depth and extent.  However, the nearest building (the equipment storage shed) is elevat ed higher than the expected water level in t he dam. Thus, the increase in water level in the dam due to local rainfall and runoff is not expected to have caused any of the damage claimed for by the insured.  The depth, direction of flow, as well as velocity of flow and colour of water (as described b y J) are consistent with flooding as opposed to local runoff.  The intensity, duration and frequency of rainfall both locally and regionally were sufficient to result in riverine flooding.  A rise in water level of this magnitude would have been enough to re sult in the inundation of the site by floodwater from L River.  This is supported by the evidence on the site, which suggests water to a depth of about 1m flowed across the site from a south westerly direction.  The local catchment is too small to have gener ated such flows. J also stated he witnessed water flowing over the bank of L River across the site.  Local runoff would not be sufficient to result in either the duration of inundation or the depth of water that inundated the site during the event. It was n ot sufficient to have inundated the damaged portions of the site before the arrival of floodwater from L River.  The water inundation of the insured property was due to flooding from the adjacent L River. Determination | Case number: 519157 Page 9 of 9 Record Key points Insurer’s loss asse ssor ( CL ) Report 3 April 2018  The insurer will cover the damage sustained to the property due to lightning/power surge, which occurred before the flooding event.  The insured has submitted documents to support a claim for lightning/power surge damage (tot alling $29,512.08, excluding GST ).  As to the water pumps, CL talked with the insured’s plumber BH who said the pumps were damaged by flood waters. CL awaits written confirmation.  The report from the insured’s electrician JW states six pumps, horse walker motor, two hot water systems and three air conditioning units were damaged during recent storms and power surges.  JW’s quotation says to replace the four air conditioners, hot water thermostat and hot water system, after water inundation.  CL enquired with JW, who was unable to recall whet her damage was caused by lightning or rising flood waters.  On the day of inspection, CL was advised the air conditioners were damaged by rising waters. Photographs taken on the day of CL’s inspection confirm wat er damage to the bungalow (where one of the a ir conditioners and the hot water system were located).  The insured submitted an invoice from DS for repair of a lawnmower. CL contacted DS who confirmed the damage to the mower was due to submersion in flood waters.  PW has invoiced the insured $381. 82 (ex cluding GST) for stabilising wat er in the horse ex ercise pool. CL does not consider this to be light ning/ power surge damage. However, the stabilisation maybe a consequence of the flood event and damage sustained to pumps on the hors e swimming pool.  The rep ort from [pool repairer] SA confirms damage to the three pumps on the horse ex ercise pool and robotic pool cleaner have been caused by power surges. Insurer’s loss asse ssor ( CL ) Report 10 April 2018  The insurer has accepted damage to three pool pumps and a robotic pool cleaner ($10,836.37 net excess).  CL previously discussed with plumber BH and he advised the five pumps stated in his invoice were damaged by rising flood waters. BH says in an email that he believes “the damage was a result of rising water”. Insurer’s repairer ( AS ) Report 23 April 2018  AS found evidence that all outdoor air conditioning units have been completed submerged by flood waters.  All electric motors and PC boards have been damaged beyond repair.  The hot water system is still operating. It is still in good working condition.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.