Partial denial of cyclone damage claim to driveway, spoon drain, tennis court and slope

FirmFinancial Firm (Unknown - Insurer)
Decided2019-01-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$7,276
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed cyclone damage to driveway, spoon drain, tennis court and slope; the insurer paid a reduced offer. AFCA found most damage was pre-existing wear, but ordered payment of the $12,276 repair estimate less the $5,000 excess and any amount already paid, with interest from 7 February 2018.

Wear, tear and gradual deterioration exclusions applied to most of the damage on the expert evidence, but the driveway damage from the cyclone was accepted at the original repair estimate.

Issues

Subjects and remedies

home or building damagenatural disasterpay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 519112 Page 1 of 12 Determination Case number: 519112 11 December 2018 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) under his Home and Contents Insurance Policy, for damage to his driveway, spoon drains, tennis court fence and slope, following a cyclone. The insurer partially accepted the claim but denied the balance of the claim. 1.2 Issues and key findings What is the ext ent of the insurer’s obligations to the complainant under the terms of the policy? The insurer is required to partially accept the claim for the driveway, in accordance with the terms of this determination, but is entitled to deny the claim for the spoon drains, tennis court fence and slope. 1.3 Determination This determination is in favour of the insurer. To meet its obligations to the complainant, the insurer is to pay an amount of $12,276, less the excess and less any amount already paid to the complainant. The insurer is to pay interest on any outstanding part of the $12,276, pursuant to the provisions of the Insurance Contracts Act 1984 (the Act), from 7 February 2018, until the balance of the amount is paid. Determination | Case number: 519112 Page 2 of 12 2 Reasons for determination 2.1 What is the extent of the insurer’s obligations to the complainant under the terms of the policy? Coverage of the policy The coverage provided by the complainant’s Home and Contents Insurance Policy is in respect to loss or damage caused by an insured event detailed within t he policy documentation. This coverage is subject to exclusions and definitions within the policy documentation. The coverage of the policy is detailed within the Product Disclosure Statement (PDS). The PDS details: … … … … As stated, the coverage provided by the policy is subject to exclusions. The PDS details: Determination | Case number: 519112 Page 3 of 12 … … … The PDS also contains: … It is accepted insurance law that the insured carries the initial onus to establish that the loss and damage claimed is covered by the terms and conditions of the policy. If the insured is able to establish the loss and damage is covered by the terms of the policy, the onus transfers to the insurer to establish the application of an exclusion or the basis on which it is otherwise entitled to deny the claim. The insured’s obligation to establish that the claim is covered by the policy, extends to establishing that the loss and damage occurred in circumstances which are consistent with the other known and confirmed evidence. Circumstances of the loss The complainant says that loss and damage was caused at his home during Tropical Cyclone Debbie in March 2017. Determination | Case number: 519112 Page 4 of 12 The complainant says that Cyclone Debbie caused damage from washout, leading to numerous potholes to both the sealed driveway and the concrete spoon drain that runs along the side of the driveway. Further, the complainant says that Cyclone Debbie caused damage to the fence of the tennis court at the property. There is no doubt that Tropical Cyclone Debbie was a significant and devastating weather event which impacted the complainant’s property. The issue for the panel is to determine the extent to which the property suffered loss and damage as a result of this storm and in accordance with the terms and conditions of the complainant’s policy. A number of helpful reports have been obtained, detailing the extent and cause of the damage at the property. However, as is often the case, some of the reports vary in their conclusion, particularly with regard to the question of the cause of the damage. The insurer arranged for a builder (M) to attend at the property on 4 May 2017. Within an assessment dated 16 May 2017, M advised: The insurer engaged a structural engineer (W) to assess the cause of damage to the driveway and tennis court area. W attended at the site on 29 November 2017 and provided a report dated 7 December 2017. Within that report, W advised: Determination | Case number: 519112 Page 5 of 12 The insurer provided W’s opinion to its assessor wh o advised: It is the Engineer’s opinion that the varying degrees of erosion, undercutting, cracking and deterioration to the driveway and surrounding areas have been exacerbated and/or made noticeable by the severity of the claim event. However, it is unlikely that the claim event is the original / sole cause of this damage. In our opinion, the claimed damages are ultimately caused over time due to general ground movement, inadequate drainage measures to capture and direct runoff around and away from the driveway and ageing of materials. The insurer provided W with a copy of GC’s assessment and W provided a further report dated 21 December 2017 which included: The insurer then requested W to assess the cause of erosion and damage to the tennis court. Within a further report dated 16 February 2018, W advised: The complainant engaged an engineer (S) who attended on site on 29 June 2018 and provided a report dated 2 July 2018. Within that report, S advised: From S’s review of the western slope of the tennis court, it is clear that a slip failure has occurred in recent past. The face of the cliff is still relatively fresh in comparison to the surface above and below the slip and would most likely be associated with a severe rainstorm event, which would have saturated the clays and resulted in a slip failure. Determination | Case number: 519112 Page 6 of 12 … Spoon Drain As the inspection carried out by S is some 15 months after the storm event, it is difficult to determine now the extent of damage to the spoon drain that can be attributed to the storm event. However it is clear from previous reports that the majority of damage to the road surface resulting from the storm event of March / April 2017 is located where the spoon drain has been washed away. Previous reports have pointed to a lack of adequate drainage for the full extent of the spoon drain, and this is clearly not correct. Finally, there are many areas where damage is evident to the driveway which has occurred at various times, and for various reasons. … Conclusion An inspection of the tennis court, driveway and spoon drain was carried out by S on 27 June 2018. The inspection was to review areas that were affected by the storm event that occurred on or about 31 March 2017. These items had previously been the subject of inspections and reports prepared by W who determined that the issues associated with the tennis court were a result of poor drainage. From S’s investigation of the slope it is clear that a recent slippage has occurred, which would be the direct result of the clay bank having been saturated, most likely during a heavy rainfall event. With respect to the driveway and spoon drain, from S’s review of documents provided and the site inspection, the damage to the lower portion of the driveway and the spoon drain are as a result of a high volume of runoff washing out the spoon drain and over the road surface. The W report notes that there were seventeen locations on this section of driveway where damage has occurred as a result of the storm event. As such, S is of the opinion that the damage to the spoon drain, and the roadway are a result of the same event. … Subsequently, the insurer engaged engineer (JH) to provide a report, which it did, dated 15 July 2018. Whilst the panel notes that JH did not attend on site, but rather reviewed the numerous reports and photographs exchanged between the parties, the panel is satisfied that the report from JH is logical and thorough and its conclusions are compelling. Determination | Case number: 519112 Page 7 of 12 The report from JH is lengthy and the panel does not propose to reproduce all of the report here. However, a summary of the report is contained within section 3.2 of this determination. JH concluded that in regard to the tennis court, a major landslip had occurred prior to the storm event in 2017. JH says that the movement of the tennis court fencing occurred due to long term differential foundation movement and not as a result of the storm event. Further, JH addresses the commentary from S to the effect that the landslip occurred in the recent past and JH refers to the aerial photographs which demonstrate that the major landslip occurred years before the storm event in 2017. The commentary from JH is supported by a number of helpful and clear photographs. With regard to the damage to the spoon drains and driveway, JH reviewed their method of construction and what elements influenced their potential movement and deterioration. Again, JH made reference to a number of historical photographs of the insured property, together with rainfall records which preceded the March 2017 tropical cyclone event. JH summarised: The evidence indicates that the driveway was poorly constructed and has inadequate drainage. As a result of poor construction, significant damage to the driveway existed at the time of the March 2017 event. Had the driveway been correctly maintained and sealed, the additional damage to the driveway is considered minimal. Due to the presence of potholes and significant cracking to the surface prior to the event, the owner would have been aware of the degraded condition of the driveway. JH addressed the commentary from S to the effect that the damage to the spoon drain and driveway occurred during the course of the March 2017 tropical cyclone event. JH concluded that the primary cause of the damage to the driveway and spoon drain was not the storm event of March 2017. JH was of the view that the driveway construction and design is poor and that further deterioration of the road will continue to occur due to the construction methods and design used. Further, JH was of the view that the evidence indicates that the pavement surfaces are beyond its serviceable life and should be replaced. Determination | Case number: 519112 Page 8 of 12 As stated, based on the exchanged material, the panel is satisfied that the report from JH is thorough and logical and its conclusions are compelling and supported by numerous helpful photographs. The result is that the panel is satisfied that the damage claimed by the complainant is largely not the result of the storm event of March 2017 and the insurer is entitled to rely upon the policy exclusions for wear, tear and gradual deterioration, to deny the bulk of the complainant’s claim. 2.2 What part of the claim is the insurer required to meet under the terms of the policy? As detailed, the builder (M) engaged by the insurer was of the view that during the storm of 30 March 2017, the amount of runoff rainwater has damaged the sealed bitumen driveway. M provided a quotation for repairs in the amount of $12,276. After being provided with further information, M submitted another quotation in the amount of $6,050. The insurer offered to settle the complainant’s claim in this amount, subject to the policy excess of $5,000. At the conciliation between the parties, the insurer offered to reinstate the origi nal M estimate of $12,276. The panel is of the view that it is fair in the circumstances that original estimate be reinstated. The full extent of the insurer’s obligation to the complainant is in the amount of $12,276, subject to the relevant policy excess. The insurer is not required to make any additional payments to the complainant in respect to this claim. Determination | Case number: 519112 Page 9 of 12 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenc ed managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim 3.2 Expert opinion Record Insurer’s engineer (J H ) Report 15 - 07 - 2018  Complainant did not allow a physical inspection but agreed to an alternative engineer to review the existing reports and provide an opinion.  Evidence indicat ed tennis court constructed by creation of a cut and fill pad. Earth us ed to fill an embankment to create building plat form on which the tennis court was constructed. When creating cut and fill plat forms to produce a platform that can be built on an d treat ed like natural ground, level one compaction is required. This method of land preparation is very expensive and rarely undertaken. Evidence of the land slip failure indicates level one compaction was not undertaken.  Experience in building would sugg est fill area would have been compacted by machinery to create fill plat form, such as a Drott or Excavator rolling backwards and forwards over the fill in an effort to compact the soil. However the benching level unknown. The created soil profile is not fu lly compacted in all areas and henc e void and fissures occur over time as the fill continues to settle. Thes e gaps and voids provide an entry point for rain water.  Foundations of the tennis court founded in fill area of embankment. As the fill has not been compacted to level one compaction, the fill will continue to settle with time. A land slip occurred in the past. This act to furt her undermined the fill zone over time and weaken the soil support under the tennis Determination | Case number: 519112 Page 10 of 12 Record court’s foundations and bas e.  Large land s lip present in Sept ember 2016. Fill never fully compacted initially and further instability created by the land slip resulted in further soil settlement. The significant land slip before the 2017 storm event undermined the embankment. As the soil settled, the tennis court foundation will have moved, resulting in the movement of the tennis court fencing. Movement of the tennis court fencing occurred due to long - term differential foundation movement and not because of the storm event.  Photograph in February 2 017 shows no fresh landslip. S’s report refers to localised area where the grass or weeds have washed away. This is not a major landslip that has undermined the foundation of the tennis court. It is a surface movement that has washed away the grass. The ti ming of the soil washout would be difficult to pinpoint given since 2017 event there has been numerous severe storms.  S’s photo shows steep unsupported embankment. It shows remedial works were not undert aken to reinstate the structural support to the fill area. The earth adjacent to the fencing has not been disturbed. No great pile of slipped earth at the bottom of the hill, which would suggest potential undermining of support for the foundation of the tennis court has occurred. S’s report does not support the storm event in March 2017 caused damage to the western side of the tennis court but due to long - term differential settlement of the fill over time.  If road pavement shows accelerated degree of deterioration, lack of maintenance would significantly inc rease pavement damage during significant event. Damage due to water entry under pavement allows washing away of subgrade material, use of road following event leads to jetting and potholing of road. Stereoscope viewer showed possible observed areas of sign ificant damage to road surface prior to event. Not possible to ascertain exact road condition and whether repairs undertaken.  M’s photos show pavement edge at crack point rounded. Asphalt rounding occurs when a cracked section of the asphalt is repeatedly driven over. When cracks develop, cracks are sharp on the corners. As car drives over it, edge of the cracks is knocked off resulting in rounding of cracks. Photos show cracks occurred prior to the storm event and water entered through the cracks resulting in the jetting and breakout of the pavement. Pothole photos suggested not recent and was pres ent prior to the storm event.  Photo indicat es no formed drain to collect wat er from the pavement or the embankment. Over time, water seeped down the hill and unde r the pavement, resulting in the subgrade material and bitumen pavement destruction. The area appears to have been excavat ed and concrete poured to provide subgrade support. The pavement has then been reinstated. Over time, concrete has broken up under loa d, due to saturation of subgrade as the fundamental drainage issue that was never dealt with. As a consequence, the asphalt pavement has broken up. Evidence indicat es primary damage present prior to storm event and not damaged by the storm event. There is inadequate side drainage that has Determination | Case number: 519112 Page 11 of 12 Record allowed water into subgrade material accelerating deterioration of the pavement.  Many areas of roadway, potholes were repaired by filling holes with concrete. Concrete is a fixed product, it does not flex or ex pand and con tract at the same rate that bitumen does. As rounding does not occur within 34 days of the event, this indicate there was a pothole downstream of the concrete area prior to the storm event. Further down the hill, the asphalt has a sharper edge and that exp osed bitumen is much darker than surrounds. This is indicative of recent subgrade damage and bitumen breakout that can be attributed to the storm event. The pothole existed but not as large prior to the event. The rounding and flattening of bitumen upstrea m has occurred over time and indicative of the condition prior to the storm event. There is only minor damage from the storm event.  Photo show combination of previous road deterioration and extensive cracking that would have occurred due to saturation of s ubgrade outside paved area over time and years of traffic resulting in longitudinal cracking of the surface. Cracking allowed wat er entry, resulting in a pothole. Evidence indicat es pothole recently increased due to storm event however a pot hole was presen t prior to the event and increased in size.  Wedging occurs where previous failure of the pavement, traffic creates a furt her break in the pavement which runs at an angle to the subgrade. This can result in a wedge of bitumen breaking off.  Combination of concret e drain in poor condition prior to event. Pavement not bounded to gutter prior to the event. Saturation of the subgrade mat erial beside the road could occur. There are longitudinal cracks within the pavement. Water jetting under saturat ed subgrade r esulted in breakout of sections of the pavement.  There is significant long - term cracking and damage to pavement area. This is attributed to no drainage on the high side of the road, hence wat er saturates the adjoining soil can track under the pavement. Thi s damage occurring for a significant period of time.  If pavement not sufficiently thick and prepared, pavement cracking occurs. Damage is symptomatic of poor original construction and not caused by storm event.  While the storm was large, it was not the lar gest storm in the road’s history. Once soil saturated, any more rain falls readily runs off, increasing wat er volume of water running down the road. March 2017 Bureau of Meteorology shows seven days prior to rain storm, there was 165mm on 30 March followed by 183mm the next day. In 2015, there was a day of rain following previous days of rain, a total of 222mm was recorded.  Evidence indicat es driveway poorly constructed and has inadequate drainage. Had the driveway been correctly maintained and sealed, addi tional damage to the driveway considered minimal. Due to presence of potholes and significant cracking to the surface prior to the event, the complainant would have been aware of the degraded driveway conditions. Determination | Case number: 519112 Page 12 of 12 Record  Given slope of driveway changes, vegetation changes and construction of spoon drain changes along length of driveway, no expectation the damage would be consistent along the length of the driveway. Did not agree with S’s comments that damage along the driveway would be consistent if the problems we re caused by poor drainage as it is not based on the site facts about the drain construction. W’s comments are consistent with the site conditions.  Agree with S’s comments the fundamental construction of driveway is flawed. Evidenc e is that driveway had su stained significant damage prior to the event and patch repairing of driveway considered an accept able solution to complainant prior to the event.  There is no requirement where a driveway is damage, the driveway must be upgraded to meet any formal design. S’s report does not provide any comments as to whet her the storm event of March 2017 caused damage to the driveway or spoon drains but links the storm to the damage commented in W’s report.