Partial denial of cyclone damage claim to driveway, spoon drain, tennis court and slope
Text of the determination
Determination | Case number: 519112 Page 1 of 12
Determination
Case number: 519112 11 December 2018
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) under his Home and
Contents Insurance Policy, for damage to his driveway, spoon drains, tennis court
fence and slope, following a cyclone.
The insurer partially accepted the claim but denied the balance of the claim.
1.2 Issues and key findings
What is the ext ent of the insurer’s obligations to the complainant under the
terms of the policy?
The insurer is required to partially accept the claim for the driveway, in accordance
with the terms of this determination, but is entitled to deny the claim for the spoon
drains, tennis court fence and slope.
1.3 Determination
This determination is in favour of the insurer.
To meet its obligations to the complainant, the insurer is to pay an amount of $12,276,
less the excess and less any amount already paid to the complainant.
The insurer is to pay interest on any outstanding part of the $12,276, pursuant to the
provisions of the Insurance Contracts Act 1984 (the Act), from 7 February 2018, until
the balance of the amount is paid.
Determination | Case number: 519112 Page 2 of 12
2 Reasons for determination
2.1 What is the extent of the insurer’s obligations to the complainant under
the terms of the policy?
Coverage of the policy
The coverage provided by the complainant’s Home and Contents Insurance Policy is
in respect to loss or damage caused by an insured event detailed within t he policy
documentation.
This coverage is subject to exclusions and definitions within the policy documentation.
The coverage of the policy is detailed within the Product Disclosure Statement (PDS).
The PDS details:
…
…
…
…
As stated, the coverage provided by the policy is subject to exclusions.
The PDS details:
Determination | Case number: 519112 Page 3 of 12
…
…
…
The PDS also contains:
…
It is accepted insurance law that the insured carries the initial onus to establish that
the loss and damage claimed is covered by the terms and conditions of the policy.
If the insured is able to establish the loss and damage is covered by the terms of the
policy, the onus transfers to the insurer to establish the application of an exclusion or
the basis on which it is otherwise entitled to deny the claim.
The insured’s obligation to establish that the claim is covered by the policy, extends to
establishing that the loss and damage occurred in circumstances which are consistent
with the other known and confirmed evidence.
Circumstances of the loss
The complainant says that loss and damage was caused at his home during Tropical
Cyclone Debbie in March 2017.
Determination | Case number: 519112 Page 4 of 12
The complainant says that Cyclone Debbie caused damage from washout, leading to
numerous potholes to both the sealed driveway and the concrete spoon drain that
runs along the side of the driveway.
Further, the complainant says that Cyclone Debbie caused damage to the fence of
the tennis court at the property.
There is no doubt that Tropical Cyclone Debbie was a significant and devastating
weather event which impacted the complainant’s property.
The issue for the panel is to determine the extent to which the property suffered loss
and damage as a result of this storm and in accordance with the terms and conditions
of the complainant’s policy.
A number of helpful reports have been obtained, detailing the extent and cause of the
damage at the property.
However, as is often the case, some of the reports vary in their conclusion,
particularly with regard to the question of the cause of the damage.
The insurer arranged for a builder (M) to attend at the property on 4 May 2017.
Within an assessment dated 16 May 2017, M advised:
The insurer engaged a structural engineer (W) to assess the cause of damage to the
driveway and tennis court area.
W attended at the site on 29 November 2017 and provided a report dated 7
December 2017.
Within that report, W advised:
Determination | Case number: 519112 Page 5 of 12
The insurer provided W’s opinion to its assessor wh o advised:
It is the Engineer’s opinion that the varying degrees of erosion, undercutting,
cracking and deterioration to the driveway and surrounding areas have been
exacerbated and/or made noticeable by the severity of the claim event. However,
it is unlikely that the claim event is the original / sole cause of this damage. In our
opinion, the claimed damages are ultimately caused over time due to general
ground movement, inadequate drainage measures to capture and direct runoff
around and away from the driveway and ageing of materials.
The insurer provided W with a copy of GC’s assessment and W provided a further
report dated 21 December 2017 which included:
The insurer then requested W to assess the cause of erosion and damage to the
tennis court.
Within a further report dated 16 February 2018, W advised:
The complainant engaged an engineer (S) who attended on site on 29 June 2018 and
provided a report dated 2 July 2018.
Within that report, S advised:
From S’s review of the western slope of the tennis court, it is clear that a slip
failure has occurred in recent past. The face of the cliff is still relatively fresh in
comparison to the surface above and below the slip and would most likely be
associated with a severe rainstorm event, which would have saturated the clays
and resulted in a slip failure.
Determination | Case number: 519112 Page 6 of 12
…
Spoon Drain
As the inspection carried out by S is some 15 months after the storm event, it is
difficult to determine now the extent of damage to the spoon drain that can be
attributed to the storm event. However it is clear from previous reports that the
majority of damage to the road surface resulting from the storm event of March /
April 2017 is located where the spoon drain has been washed away. Previous
reports have pointed to a lack of adequate drainage for the full extent of the spoon
drain, and this is clearly not correct.
Finally, there are many areas where damage is evident to the driveway which has
occurred at various times, and for various reasons.
…
Conclusion
An inspection of the tennis court, driveway and spoon drain was carried out by S
on 27 June 2018. The inspection was to review areas that were affected by the
storm event that occurred on or about 31 March 2017.
These items had previously been the subject of inspections and reports prepared
by W who determined that the issues associated with the tennis court were a
result of poor drainage.
From S’s investigation of the slope it is clear that a recent slippage has occurred,
which would be the direct result of the clay bank having been saturated, most
likely during a heavy rainfall event.
With respect to the driveway and spoon drain, from S’s review of documents
provided and the site inspection, the damage to the lower portion of the driveway
and the spoon drain are as a result of a high volume of runoff washing out the
spoon drain and over the road surface.
The W report notes that there were seventeen locations on this section of
driveway where damage has occurred as a result of the storm event. As such, S
is of the opinion that the damage to the spoon drain, and the roadway are a result
of the same event.
…
Subsequently, the insurer engaged engineer (JH) to provide a report, which it did,
dated 15 July 2018.
Whilst the panel notes that JH did not attend on site, but rather reviewed the
numerous reports and photographs exchanged between the parties, the panel is
satisfied that the report from JH is logical and thorough and its conclusions are
compelling.
Determination | Case number: 519112 Page 7 of 12
The report from JH is lengthy and the panel does not propose to reproduce all of the
report here.
However, a summary of the report is contained within section 3.2 of this
determination.
JH concluded that in regard to the tennis court, a major landslip had occurred prior to
the storm event in 2017.
JH says that the movement of the tennis court fencing occurred due to long term
differential foundation movement and not as a result of the storm event. Further, JH
addresses the commentary from S to the effect that the landslip occurred in the recent
past and JH refers to the aerial photographs which demonstrate that the major
landslip occurred years before the storm event in 2017.
The commentary from JH is supported by a number of helpful and clear photographs.
With regard to the damage to the spoon drains and driveway, JH reviewed their
method of construction and what elements influenced their potential movement and
deterioration.
Again, JH made reference to a number of historical photographs of the insured
property, together with rainfall records which preceded the March 2017 tropical
cyclone event.
JH summarised:
The evidence indicates that the driveway was poorly constructed and has
inadequate drainage. As a result of poor construction, significant damage to the
driveway existed at the time of the March 2017 event. Had the driveway been
correctly maintained and sealed, the additional damage to the driveway is
considered minimal. Due to the presence of potholes and significant cracking to
the surface prior to the event, the owner would have been aware of the degraded
condition of the driveway.
JH addressed the commentary from S to the effect that the damage to the spoon
drain and driveway occurred during the course of the March 2017 tropical cyclone
event.
JH concluded that the primary cause of the damage to the driveway and spoon drain
was not the storm event of March 2017.
JH was of the view that the driveway construction and design is poor and that further
deterioration of the road will continue to occur due to the construction methods and
design used.
Further, JH was of the view that the evidence indicates that the pavement surfaces
are beyond its serviceable life and should be replaced.
Determination | Case number: 519112 Page 8 of 12
As stated, based on the exchanged material, the panel is satisfied that the report from
JH is thorough and logical and its conclusions are compelling and supported by
numerous helpful photographs.
The result is that the panel is satisfied that the damage claimed by the complainant is
largely not the result of the storm event of March 2017 and the insurer is entitled to
rely upon the policy exclusions for wear, tear and gradual deterioration, to deny the
bulk of the complainant’s claim.
2.2 What part of the claim is the insurer required to meet under the terms of
the policy?
As detailed, the builder (M) engaged by the insurer was of the view that during the
storm of 30 March 2017, the amount of runoff rainwater has damaged the sealed
bitumen driveway.
M provided a quotation for repairs in the amount of $12,276.
After being provided with further information, M submitted another quotation in the
amount of $6,050.
The insurer offered to settle the complainant’s claim in this amount, subject to the
policy excess of $5,000.
At the conciliation between the parties, the insurer offered to reinstate the origi nal M
estimate of $12,276.
The panel is of the view that it is fair in the circumstances that original estimate be
reinstated.
The full extent of the insurer’s obligation to the complainant is in the amount of
$12,276, subject to the relevant policy excess.
The insurer is not required to make any additional payments to the complainant in
respect to this claim.
Determination | Case number: 519112 Page 9 of 12
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenc ed managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Expert opinion
Record
Insurer’s engineer (J H )
Report
15 - 07 - 2018
Complainant did not allow a physical inspection but agreed to
an alternative engineer to review the existing reports and
provide an opinion.
Evidence indicat ed tennis court constructed by creation of a
cut and fill pad. Earth us ed to fill an embankment to create
building plat form on which the tennis court was constructed.
When creating cut and fill plat forms to produce a platform that
can be built on an d treat ed like natural ground, level one
compaction is required. This method of land preparation is
very expensive and rarely undertaken. Evidence of the land
slip failure indicates level one compaction was not
undertaken.
Experience in building would sugg est fill area would have
been compacted by machinery to create fill plat form, such as
a Drott or Excavator rolling backwards and forwards over the
fill in an effort to compact the soil. However the benching
level unknown. The created soil profile is not fu lly compacted
in all areas and henc e void and fissures occur over time as
the fill continues to settle. Thes e gaps and voids provide an
entry point for rain water.
Foundations of the tennis court founded in fill area of
embankment. As the fill has not been compacted to level one
compaction, the fill will continue to settle with time. A land slip
occurred in the past. This act to furt her undermined the fill
zone over time and weaken the soil support under the tennis
Determination | Case number: 519112 Page 10 of 12
Record
court’s foundations and bas e.
Large land s lip present in Sept ember 2016. Fill never fully
compacted initially and further instability created by the land
slip resulted in further soil settlement. The significant land slip
before the 2017 storm event undermined the embankment.
As the soil settled, the tennis court foundation will have
moved, resulting in the movement of the tennis court fencing.
Movement of the tennis court fencing occurred due to long -
term differential foundation movement and not because of the
storm event.
Photograph in February 2 017 shows no fresh landslip. S’s
report refers to localised area where the grass or weeds have
washed away. This is not a major landslip that has
undermined the foundation of the tennis court. It is a surface
movement that has washed away the grass. The ti ming of the
soil washout would be difficult to pinpoint given since 2017
event there has been numerous severe storms.
S’s photo shows steep unsupported embankment. It shows
remedial works were not undert aken to reinstate the
structural support to the fill area. The earth adjacent to the
fencing has not been disturbed. No great pile of slipped earth
at the bottom of the hill, which would suggest potential
undermining of support for the foundation of the tennis court
has occurred. S’s report does not support the storm event in
March 2017 caused damage to the western side of the tennis
court but due to long - term differential settlement of the fill
over time.
If road pavement shows accelerated degree of deterioration,
lack of maintenance would significantly inc rease pavement
damage during significant event. Damage due to water entry
under pavement allows washing away of subgrade material,
use of road following event leads to jetting and potholing of
road. Stereoscope viewer showed possible observed areas of
sign ificant damage to road surface prior to event. Not
possible to ascertain exact road condition and whether
repairs undertaken.
M’s photos show pavement edge at crack point rounded.
Asphalt rounding occurs when a cracked section of the
asphalt is repeatedly driven over. When cracks develop,
cracks are sharp on the corners. As car drives over it, edge of
the cracks is knocked off resulting in rounding of cracks.
Photos show cracks occurred prior to the storm event and
water entered through the cracks resulting in the jetting and
breakout of the pavement. Pothole photos suggested not
recent and was pres ent prior to the storm event.
Photo indicat es no formed drain to collect wat er from the
pavement or the embankment. Over time, water seeped
down the hill and unde r the pavement, resulting in the
subgrade material and bitumen pavement destruction. The
area appears to have been excavat ed and concrete poured
to provide subgrade support. The pavement has then been
reinstated. Over time, concrete has broken up under loa d,
due to saturation of subgrade as the fundamental drainage
issue that was never dealt with. As a consequence, the
asphalt pavement has broken up. Evidence indicat es primary
damage present prior to storm event and not damaged by the
storm event. There is inadequate side drainage that has
Determination | Case number: 519112 Page 11 of 12
Record
allowed water into subgrade material accelerating
deterioration of the pavement.
Many areas of roadway, potholes were repaired by filling
holes with concrete. Concrete is a fixed product, it does not
flex or ex pand and con tract at the same rate that bitumen
does. As rounding does not occur within 34 days of the event,
this indicate there was a pothole downstream of the concrete
area prior to the storm event. Further down the hill, the
asphalt has a sharper edge and that exp osed bitumen is
much darker than surrounds. This is indicative of recent
subgrade damage and bitumen breakout that can be
attributed to the storm event. The pothole existed but not as
large prior to the event. The rounding and flattening of
bitumen upstrea m has occurred over time and indicative of
the condition prior to the storm event. There is only minor
damage from the storm event.
Photo show combination of previous road deterioration and
extensive cracking that would have occurred due to
saturation of s ubgrade outside paved area over time and
years of traffic resulting in longitudinal cracking of the
surface. Cracking allowed wat er entry, resulting in a pothole.
Evidence indicat es pothole recently increased due to storm
event however a pot hole was presen t prior to the event and
increased in size.
Wedging occurs where previous failure of the pavement,
traffic creates a furt her break in the pavement which runs at
an angle to the subgrade. This can result in a wedge of
bitumen breaking off.
Combination of concret e drain in poor condition prior to
event. Pavement not bounded to gutter prior to the event.
Saturation of the subgrade mat erial beside the road could
occur. There are longitudinal cracks within the pavement.
Water jetting under saturat ed subgrade r esulted in breakout
of sections of the pavement.
There is significant long - term cracking and damage to
pavement area. This is attributed to no drainage on the high
side of the road, hence wat er saturates the adjoining soil can
track under the pavement. Thi s damage occurring for a
significant period of time.
If pavement not sufficiently thick and prepared, pavement
cracking occurs. Damage is symptomatic of poor original
construction and not caused by storm event.
While the storm was large, it was not the lar gest storm in the
road’s history. Once soil saturated, any more rain falls readily
runs off, increasing wat er volume of water running down the
road. March 2017 Bureau of Meteorology shows seven days
prior to rain storm, there was 165mm on 30 March followed
by 183mm the next day. In 2015, there was a day of rain
following previous days of rain, a total of 222mm was
recorded.
Evidence indicat es driveway poorly constructed and has
inadequate drainage. Had the driveway been correctly
maintained and sealed, addi tional damage to the driveway
considered minimal. Due to presence of potholes and
significant cracking to the surface prior to the event, the
complainant would have been aware of the degraded
driveway conditions.
Determination | Case number: 519112 Page 12 of 12
Record
Given slope of driveway changes, vegetation changes and
construction of spoon drain changes along length of
driveway, no expectation the damage would be consistent
along the length of the driveway. Did not agree with S’s
comments that damage along the driveway would be
consistent if the problems we re caused by poor drainage as it
is not based on the site facts about the drain construction.
W’s comments are consistent with the site conditions.
Agree with S’s comments the fundamental construction of
driveway is flawed. Evidenc e is that driveway had su stained
significant damage prior to the event and patch repairing of
driveway considered an accept able solution to complainant
prior to the event.
There is no requirement where a driveway is damage, the
driveway must be upgraded to meet any formal design. S’s
report does not provide any comments as to whet her the
storm event of March 2017 caused damage to the driveway
or spoon drains but links the storm to the damage
commented in W’s report.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.