Roof, ceiling and wall damage claim partly denied for faulty materials or workmanship
Text of the determination
Determination
Case No: 518769 Determination Page 1 of 3
Case number: 518769 2 August 2018
1 Overview
1.1 Dispute
The applicant holds a business insurance policy with the financial services provider
(FSP). The policy covers the applicant’s investment property, from which a business
operates. The applicant lodged a claim against the policy after the property’s tenant
noticed the ceiling was sagging. The applicant said this had resulted from strong
winds in April 2017.
The FSP arranged an assessment of the damage and the experts concluded the
damage to the roof resulted from factors that are excluded from cover under the
policy.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was substantially in favour of the FSP. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. There were no further submissions provided after the
recommendation.
Was the FSP entitled to deny the claim?
The FSP was entitled to deny the claim in relation to the damage to the roof, however
it has not established the application of the policy exclusions with respect to the
ceiling or walls.
1.3 Determination
This determination is substantially in favour of the FSP.
I agree with the case analyst’ s reasons for the recommendation and the
recommended outcome.
The FSP is required to obtain a quote (at market rates) for repairing the ceiling and
walls and cash settle the applicant. However, it is not required to take any further
action in relation to the claim for roof damage.
Case No: 518769 Determination Page 2 of 3
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case analyst ’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Was the FSP entitled to deny the claim?
Applicant has established a valid claim
The applicant lodged a claim on 3 August 2017 because his investment property
suffered damage after strong winds had struck the area in April 2017. The policy
responds to physical loss or damage that occurs to the insured property. Although
the FSP questioned the strength of the wind around that time, the information shows
the applicant’s tenant first noticed the ceiling sagg ing after the strong winds in April
2017.
The applicant has established a valid claim for which the policy responds. The FSP
relied on policy exclusions when denying the claim. The FSP bears the onus of
establishing the application of those exclusions.
FSP obtained experts’ reports
B, a builder, assessed the damage (report dated 17 August 2017), concluding the
roof’s construction, along with the way the trusses had been manufactured and the
weight of the concrete roof tiles had caused the roof to sag over time. B suggested a
roof truss specialist carry out an inspection.
S, an engineer, provided a report (dated 20 September 2017) noting a sag in the roof
along the line of the timber roof trusses. S also noted a sag of the ceiling lining
between the supports and two cracks in the plasterboard wall on the eastern
elevation.
S concluded the sagging roof line and damage to the timber roof trusses resulted
from poor construction and building practices. Wind during a storm event exposed
the defective structural joints. The timber roof truss modifications were contrary to the
requirements of the relevant standard at the time of construction and are considered
a building defect.
A wind event is not the proximate cause of the sagging roof line. S said the damage
to the timber roof trusses is structurally significant. S also provided a roof survey and
scope of works in support of his opinion.
Case No: 518769 Determination Page 3 of 3
S addressed various issues in a supplementary report (dated 13 April 2018). S said
the trusses may not have had an adequate load capacity for the significant extra
weight of tiles instead of the likely intended sheet roofing. A properly designed and
installed (and unmodified) trussed roof would not be expected to fail in the manner it
has in this case. The earlier report noted modifications had been carried out to the
trusses at some earlier time.
The reason for the failure of the roof structure was the inherent defects in the
design/installation/modification of the trusses. S said the defects are inherent in the
construction and became evident because of the wind event.
Applicant provided various documents
The applicant provided various documents such as the building application, approval,
occupancy permit, architectural plans and soil test results to show the local authority
had approved the building ’s construction. This was in response to S’s early comment
about the building not being constructed in accordance with the standards at that
time.
S subsequently qualified the earlier comment by saying the building most likely met
the building code at the time, however there was evidence of modification of the roof
structure that was poor building practice (such as the splice connections in the roof).
S also said the building was not built to the original construction drawings, citing
examples in support.
The applicant also provided a news media article which indicated the wind speed at
the time of the loss reached 115 kilometres per hour. However, this wind speed was
recorded some distance from the applicant’s property.
FSP was entitled to deny claim
The applicant rejected the recommendation that was substantially in the FSP’s
favour, although he provided no submissions in support. The FSP accepted the
recommendation. The available information establishes there were structural defects
with respect to the roof. The information also shows the roof structure deteriorated
over time.
As such, the FSP has established the application of the policy exclusions upon which
it relied in deny the claim in relation to the roof. However, I am not satisfied that the
FSP has establish the application of the exclusions in relation to the ceiling and wall
damage. The FSP is required to settle the applicant with respect to the ceiling and
wall damage.
Recommendation
Case No: 518769 Recommendation Page 1 of 7
Case number: 518769 14 June 2018
3 Overview
3.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) when he
noticed damage to the ceiling and roof of a building after a storm event in April 2017.
The FSP obtained several expert reports when assessing the claim. Ultimately, it
denied the claim. It says the expert information shows the proximate causes of the
damage are gradual deterioration/developing flaws and/or faulty materials/faulty
workmanship, which are all exclusions on the policy.
The applicant says the proximate cause of the damage is the April 2017 storm event
and seeks coverage on the policy accordingly.
3.2 Issues and key findings
Has the applicant established a valid claim on the policy?
There is no dispute the applicant first noticed the damage after a storm in April 2017.
Therefore, the applicant has established a valid claim under the policy.
Is the FSP entitled to deny the claim?
The FSP is entitled to deny the claim for roof damage. The expert information shows
the proximate cause of the roof damage is faulty materials/faulty workmanship, which
is excluded on the policy.
The FSP is not entitled to deny the claim for ceiling or wall damage. The FSP has
failed to establish whether an exclusion applies to the ceiling or wall damage.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
The FSP is entitled to deny the claim for roof damage.
The FSP is obliged to accept the claim for the ceiling and wall damage.
The FSP is obliged to obtain a quote for the required ceiling and wall repairs. The
FSP is then required to cash settle the applicant the appropriate costs.
Case No: 518769 Recommendation Page 2 of 7
4 Reasons for recommendation
4.1 Has the applicant established a valid claim on the policy?
Applicant established a valid claim
It is an accepted principle of general insurance law that an insured bears the onus to
show they have suffered a loss which, on the balance of probabilities, was caused by
an event to which the policy responds.
Once this is established, the onus shifts to the insurer to prove the application of an
exclusion or limitation, if it seeks to deny or limit its liability for the damage.
There is no dispute the applicant experienced a storm in April 2017. Further, the
expert information provided by the FSP confirms the wind experienced on the day
contributed to the damage.
Therefore, it is clear the applicant has established a valid storm claim under the
policy.
As the FSP seeks to deny the claim, the onus is on it to prove whether any
exclusion/s apply to the claimed damage.
4.2 Is the FSP entitled to deny the claim?
Proximate cause of roof damage is faulty materials and/or workmanship
The FSP appointed two experts during the life of the claim. Builder B was the first
expert to attend. Builder B’s report attributes the roof damage to ‘ the way the roof has
been constructed and the way the roof trusses have been manufactured ’.
Further, B says due to the identified combination of faulty materials and
workmanship, ‘the weight of the concrete roof tiles has caused the roof to sag over
time’.
The second expert to attend was structural engineer S. S provided two reports and
some further comments during the life of the claim.
S attributes the roof damage to ‘ poor construction and poor structural modifications
that became apparent during a gust of wind ’ in its firs t report.
The applicant says the roof was up to code when it was constructed in the mid-
1990s. In its supplementary report, S agrees with this for the construction of the roof
trusses. However, S says it is possible the trusses were made for a metal sheet roof
rather than the concrete tiles which were in place.
S states:
properly designed and installed (and unmodified) trussed roof would not be
expected to fail under these normal and predictable wind loads
in its opinion the roof was sagging prior to the storm event due to defects with
the design/construction/modification of the roof trusses.
Case No: 518769 Recommendation Page 3 of 7
Finally, the FSP relayed some further comments by S via a 24 April 2018 email. The
FSP says that S says whilst the building likely met design and code standards at the
time, S viewed evidence there were modifications to the roof. These are outlined in
Section 3.1 below.
The applicant provided the original construction drawings, council approval and an
occupancy permit to show the building was up to code in 1993. However, the
applicant has not addressed the comments made by S that the applicant told it the
roof was modified approximately ten years ago, prior to the applicant purchasing the
property.
Further, the applicant has not provided any expert information to confirm the
proximate cause of the damage is solely wind/storm as he claims.
In the absence of any contrary expert information, I am satisfied that the reports by S
are the most persuasive information available.
It is clear that, in the professional opinion of S, the proximate cause of the damage is
not wind. Rather, it attributes the roof damage to faulty materials and/or
workmanship.
Therefore, I am satisfied the FSP has proven the policy exclusions for faulty
materials and/or workmanship apply and it is entitled to deny the claim.
FSP has not proven an exclusion applies to ceiling/wall damage
As outlined above, the FSP appointed builder B and engineer S as its experts to
report on the proximate cause of all damage at the property.
B does not comment on the ceiling or wall damage at all. Therefore, it is unknown
what B’s opinion is on this damage.
S confirms the presence of a sag to the ceiling and cracking to the wall. However, it
does not confirm the proximate cause of this damage.
The FSP has not provided any specific comment on the cause of the damage to the
ceiling or wall in its view. However, it is clear from the applicant’s claim form and the
first report by S that the FSP is aware of ceiling and wall damage.
I note the policy wording says the faulty materials or workmanship exclusion does not
apply to subsequent loss or damage which isn’t otherwise excluded. I consider the
ceiling and wall damage to be subsequent damage to the roof damage.
The FSP has failed to identify or establish what exclusion (if any) applies to the
ceiling and wall damage. Therefore, I am satisfied it should accept the claim for
ceiling and wall damage accordingly.
As stated above in Section 1.3, the FSP is therefore obliged to obtain a quote for the
required ceiling and wall repairs. The FSP should cash settle the applicant the
appropriate costs as cash settlement is the applicant’s preference and roof repairs
may have to be completed before ceiling and wall repairs.
Case No: 518769 Recommendation Page 4 of 7
5 Supporting information
5.1 Key references
Record Key points
Policy wording PROPERTY DAMAGE COVER SECTION
…
EXCLUSIONS APPLICABLE TO THIS COVER SECTION
…
2) We will not cover You for loss or damage caused by:
a) wear and tear, gradual deterioration, scratching, marring,
developing flaws, normal upkeep or any gradual caus e;
…
h) i) error or omission in design, plan or specification or failure
during testing;
ii) faulty materials or workmanship;
provided that this exclusion 2) h) shall not apply to subsequent loss
or damage to Property Insured (no t otherwise excluded) resulting
from a circumstance referred to in this exclusion 2) h);
Occupancy Permit
07 - 08 - 1995
This occupancy permit is not evidence that the building, part of the
building or building work described above complies with the
Building Act 1993 or the Building Regulations 1994.
News article about
weather
10 - 04 - 2017
Confirms severe weather experienced in nearby region/s to
applicant’s building on the date of loss
FSP builder report (B)
17 - 08 - 2017
… noticed that the roof appeared to [be] sagging on the north and
south elevations of the building .
Upon inspection of the roof trusses inside the roof cavity we noted
no damage to the trusses and that the sagging of the roof to be
attributed to the way the roof has been constructed and the way
t he roof trusses have been manufactured. The main trusses have a
span of approximately 2.4m from the top of the ridge down to the
first web, with a span of approximat ely 3.6m across the roof with
the trusses spaced at approximately 900mm apart. We believe t hat
the weight of the tiles over this type of span over time has caused
the sagging in the roof.
In conclusion, we believe that the construction of the roof and the
way that the roof trusses have been manufactured, with the weight
of the concrete roof tile s has caused the roof to sag over time.
This report does not mention the ceiling or wall
FSP engineer report (S)
20 - 09 - 2017
No modification to the timber roof has occurred during occupation
of the current Ins ured.
Several structural defects and damage wer e noted in the roof
cavity.
Deflection of the ceiling was measured to exceed serviceability
expectations.
The sag of the exterior roof matches the observations in the roof
Case No: 518769 Recommendation Page 5 of 7
cavity.
A combination of sudden structural failure and long - term dead load
was noted in the roof cavity. The splice connections of the timber
trusses are indic ative of sudden high lateral loading such as a gust
of wind in a storm event.
On the 8 th April 2017 the Australian Government Bureau of
Meteorology weather recording station at Ball arat recorded
northerly wind gusts up to 85 km/h, which is consistent with the
Insureds testimony. The wind gusts are significant, but not
normally expected to be structurally damaging.
The proximate caus e of damage to the timber roof trusses is
unconventi onal construction methodology, low quality and/or
inadequate materials and fixing of the lateral bracing straps and
post - construction modifications that have compromised the
structural stability.
The damage (to the roof trusses) was brought on by a large w ind
on the 8th of April 2017. As noted above, a wind gust up to 85
km/h was recorded. Damage to some timber connections and
structural members is a result of sudden load, and not indicative of
long - term loading.
Deformation of the timber trusses is caused by long - t erm dead
loading that has been exacerbated by inadequate connections and
what appear to be undersized structural members.
The proximate caus e of damage to the timber roof is poor
construction and poor structural modifications that became
apparent during a gust of wind.
The sagging roof line and damage to the timber roof truss
members and connections is a direct result of poor construction
and building practices. Wind during a storm event exposed the
defective structural joints.
The timber roof truss modifications are contrary to the
requirements of the relevant standard at the time of construction.
They are considered a building defect.
A wind event is not the proximate cause of the sagging roof line.
S does not confirm the proximate cause of th e ceiling or wall
damage
FSP supplementary
engineer report
13 - 04 - 2018
The original truss construction would more than likely have
complied with relevant codes and good building practice of time
It is possible that the trusses were designed for a met al sheet roof,
rather than the concrete tiles which are actually installed. The
trusses may therefore not have adequate load capacity for the
significant extra weight of tiles rather than sheet roofing, however
we have no design details of the original constr uction. The metal
roofing battens are more typically used wit h a sheet metal roof
rather than concrete tiles.
… the proximate reason for the failure is the inherent defects in the
design/installation/modification of the trusses.
As the trusses and joints we re already inherently defective, an
additional wind loading could cause structural damage and the
amount of damage would be proportional to the wind speed.
Case No: 518769 Recommendation Page 6 of 7
A properly designed and installed (and unmodified) trussed roof
would not be expected to fail under these normal and predictable
wind loads.
It is our opinion that the roof was sagging prior to the event due to
inherent defects with the design/construction/modification of the
trusses. It is possible that the original trusses were overloaded due
having be en designed for sheet roofing, rather than tiles.
Given the inherent defects with the modified trusses, the damage
of the joints has likely occurred over an extended period of time
and is not the result of a one - off event.
The insured advised that the modi fications were made prior to his
purchase, approximately 10 years ago. The truss issues and
damage was therefore present prior to 10 years ago.
A timber truss roof is normally very stable under normal load
conditions, even when damaged, due to its ability to re - distribute
loading. An external force such as very high wind or impact is
required to de - stabilise the structure.
A properly designed and installed (and unmodified) trussed roof
would not be expected to fail in this manner.
We confirm that the proxim ate cause of the failure is the inherent
defects of the trusses, and not any one - off wind event.
No mention of the ceiling or wall damage in this report
Applicant email
17 - 04 - 2018
Applicant says he saw no sagging or cracks in ceiling until aft er the
April 2017 storm
Applicant makes no comment on the roof sagging identified by the
FSP’s attending experts
FSP email
24 - 04 - 2018
Engineer S says the roof likely met the building code at the time of
construction, but there is evidence it has been modified since then,
FSP says S made the following comments:
… different splice connections were not ed in the roof. One was
standard practice and another was poor building practice. This tells
me (S) that more than one contractor was onsite and at a different
time period
As noted in the original construction drawings … to my best
interpretation of the text, the roof was to be built with timber
battens. Steel battens was noted onsite, which indicates either the
building was not built to the original construction drawings or was
modified at a later date, such as a re - roof.
… the same construction drawings called up double - sided reflective
membrane in the roof. This was not installed during my site
inspection, and again, this indicates either the building was not
built to the or iginal construction drawings or was modified at a later
date, such as a re - roof.
Applicant Statutory
Declaration
26 - 04 - 2018
Applicant declares during continuous visits to the premises prior to
April 2017 he did not see any sagging to the ceiling and it wa s
perfectly flat
Applicant makes no comment on the roof
Case No: 518769 Recommendation Page 7 of 7