Home / Financial Firm (Unknown - Insurer) / Determination 518677

Determination 518677

Settlement amount for ground movement and water damage claim to home

FirmFinancial Firm (Unknown - Insurer)
Decided2019-04-09
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$21,806
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for building movement and damage to her home, and the insurer offered a cash settlement on its engineer's scope. AFCA accepted the insurer's assessment of cause and scope and ordered cash settlement on the adjusted repair quotation.

Expert evidence established that the damage resulted from drainage and seasonal soil movement, which falls within the soil movement exclusion, so the insurer's settlement scope was fair.

Issues

Subjects and remedies

home or building damagepay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 518677 Page 1 of 6 Determination Case number: 518677 9 April 2019 1 Determination overview 1.1 Complaint In June 2016 the complainant lodged a claim with her financial firm (insurer) for movement and damage in her home. The insurer assessed the damage and found several causes, including damaged pipe work, and environmental issues. The insurer accepted some of the internal repairs, but required maintenance works to be completed before repairs could proceed. The complainant disagreed with the findings of the insurer’s experts and arranged her own reports. Several experts reviewed the property to identify a defi nitive cause of damage. However, none were able to identify a different cause of damage. 1.2 Issues and key findings Has the insurer correctly assessed the damage? On review of the information provided by both the complainant and insurer, I am satisfied the damage has been correctly assessed. The underlying causes have been established by several experts. Therefore, the insurer has offered an appropriate settlement. Has the claim been handled in a timely and appropriate manner? Based on the details of the claim provided I am satisfied the insurer has taken all appropriate steps to finalise the claim. I accept some delays have occurred. However, I do not accept they are outside the bounds of acceptable claims handling practices. 1.3 Determination This determination is in favour of the insurer. The insurer is to cash settle the complainant based on the adjusted repair quotation. Determination | Case number: 518677 Page 2 of 6 2 Reasons for determination 2.1 Has the insurer correctly assessed the damage? Circumstances of the claim The insurer appointed an assessor (CR) to attend the property and assess the damages. CR appointed a leak detection specialist (AL) who found several issues, including leaks in a storm water line, and several drainage issues. CR recommended an engineer be appointed to further investigate the cause of damage. The appointed engineer (GM) concluded the damage and movement was due to several factors:  Over-wetting of the supporting ground.  Ineffective articulation within the existing structure.  Ineffective surface drainage within the property.  Various leaks and cracks observed in the stormwater drains and a drainage system that does not drain freely.  The installation of an extensive ceramic tile floor treatment without adequate movement joints. CR recommended acceptance of the resultant damage to the property, providing the complainant rectified the maintenance issues. These maintenance issues included repairing the damaged stormwater pipes and to install surface drainage systems away from the backyard, gravel areas and lawns. The complainant arranged her own engineer (BM) and plumber (GV) to further review her property. Neither located any evidence of other leaking pipes contributing to the building movement. The insurer arranged a builder (LI) to quote on the scope provided by BM. The initial quote included the cost to underpin the home. However, after further investigation, BM determined that no leaks were seen, and the moisture was due to seasonal changes. BM commented in November 2018, stating: The likely cause of the moisture is from the wet winter in 2016 saturating the soil in the back yard and water has flowed long the sewer trench from the back yard to the southern side of the house. There is a subsoil drain along the southern boundary to intercept water from the neighbours property and if this is not working properly this is another source of moisture which has contributed to foundation movement. This change in moisture has caused the soils to heave resulting in the observed damage. In October 2018 the complainant engaged a builder (TJ) to review the damage. TJ found no other issues, stating ‘the underlying cause is to be determined’. Determination | Case number: 518677 Page 3 of 6 The cause of the movement has been established The initial report from GM established several likely causes of the movement, along with the maintenance steps required by the complainant. This included improving the site drainage. Although the complainant did not agree with the site drainage aspect, the evidence provided by all experts indicates the findings from GM were correct. In particular, BM’s current opinion says the water is likely entering the property from the rear and possibly the southern boundary. This is consistent with:  GM’s conclusions that surface drainage is inadequate and should be rectified  extensive testing showing no other leaks in the sewer or stormwater systems were identified In addition, the insurer has taken appropriate steps to confirm no other underlying causes were evident. The complainant has also taken steps which shows that no other underlying cause is identified. Throughout the claim process CR expressed concerns to the complainant, and her solicitor that the maintenance issues had not been actioned. The complainant stated she received advice from several plumbers advising she did not need to action any of these issues. However, to date no information has been provided to support this. Insurer’s cash settlement is reasonable Several experts suggested the property may take up to two years for the moisture levels in the soil to stabilise after the drainage issues have been rectified. Consi dering this, the insurer has offered a cash settlement. As further damages may arise if the maintenance issues are not actioned, I believe it to be appropriate for the insurer to cash settle on the scope of work provided. The complainant has raised concerns about the scope of works being incomplete. This is because it does not include various items, such as the concrete pathways, the garden shed or carport. However, as the insurer has highlighted, part of the damage appears to be associated with drainage issues and seasonal changes affecting the soil. Such damage would generally not be covered as it would fall within the exclusion for soil movement or shrinkage or expansion of earth or land. Therefore, it is clear the insurer’s liability would be limited to the resultant damage caused by the leaking pipes only. Given this, and based on all the information, I am satisfied the insurer’s proposed cash settlement is fair in all the circumstances. Determination | Case number: 518677 Page 4 of 6 2.2 Has the claim been handled in a timely and appropriate manner? The insurer has handled the claim appropriately Throughout the claim the insurer has taken all appropriate steps to assess the damage, and to alleviate the complainant’s concerns of unseen leaks. The assessor confirmed some delays in arranging an engineer. Following the initial assessment, the insurer gave clear instructions to the complainant regarding the remedial works required before repairs could proceed. The complainant appointed a solicitor to take control of the claim. The complainant was advised of the drainage issues requiring attention in October 2016. Following the solicitor’s appointment in November 2016 communication between the parties slowed. CR provided evidence of multiple attempts to contact the solicitor to progress the claim. In September 2017 the complainant contacted CR directly, confirming the solicitor was no longer attached to the claim. Once communication had been re-established the insurer took all appropriate steps to confirm if any unforeseen causes existed. Although I accept there may have been some unnecessary delays in responding to the complainant, I do not believe that such delays warrant compensation given the above. Determination | Case number: 518677 Page 5 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint 3.2 Expert reports Record Key Points Complainant ’s expert ( AB ) Report 22 June 2016  Damage throughout home  Possibly due to leaking pipe Insurer’s expert ( AL ) Report 18 July 2016  Several small leaks located  Drainage issues found  Leak in storm water drain Insurer’s expert (CR ) Report 26 July 2016  Engineer required to review Insurer’s expert (GM ) Report 17 October 2016  General movement due to several issues  Drainage inadequate and cracks in pipe work  Tiles cracked due to lack of expansion joints Co mplainant ’s expert ( BM ) Report 23 July 2017  Possible unconfirmed leak under bath causing movement  Recommend entire sewer drainage system be checked Complainant ’s expert (GV ) Report October 2017  No further leaks found  Soil very moist, possibly due to wet weather  Allow weather to dry and check soil again Determination | Case number: 518677 Page 6 of 6 Record Key Points Insurer’s expert (CR ) Report 28 November 2017  Complainant confirmed no fix to drainage issues  Water possibly coming from neighbouring property  Further plumbing tests agreed Complainant ’s expert (GV ) Report January 2018  No leaks found  Neighbouring property draining onto troubled area  Rocks near home possibly preventing drying of soil Insurer ’s expert (CR ) Report 14 March 2018  No leaking pipes found  Refer to complainant engineer for review  Complainant advised to remedy drainage issues Complainant’s expert ( BM ) Report 26 April 2018  Complainant advised to repair stormwater pipe  Possible leak in shower waterproofing  Invasive investigation needed to check shower Complainant ’s expert (GV ) Report April 2018  Hole made approx. 2.5m from bath and 4m from shower  No moisture found in soil  Need permission to drill closer to shower Insurer ’s repo rt (CR ) Report 2 May 2018  Quote received for $95,855.76 for internal repairs and underpinning  Still unable to confirm source of moisture Insurer ’s expert (CR ) Correspondence 3 May 2018  Engineer confirmed damage due to seasonal changes  No underpinning required as confirmed by BM  Amended cash settlement amount $21, 806.40

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.