Home / Financial Firm (Unknown - Insurer) / Determination 518677
Determination 518677
Settlement amount for ground movement and water damage claim to home
Summary
The complainant claimed for building movement and damage to her home, and the insurer offered a cash settlement on its engineer's scope. AFCA accepted the insurer's assessment of cause and scope and ordered cash settlement on the adjusted repair quotation.
Expert evidence established that the damage resulted from drainage and seasonal soil movement, which falls within the soil movement exclusion, so the insurer's settlement scope was fair.
Subjects and remedies
home or building damagepay claim
Text of the determination
Determination | Case number: 518677 Page 1 of 6
Determination
Case number: 518677 9 April 2019
1 Determination overview
1.1 Complaint
In June 2016 the complainant lodged a claim with her financial firm (insurer) for
movement and damage in her home.
The insurer assessed the damage and found several causes, including damaged pipe
work, and environmental issues. The insurer accepted some of the internal repairs,
but required maintenance works to be completed before repairs could proceed.
The complainant disagreed with the findings of the insurer’s experts and arranged her
own reports. Several experts reviewed the property to identify a defi nitive cause of
damage. However, none were able to identify a different cause of damage.
1.2 Issues and key findings
Has the insurer correctly assessed the damage?
On review of the information provided by both the complainant and insurer, I am
satisfied the damage has been correctly assessed. The underlying causes have been
established by several experts.
Therefore, the insurer has offered an appropriate settlement.
Has the claim been handled in a timely and appropriate manner?
Based on the details of the claim provided I am satisfied the insurer has taken all
appropriate steps to finalise the claim. I accept some delays have occurred. However,
I do not accept they are outside the bounds of acceptable claims handling practices.
1.3 Determination
This determination is in favour of the insurer.
The insurer is to cash settle the complainant based on the adjusted repair quotation.
Determination | Case number: 518677 Page 2 of 6
2 Reasons for determination
2.1 Has the insurer correctly assessed the damage?
Circumstances of the claim
The insurer appointed an assessor (CR) to attend the property and assess the
damages. CR appointed a leak detection specialist (AL) who found several issues,
including leaks in a storm water line, and several drainage issues.
CR recommended an engineer be appointed to further investigate the cause of
damage. The appointed engineer (GM) concluded the damage and movement was
due to several factors:
Over-wetting of the supporting ground.
Ineffective articulation within the existing structure.
Ineffective surface drainage within the property.
Various leaks and cracks observed in the stormwater drains and a drainage
system that does not drain freely.
The installation of an extensive ceramic tile floor treatment without adequate
movement joints.
CR recommended acceptance of the resultant damage to the property, providing the
complainant rectified the maintenance issues. These maintenance issues included
repairing the damaged stormwater pipes and to install surface drainage systems
away from the backyard, gravel areas and lawns.
The complainant arranged her own engineer (BM) and plumber (GV) to further review
her property. Neither located any evidence of other leaking pipes contributing to the
building movement.
The insurer arranged a builder (LI) to quote on the scope provided by BM. The initial
quote included the cost to underpin the home. However, after further investigation,
BM determined that no leaks were seen, and the moisture was due to seasonal
changes. BM commented in November 2018, stating:
The likely cause of the moisture is from the wet winter in 2016 saturating the soil
in the back yard and water has flowed long the sewer trench from the back yard to
the southern side of the house. There is a subsoil drain along the southern
boundary to intercept water from the neighbours property and if this is not working
properly this is another source of moisture which has contributed to foundation
movement. This change in moisture has caused the soils to heave resulting in the
observed damage.
In October 2018 the complainant engaged a builder (TJ) to review the damage. TJ
found no other issues, stating ‘the underlying cause is to be determined’.
Determination | Case number: 518677 Page 3 of 6
The cause of the movement has been established
The initial report from GM established several likely causes of the movement, along
with the maintenance steps required by the complainant. This included improving the
site drainage. Although the complainant did not agree with the site drainage aspect,
the evidence provided by all experts indicates the findings from GM were correct.
In particular, BM’s current opinion says the water is likely entering the property from
the rear and possibly the southern boundary. This is consistent with:
GM’s conclusions that surface drainage is inadequate and should be rectified
extensive testing showing no other leaks in the sewer or stormwater systems were
identified
In addition, the insurer has taken appropriate steps to confirm no other underlying
causes were evident. The complainant has also taken steps which shows that no
other underlying cause is identified.
Throughout the claim process CR expressed concerns to the complainant, and her
solicitor that the maintenance issues had not been actioned. The complainant stated
she received advice from several plumbers advising she did not need to action any of
these issues.
However, to date no information has been provided to support this.
Insurer’s cash settlement is reasonable
Several experts suggested the property may take up to two years for the moisture
levels in the soil to stabilise after the drainage issues have been rectified. Consi dering
this, the insurer has offered a cash settlement. As further damages may arise if the
maintenance issues are not actioned, I believe it to be appropriate for the insurer to
cash settle on the scope of work provided.
The complainant has raised concerns about the scope of works being incomplete.
This is because it does not include various items, such as the concrete pathways, the
garden shed or carport. However, as the insurer has highlighted, part of the damage
appears to be associated with drainage issues and seasonal changes affecting the
soil. Such damage would generally not be covered as it would fall within the exclusion
for soil movement or shrinkage or expansion of earth or land.
Therefore, it is clear the insurer’s liability would be limited to the resultant damage
caused by the leaking pipes only.
Given this, and based on all the information, I am satisfied the insurer’s proposed
cash settlement is fair in all the circumstances.
Determination | Case number: 518677 Page 4 of 6
2.2 Has the claim been handled in a timely and appropriate manner?
The insurer has handled the claim appropriately
Throughout the claim the insurer has taken all appropriate steps to assess the
damage, and to alleviate the complainant’s concerns of unseen leaks. The assessor
confirmed some delays in arranging an engineer.
Following the initial assessment, the insurer gave clear instructions to the complainant
regarding the remedial works required before repairs could proceed. The complainant
appointed a solicitor to take control of the claim.
The complainant was advised of the drainage issues requiring attention in October
2016. Following the solicitor’s appointment in November 2016 communication
between the parties slowed. CR provided evidence of multiple attempts to contact the
solicitor to progress the claim.
In September 2017 the complainant contacted CR directly, confirming the solicitor
was no longer attached to the claim. Once communication had been re-established
the insurer took all appropriate steps to confirm if any unforeseen causes existed.
Although I accept there may have been some unnecessary delays in responding to
the complainant, I do not believe that such delays warrant compensation given the
above.
Determination | Case number: 518677 Page 5 of 6
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
3.2 Expert reports
Record Key Points
Complainant ’s expert ( AB )
Report
22 June 2016
Damage throughout home
Possibly due to leaking pipe
Insurer’s expert ( AL )
Report
18 July 2016
Several small leaks located
Drainage issues found
Leak in storm water drain
Insurer’s expert (CR )
Report
26 July 2016
Engineer required to review
Insurer’s expert (GM )
Report
17 October 2016
General movement due to several issues
Drainage inadequate and cracks in pipe work
Tiles cracked due to lack of expansion joints
Co mplainant ’s expert ( BM )
Report
23 July 2017
Possible unconfirmed leak under bath causing movement
Recommend entire sewer drainage system be checked
Complainant ’s expert (GV )
Report
October 2017
No further leaks found
Soil very moist, possibly due to wet weather
Allow weather to dry and check soil again
Determination | Case number: 518677 Page 6 of 6
Record Key Points
Insurer’s expert (CR )
Report
28 November 2017
Complainant confirmed no fix to drainage issues
Water possibly coming from neighbouring property
Further plumbing tests agreed
Complainant ’s expert (GV )
Report
January 2018
No leaks found
Neighbouring property draining onto troubled area
Rocks near home possibly preventing drying of soil
Insurer ’s expert (CR )
Report
14 March 2018
No leaking pipes found
Refer to complainant engineer for review
Complainant advised to remedy drainage issues
Complainant’s expert ( BM )
Report
26 April 2018
Complainant advised to repair stormwater pipe
Possible leak in shower waterproofing
Invasive investigation needed to check shower
Complainant ’s expert (GV )
Report
April 2018
Hole made approx. 2.5m from bath and 4m from shower
No moisture found in soil
Need permission to drill closer to shower
Insurer ’s repo rt (CR )
Report
2 May 2018
Quote received for $95,855.76 for internal repairs and underpinning
Still unable to confirm source of moisture
Insurer ’s expert (CR )
Correspondence
3 May 2018
Engineer confirmed damage due to seasonal changes
No underpinning required as confirmed by BM
Amended cash settlement amount $21, 806.40