Text of the determination
Determination | Case number: 518367 Page 1 of 16
Determination
Case number: 518367 29 November 2018
1 Determination overview
1.1 Complaint
The complainant, who is the policy holder, is represented by a family member, PC.
For simplicity, the complainant and her representative will be referred to as ‘ the
complainant ’ .
The complainant held house and contents policies with the financial firm (insurer). On
21 August 2017, she lodged a claim for damage sustained to her ceilings and walls
following a burst hot water pipe. On 20 October 2017, she lodged a second claim for
her foundation subfloor damage caused by a broken storm water pipe.
The insurer assessed the damage for both claims and partially cash settled the
complainant for resultant damage. In doing so, the insurer’s experts say not all of the
claimed damage was caused by the leaking pipes. The complainant disagrees with
the settlement and says the insurer is liable for all of the damage to her house.
1.2 Issues and key findings
Is the insurer liable for the disputed physical damage?
Based on the exchanged information, the insurer is liable for the ceilings in the foyer,
hallway and dining room. However, based on the engineers’ reports, the insurer is
entitled to deny indemnity for the subfloor damage to zones two, three and four.
Is the insurer ’s cash settlement fair?
The insurer is required to increase the cash settlement as set out in section 2 of this
determination. The insurer is required to factor in the ceilings damage and to take into
account variations in the different scope of works/quotes (contingencies).
1.3 Determination
This determination is partly in favour of the complainant.
The insurer is liable to pay the complainant the following amounts in full and final
settlement:
Determination | Case number: 518367 Page 2 of 16
$25,000 for the ceilings damage
$6,333 for the subfloor damage
$3,240 for the electrical damage
interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on the
settlement sum from 5 March 2018 (final decline letter) to date of payment of the
claim.
Determination | Case number: 518367 Page 3 of 16
2 Reasons for determination
2.1 Is the insurer liable for the disputed physical damage?
Policy provides cover for escape of liquid damage subject to exclusions
The complainant is required to show that, on the balance of probabilities, she has
suffered a loss caused by a risk insured against under the policy. This is known as a
prima facie claim.
If the complainant is able to establish a prima facie claim, then the onus shifts to the
insurer to show that, on the balance of probabilities, it is entitled to rely on an
exclusion under the policy or is otherwise entitled to deny the claim.
The complainant’s policy provides cover for damage caused by the insured events
listed in the policy (including escape of liquid), subject to the conditions and
exclusions set out in the policy.
On 21 August 2017, the complainant lodged a claim with the insurer following a burst
hot water pipe in the roof of the property. On 20 October 2017, the complainant
lodged a new claim for a cracked storm water pipe.
Various reports prepared by parties confirm the insured property sustained damage
as a result of both escape of liquid events. On this basis, the panel is satisfied the
complainant has established a prima facie claim for both claims.
However, parties disagree about the extent of the resultant damage to the property.
The insurer has accepted liability for some, but not all, of the observed damage at the
property. The insurer says the remainder of the damage was not caused by the
escape of liquid event(s), but by factors which are excluded from cover under the
policy, such as wear and tear.
The proximate cause of damage must be established
In order to determine whether the comp lainant’s claim falls within scope of cover, it is
necessary to determine the proximate cause of the loss. What is the proximate cause
of the loss is the question of fact depending upon the circumstances of each case.
It is well established that a proximate cause is not necessarily the first or last or the
sole cause of the loss. It is the effective or dominant or operative cause of the loss. If
there are several causes operating contemporaneously, then each must be examined
for the qualities of predominance and efficiency as the active efficient cause that sets
a relevant train of events in motion.
Courts have said that if one cause would have resulted in the harm in any case and
the other would not have done so in the absence of the first, then the first is the
proximate cause.
Determination | Case number: 518367 Page 4 of 16
The property has been subject to a burst hot water pipe
On 21 August 2017, the complainant returned home to find a burst pipe in the roof
cavity. The insurer engaged an assessor (RC) to assess the resultant damage. In his
report dated 23 August 2017, RC says:
the pipe above bedroom two has burst where the ceiling has partially collapsed
the walls were wet and carpet was removed
the water has flowed out into the foyer and front entry areas where the walls were
wet
carpets in main lounge, dining rooms are wet in the doorways.
Relevantly, RC says no other rooms were affected by this event. However, he noted
there is pre-existing damage at the property. He noted mould in the subfloor, rotted
bearers and joists. Further, the ceilings generally throughout the house are sagging.
In his report, RC did not elaborate on the cause of the sagging ceilings throughout the
house.
The complainant says the burst pipe was a hot water pipe where it has steamed the
ceiling. The complainant disagreed with RC’s proposed scope of works.
Subsequently, the insurer engaged another assessor (AS) to inspect the property and
establish the extent of the damage.
In addressing the source of the water, AS says the unrepaired pipe (at time of
inspection) is a cold feed to kitchen area and is split above bedroom three (damaged
room). In addressing the extent of the damage, AS confined the water damage to the
bedroom three ceiling and walls and floor coverings as the affected areas of the
house.
Further, AS says most of the rooms have extensive mould to the walls and ceilings
which is due to the long-term condensation from nil sarking vapour barrier in the roof.
AS noted old water stains throughout the roof cavity and rot to the ceiling sheets in
some areas, especially above kitchen. AS attributed such damage to the water
ingress from the roof sheeting. AS noted long floor movement and possible rot to the
floor framing.
In concluding his report, AS says all rooms affected by the burst pipe have been
dried. In his report, he outlined the scope of works for the permanent water damage
sustained to the property.
AS did not attribute the soft rotten floors to the burst pipe, but rather to the long-term
floor movement. AS also noted in his report, to check and test all electricals to the
home in damaged areas. Further, to remove and refit all electricals to affected rooms
to facilitate wall and ceiling repairs.
Determination | Case number: 518367 Page 5 of 16
Subsequently, the insurer denied indemnity for the ceilings in the foyer, hallway and
dining room. The panel notes the insurer, in its denial letter, says it contacted the
assessor, who did not consider mould development is possible between the first
assessment and second assessment. However, the insurer did not tender any
evidence to such assertion.
The complainant says the house was well maintained with no pre-existing
issues
Following disagreement, the complainant engaged a plumber (INS), a builder (BE), an
electrician (SH) and an engineer (GD).
In outlining the maintenance carried out to the property, the complainant says:
the exterior roof, gutters, down pipes and eaves were painted 12 months prior to
the initial event
the only areas yet to be painted are hallway, foyer and dining room
ceiling stains are common in houses of this age using fuel cooking and heating
ovens.
The complainant says the mould present at the property is because of the hot water
spray following the burst pipe. The complainant further says the weather conditions
were cold at the time of the burst pipe and therefore the hot water eventually caused
condensation given the steamy conditions.
In addressing the burst ceiling pipe and the extent of the resultant damage, the
complainant’s buil der, BE, says a thorough inspection of the roof sheeting and cavity
produced no evidence of water leaks due to rain. Further, GD says the roof sarkings
were not used at the time when the house was bui lt.
Further, BE says there are widespread marks caused by the condensation and the
spray from the burst hot water pipe. BE attributed the sagging throughout the ceiling
to the burst pipe.
BE says the canite ceiling in the master bedroom previously assessed as adequate,
popped from moisture.
In saying so, the panel accepts the complainant’s argument; the burst hot water pipe
would cause more damage than the cold water pipe. Further, the panel notes BE’s
assertion the ceiling is made out of canite which is prone to moisture absorption.
The insurer is not entitled to limit its liability for the ceilings damage
The insurer is seeking to rely on the gradual deterioration, wear and tear exclusion
under the policy. Photographs taken supplied by parties show the property was
reasonably maintained.
Determination | Case number: 518367 Page 6 of 16
The panel notes in RC’s report (compiled two days after the event), there is no
mention of any mould being present in the ceiling or walls. The only mould RC
identified was in the subfloor, which the panel will address in this determination.
The insurer did not provide plausible explanation as to the presence of the mould in
AS’s report and not RC’s report which was compiled two days post the event.
Relevantly, AS carried out his assessment approximately four weeks post the escape
of liquid event.
The panel considered AS’s comments addressing the long -term condensation issue.
Even if the panel accepts such causation to be a contributing factor, the panel is not
satisfied the insurer established the extent of water marks were pre-existing, or ruled
out the condensation is due to the hot water escape event.
The panel does not consider AS’s findings to be conclusive . He asserts the roof
sheetings are leaking, however, did not elaborate on the condition of the roof and the
reason for the leak. There is no evidence documenting the external condition of the
roof.
Further, the insurer did not tender any compelling evidence to refute the condensation
is because of the hot water escape, rather than the proposed long -standing
condensation.
Whilst AS reports the pipe as being cold feed, the complainant tendered a plumber’s
report confirming the repairs were carried out to a hot water pipe. The insurer did not
provide any evidence to refute the plumber’s assertion.
Relevantly, the complainant was away at the time of the event and the leaking
duration and water escape rate are unknown.
In the absence of any other information, the panel is not satisfied the insurer has
established an entitlement to limit its liability. It follows, the ins urer is required to
indemnify the complainant for the water damage sustained to the ceilings in the foyer,
hallway and dining room.
A cracked storm water pipe identified during floor investigation
In addressing the source of the water leak, INS identified a crack and a blockage to a
storm water pipe which discharged to the street kerb.
Further, the complainant contacted the insurer and advised her repairer fell through
the floor during home inspection. The complainant asserts the entire floor, bearers
and joists are all damaged by a recently identified broken storm water pipe.
Subsequently, a second claim was raised for the floor and frame damage sustained to
the property following the discovery of the cracked storm water pipe.
Determination | Case number: 518367 Page 7 of 16
Relevantly, the cracked storm water pipe is connected into the earthenware pipe
which had been installed partly beneath the north-eastern corner of the dwelling.
Insurer’s engineer identifies the proximate cause and extent of floor damage
Following the lodgement of the second claim, the insurer engaged an assessor (JP)
to address causation and the extent of the damage.
In his report, JP attributed the rotting timber bearers and joists to moisture and
dampness issues over several years. Further, JP says these issues are due to poor
construction including inadequate subfloor ventilation and no wall barrier under the
external wall to prevent water seepage through the earth and under the house.
The panel notes, at the time of JP’s assessment the complainant removed the down
pipe and concrete sealed the original penetration.
Given the nature and extent of damage, the insurer engaged an engineer (IM) to
address causation and resultant damage. In his report, IM says parts of the
foundation soil were damp with no free water on the surface of the soil. Further, IM
says this is consistent with the lack of water following rainfall two days before site
visit.
IM’s inspection of the property identified different types of air vents at the base of the
external walls. In his report, IM says:
the purpose for these vents is to provide ventilation of the subfloor and to reduce
humidity
the majority of these vents are positioned slightly above ground level, allowing
water to enter the subfloor and therefore increase humidity.
Further, IM says even if there were good ventilation techniques, it will be of little value
as the underfloor area will remain wet due to a poor drainage issue identified.
IM assessed the two air vents within the proximity of the subject storm water pipe. He
says, given they are above the floor level, they would not contribute to the subfloor
ventilation.
IM sectioned the subfloor into four zones, nominating the subfloor section which
would be directly affected by the lea king storm water pipe as ‘zone one’ . The leaking
storm water pipe would have introduced water into the underfloor space even when
no surface water entered through the underfloor vents. IM says, the leakage has not
caused or contributed to damage to the timber floor structure in zones two, three or
four. IM opines, any water which may have reached the south-western margin of zone
two would have dissipated because of the better subfloor ventilation in that section.
In identifying the cause of water entry and accumulation within the subfloor area, IM
highlighted the poor drainage and the water entry through external subfloor vents. He
Determination | Case number: 518367 Page 8 of 16
says the storm water pipe leakage would have contributed to the ongoing elevated
humidity.
In his opinion, the rot which affected the bearers and joists is the result of long-term
high humidity within the subfloor void because of the lack of ventilation. The rot would
have developed over an extended period of time whilst being invisible to the
complainant.
Complainant ’s engineer agrees generally with insurer’s engineers’ findings
Following the compl ainant’s disagreement with IM’s findings, she engaged an
engineer. In his report, GD says:
IM’s report is thorough and clearly outlines the causes of the problem
GD disagrees with IM’s comments about the poor drainage and water entry
through external subfloor vents
rotted bearers and joists is the result of long-term high humidity within the subfloor
void
vents may allow water ingress, however, the ground outside slopes away from the
opening
water ingress through these vents is most unlikely in normal, even heavy, rain
events.
However, GD attributed the main dominant cause for the water ingress to the subfloor
to the cracked storm water pipe. GD asserts, had the water ingress been happening
since 1948, (date of property construction), the rot would have been detected a long
time ago.
The insurer sought further clarification from IM in light of GD’s report. In addressing
the effectiveness of the roof gutter overflows (if any), IM says any roof gutter
overflows in the area near the vents are likely to cause water to accumulate on the
ground and enter the underfloor space through the vents.
In his supplementary report, IM outlined the historical rainfall records from 2015. IM
says the percentage of days where no rain fell is greater than the days where there
was rain. It follows, the cracked storm water pipe was sporadic and the leakage was
not the normal condition in the subfloor.
The panel accepts GD’s assertion and considers the leaking pipe would have
exacerbated the humidity levels in the subfloor level in zone one. However, the
question of fact in this complaint is whether this cracked storm water pipe is the
proximate cause of the damage in the subfloor area. Further, whether the bearers and
joists would have rotted in the absence of this leaking storm water pipe.
Determination | Case number: 518367 Page 9 of 16
The insurer is not liable for the subfloor damage
The panel has carefully considered the exchanged evidence, parties’ argume nts and
policy wordings.
The panel considers IM’s findings thorough, logical and more persuasive. This is
because:
IM identified the different causes for water ingress into the subfloor
IM zoned the subfloor into different zones, outlining the damage causa tion to each
zone
IM outlined the water escaping out of zone one would dissipated because of the
better subfloor ventilation in that section.
The panel does not consider GD has adequately addressed the drainage and vents
issues identified by IM. GD says the vents may permit water ingress; conversely, he
adds water ingress through these vents is most unlikely in normal, even heavy rain
events. Relevantly, GD did not eliminate the vents as points of water entry and a main
contributing factor for the overall damage to the subfloor.
The panel accepts in the absence of the cracked storm water pipe, the subfloor
bearers and joists would have gradually deteriorated given the poor drainage and the
identified vents issue.
It follows, the panel considers the poor drainage, the vents and the cracked storm
water pipe to be the sources of elevated humidity issue present in the property’s
subfloor.
Further, the panel is satisfied the leaking storm water pipe would have only
contributed to the damage in zone one. It follows, the insurer is only liable for damage
sustained to the property in zone one.
The insurer has partially indemnified the complainant for the resultant damage to
zone one. The panel will address the settlement in the next section of this
determination.
2.2 Is the insurer’s cash settlement for both claims fair?
Insurer must act fairly and ensure the cash settlement covers all the repairs
It is clear from the terms of the policy that the insurer has the discretion to decide
which settlement method to adopt. Howe ver, we expect an insurer to act reasonably
in exercising its discretion, having regard to the circumstances of the claim.
Notwithstanding the above, the cash settlement must accurately reflect the costs the
complainant will incur to repair the resultant water damage.
Determination | Case number: 518367 Page 10 of 16
It must also be recognised that in cash settling the claim, the complainant has given
up the lifetime guarantee provided under the insurer ’s policy. Further, a cash
settlement transfers all the risk from the insurer to the complainant of any unforeseen
damage and any additional work required once repairs commence.
The insurer ’s repairer says it is unable to carry out the repairs due to the pre -existing
damage, which is excluded under the policy. Given the panel ’ s findings above, the
panel accepts the insurer acted reasonably in deciding to cash settle the claim.
Complainant is claiming $133,834 following the two events
The complainant tendered a letter from her builder, BE, for the repairs totalling
$102,634. BE says the complainant paid $97,634 with a further $5,000 to be paid
following the complainant moving back into the property on completion of repairs.
Despite numerous requests from both the insurer and the Service for itemised
invoices for the completed building repairs, the complainant did not provide any
further proof of loss.
Further, the complainant provided the following invoices:
a quote for $16,940 for the electrical work carried out to the property
an invoice for $7,405 for the replacement of the floor coverings
an electricity bill for $905 for the increased usage following the restoration works.
The complainant was dissatisfied with the insurer’s cash settlement for the physical
damage. In reasoning her dissatisfaction, the complainant says the insurer’s cash
settlement did not consider:
travelling distances for trades people as the insured property is located in rural
NSW
removal of debris and disposal cost incurring $260 per visit (20 visits) to the waste
disposal service
extent of electrical damage following the first escape of liquid event.
The complainant is also claiming $5,400 for alternative accommodation and $1,000
food loss following the insurer’s restorer accidently unplugging the fridge and freezer.
The panel will address the adequacy for the insurer’s cash set tlement for each of
these items separately.
Insurer ’s cash settlement was based on estimated scope of works
The insurer cash settled the complainant:
$11,983 for the internal ceilings and walls damage (claim one) based on RC’s
quote
$10,556 for the subfloo r damage to zone one based on RC’s quote
Determination | Case number: 518367 Page 11 of 16
$881.28 reimbursement of the electricity bill based on the restorer’s calculation
$5,431.66 for the replacement of floor coverings based on an adjusted quote
$500 for the food spoilage
$3,143 for temporary accommodation from 21 August 2017 until 29 March 2018
$5,402 for upgrading of switch board and rewiring the house based on RC’s quote.
Insurer is required to increase the cash settlement amount for first event
Given the panel ’s findings above, the insurer is liable for the ceilings in the foyer,
hallway and dining room following the initial escape of liquid event. In saying this, the
complainant did not provide the requested itemised scope of works/invoice for the
works completed.
The panel is not satisfied the complainant has established the extent of cost incurred.
For a repair job of that scale, the panel expects a reasonable level of substantiation.
The insurer ’s request for an itemised scope of works to show the breakdown of
materials used and labour is reasonable. The complainant did not elaborate as to her
inability in providing this information.
It is difficult to conclude the complainant ’s incurred cost s for different areas of the
property. This is important given the different damage causation to different areas of
the property.
In saying this, the panel considers the insurer ’s cash settlement inadequate given it
does not equate to its liability under the policy, ie. affected ceilings in light of the
panel ’s findings above.
Further, the panel accepts it is reasonable and appropriate to expect the complainant
might incur extra costs given the rural location of the property, removal of debris,
contingencies and the builder’s margin.
In addition, the cash settlement should also be increased to allow for:
any volume discounts reflected in the quotation provided by RC (noting that his
quotation was provided for cash settlement purposes only and therefore was not
actionable)
project management or supervision costs (which were omitted from RC’s quotation
but are likely to be incurred by the complainant in undertaking the repairs)
waste disposal fees for the removal of debris
rural location of the property and the extra trades cost increase
the additional risk assumed by the complainant due to the absence of the lifetime
guarantee.
For the sake of closure and in the absence of the requested breakdown, the panel
considers it fair in the circumstances the insurer increases its cash settlement by
$25,000.
Determination | Case number: 518367 Page 12 of 16
This will factor in the ceilings to the foyer, hallway and dining room. Further, it will take
into account variation in the scope of works.
Insurer to increase zone one cash settlement by 60 percent
The insurer based its cash settlement for zone one on RC ’s quote for $10,556. The
panel notes RC included a 15% builder’s margin. However, the panel is not satisfied
such figure is adequate to cover any possible contingencies, increased trades cost
given the location of the property, and the debris disposal.
Further, RC provided the quote for the purpose of a cash settlement and therefore it
was not actionable by the complainant. RC carried out a desktop estimate based on
IM’s findings.
Given the nature of damage, the panel considers it fair the insurer increases its cash
settlement by an additional 60%, being $6,333.
Insurer to increase electrical damage cash settlement by 60 percent
In electrician SH’s report, he says there was water damage to all outlets, light points
and cooking appliances. Further, SH says the rear of the house was upgraded and re -
wired.
SH says most of the electricals in the building will need to be replaced and the
switchboard upgraded as the asbestos panel will need to be replaced. Further, the
complainant says the rear of the house wiring passed the test and did not require an
upgrade, however, all circuits would need to be upgraded on the switchboard as it is
illegal to re-use an asbestos board.
The panel notes the policy does not provide cover for upgrading undamaged parts of
the house to comply with current building requirements.
The complainant tendered a quote from her electrician for $16,940. The insurer and
the Service requested a breakdown of SH’s quote to reflect the extent of the water
damaged electricals. The complainant did not provide such breakdown and did not
elaborate on her inability to provide the requested information.
In SH’s invoice, the electrician says he disconnected and removed old cabling, re -
wired and re-fitted:
20 light points
22 power points
stove hot water.
Further, SH says he removed and replaced the old meter box and consumer mains
and installed a new meter box and circuit breakers to suite. The complainant did not
tender an invoice for the completed work.
Determination | Case number: 518367 Page 13 of 16
The insurer cash settled the complainant for $5,402 for upgrading the switchboard (to
be compliant) and re- wiring the house based on RC’s quote.
RC’s quote is a liability quote for cash settlement only, ie. does not factor in
contingencies. Further, the insurer did not show this quote is actionable by the
complainant. Therefore, the panel considers it fair the insurer increases its cash
settlement by 60%, being an additional $3,240.
Insurer’s settlement for floor coverings is fair and reasonable
The complainant tendered a quote from (CH) for the replacement of the entire house
flooring totalling $7,405. The quote does not provide the breakdown of cost or
area/rooms addressed.
The insurer accepted the replacement of the carpet in one of the bedrooms, front
entry and foyer following the burst hot water pipe. F urther, the insurer accepted to
replace the vinyl in the kitchen.
Information on file does not suggest the carpet in the rest of the house was water
damaged by the burst hot water pipe. The insurer contacted CH and requested an
updated quote for the carpet in the affected area. CH later provided a quote for
$5,431. Given, it is not evident the carpet is water damaged in the rest of the property,
the panel considers the insurer’s flooring settlement fair in the circumstances.
Insurer’s settlement for electri city is fair and reasonable
The complainant tendered an electricity bill for $905.26 for the period between 2
August 2017 and 27 October 2017.
The insurer cash settled the complainant $881.28 towards the electricity bill. In doing
so, the insurer based it s calculation on the restorer’s electricity usage for 12 air
movers and two dehumidifiers. Given the electricity bill usage pre-dates the initial loss
date, being 21 August 2017, the panel considers the insurer’s cash settlement fair in
the circumstances.
Insurer’s settlement for alternative accommodation is fair in the circumstances
The insurer’s policy provides cover for the reasonable cost for temporary
accommodation should the insured property become unliveable following an insured
loss.
Following the initial burst hot water pipe, the complainant vacated her property and
resided with a family member (daughter). The complainant did not tender any
evidence for any cost incurred for alternative accommodation.
The complainant says she is suffering losses such as rates, utilities, insurance,
garden maintenance, in addition to her out of pocket expenses. The complainant is
Determination | Case number: 518367 Page 14 of 16
claiming 27 weeks at $200 per week. The complainant completed the repairs and
moved back into her property in March 2018.
The insurer offered the complainant $100 per week from 21 August 2017 until 29
March 2018, being 31 weeks and 3 days.
The panel does not consider:
all damage sustained to the property is covered by the policy
the insurer is liable for any outgoing costs such as rates
the flooring claim (except for zone one) is not covered by the policy
the flooring damage to the bearers and joists renders the property unliveable
the complainant substantiated her loss for the temporary accommodation benefit.
It follows, in the absence of any substantiation from the complainant, the insurer’s
settlement of $3,143 is fair and reasonable in the circumstances.
Determination | Case number: 518367 Page 15 of 16
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with Financial Ombudsman Service (FOS).
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFC A
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Our approach to this complaint
We considered this complaint in line with the Operational Guidelines of the FOS
Terms of Reference because of the nature of this complaint. It has progressed directly
to a determination by a panel, consisting of an ombudsman, and advocates with
extensive experience in consumer complaints, and insurance industry practice.
We shared all information in this determination with the parties, and the parties had
the opportunity to respond. We also reviewed all material supplied in response to
make our determination. While the parties raised many issues, we have only
commented on those directly relevant.
We decided this complaint on its merits, considering the relevant law, good industry
practice, codes of practice, and previous decisions where relevant.
Determination | Case number: 518367 Page 16 of 16
3.3 Key policy terms
Subject T erm
Escape of Liquid Loss or damage caused by liquid leaking, overflowing or bursting
from any of the following
any drain, fixed pipes, roof gutters or guttering and rai nwater
downpipes, drainage and sewage systems (not forming part of a
shower cubicle wall, floor or base);
Other repair /
rebuilding costs
When we are rebuilding or repairing damaged parts of your home,
we will pay the reasonable and necessary costs:
to make the damaged parts of your home comply with the cu rrent
home building regulations and laws
We do not cover
The cost of:
upgrading undamaged parts of your home to comply with the
current building regulations and laws;
Temporary
accommodation
When an ins ured event damages your ho me to the extent you
cannot live there, and we agree, we will pay for your reasonable
temporary accommodation costs for the time it will take to repair or
rebuild your home to a liveable condition.
Limit
The most we will pay under this feature is 20% of your home sum
insured and the longest period we will cover is 52 weeks
We do not cover
Temporary accommodation costs:
If you do not need to p ay for temporary accommodation beyond the
period we decide it should reasonably take to replace or repair your
home so you can live there again
How we settle your
claim
How we settle your claim
We choose how we settle home claims
If we agree to pay a claim for loss, theft or damage to your home,
we will decide if we will:
repair damage to your home;
rebuild yo ur home;
pay you what it would cost us to repair or rebuild your home;
General exclusions You are not covered under any section of this policy for damage,
loss, cost or legal liability that is caused by, arises from or involves:
Wear, tear, mould, gradual deterioration and other conditions
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light,
atmospheric or climatic conditions or gradual det erioration such as,
but not limited to:
tiles and their adhesive or grouting breaking down;
weat hering of roof tiles or roof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.