Home / Financial Firm (Unknown - Insurer) / Determination 518367

Determination 518367

Insurer partly denied water damage claims and cash settlement was inadequate

FirmFinancial Firm (Unknown - Insurer)
Decided2018-12-19
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$34,573
Non-financial loss—
Amount claimed$140,234
SourceAFCA PDF

Summary

The complainant claimed for water damage from a burst hot water pipe and a cracked storm water pipe, and the insurer accepted part of the damage and cash settled it. AFCA found the insurer liable for the ceilings and zone one of the subfloor and required a further $34,573 cash settlement plus interest, but denied the rest of the subfloor damage.

The proximate cause test applied to each area of damage showed the burst pipe caused the ceiling damage and only zone one of the subfloor damage was caused by the leaking pipe, with the rest due to long-term humidity and poor drainage.

Issues

Subjects and remedies

home or building damagepay claimpay interest

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 518367 Page 1 of 16 Determination Case number: 518367 29 November 2018 1 Determination overview 1.1 Complaint The complainant, who is the policy holder, is represented by a family member, PC. For simplicity, the complainant and her representative will be referred to as ‘ the complainant ’ . The complainant held house and contents policies with the financial firm (insurer). On 21 August 2017, she lodged a claim for damage sustained to her ceilings and walls following a burst hot water pipe. On 20 October 2017, she lodged a second claim for her foundation subfloor damage caused by a broken storm water pipe. The insurer assessed the damage for both claims and partially cash settled the complainant for resultant damage. In doing so, the insurer’s experts say not all of the claimed damage was caused by the leaking pipes. The complainant disagrees with the settlement and says the insurer is liable for all of the damage to her house. 1.2 Issues and key findings Is the insurer liable for the disputed physical damage? Based on the exchanged information, the insurer is liable for the ceilings in the foyer, hallway and dining room. However, based on the engineers’ reports, the insurer is entitled to deny indemnity for the subfloor damage to zones two, three and four. Is the insurer ’s cash settlement fair? The insurer is required to increase the cash settlement as set out in section 2 of this determination. The insurer is required to factor in the ceilings damage and to take into account variations in the different scope of works/quotes (contingencies). 1.3 Determination This determination is partly in favour of the complainant. The insurer is liable to pay the complainant the following amounts in full and final settlement: Determination | Case number: 518367 Page 2 of 16  $25,000 for the ceilings damage  $6,333 for the subfloor damage  $3,240 for the electrical damage  interest pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on the settlement sum from 5 March 2018 (final decline letter) to date of payment of the claim. Determination | Case number: 518367 Page 3 of 16 2 Reasons for determination 2.1 Is the insurer liable for the disputed physical damage? Policy provides cover for escape of liquid damage subject to exclusions The complainant is required to show that, on the balance of probabilities, she has suffered a loss caused by a risk insured against under the policy. This is known as a prima facie claim. If the complainant is able to establish a prima facie claim, then the onus shifts to the insurer to show that, on the balance of probabilities, it is entitled to rely on an exclusion under the policy or is otherwise entitled to deny the claim. The complainant’s policy provides cover for damage caused by the insured events listed in the policy (including escape of liquid), subject to the conditions and exclusions set out in the policy. On 21 August 2017, the complainant lodged a claim with the insurer following a burst hot water pipe in the roof of the property. On 20 October 2017, the complainant lodged a new claim for a cracked storm water pipe. Various reports prepared by parties confirm the insured property sustained damage as a result of both escape of liquid events. On this basis, the panel is satisfied the complainant has established a prima facie claim for both claims. However, parties disagree about the extent of the resultant damage to the property. The insurer has accepted liability for some, but not all, of the observed damage at the property. The insurer says the remainder of the damage was not caused by the escape of liquid event(s), but by factors which are excluded from cover under the policy, such as wear and tear. The proximate cause of damage must be established In order to determine whether the comp lainant’s claim falls within scope of cover, it is necessary to determine the proximate cause of the loss. What is the proximate cause of the loss is the question of fact depending upon the circumstances of each case. It is well established that a proximate cause is not necessarily the first or last or the sole cause of the loss. It is the effective or dominant or operative cause of the loss. If there are several causes operating contemporaneously, then each must be examined for the qualities of predominance and efficiency as the active efficient cause that sets a relevant train of events in motion. Courts have said that if one cause would have resulted in the harm in any case and the other would not have done so in the absence of the first, then the first is the proximate cause. Determination | Case number: 518367 Page 4 of 16 The property has been subject to a burst hot water pipe On 21 August 2017, the complainant returned home to find a burst pipe in the roof cavity. The insurer engaged an assessor (RC) to assess the resultant damage. In his report dated 23 August 2017, RC says:  the pipe above bedroom two has burst where the ceiling has partially collapsed  the walls were wet and carpet was removed  the water has flowed out into the foyer and front entry areas where the walls were wet  carpets in main lounge, dining rooms are wet in the doorways. Relevantly, RC says no other rooms were affected by this event. However, he noted there is pre-existing damage at the property. He noted mould in the subfloor, rotted bearers and joists. Further, the ceilings generally throughout the house are sagging. In his report, RC did not elaborate on the cause of the sagging ceilings throughout the house. The complainant says the burst pipe was a hot water pipe where it has steamed the ceiling. The complainant disagreed with RC’s proposed scope of works. Subsequently, the insurer engaged another assessor (AS) to inspect the property and establish the extent of the damage. In addressing the source of the water, AS says the unrepaired pipe (at time of inspection) is a cold feed to kitchen area and is split above bedroom three (damaged room). In addressing the extent of the damage, AS confined the water damage to the bedroom three ceiling and walls and floor coverings as the affected areas of the house. Further, AS says most of the rooms have extensive mould to the walls and ceilings which is due to the long-term condensation from nil sarking vapour barrier in the roof. AS noted old water stains throughout the roof cavity and rot to the ceiling sheets in some areas, especially above kitchen. AS attributed such damage to the water ingress from the roof sheeting. AS noted long floor movement and possible rot to the floor framing. In concluding his report, AS says all rooms affected by the burst pipe have been dried. In his report, he outlined the scope of works for the permanent water damage sustained to the property. AS did not attribute the soft rotten floors to the burst pipe, but rather to the long-term floor movement. AS also noted in his report, to check and test all electricals to the home in damaged areas. Further, to remove and refit all electricals to affected rooms to facilitate wall and ceiling repairs. Determination | Case number: 518367 Page 5 of 16 Subsequently, the insurer denied indemnity for the ceilings in the foyer, hallway and dining room. The panel notes the insurer, in its denial letter, says it contacted the assessor, who did not consider mould development is possible between the first assessment and second assessment. However, the insurer did not tender any evidence to such assertion. The complainant says the house was well maintained with no pre-existing issues Following disagreement, the complainant engaged a plumber (INS), a builder (BE), an electrician (SH) and an engineer (GD). In outlining the maintenance carried out to the property, the complainant says:  the exterior roof, gutters, down pipes and eaves were painted 12 months prior to the initial event  the only areas yet to be painted are hallway, foyer and dining room  ceiling stains are common in houses of this age using fuel cooking and heating ovens. The complainant says the mould present at the property is because of the hot water spray following the burst pipe. The complainant further says the weather conditions were cold at the time of the burst pipe and therefore the hot water eventually caused condensation given the steamy conditions. In addressing the burst ceiling pipe and the extent of the resultant damage, the complainant’s buil der, BE, says a thorough inspection of the roof sheeting and cavity produced no evidence of water leaks due to rain. Further, GD says the roof sarkings were not used at the time when the house was bui lt. Further, BE says there are widespread marks caused by the condensation and the spray from the burst hot water pipe. BE attributed the sagging throughout the ceiling to the burst pipe. BE says the canite ceiling in the master bedroom previously assessed as adequate, popped from moisture. In saying so, the panel accepts the complainant’s argument; the burst hot water pipe would cause more damage than the cold water pipe. Further, the panel notes BE’s assertion the ceiling is made out of canite which is prone to moisture absorption. The insurer is not entitled to limit its liability for the ceilings damage The insurer is seeking to rely on the gradual deterioration, wear and tear exclusion under the policy. Photographs taken supplied by parties show the property was reasonably maintained. Determination | Case number: 518367 Page 6 of 16 The panel notes in RC’s report (compiled two days after the event), there is no mention of any mould being present in the ceiling or walls. The only mould RC identified was in the subfloor, which the panel will address in this determination. The insurer did not provide plausible explanation as to the presence of the mould in AS’s report and not RC’s report which was compiled two days post the event. Relevantly, AS carried out his assessment approximately four weeks post the escape of liquid event. The panel considered AS’s comments addressing the long -term condensation issue. Even if the panel accepts such causation to be a contributing factor, the panel is not satisfied the insurer established the extent of water marks were pre-existing, or ruled out the condensation is due to the hot water escape event. The panel does not consider AS’s findings to be conclusive . He asserts the roof sheetings are leaking, however, did not elaborate on the condition of the roof and the reason for the leak. There is no evidence documenting the external condition of the roof. Further, the insurer did not tender any compelling evidence to refute the condensation is because of the hot water escape, rather than the proposed long -standing condensation. Whilst AS reports the pipe as being cold feed, the complainant tendered a plumber’s report confirming the repairs were carried out to a hot water pipe. The insurer did not provide any evidence to refute the plumber’s assertion. Relevantly, the complainant was away at the time of the event and the leaking duration and water escape rate are unknown. In the absence of any other information, the panel is not satisfied the insurer has established an entitlement to limit its liability. It follows, the ins urer is required to indemnify the complainant for the water damage sustained to the ceilings in the foyer, hallway and dining room. A cracked storm water pipe identified during floor investigation In addressing the source of the water leak, INS identified a crack and a blockage to a storm water pipe which discharged to the street kerb. Further, the complainant contacted the insurer and advised her repairer fell through the floor during home inspection. The complainant asserts the entire floor, bearers and joists are all damaged by a recently identified broken storm water pipe. Subsequently, a second claim was raised for the floor and frame damage sustained to the property following the discovery of the cracked storm water pipe. Determination | Case number: 518367 Page 7 of 16 Relevantly, the cracked storm water pipe is connected into the earthenware pipe which had been installed partly beneath the north-eastern corner of the dwelling. Insurer’s engineer identifies the proximate cause and extent of floor damage Following the lodgement of the second claim, the insurer engaged an assessor (JP) to address causation and the extent of the damage. In his report, JP attributed the rotting timber bearers and joists to moisture and dampness issues over several years. Further, JP says these issues are due to poor construction including inadequate subfloor ventilation and no wall barrier under the external wall to prevent water seepage through the earth and under the house. The panel notes, at the time of JP’s assessment the complainant removed the down pipe and concrete sealed the original penetration. Given the nature and extent of damage, the insurer engaged an engineer (IM) to address causation and resultant damage. In his report, IM says parts of the foundation soil were damp with no free water on the surface of the soil. Further, IM says this is consistent with the lack of water following rainfall two days before site visit. IM’s inspection of the property identified different types of air vents at the base of the external walls. In his report, IM says:  the purpose for these vents is to provide ventilation of the subfloor and to reduce humidity  the majority of these vents are positioned slightly above ground level, allowing water to enter the subfloor and therefore increase humidity. Further, IM says even if there were good ventilation techniques, it will be of little value as the underfloor area will remain wet due to a poor drainage issue identified. IM assessed the two air vents within the proximity of the subject storm water pipe. He says, given they are above the floor level, they would not contribute to the subfloor ventilation. IM sectioned the subfloor into four zones, nominating the subfloor section which would be directly affected by the lea king storm water pipe as ‘zone one’ . The leaking storm water pipe would have introduced water into the underfloor space even when no surface water entered through the underfloor vents. IM says, the leakage has not caused or contributed to damage to the timber floor structure in zones two, three or four. IM opines, any water which may have reached the south-western margin of zone two would have dissipated because of the better subfloor ventilation in that section. In identifying the cause of water entry and accumulation within the subfloor area, IM highlighted the poor drainage and the water entry through external subfloor vents. He Determination | Case number: 518367 Page 8 of 16 says the storm water pipe leakage would have contributed to the ongoing elevated humidity. In his opinion, the rot which affected the bearers and joists is the result of long-term high humidity within the subfloor void because of the lack of ventilation. The rot would have developed over an extended period of time whilst being invisible to the complainant. Complainant ’s engineer agrees generally with insurer’s engineers’ findings Following the compl ainant’s disagreement with IM’s findings, she engaged an engineer. In his report, GD says:  IM’s report is thorough and clearly outlines the causes of the problem  GD disagrees with IM’s comments about the poor drainage and water entry through external subfloor vents  rotted bearers and joists is the result of long-term high humidity within the subfloor void  vents may allow water ingress, however, the ground outside slopes away from the opening  water ingress through these vents is most unlikely in normal, even heavy, rain events. However, GD attributed the main dominant cause for the water ingress to the subfloor to the cracked storm water pipe. GD asserts, had the water ingress been happening since 1948, (date of property construction), the rot would have been detected a long time ago. The insurer sought further clarification from IM in light of GD’s report. In addressing the effectiveness of the roof gutter overflows (if any), IM says any roof gutter overflows in the area near the vents are likely to cause water to accumulate on the ground and enter the underfloor space through the vents. In his supplementary report, IM outlined the historical rainfall records from 2015. IM says the percentage of days where no rain fell is greater than the days where there was rain. It follows, the cracked storm water pipe was sporadic and the leakage was not the normal condition in the subfloor. The panel accepts GD’s assertion and considers the leaking pipe would have exacerbated the humidity levels in the subfloor level in zone one. However, the question of fact in this complaint is whether this cracked storm water pipe is the proximate cause of the damage in the subfloor area. Further, whether the bearers and joists would have rotted in the absence of this leaking storm water pipe. Determination | Case number: 518367 Page 9 of 16 The insurer is not liable for the subfloor damage The panel has carefully considered the exchanged evidence, parties’ argume nts and policy wordings. The panel considers IM’s findings thorough, logical and more persuasive. This is because:  IM identified the different causes for water ingress into the subfloor  IM zoned the subfloor into different zones, outlining the damage causa tion to each zone  IM outlined the water escaping out of zone one would dissipated because of the better subfloor ventilation in that section. The panel does not consider GD has adequately addressed the drainage and vents issues identified by IM. GD says the vents may permit water ingress; conversely, he adds water ingress through these vents is most unlikely in normal, even heavy rain events. Relevantly, GD did not eliminate the vents as points of water entry and a main contributing factor for the overall damage to the subfloor. The panel accepts in the absence of the cracked storm water pipe, the subfloor bearers and joists would have gradually deteriorated given the poor drainage and the identified vents issue. It follows, the panel considers the poor drainage, the vents and the cracked storm water pipe to be the sources of elevated humidity issue present in the property’s subfloor. Further, the panel is satisfied the leaking storm water pipe would have only contributed to the damage in zone one. It follows, the insurer is only liable for damage sustained to the property in zone one. The insurer has partially indemnified the complainant for the resultant damage to zone one. The panel will address the settlement in the next section of this determination. 2.2 Is the insurer’s cash settlement for both claims fair? Insurer must act fairly and ensure the cash settlement covers all the repairs It is clear from the terms of the policy that the insurer has the discretion to decide which settlement method to adopt. Howe ver, we expect an insurer to act reasonably in exercising its discretion, having regard to the circumstances of the claim. Notwithstanding the above, the cash settlement must accurately reflect the costs the complainant will incur to repair the resultant water damage. Determination | Case number: 518367 Page 10 of 16 It must also be recognised that in cash settling the claim, the complainant has given up the lifetime guarantee provided under the insurer ’s policy. Further, a cash settlement transfers all the risk from the insurer to the complainant of any unforeseen damage and any additional work required once repairs commence. The insurer ’s repairer says it is unable to carry out the repairs due to the pre -existing damage, which is excluded under the policy. Given the panel ’ s findings above, the panel accepts the insurer acted reasonably in deciding to cash settle the claim. Complainant is claiming $133,834 following the two events The complainant tendered a letter from her builder, BE, for the repairs totalling $102,634. BE says the complainant paid $97,634 with a further $5,000 to be paid following the complainant moving back into the property on completion of repairs. Despite numerous requests from both the insurer and the Service for itemised invoices for the completed building repairs, the complainant did not provide any further proof of loss. Further, the complainant provided the following invoices:  a quote for $16,940 for the electrical work carried out to the property  an invoice for $7,405 for the replacement of the floor coverings  an electricity bill for $905 for the increased usage following the restoration works. The complainant was dissatisfied with the insurer’s cash settlement for the physical damage. In reasoning her dissatisfaction, the complainant says the insurer’s cash settlement did not consider:  travelling distances for trades people as the insured property is located in rural NSW  removal of debris and disposal cost incurring $260 per visit (20 visits) to the waste disposal service  extent of electrical damage following the first escape of liquid event. The complainant is also claiming $5,400 for alternative accommodation and $1,000 food loss following the insurer’s restorer accidently unplugging the fridge and freezer. The panel will address the adequacy for the insurer’s cash set tlement for each of these items separately. Insurer ’s cash settlement was based on estimated scope of works The insurer cash settled the complainant:  $11,983 for the internal ceilings and walls damage (claim one) based on RC’s quote  $10,556 for the subfloo r damage to zone one based on RC’s quote Determination | Case number: 518367 Page 11 of 16  $881.28 reimbursement of the electricity bill based on the restorer’s calculation  $5,431.66 for the replacement of floor coverings based on an adjusted quote  $500 for the food spoilage  $3,143 for temporary accommodation from 21 August 2017 until 29 March 2018  $5,402 for upgrading of switch board and rewiring the house based on RC’s quote. Insurer is required to increase the cash settlement amount for first event Given the panel ’s findings above, the insurer is liable for the ceilings in the foyer, hallway and dining room following the initial escape of liquid event. In saying this, the complainant did not provide the requested itemised scope of works/invoice for the works completed. The panel is not satisfied the complainant has established the extent of cost incurred. For a repair job of that scale, the panel expects a reasonable level of substantiation. The insurer ’s request for an itemised scope of works to show the breakdown of materials used and labour is reasonable. The complainant did not elaborate as to her inability in providing this information. It is difficult to conclude the complainant ’s incurred cost s for different areas of the property. This is important given the different damage causation to different areas of the property. In saying this, the panel considers the insurer ’s cash settlement inadequate given it does not equate to its liability under the policy, ie. affected ceilings in light of the panel ’s findings above. Further, the panel accepts it is reasonable and appropriate to expect the complainant might incur extra costs given the rural location of the property, removal of debris, contingencies and the builder’s margin. In addition, the cash settlement should also be increased to allow for:  any volume discounts reflected in the quotation provided by RC (noting that his quotation was provided for cash settlement purposes only and therefore was not actionable)  project management or supervision costs (which were omitted from RC’s quotation but are likely to be incurred by the complainant in undertaking the repairs)  waste disposal fees for the removal of debris  rural location of the property and the extra trades cost increase  the additional risk assumed by the complainant due to the absence of the lifetime guarantee. For the sake of closure and in the absence of the requested breakdown, the panel considers it fair in the circumstances the insurer increases its cash settlement by $25,000. Determination | Case number: 518367 Page 12 of 16 This will factor in the ceilings to the foyer, hallway and dining room. Further, it will take into account variation in the scope of works. Insurer to increase zone one cash settlement by 60 percent The insurer based its cash settlement for zone one on RC ’s quote for $10,556. The panel notes RC included a 15% builder’s margin. However, the panel is not satisfied such figure is adequate to cover any possible contingencies, increased trades cost given the location of the property, and the debris disposal. Further, RC provided the quote for the purpose of a cash settlement and therefore it was not actionable by the complainant. RC carried out a desktop estimate based on IM’s findings. Given the nature of damage, the panel considers it fair the insurer increases its cash settlement by an additional 60%, being $6,333. Insurer to increase electrical damage cash settlement by 60 percent In electrician SH’s report, he says there was water damage to all outlets, light points and cooking appliances. Further, SH says the rear of the house was upgraded and re - wired. SH says most of the electricals in the building will need to be replaced and the switchboard upgraded as the asbestos panel will need to be replaced. Further, the complainant says the rear of the house wiring passed the test and did not require an upgrade, however, all circuits would need to be upgraded on the switchboard as it is illegal to re-use an asbestos board. The panel notes the policy does not provide cover for upgrading undamaged parts of the house to comply with current building requirements. The complainant tendered a quote from her electrician for $16,940. The insurer and the Service requested a breakdown of SH’s quote to reflect the extent of the water damaged electricals. The complainant did not provide such breakdown and did not elaborate on her inability to provide the requested information. In SH’s invoice, the electrician says he disconnected and removed old cabling, re - wired and re-fitted:  20 light points  22 power points  stove hot water. Further, SH says he removed and replaced the old meter box and consumer mains and installed a new meter box and circuit breakers to suite. The complainant did not tender an invoice for the completed work. Determination | Case number: 518367 Page 13 of 16 The insurer cash settled the complainant for $5,402 for upgrading the switchboard (to be compliant) and re- wiring the house based on RC’s quote. RC’s quote is a liability quote for cash settlement only, ie. does not factor in contingencies. Further, the insurer did not show this quote is actionable by the complainant. Therefore, the panel considers it fair the insurer increases its cash settlement by 60%, being an additional $3,240. Insurer’s settlement for floor coverings is fair and reasonable The complainant tendered a quote from (CH) for the replacement of the entire house flooring totalling $7,405. The quote does not provide the breakdown of cost or area/rooms addressed. The insurer accepted the replacement of the carpet in one of the bedrooms, front entry and foyer following the burst hot water pipe. F urther, the insurer accepted to replace the vinyl in the kitchen. Information on file does not suggest the carpet in the rest of the house was water damaged by the burst hot water pipe. The insurer contacted CH and requested an updated quote for the carpet in the affected area. CH later provided a quote for $5,431. Given, it is not evident the carpet is water damaged in the rest of the property, the panel considers the insurer’s flooring settlement fair in the circumstances. Insurer’s settlement for electri city is fair and reasonable The complainant tendered an electricity bill for $905.26 for the period between 2 August 2017 and 27 October 2017. The insurer cash settled the complainant $881.28 towards the electricity bill. In doing so, the insurer based it s calculation on the restorer’s electricity usage for 12 air movers and two dehumidifiers. Given the electricity bill usage pre-dates the initial loss date, being 21 August 2017, the panel considers the insurer’s cash settlement fair in the circumstances. Insurer’s settlement for alternative accommodation is fair in the circumstances The insurer’s policy provides cover for the reasonable cost for temporary accommodation should the insured property become unliveable following an insured loss. Following the initial burst hot water pipe, the complainant vacated her property and resided with a family member (daughter). The complainant did not tender any evidence for any cost incurred for alternative accommodation. The complainant says she is suffering losses such as rates, utilities, insurance, garden maintenance, in addition to her out of pocket expenses. The complainant is Determination | Case number: 518367 Page 14 of 16 claiming 27 weeks at $200 per week. The complainant completed the repairs and moved back into her property in March 2018. The insurer offered the complainant $100 per week from 21 August 2017 until 29 March 2018, being 31 weeks and 3 days. The panel does not consider:  all damage sustained to the property is covered by the policy  the insurer is liable for any outgoing costs such as rates  the flooring claim (except for zone one) is not covered by the policy  the flooring damage to the bearers and joists renders the property unliveable  the complainant substantiated her loss for the temporary accommodation benefit. It follows, in the absence of any substantiation from the complainant, the insurer’s settlement of $3,143 is fair and reasonable in the circumstances. Determination | Case number: 518367 Page 15 of 16 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with Financial Ombudsman Service (FOS). This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFC A terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term applicant complainant financial services provider financial firm dispute complaint claim claim 3.2 Our approach to this complaint We considered this complaint in line with the Operational Guidelines of the FOS Terms of Reference because of the nature of this complaint. It has progressed directly to a determination by a panel, consisting of an ombudsman, and advocates with extensive experience in consumer complaints, and insurance industry practice. We shared all information in this determination with the parties, and the parties had the opportunity to respond. We also reviewed all material supplied in response to make our determination. While the parties raised many issues, we have only commented on those directly relevant. We decided this complaint on its merits, considering the relevant law, good industry practice, codes of practice, and previous decisions where relevant. Determination | Case number: 518367 Page 16 of 16 3.3 Key policy terms Subject T erm Escape of Liquid Loss or damage caused by liquid leaking, overflowing or bursting from any of the following  any drain, fixed pipes, roof gutters or guttering and rai nwater downpipes, drainage and sewage systems (not forming part of a shower cubicle wall, floor or base); Other repair / rebuilding costs When we are rebuilding or repairing damaged parts of your home, we will pay the reasonable and necessary costs:  to make the damaged parts of your home comply with the cu rrent home building regulations and laws We do not cover The cost of:  upgrading undamaged parts of your home to comply with the current building regulations and laws; Temporary accommodation When an ins ured event damages your ho me to the extent you cannot live there, and we agree, we will pay for your reasonable temporary accommodation costs for the time it will take to repair or rebuild your home to a liveable condition. Limit The most we will pay under this feature is 20% of your home sum insured and the longest period we will cover is 52 weeks We do not cover Temporary accommodation costs: If you do not need to p ay for temporary accommodation beyond the period we decide it should reasonably take to replace or repair your home so you can live there again How we settle your claim How we settle your claim We choose how we settle home claims If we agree to pay a claim for loss, theft or damage to your home, we will decide if we will:  repair damage to your home;  rebuild yo ur home;  pay you what it would cost us to repair or rebuild your home; General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability that is caused by, arises from or involves: Wear, tear, mould, gradual deterioration and other conditions wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual det erioration such as, but not limited to:  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or roof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.