Home / Financial Firm (Unknown - Insurer) / Determination 517817
Determination 517817
claim_denial
Summary
The complainant claimed for storm damage to his shed and contents, which the insurer denied on a building-regulations exclusion, and sought compensation. AFCA found the insurer could deny the shed claim and no compensation was payable, while the accepted house damage was not in dispute.
The insurer's expert evidence showed the non-compliant shed extension was the proximate cause of the shed damage, which the policy excludes.
Issues
- Claim denial primary · not upheld“The insurer has established the cause of the damage to the original shed was the failure of the extension, which did not comply with building regulations.”
- Delay secondary · not upheld“The insurer took nearly three months to decide, which was not unreasonable and within fair industry standard time frames.”
Subjects and remedies
home or building damagenatural disasterno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Case number: 517817 5 November 2018
1 Determination overview
1.1 Complaint
The complainant lodged a claim with the financial firm (insurer) for storm damage to
his house, shed and contents in late December 2017.
The insurer accepted the claim for the house damage. It denied the claim for the shed
and its extension because it says the storm was not the proximate cause of the
damage. It relied on a number of exclusions, predominantly that the shed extension
did not comply with building laws or regulations. The complainant has withdrawn his
claim for damage to the extension but says the storm caused the damage to the
original shed and contents, not the non-compliant extension.
The case analyst provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the insurer. A copy of the
recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Can the insurer deny the claim?
The insurer can deny the claim because it has provided expert information to
establish the damage to the original shed was caused by the extension not complying
with building regulations and other exclusions. The complainant has not provided any
substantial information to refu te the insurer’s expert evidence.
Is the insurer required to pay compensation to the complainant?
The insurer did not unreasonably delay its decision about the claim. It is not required
to compensate the complainant for or non-financial loss.
Determination | Case number: 517817 Page 2 of 6
1.3 Determination
This determination is in favour of the insurer. I agree with the case analyst’s reasons
for the recommendation and the recommended outcome. The insurer can deny the
claim for damage to the original shed and contents.
Determination | Case number: 517817 Page 3 of 6
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good industry
practice, codes of practice and our previous decisions. I have taken into account all
the material submitted by the parties, both before and after the recommendation. I am
satisfied that the documentation I have relied on has been provided to both parties.
I am satisfied that the case analyst’s recommendation contains an accurate summary
of the complaint, the issues to be determined, any applicable paragraphs of the FOS
Terms of Reference and any relevant law.
The complainant rejected the recommendation saying:
he is seeking compensation for replacement of the old shed roof
the proximate cause of the damage was the storm, if there was no storm the
damage would not have occurred
he believes the storm exceeded 147kmh although he cannot prove it, a neighbour
3 km away also lost their roof in the storm
if he knew sooner his claim was to be denied, he could ha ve obtained accurate
wind velocity readings from Tullamarine airport, which keeps accurate readings for
all of Victoria for three months
the only connection between the extension and old shed is the overlapping roof of
the old shed with the roof to the extension, the extension roof was placed 10cm
under the old roof to make the extension building watertight
the extension roof could have been lifted off without affecting the old roof, the old
shed roof could have torn off before the new shed lost its roof.
I nsurer has agreed to accept the complainant’s claim for damage to the house
The insurer has agreed to settle the complainant’s claim for damage to the house and
flue. It has requested the complainant advise how he wants this claim settled, i.e.
insurer to repair the damage or cash settlement. The complainant has not yet
responded to this request.
The complainant has not raised any issues with the insurer’s acceptance of the house
damage claim and I have not dealt with the issue in this determination.
2.2 Can the insurer deny the claim?
Insurer has established proximate cause of damage to the old shed
The insurer’s expert’s (FMG) notes in its report that the information from the nearest
weather station and information from the complainant, indicates the extension was
upwind of the original shed during the storm.
Determination | Case number: 517817 Page 4 of 6
It notes the complainant described how the northern door of the extension failed
leading to the failure of the extension roof, then the failure of the original roof. This is
not consistent with the compl ainant’s submission that the old shed roof could have
torn off prior to the extension shed roof.
FMG provided its view about why it considered the failure of the extension, which was
excluded because it did not comply with building regulations, caused the damage to
the original shed. In its view:
if the roof sheeting of the of the original shed overlapped (as described by the
complainant) but was not connected to the extension, the failure of the extension
would have caused the damage to the original shed
the sheeting of the extension would have pried off the western ends of the original
roof sheets on the windward side of the original shed as the next fixing to the
original roof sheets were approximately 1.8 metres to the east.
Complainant has not provided information to overcome the insurer’s
information
The complainant has not provided any specialist or expert report to contradict FMG’s
report and opinions despite advising he would do so, and having the opportunity to do
so.
He says FMG’s opinions about w ind speed cannot be supported because the weather
stations are too far away to be meaningful. In his opinion, the wind speeds during the
storm exceeded the 147kmh the extension shed should have been able to withstand if
it had been built in accordance with the building regulations. He also says he would
have been able to get accurate readings from Tullamarine airport if his claim had
been denied sooner.
The complainant does not provide any information in support of his opinion other than
a photograph of a property he says is three kilometres away that lost its roof in the
storm. There is nothing to show when or where the photograph was taken.
The complainant has not provided any information to show Tullamarine airport would
have had accurate readings of wind speeds in the complainant’s area. There is no
information that there are any other weather stations from which Tullamarine airport
could have obtained that information. Even if that information could have been
obtained, it is speculative what it would show.
FMG’s opinions about the wind speeds is somewhat speculative but is supported by
the best available evidence from the nearest weather stations. FMG’s report also
notes in support of its conclusion that the wind speed was less than the required
design wind speed that the house on the same site did not suffer similar damage.
Determination | Case number: 517817 Page 5 of 6
Insurer can deny the claim
Based on the available information, I am satisfied on balance the insurer has
established the cause of the damage to the original shed was caused by the failure of
the extension. This was due to non-compliance with building regulations.
The failure to comply with the building regulations is the proximate cause of the
damage, not the storm. If the extension had complied with the regulations it could
have withstood the storm and the damage would not have occurred.
Therefore, the insurer can deny the complainant’s claim for damage to the original
shed.
2.3 Is the insurer required to pay compensation to the complainant?
Insurer not required to pay compensation
The insurer took nearly three months from claim lodgement to notifying the
complainant of the claim decision. I have reviewed the information on the complaint
file and, in the circumstances, I agree with the case analyst’s view that this was not
unreasonable and within fair industry standard time frames.
The insurer is not required to pay compensation to the complainant for non-financial
loss.
Determination | Case number: 517817 Page 6 of 6
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
Recommendation
Case No: 517817 Recommendation Page 1 of 11
Case number: 517817 7 September 2018
1 Overview
1.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for storm
damage to a shed and its contents, a shed extension, and his house in late
December 2017.
Upon reviewing its expert information, the FSP denied the claim for the shed and the
extension. It says its experts found the proximate cause of all of the damage to be
the extension being non-compliant to Australian building standards. The FSP
however agrees to repair the house damage.
The applicant confirmed during a 29 June 2018 conciliation call with FOS and the
FSP that he did not obtain a building permit for the shed extension. Therefore, he
withdrew his claim for damage to the extension.
However, the applicant maintains storm was the proximate cause of the damage to
the main shed and its contents, and his house. He seeks acceptance of these items
accordingly.
1.2 Issues and key findings
Is the FSP entitled to deny the claim?
There is no dispute the applicant established a valid claim on the policy and the FSP
agreed to repair the house damage. The only available expert information shows the
proximate cause of the main shed damage is the shed extension not complying with
building regulations. The FSP has therefore provided sufficient information to prove
an exclusion applies to the shed damage.
Is the applicant entitled to compensation?
The applicant is not entitled to compensation for either non-financial or consequential
losses. He has not provided any information to support his claim(s) for compensation.
Further, my review of the information provided by the FSP did not raise any issues
warranting compensation.
Case No: 517817 Recommendation Page 2 of 11
1.3 Recommendation
This recommendation is in favour of the FSP.
The applicant is to contact the FSP to arrange authorisation or cash settlement of the
house repairs.
The FSP is entitled to deny the claim for damage to the main shed and its contents.
Case No: 517817 Recommendation Page 3 of 11
2 Reasons for recommendation
2.1 Is the FSP entitled to deny the claim?
Applicant established a valid claim
General insurance policies provide cover with conditions and exclusions. The policy
wording and certificate of insurance outline the cover provided by the insurer, and
any applicable exclusions.
When lodging a claim with an insurer, the insured must establish a valid claim. That
is, on the balance of probabilities, an eve nt covered by the policy must have caused
the loss.
Once a valid claim is established, the insurer must show, on the balance of
probabilities, the policy excludes or otherwise does not cover the loss.
There is no dispute amongst the parties damage occurred to the shed, the shed
extension, and the house during a period of strong winds/storm. Therefore, it is clear
the applicant has suffered a loss to which the policy could respond.
As the FSP seeks to deny the damage to the shed and its extension, the onus is on it
to prove which policy exclusion/s or limitation/s apply.
Proximate cause of shed damage is not complying with building regulations
As outlined in Section 3.1 below, the FSP’s appointed engineer (FE) clearly
establishes the 2014 shed extension required a building permit. The applicant
concedes he did not obtain a building permit and therefore he withdrew any dispute
regarding the shed extension damage.
However, the applicant says the damage to his house and the main shed is storm
related damage. Therefore, he says the main shed and house damage is covered on
the policy.
The FSP agrees the house damage is covered by the policy. As outlined in Section
1.3 above, the applicant needs to contact the FSP to organise settlement of that
damage.
Howe`ver, the FSP says FE’s reports clearly show the proximate cause of the
damage to the main shed is the applicant’s non -compliance with building regulations
when constructing the extension.
Proximate cause is the dominant, efficient or operative cause of the loss. It is not
required to be last in time or the sole cause. It is a question of fact that depends on
the circumstances of each case. It requires a common sense evaluation of the
evidence.
Case No: 517817 Recommendation Page 4 of 11
FE’s reports are comprehensive and based on physically visiting the site . By
contrast, the applicant’s engineer (BCE) did not attend site. Rather, BCE’s report is a
commentary on FE’s report.
Importantly, BCE’s report specifically states ‘[BCE] cannot categorically state the
conclusion in the [FE] report is incorrect but believe the [FE] report should have
included other possible scenarios ’.
Given BCE’s report says FE’s findings are not necessarily incorrect and BCE did not
attend site, I am not satisfied BCE’s findings are persuasive or reliable. I am of the
view FE’s report i s clearly far more complete and persuasive. Therefore, I am
satisfied FE’s findings are the most reliable available expert information.
FE’s reports clearly state the proximate cause of the damage to both the main shed
and its extension is the applicant’s failure to adhere to several Australian design and
building code standards.
Therefore, particularly in the absence of any other reliable information, I am satisfied
the proximate cause of the damage is the shed extension not complying with building
regulations.
FSP entitled to deny the claim
As outlined in Section 3.1 below, the policy excludes damage caused by ‘ your home
or unit not complying with building laws or regulations, except those laws or
regulations introduced after your home or unit was originally built or last altered which
you w ere not required to comply with’.
The applicant agrees the shed extension commenced construction in 2014. FE’s
reports outline the applicable Australian standards and building codes which the shed
extension did not adhere to in 2014. The applicant does not appear to dispute his
non-compliance with these standards and codes.
FE says once the roof to the extension failed and started to blow off during the event,
it caused the connected main shed roof to peel off simultaneously. Therefore, FE
directly attributes the damage to the main shed roof (and its contents) to the
applicant’s failure to comply with building regulations when he built the shed
extension in 2014.
I am satisfied FE’s view of the proximate cause is the most persuasive and reliable
expert information available. Therefore, I accept the proximate cause of the damage
is the applicant not complying with building regulations.
As I am satisfied the FSP has proven a policy exclusion applies to all of the shed and
shed contents damage, it is therefore entitled to deny the claim.
Case No: 517817 Recommendation Page 5 of 11
2.2 Is the applicant entitled to compensation?
FOS applies non-financial loss compensation conservatively
Non-financial loss includes claims for stress or inconvenience caused by an error of
the insurer. The maximum amount we can award for non-financial loss is $3,000 for
each claim of loss.
We will only award this type of compensation if there has been an unusual degree or
extent of inconvenience. We will not award compensation for loss that an applicant
may incur because of pursuing a dispute or rectifying an insurer’s error.
When assessing whether the circumstances are of an unusual nature we will review:
the degree or extent of physical inconvenience suffered
the general time taken to resolve the dispute
the extent to which the insurer’s actions interfered with the applicant’s
expectation of enjoyment or peace of mind.
Applicant not entitled to compensation for non-financial losses
The applicant says he is entitled to compensation for non-financial losses because
the FSP took too long to make and communicate its claim decision.
I have outlined a brief timeline of events according to the FSP’s claim notes in
Section 3.1 below. The notes confirm:
claim lodged 20 December 2017
shed make safe organised on the same day
applicant queries time taken to accept claim and why an engineer is required on
or around 16 January 2018
the FSP tells the applicant he can provide information to confirm how the shed
and its extension is constructed, or it can appoint an engineer
FSP engineer (FE) attends 31 January 2018
FE submits its report on 23 February 2018
the applicant is verbally told the claim is denied on 2 March 2018.
I appreciate an approximate two month timeframe between claim lodgement and the
FE submitting its report was likely frustrating for the applicant.
However, I am satisfied it is fair in the circumstances for the FSP to both appoint an
engineer and rely on its subsequent report. Further, I am satisfied FE provided its
report in a timely fashion.
I also appreciate it took over three months from claim lodgement for the FSP to make
a claim decision and this too was likely frustrating for the applicant.
However, with consideration to the General Insurance Code of Practice (GICOP)
timeframes, I am satisfied the FSP made its decision in a timely fashion. A claim
decision was communicated to the applicant within four months of claim lodgement.
Case No: 517817 Recommendation Page 6 of 11
Further, the claim decision was made within 10 days of the FSP receiving FE’s
report. Both of these timeframes are within what I consider to be fair industry
standards (and within the timeframes expected in the GICOP).
Finally, and most significantly, the applicant did not provide any information to
support his claim for compensation.
Therefore, for the reasons outlined above, I am not satisfied the applicant is entitled
to compensation for non-financial losses.
Case No: 517817 Recommendation Page 7 of 11
3 Supporting information
3.1 Key references
Record Key points
Policy wording What we cover as your home
Your home that you own or are responsible for and us e primarily
for domestic purpos es including the following at the insured
address:
garages, carports, outbuildings, outdoor walls, gates, fenc es …
and any structural improvements on land;
decks, pergolas, pagodas, verandas and balconies, fixed water
tanks, fi xed swimming pools and spas and their accessories,
gra nny flats, sheds, tennis courts
General exclusions
You are not covered under any section of this policy for damage,
loss, cost or legal liability th at is caused by, arises from or involves:
…
Consequential losse s or extra costs following an incident
covered by your policy
consequential loss (financial and non - financial loss) or extra costs
following an incident covered by your policy, such as:
loss of income or wages;
medical expenses;
loss or costs, including the cost of your time (e.g. inconvenience),
to prove your loss or to help us with your claim (e.g. telephone
calls, postage);
cost of hiring appliances after yours suffer loss or damage;
professional, expert, legal, consulting or valuation costs unless you
obtained our prior written authority to incur these costs;
cost of replacing or reapplying pest control chemicals and baits in
or around the ins ured address;
cleaning costs;
any costs related to stress or anxiety;
any costs not covered by your policy.
…
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or
should reasonably have known about) and did not fix before the
loss or damage occurred (e. g. if there are signs that a defect
previo usly caused damage, we will not pay a later claim for further
damage from this defect).
…
Not com plying with building regulations
your home or unit not complying with building laws or regulations,
except those laws or regulations introduced aft er your home or unit
was originally built or last altered which you were not required to
comply with.
…
Case No: 517817 Recommendation Page 8 of 11
Wear, tear and gradual deterioration
wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot,
action of light, atmospheric or climatic conditions or gradual
deterioration such as but not limited to :
tiles and their adhesive or grouting breaking down;
weat hering of roof tiles or r oof ridge capping;
gradual weathering and breakdown of bricks, mortar or concrete.
Certificate of insurance
20 - 11 - 2017
No optional accidental damage cover selected for either building or
contents
Claim notes
20 - 12 - 2017 to 22 - 03 - 2018
Claim lodged 20 Decem ber 2017
Make safe for shed organised 20 December 2017
Restorer appointed on 29 December 2017
Applicant raises concerns with delays on 16 January 2018,
particularly surrounding engineer appointment
FSP attempts to obtain documents regarding shed construction
from applicant, but applicant confirms he does not have any
documentation on 30 January 2018
FSP confirms engineer attendance on 31 January 2018
Applicant complains about delays on 2 March 2018
FSP sends FE’s report to applicant on 2 Marc h 201 8
Applicant informed verbally of claim denial on 2 Marc h 2018
Applicant confirms he will get his own expert report on 2 March
2018
Applicant’s engineer report received by FSP on or around 14
March 2018
Applicant verbally informed of denial being upheld on 22 March
2018
FSP engineer report (FE)
23 - 02 - 2018
‘ A photograph provided by the make - safe builder indicates that the
roof battens became detached from the roof largely in - tact with the
roof sheeting attached indicating the failure of the fixing between
the battens and the raft ers ’
‘[FE] ’s opinion is that while the high winds on the 19th December
2017 have precipitat ed the damage to the roof of the structure; the
wind event was not the proximate cause of the damage. [FE] ’s
opinion is that the proximate ca use of the damage to the structure
is inadequate design and/or construction of the western extension
which has also affected the roof of the original shed as explained
below. ’
‘[FE] ’s opinion is that the construction of the western extension to
the subject structure is not complaint (sic) with the requirements of
the current National Construction Code (NCC) or the Building Code
of Australia (BCC) which was current at the time of the
construction. ’
FE goes into great detail confirming which sections of the s hed
extension are not up to Australian standards/building codes which
were relevant in 2014
‘ The roof battens of the weste rn extension were inadequate.’
‘ Regardless of the inadequacy of the roof battens, FMG’s opinion
is that the primary cause of the damag e to the roof of the western
Case No: 517817 Recommendation Page 9 of 11
extension was caused by a failure of the connections between the
75 x 45mm roof battens and the supporting timber raft ers. ’
‘… capacity of the skew nailed connection between the battens and
the rafters of the western extension w as approximately 25% of the
capacity required by the design wind speed for the structure, and
therefore substantially inadequate ’
‘ Wind speeds of 98km/h and 117km/h were recorded from the
north and northwest at the closest weather stations to the subject
site on the 19th December 2017. [FE] notes that these wind
speeds are less than the design wind speed of 147km/h as
specified in AS1170. [FE] acknowledges that the weat her stations
are locat ed in excess of 25km from the subject site and may not be
an accurate reflection of the wind speed experienced at the site on
the day of the Event. Despite this FMG’s opinion is that the wind
speed at the site on the day of the Event was less than the
required design wind speed. ’
‘ The damage to the roof of the original shed, which has existed on
the site for many years, has been caus ed by the failure of the roof
of the western extension. [FE] ’s opinion is that the corrugated
metal roof sheeting of the western extension was connected to the
roof sheeting of the original shed. The failure of the roof to the
western extension, while still attached to the roof sheeting of the
original shed, has peeled the roof off of the original shed. [FE]
notes that the majority of the roof rafters of the original part of the
shed were still intact and bolted to the steel roof trusses with the
roof sheeting detached from the rafters. Some failures of these
timbers were inevit able given the age of the build ing and the forc e
exerted on the rafters by the roof of the western extension. ’
‘[FE] ’s opinion is that the wind speed at the site on the 19t h
December 2017 did not exceed the design wind speed for the site,
and if the western extension had been constructe d in accordance
with Australian Standards as required by the Building Code of
Australia (current at the time of construction) the failure would not
have occurred. ’
‘[FE] observed other inadequacies in the construction of the
western extension to the shed a lthough these have not failed to
date. ’
Applicant engineer
report (BCE)
09 - 03 - 2018
BCE confirms it did not visit the site as the buildings were already
demolished.
‘[FE] state in their report that the wind event was not the proximate
cause of the damage. This appears to be based on weather station
readings many kilometres away. Refer clause 3.3 of the [FE]
report. Historically this area has undergone many strong winds and
the width of the strong wind corridors can vary from 100m wide to
several kilometres wide. One cannot rely on the reading of a
weat her station 20 - 30km away. The winds could have been much
stronger than the readings at the weather station on this particular
day. Local news articles indicate that many trees and buildings
were destroyed by th is December 2017 wind event. ’
‘[FE] state correctly that Shed 2 [the extension] did not have a
Case No: 517817 Recommendation Page 10 of 11
building permit. ’
‘[FE] state in their report that the roofing of Shed 2 was peeled
away because the sheeting of Shed 2 was connected to the
sheeting of Shed 1. There is not photographic evidence to show
this was the case. Normal building practice would be for the
sheeting of the Shed 2 to ‘ slide under ’ the outer extremity of the
Shed 1 sheeting. The owner [the applicant] , when questioned by
[BCE] , indicated the overlap of sheeting was only 100mm and no
physical fixing of sheeting was required or needed at this point. ’
‘ CONCLUSION
1. [BCE] believe, from examining the evidence that the roofing
sheeting from Shed 1, would have been more susceptible to wind
damage du e to its age, fixing methods and support purlins.
2. Whilst Shed 2 did not have a permit it would appear to be in
much better condition than Shed 1.
3. Whilst there was an overlap of sheeting bet ween Shed 1 and
Shed 2 it cannot be concluded that this is th e sole reason
particularly when there appears to have been no secure fixing
between the iron cladding.
4. Given the age and condition of Shed 1, it is most likely the
roofing iron of Shed 1 was destroyed before Shed 2.
5. [BCE] cannot categorically state the conclusion in the [FE] report
is incorrect but believe the [FE] report should have included other
possible scenarios as mentioned in the above item 4. ’
FSP assessor report
19 - 03 - 2018
This report is a response to BCE’s above report
‘[BCE] claim that the winds could have been much stronger in the
area of the customer’s property, but by the same token could have
been less intense. ’
‘ Considering the above factual information and the fact that [BCE]
conclude in their report that [BCE] cannot categorically state the
conclusion in the [FE] report is incorrect, and the lack of any
evidence that disputes the [FE] findings, I see no reason for the
initial decision to deny the claim should be changed. ’
Supplementary FSP
engineer report (FE)
20 - 04 - 2018
This report is primarily a response to BCE’s above report
‘[FE] ’s opinion is that if the roof sheeting of the original shed
overlapped, but was not connected to the sheeting of the
extension, then the failure of the extension would still have caused
the damage to the original shed in that the sheeting of the
extension would have pried off the western ends of the existing
roof sheets on the windward side of the original shed, the next
fixing to the roof sheets of the original shed being app roximately
1.8m to the east. ’
‘ The extension to the west side of the shed is reliant on the original
shed for lateral stability in an east/west direction. Hence if the
extension had been engineered and doc ument ed to obt ain a
building permit then [FE] wo uld expect the documentation to show
structure such that the extension would be capable of withstanding
lateral wind loads independently or show an enhancement to the
structure of the original shed. ’
‘ The Australian Standards referenc ed to determine the adequ acy
Case No: 517817 Recommendation Page 11 of 11
of the roof battens, the fixings of the roof battens and the design
wind loads were issued in 2010 and 2011 respectively. As noted
above the extension was constructed in 2014/2015. As such [FE] ’s
opinion is that the extension to the shed was not compli ant with
building codes at the time of construction.
The Building Code of Australia 2007 references the following
documents in relation to the design and construction if Class 10
buildings:
AS/NZS 1170 – Structural Design Actions Parts 0 – 3
issued in 2002 & 2003.
AS 1720 – Timber Structures – issued in 1997.
The extension to the shed would not be compliant with either of the
above - mentioned standards. ’
FSP email to applicant
26 - 04 - 2018
FSP makes several comments on FE’s supplementary report
Based on FE’s supplementary report, the FSP maintains the
proximat e cause of the main shed damage is the shed extension
being non - compliant to several building codes and regulations
FSP submission
22 - 05 - 2018
FSP concedes it neglected to deal with the house damage and
c onfirms it will arrange inspection of the damage accordingly
FSP maintains its handling of the claim was reasonable
FSP says it has no compensation offer to mak e to the applicant
FSP email to applicant
28 - 05 - 2018
FSP says its builder has been unsuccessful in contacting the
applicant to organise assessment of the house damage
FSP provides the builder’s contact number to the applicant
FSP email to applicant
10 - 07 - 2018
FSP provides the applicant with the report and quotes for the
accepted house damage
FSP co nfirms both the flue and several internal works are covered
by the policy
FSP confirms the builder did not allow for some ceiling and cornice
repairs in the kitchen which it appears the FSP says were pre -
existing
FSP asks applicant to confirm if he wants t he repairs authorised or
cash settled
FSP submission
13 - 08 - 2018
FSP says it followed up the applicant on ’10, 19, 23 and 30 July as
well as 9 August 2018’ for a res ponse to its 10 July 2018 email
confirming coverage for storm damage to the house
FSP asks applicant to confirm how he wants to proceed (i.e.
authorise or cash settle repairs)
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.