Home / Financial Firm (Unknown - Insurer) / Determination 517817

Determination 517817

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-11-05
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The complainant claimed for storm damage to his shed and contents, which the insurer denied on a building-regulations exclusion, and sought compensation. AFCA found the insurer could deny the shed claim and no compensation was payable, while the accepted house damage was not in dispute.

The insurer's expert evidence showed the non-compliant shed extension was the proximate cause of the shed damage, which the policy excludes.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Case number: 517817 5 November 2018 1 Determination overview 1.1 Complaint The complainant lodged a claim with the financial firm (insurer) for storm damage to his house, shed and contents in late December 2017. The insurer accepted the claim for the house damage. It denied the claim for the shed and its extension because it says the storm was not the proximate cause of the damage. It relied on a number of exclusions, predominantly that the shed extension did not comply with building laws or regulations. The complainant has withdrawn his claim for damage to the extension but says the storm caused the damage to the original shed and contents, not the non-compliant extension. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the insurer. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. Can the insurer deny the claim? The insurer can deny the claim because it has provided expert information to establish the damage to the original shed was caused by the extension not complying with building regulations and other exclusions. The complainant has not provided any substantial information to refu te the insurer’s expert evidence. Is the insurer required to pay compensation to the complainant? The insurer did not unreasonably delay its decision about the claim. It is not required to compensate the complainant for or non-financial loss. Determination | Case number: 517817 Page 2 of 6 1.3 Determination This determination is in favour of the insurer. I agree with the case analyst’s reasons for the recommendation and the recommended outcome. The insurer can deny the claim for damage to the original shed and contents. Determination | Case number: 517817 Page 3 of 6 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and our previous decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied that the documentation I have relied on has been provided to both parties. I am satisfied that the case analyst’s recommendation contains an accurate summary of the complaint, the issues to be determined, any applicable paragraphs of the FOS Terms of Reference and any relevant law. The complainant rejected the recommendation saying:  he is seeking compensation for replacement of the old shed roof  the proximate cause of the damage was the storm, if there was no storm the damage would not have occurred  he believes the storm exceeded 147kmh although he cannot prove it, a neighbour 3 km away also lost their roof in the storm  if he knew sooner his claim was to be denied, he could ha ve obtained accurate wind velocity readings from Tullamarine airport, which keeps accurate readings for all of Victoria for three months  the only connection between the extension and old shed is the overlapping roof of the old shed with the roof to the extension, the extension roof was placed 10cm under the old roof to make the extension building watertight  the extension roof could have been lifted off without affecting the old roof, the old shed roof could have torn off before the new shed lost its roof. I nsurer has agreed to accept the complainant’s claim for damage to the house The insurer has agreed to settle the complainant’s claim for damage to the house and flue. It has requested the complainant advise how he wants this claim settled, i.e. insurer to repair the damage or cash settlement. The complainant has not yet responded to this request. The complainant has not raised any issues with the insurer’s acceptance of the house damage claim and I have not dealt with the issue in this determination. 2.2 Can the insurer deny the claim? Insurer has established proximate cause of damage to the old shed The insurer’s expert’s (FMG) notes in its report that the information from the nearest weather station and information from the complainant, indicates the extension was upwind of the original shed during the storm. Determination | Case number: 517817 Page 4 of 6 It notes the complainant described how the northern door of the extension failed leading to the failure of the extension roof, then the failure of the original roof. This is not consistent with the compl ainant’s submission that the old shed roof could have torn off prior to the extension shed roof. FMG provided its view about why it considered the failure of the extension, which was excluded because it did not comply with building regulations, caused the damage to the original shed. In its view:  if the roof sheeting of the of the original shed overlapped (as described by the complainant) but was not connected to the extension, the failure of the extension would have caused the damage to the original shed  the sheeting of the extension would have pried off the western ends of the original roof sheets on the windward side of the original shed as the next fixing to the original roof sheets were approximately 1.8 metres to the east. Complainant has not provided information to overcome the insurer’s information The complainant has not provided any specialist or expert report to contradict FMG’s report and opinions despite advising he would do so, and having the opportunity to do so. He says FMG’s opinions about w ind speed cannot be supported because the weather stations are too far away to be meaningful. In his opinion, the wind speeds during the storm exceeded the 147kmh the extension shed should have been able to withstand if it had been built in accordance with the building regulations. He also says he would have been able to get accurate readings from Tullamarine airport if his claim had been denied sooner. The complainant does not provide any information in support of his opinion other than a photograph of a property he says is three kilometres away that lost its roof in the storm. There is nothing to show when or where the photograph was taken. The complainant has not provided any information to show Tullamarine airport would have had accurate readings of wind speeds in the complainant’s area. There is no information that there are any other weather stations from which Tullamarine airport could have obtained that information. Even if that information could have been obtained, it is speculative what it would show. FMG’s opinions about the wind speeds is somewhat speculative but is supported by the best available evidence from the nearest weather stations. FMG’s report also notes in support of its conclusion that the wind speed was less than the required design wind speed that the house on the same site did not suffer similar damage. Determination | Case number: 517817 Page 5 of 6 Insurer can deny the claim Based on the available information, I am satisfied on balance the insurer has established the cause of the damage to the original shed was caused by the failure of the extension. This was due to non-compliance with building regulations. The failure to comply with the building regulations is the proximate cause of the damage, not the storm. If the extension had complied with the regulations it could have withstood the storm and the damage would not have occurred. Therefore, the insurer can deny the complainant’s claim for damage to the original shed. 2.3 Is the insurer required to pay compensation to the complainant? Insurer not required to pay compensation The insurer took nearly three months from claim lodgement to notifying the complainant of the claim decision. I have reviewed the information on the complaint file and, in the circumstances, I agree with the case analyst’s view that this was not unreasonable and within fair industry standard time frames. The insurer is not required to pay compensation to the complainant for non-financial loss. Determination | Case number: 517817 Page 6 of 6 3 Supporting information 3.1 The determination is made under FOS Terms of Reference The Australian Financial Complaints Authority ( AFCA) has commenced managing disputes previously lodged with F inancial O mbudsman S ervice (FOS) . This determination is made under FOS Terms of Reference but has adopted the following terminology for consistency with AFCA. In this determination the AFCA terms have the same meaning as the FOS terms defined in paragraph 20.1 and Schedule 1, 2 & 3 of the FOS Terms of Reference. FOS definitions AFCA term  applicant  complainant  financial services provider  financial firm  dispute  complaint  claim  claim Recommendation Case No: 517817 Recommendation Page 1 of 11 Case number: 517817 7 September 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for storm damage to a shed and its contents, a shed extension, and his house in late December 2017. Upon reviewing its expert information, the FSP denied the claim for the shed and the extension. It says its experts found the proximate cause of all of the damage to be the extension being non-compliant to Australian building standards. The FSP however agrees to repair the house damage. The applicant confirmed during a 29 June 2018 conciliation call with FOS and the FSP that he did not obtain a building permit for the shed extension. Therefore, he withdrew his claim for damage to the extension. However, the applicant maintains storm was the proximate cause of the damage to the main shed and its contents, and his house. He seeks acceptance of these items accordingly. 1.2 Issues and key findings Is the FSP entitled to deny the claim? There is no dispute the applicant established a valid claim on the policy and the FSP agreed to repair the house damage. The only available expert information shows the proximate cause of the main shed damage is the shed extension not complying with building regulations. The FSP has therefore provided sufficient information to prove an exclusion applies to the shed damage. Is the applicant entitled to compensation? The applicant is not entitled to compensation for either non-financial or consequential losses. He has not provided any information to support his claim(s) for compensation. Further, my review of the information provided by the FSP did not raise any issues warranting compensation. Case No: 517817 Recommendation Page 2 of 11 1.3 Recommendation This recommendation is in favour of the FSP. The applicant is to contact the FSP to arrange authorisation or cash settlement of the house repairs. The FSP is entitled to deny the claim for damage to the main shed and its contents. Case No: 517817 Recommendation Page 3 of 11 2 Reasons for recommendation 2.1 Is the FSP entitled to deny the claim? Applicant established a valid claim General insurance policies provide cover with conditions and exclusions. The policy wording and certificate of insurance outline the cover provided by the insurer, and any applicable exclusions. When lodging a claim with an insurer, the insured must establish a valid claim. That is, on the balance of probabilities, an eve nt covered by the policy must have caused the loss. Once a valid claim is established, the insurer must show, on the balance of probabilities, the policy excludes or otherwise does not cover the loss. There is no dispute amongst the parties damage occurred to the shed, the shed extension, and the house during a period of strong winds/storm. Therefore, it is clear the applicant has suffered a loss to which the policy could respond. As the FSP seeks to deny the damage to the shed and its extension, the onus is on it to prove which policy exclusion/s or limitation/s apply. Proximate cause of shed damage is not complying with building regulations As outlined in Section 3.1 below, the FSP’s appointed engineer (FE) clearly establishes the 2014 shed extension required a building permit. The applicant concedes he did not obtain a building permit and therefore he withdrew any dispute regarding the shed extension damage. However, the applicant says the damage to his house and the main shed is storm related damage. Therefore, he says the main shed and house damage is covered on the policy. The FSP agrees the house damage is covered by the policy. As outlined in Section 1.3 above, the applicant needs to contact the FSP to organise settlement of that damage. Howe`ver, the FSP says FE’s reports clearly show the proximate cause of the damage to the main shed is the applicant’s non -compliance with building regulations when constructing the extension. Proximate cause is the dominant, efficient or operative cause of the loss. It is not required to be last in time or the sole cause. It is a question of fact that depends on the circumstances of each case. It requires a common sense evaluation of the evidence. Case No: 517817 Recommendation Page 4 of 11 FE’s reports are comprehensive and based on physically visiting the site . By contrast, the applicant’s engineer (BCE) did not attend site. Rather, BCE’s report is a commentary on FE’s report. Importantly, BCE’s report specifically states ‘[BCE] cannot categorically state the conclusion in the [FE] report is incorrect but believe the [FE] report should have included other possible scenarios ’. Given BCE’s report says FE’s findings are not necessarily incorrect and BCE did not attend site, I am not satisfied BCE’s findings are persuasive or reliable. I am of the view FE’s report i s clearly far more complete and persuasive. Therefore, I am satisfied FE’s findings are the most reliable available expert information. FE’s reports clearly state the proximate cause of the damage to both the main shed and its extension is the applicant’s failure to adhere to several Australian design and building code standards. Therefore, particularly in the absence of any other reliable information, I am satisfied the proximate cause of the damage is the shed extension not complying with building regulations. FSP entitled to deny the claim As outlined in Section 3.1 below, the policy excludes damage caused by ‘ your home or unit not complying with building laws or regulations, except those laws or regulations introduced after your home or unit was originally built or last altered which you w ere not required to comply with’. The applicant agrees the shed extension commenced construction in 2014. FE’s reports outline the applicable Australian standards and building codes which the shed extension did not adhere to in 2014. The applicant does not appear to dispute his non-compliance with these standards and codes. FE says once the roof to the extension failed and started to blow off during the event, it caused the connected main shed roof to peel off simultaneously. Therefore, FE directly attributes the damage to the main shed roof (and its contents) to the applicant’s failure to comply with building regulations when he built the shed extension in 2014. I am satisfied FE’s view of the proximate cause is the most persuasive and reliable expert information available. Therefore, I accept the proximate cause of the damage is the applicant not complying with building regulations. As I am satisfied the FSP has proven a policy exclusion applies to all of the shed and shed contents damage, it is therefore entitled to deny the claim. Case No: 517817 Recommendation Page 5 of 11 2.2 Is the applicant entitled to compensation? FOS applies non-financial loss compensation conservatively Non-financial loss includes claims for stress or inconvenience caused by an error of the insurer. The maximum amount we can award for non-financial loss is $3,000 for each claim of loss. We will only award this type of compensation if there has been an unusual degree or extent of inconvenience. We will not award compensation for loss that an applicant may incur because of pursuing a dispute or rectifying an insurer’s error. When assessing whether the circumstances are of an unusual nature we will review:  the degree or extent of physical inconvenience suffered  the general time taken to resolve the dispute  the extent to which the insurer’s actions interfered with the applicant’s expectation of enjoyment or peace of mind. Applicant not entitled to compensation for non-financial losses The applicant says he is entitled to compensation for non-financial losses because the FSP took too long to make and communicate its claim decision. I have outlined a brief timeline of events according to the FSP’s claim notes in Section 3.1 below. The notes confirm:  claim lodged 20 December 2017  shed make safe organised on the same day  applicant queries time taken to accept claim and why an engineer is required on or around 16 January 2018  the FSP tells the applicant he can provide information to confirm how the shed and its extension is constructed, or it can appoint an engineer  FSP engineer (FE) attends 31 January 2018  FE submits its report on 23 February 2018  the applicant is verbally told the claim is denied on 2 March 2018. I appreciate an approximate two month timeframe between claim lodgement and the FE submitting its report was likely frustrating for the applicant. However, I am satisfied it is fair in the circumstances for the FSP to both appoint an engineer and rely on its subsequent report. Further, I am satisfied FE provided its report in a timely fashion. I also appreciate it took over three months from claim lodgement for the FSP to make a claim decision and this too was likely frustrating for the applicant. However, with consideration to the General Insurance Code of Practice (GICOP) timeframes, I am satisfied the FSP made its decision in a timely fashion. A claim decision was communicated to the applicant within four months of claim lodgement. Case No: 517817 Recommendation Page 6 of 11 Further, the claim decision was made within 10 days of the FSP receiving FE’s report. Both of these timeframes are within what I consider to be fair industry standards (and within the timeframes expected in the GICOP). Finally, and most significantly, the applicant did not provide any information to support his claim for compensation. Therefore, for the reasons outlined above, I am not satisfied the applicant is entitled to compensation for non-financial losses. Case No: 517817 Recommendation Page 7 of 11 3 Supporting information 3.1 Key references Record Key points Policy wording  What we cover as your home Your home that you own or are responsible for and us e primarily for domestic purpos es including the following at the insured address:  garages, carports, outbuildings, outdoor walls, gates, fenc es … and any structural improvements on land;  decks, pergolas, pagodas, verandas and balconies, fixed water tanks, fi xed swimming pools and spas and their accessories, gra nny flats, sheds, tennis courts  General exclusions You are not covered under any section of this policy for damage, loss, cost or legal liability th at is caused by, arises from or involves: … Consequential losse s or extra costs following an incident covered by your policy consequential loss (financial and non - financial loss) or extra costs following an incident covered by your policy, such as:  loss of income or wages;  medical expenses;  loss or costs, including the cost of your time (e.g. inconvenience), to prove your loss or to help us with your claim (e.g. telephone calls, postage);  cost of hiring appliances after yours suffer loss or damage;  professional, expert, legal, consulting or valuation costs unless you obtained our prior written authority to incur these costs;  cost of replacing or reapplying pest control chemicals and baits in or around the ins ured address;  cleaning costs;  any costs related to stress or anxiety;  any costs not covered by your policy. …  Defect, structural fault or design fault a defect, structural fault or design fault that you knew about (or should reasonably have known about) and did not fix before the loss or damage occurred (e. g. if there are signs that a defect previo usly caused damage, we will not pay a later claim for further damage from this defect). …  Not com plying with building regulations your home or unit not complying with building laws or regulations, except those laws or regulations introduced aft er your home or unit was originally built or last altered which you were not required to comply with. … Case No: 517817 Recommendation Page 8 of 11  Wear, tear and gradual deterioration wear, tear, rust, fading, rising damp, mould, mildew, corrosion, rot, action of light, atmospheric or climatic conditions or gradual deterioration such as but not limited to :  tiles and their adhesive or grouting breaking down;  weat hering of roof tiles or r oof ridge capping;  gradual weathering and breakdown of bricks, mortar or concrete. Certificate of insurance 20 - 11 - 2017  No optional accidental damage cover selected for either building or contents Claim notes 20 - 12 - 2017 to 22 - 03 - 2018  Claim lodged 20 Decem ber 2017  Make safe for shed organised 20 December 2017  Restorer appointed on 29 December 2017  Applicant raises concerns with delays on 16 January 2018, particularly surrounding engineer appointment  FSP attempts to obtain documents regarding shed construction from applicant, but applicant confirms he does not have any documentation on 30 January 2018  FSP confirms engineer attendance on 31 January 2018  Applicant complains about delays on 2 March 2018  FSP sends FE’s report to applicant on 2 Marc h 201 8  Applicant informed verbally of claim denial on 2 Marc h 2018  Applicant confirms he will get his own expert report on 2 March 2018  Applicant’s engineer report received by FSP on or around 14 March 2018  Applicant verbally informed of denial being upheld on 22 March 2018 FSP engineer report (FE) 23 - 02 - 2018  ‘ A photograph provided by the make - safe builder indicates that the roof battens became detached from the roof largely in - tact with the roof sheeting attached indicating the failure of the fixing between the battens and the raft ers ’  ‘[FE] ’s opinion is that while the high winds on the 19th December 2017 have precipitat ed the damage to the roof of the structure; the wind event was not the proximate cause of the damage. [FE] ’s opinion is that the proximate ca use of the damage to the structure is inadequate design and/or construction of the western extension which has also affected the roof of the original shed as explained below. ’  ‘[FE] ’s opinion is that the construction of the western extension to the subject structure is not complaint (sic) with the requirements of the current National Construction Code (NCC) or the Building Code of Australia (BCC) which was current at the time of the construction. ’  FE goes into great detail confirming which sections of the s hed extension are not up to Australian standards/building codes which were relevant in 2014  ‘ The roof battens of the weste rn extension were inadequate.’  ‘ Regardless of the inadequacy of the roof battens, FMG’s opinion is that the primary cause of the damag e to the roof of the western Case No: 517817 Recommendation Page 9 of 11 extension was caused by a failure of the connections between the 75 x 45mm roof battens and the supporting timber raft ers. ’  ‘… capacity of the skew nailed connection between the battens and the rafters of the western extension w as approximately 25% of the capacity required by the design wind speed for the structure, and therefore substantially inadequate ’  ‘ Wind speeds of 98km/h and 117km/h were recorded from the north and northwest at the closest weather stations to the subject site on the 19th December 2017. [FE] notes that these wind speeds are less than the design wind speed of 147km/h as specified in AS1170. [FE] acknowledges that the weat her stations are locat ed in excess of 25km from the subject site and may not be an accurate reflection of the wind speed experienced at the site on the day of the Event. Despite this FMG’s opinion is that the wind speed at the site on the day of the Event was less than the required design wind speed. ’  ‘ The damage to the roof of the original shed, which has existed on the site for many years, has been caus ed by the failure of the roof of the western extension. [FE] ’s opinion is that the corrugated metal roof sheeting of the western extension was connected to the roof sheeting of the original shed. The failure of the roof to the western extension, while still attached to the roof sheeting of the original shed, has peeled the roof off of the original shed. [FE] notes that the majority of the roof rafters of the original part of the shed were still intact and bolted to the steel roof trusses with the roof sheeting detached from the rafters. Some failures of these timbers were inevit able given the age of the build ing and the forc e exerted on the rafters by the roof of the western extension. ’  ‘[FE] ’s opinion is that the wind speed at the site on the 19t h December 2017 did not exceed the design wind speed for the site, and if the western extension had been constructe d in accordance with Australian Standards as required by the Building Code of Australia (current at the time of construction) the failure would not have occurred. ’  ‘[FE] observed other inadequacies in the construction of the western extension to the shed a lthough these have not failed to date. ’ Applicant engineer report (BCE) 09 - 03 - 2018  BCE confirms it did not visit the site as the buildings were already demolished.  ‘[FE] state in their report that the wind event was not the proximate cause of the damage. This appears to be based on weather station readings many kilometres away. Refer clause 3.3 of the [FE] report. Historically this area has undergone many strong winds and the width of the strong wind corridors can vary from 100m wide to several kilometres wide. One cannot rely on the reading of a weat her station 20 - 30km away. The winds could have been much stronger than the readings at the weather station on this particular day. Local news articles indicate that many trees and buildings were destroyed by th is December 2017 wind event. ’  ‘[FE] state correctly that Shed 2 [the extension] did not have a Case No: 517817 Recommendation Page 10 of 11 building permit. ’  ‘[FE] state in their report that the roofing of Shed 2 was peeled away because the sheeting of Shed 2 was connected to the sheeting of Shed 1. There is not photographic evidence to show this was the case. Normal building practice would be for the sheeting of the Shed 2 to ‘ slide under ’ the outer extremity of the Shed 1 sheeting. The owner [the applicant] , when questioned by [BCE] , indicated the overlap of sheeting was only 100mm and no physical fixing of sheeting was required or needed at this point. ’  ‘ CONCLUSION 1. [BCE] believe, from examining the evidence that the roofing sheeting from Shed 1, would have been more susceptible to wind damage du e to its age, fixing methods and support purlins. 2. Whilst Shed 2 did not have a permit it would appear to be in much better condition than Shed 1. 3. Whilst there was an overlap of sheeting bet ween Shed 1 and Shed 2 it cannot be concluded that this is th e sole reason particularly when there appears to have been no secure fixing between the iron cladding. 4. Given the age and condition of Shed 1, it is most likely the roofing iron of Shed 1 was destroyed before Shed 2. 5. [BCE] cannot categorically state the conclusion in the [FE] report is incorrect but believe the [FE] report should have included other possible scenarios as mentioned in the above item 4. ’ FSP assessor report 19 - 03 - 2018  This report is a response to BCE’s above report  ‘[BCE] claim that the winds could have been much stronger in the area of the customer’s property, but by the same token could have been less intense. ’  ‘ Considering the above factual information and the fact that [BCE] conclude in their report that [BCE] cannot categorically state the conclusion in the [FE] report is incorrect, and the lack of any evidence that disputes the [FE] findings, I see no reason for the initial decision to deny the claim should be changed. ’ Supplementary FSP engineer report (FE) 20 - 04 - 2018  This report is primarily a response to BCE’s above report  ‘[FE] ’s opinion is that if the roof sheeting of the original shed overlapped, but was not connected to the sheeting of the extension, then the failure of the extension would still have caused the damage to the original shed in that the sheeting of the extension would have pried off the western ends of the existing roof sheets on the windward side of the original shed, the next fixing to the roof sheets of the original shed being app roximately 1.8m to the east. ’  ‘ The extension to the west side of the shed is reliant on the original shed for lateral stability in an east/west direction. Hence if the extension had been engineered and doc ument ed to obt ain a building permit then [FE] wo uld expect the documentation to show structure such that the extension would be capable of withstanding lateral wind loads independently or show an enhancement to the structure of the original shed. ’  ‘ The Australian Standards referenc ed to determine the adequ acy Case No: 517817 Recommendation Page 11 of 11 of the roof battens, the fixings of the roof battens and the design wind loads were issued in 2010 and 2011 respectively. As noted above the extension was constructed in 2014/2015. As such [FE] ’s opinion is that the extension to the shed was not compli ant with building codes at the time of construction. The Building Code of Australia 2007 references the following documents in relation to the design and construction if Class 10 buildings:  AS/NZS 1170 – Structural Design Actions Parts 0 – 3 issued in 2002 & 2003.  AS 1720 – Timber Structures – issued in 1997. The extension to the shed would not be compliant with either of the above - mentioned standards. ’ FSP email to applicant 26 - 04 - 2018  FSP makes several comments on FE’s supplementary report  Based on FE’s supplementary report, the FSP maintains the proximat e cause of the main shed damage is the shed extension being non - compliant to several building codes and regulations FSP submission 22 - 05 - 2018  FSP concedes it neglected to deal with the house damage and c onfirms it will arrange inspection of the damage accordingly  FSP maintains its handling of the claim was reasonable  FSP says it has no compensation offer to mak e to the applicant FSP email to applicant 28 - 05 - 2018  FSP says its builder has been unsuccessful in contacting the applicant to organise assessment of the house damage  FSP provides the builder’s contact number to the applicant FSP email to applicant 10 - 07 - 2018  FSP provides the applicant with the report and quotes for the accepted house damage  FSP co nfirms both the flue and several internal works are covered by the policy  FSP confirms the builder did not allow for some ceiling and cornice repairs in the kitchen which it appears the FSP says were pre - existing  FSP asks applicant to confirm if he wants t he repairs authorised or cash settled FSP submission 13 - 08 - 2018  FSP says it followed up the applicant on ’10, 19, 23 and 30 July as well as 9 August 2018’ for a res ponse to its 10 July 2018 email confirming coverage for storm damage to the house  FSP asks applicant to confirm how he wants to proceed (i.e. authorise or cash settle repairs)

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.