Settlement offer for water damage to flooring; scope of works, mould, shelving and accommodation disputed
Text of the determination
Determination
Case No: 517258 Determination Page 1 of 7
Case number: 517258 7 September 2018
1 Overview
1.1 Dispute
The applicant held a Home Building and Contents Insurance Policy with the Financial
services provider (FSP). On or about 2 February 2017 the applicant lodged a claim
for damage caused to the hallway and bedroom of the insured property.
The FSP assessed the claim and determined that during heavy rains, water had
leaked into the wall behind the closet of the main bedroom. Subsequently, it
accepted the claim and offered settlement for the amount of $13,763.75 based on its
scope of works. The FSP offered the applicant the opportunity to have the FSP
complete the repairs or to cash settle the claim.
The applicant remained dissatisfied with the FSP’s scope of works a nd the
settlement amount offered.
1.2 Issues and key findings
Is the FSP’s offer fair in the circumsta nces
The FSP is liable for the damage in accordance with the scope of works prepared by
its building consultant (PP). In addition, the scope of works should be expanded to
include:
Mould remediation
Removal and reinstatement of shelving.
Therefore, the FSP is required to increase its settlement offer to $18,003.75 plus 8
nights’ accommodation at $392.00 per night (less excess).
Should the applicant elect for a cash settlement then a 10% contingency is to be
added to the settlement amount to allow for any unforeseen costs incurred in the
process of carrying out repairs.
Is the applicant entitled to any further payment for storage and accommodation
costs?
I am not satisfied the information before me establishes the applicant’s entitlement
for further payment of storage costs. In these circumstanc es, I consider the FSP’s
offer is fair.
Therefore, the FSP is not required to make any additional payments for storage
allowances.
Case No: 517258 Determination Page 2 of 7
1.3 Determination
The determination is substantially in favour of the FSP.
The FSP is required to, at the election of the insured applicant:
cash settle the claim as for $18,003.75, plus 8 nights’ accommodation at
$392.00 per night (less excess). In addition, an 10% contingency is to be paid.
arrange for its contractor (PP) (or an equivalently qualified builder) to complete
the repairs, on the basis set out in section 2.1 below.
The FSP is not required to make any additional payments for storage fees.
Case No: 517258 Determination Page 3 of 7
2 Reasons for determination
I have decided this case on the basis of what I consider fair in all the circumstances,
having regard to the relevant law, the terms of the policy, good industry practice,
codes of practice and previous FOS decisions.
I have taken into account all the mate rial submitted by the parties, both before and
after the recommendation. I am satisfied that the documentation I have relied on has
been provided to both parties. For the purposes of this determination, I will deal with
only those points considered relevant.
This dispute has been the subject of a recommendation, dated 25 June 2018. It was
the case analyst’s recommendation that the FSP offer and scope of works was fair in
the circumstances.
The applicant disputes the recommended outcome. Further material and
submissions in respect to the claim and the dispute have been provided and
exchanged with the parties.
2.1 Is the FSP settlement offer fair in the circumstances?
The policy covers damage caused by insured events
The applicant’s policy provides cover for loss or damage caused by listed events
within the policy, subject to certain exclusions.
It is not in dispute that the applicant’s property sustained water damage . The FSP
accepted the claim and agreed to indemnify the applicant in relation to the water
damage, totalling $13,763.75. However, a dispute has arose between the parties
regarding the FSP’s offer of settlement and final scope of works.
To support her claim the applicant had previously supplied the following three
independent quotations:
BCG for $32,595 plus GST
FBH for $32,296 inc GST
FB for $28,863 plus GST
The FSP says as per its policy terms and conditions its liability is limited to the repair
of flooring in the master bedroom, walk in wardrobe and hallway where water
damage has been sustained.
Policy Terms and conditions limits cover to flooring in damaged room(s)
In reviewing the policy, I consider the terms and conditions clear and unambiguous.
With regard to the damaged flooring, I accept the policy will pay to replace
continuously joined undamaged floor coverings of the same material in the same
room, stairs, hallway or passageway where the damage occurred.
Whilst there is no dispute the damage to floor coverings was isolated to the bedroom
and hallway, the applicant has concerns relating to the matching of the new
coverings to existing floor coverings.
Case No: 517258 Determination Page 4 of 7
The policy defines the same room as:
A room in an area starting and finishing at:
its nearest walls;
nearest doorway, archway or similar opening of any width;
a change in the floor or wall covering.
A hallway next to a room is not the same room, even if it has the same floor or wall
covering as the room.
Any archway or similar opening separates a room unless it is a combined lounge -dining
room.
I am satisfied the policy does not extend cover to undamaged floor coverings in a
different room to create a uniform appearance. Therefore, in considering the policy
terms, the applicant’s floor plan and the location of the water damage, I am satisfied
that undamaged flooring is separated by either a doorway or archway.
In reviewing the FSP’s scope of works and submissions, I am satisfied they have met
their obligations in line with the policy terms and conditions relating to the floor
coverings. Given the policy does not provide cover for undamaged flooring in
separate rooms and considering the FSP in good faith has extended its scope to
include both living areas of the home, I am satisfied the FSP is not required to repair
or sand further undamaged floorboards to ensure a uniform appearance throughout
the entire home.
Under the terms of the applicant’s policy, the FSP may settle a claim by:
repairing damage to the building
rebuild the building
pay an insured what it would cost the FSP to repair or rebuild the building.
It is clear from the terms of the policy that the FSP has the discretion to decide which
settlement method to adopt.
In the present case, the FSP has offered to settle the claim by either:
arranging for its contractor to undertake the repairs based on a scope of works
prepared its building builder, PP or
cash settling the applicant for the amount outlined in PP’s scope of works and
quotation ($13,763.75).
FOS expects an insurer to act reasonably in exercising its discretion, having regard
to the circumstances of the claim. I accept in this case, the FSP has acted in good
faith and acted reasonably in allowing the applicant to decide which settlement
method they prefer; given the applicant’ s ongoing concerns relating to the finish and
appearance of the timber flooring throughout the home.
Applicant says the offer and scope of works is not complete
PP, the FSP’s builder provided an updated scope of works and quotation dated,
March 2018 which estimated the cost of completing the claim-related works as
$13,763.75 (total includes additions and mark-up at 10%).
Case No: 517258 Determination Page 5 of 7
I accept the quotation includes the builders warranty, furniture removalist, plastering,
painting in the walk-in robe and repairs of the damaged floor boards in bedroom 1,
the hallway and walk in robe. In addition, the FSP has accepted to sand flooring in
the lounge and rear living (stopping at doorways to other rooms) which is not subject
to the claimed damage and outside the policy terms and conditions.
The above amount was included in the FSP’s offer to the applicant in settlement of
the claim.
The applicant says the scope of works prepared by PP and offer to remedy to the
damage is not sufficient and says the FSP’s scope of works does not adequately
provide for:
for removal of shelving in the walk-in wardrobe
storage costs and accommodation allowance for days and costs to relocate the
family and a pet.
FSP is liable for some of the additional items claimed
Having reviewed the available information and the scope of works provided by both
parties , I accept PP’s, final scope of works and that of the applicant ’ s, provide a
similar assessment and breakdown of the damaged items requiring repair. Whilst I
accept this, I also acknowledge a pplicant’s three quotations are significantly higher in
cost and provide for the following additional items;
anti-microbial treatment for mould
removing and reinstating shelving in the walk-in wardrobe
increased storage costs due to longer repair times.
The FSP says its final scope of works is in line with the policy terms and conditions ,
having also provided an allowance in good faith to include the flooring in the living
areas, which address the applicant’s concerns regarding matching floor coverings.
The FSP further says the applicant’s quotations and scope of works were much
larger, with storage costs claimed been excessive, additional costs for repairs to the
floor on the entire ground floor and anti- microbial treatment which had previously
been addressed and remediated by the FSP.
The applicant disagrees with PP’s final scope of works, stating that her independent
quotes do not reflect any additional items not previously agreed upon by the FSP and
that the need for the shelving to be removed was noted in the FSP’s initial scope and
report, dated 27 June 2017.
Having carefully reviewed this information and the scope of works, I acknowledge the
applicant’s concerns regarding the matching of floor boards. However, I accept the
FSP acted in line with the policy terms and conditions when determining its liability
for the damaged floor coverings. Given the FSP has acted in good faith and elected
to keep the two living areas on the ground floor in its scope of works, I accept the
FSP’s quote.
In considering whether it is appropriate for the FSP to include in its settlement the
cost of removing and reinstating of shelving and anti-microbial treatment for mould, I
have considered the three quotations prov ided by the applicant and the FSP’s initial
scope of works, dated 27 June 2017. Whilst I accept the FSP’s claim notes, dated 15
Case No: 517258 Determination Page 6 of 7
November 2017 indicate mould remediation took place at the insured property, there
has been no certificate of clearance or report provided to show the affected areas are
mould free. Failing this or any report to refute to the applicant’s positions and given
the applicant’ s scope of works from April 2018 and May 2018 have identified the
need for mould remediation and sanitisation, I accept on balance, that mould may still
be an issue at the insured property given the water damage. In the circumstances
and based on the information before me I am satisfied the FSP is required to include
mould remediation in its settlement offer.
Whilst I acknowledge the FSP has not accepted liability for the removal and
reinstatement of shelving, I acknowledge the applicant’s three quotations have
included the need for these repairs. Whilst the FSP does not accept this item as per
its scope of works, I accept their initial scope of works addressed the need to remove
shelving. On balance, and in reviewing the scope of works provided by three
independent builders, I accept the need to remove and reinstate the shelving to
repair the damage.
Applicant is entitled to further temporary accommodation cover
The policy provides for the payment of reasonable costs for temporary
accommodation where;
temporary work is required to make the damaged or destroyed home building
and insured address safe again
services of professional, such as architects or surveyors, are used to repair or
rebuild at the insured address
damaged parts of the building are rebuilt/repaired to comply with the current
home building regulations and laws.
Having reviewed the FSP’ s submissions it has offered 6 nights’ accommodation in
accordance with the policy terms and conditions for the days it would expect the
repairs to be take place. It further, agreed to accept the applicant’s accommodation
quote at $392.00 per night for a 3-bedroom apartment.
In the circumstances, and given the increased scope of work, including mould
remediation, I consider it fair in the circumstances that the FSP increase the
temporary accommodation allowance to 8 nights for purposes of allowing trades to
engage in mould remediation and the remainder of the repairs to take place.
In considering whether the applicant is entitled to further storage allowance, I
consider the FSP’s quoted amount fair in the circumstances.
FSP is required to increase its cash settlement offer for building repairs
Whilst the applicant maintains the FSP’s settlement based on PP ’s quotation is
inadequate, I accept it is not uncommon for there to be significant variation between
estimates provided by different builders for the same work. Further, the fact that the
applicant’s contractors ( BCG, FBH, FB) have quoted significantly higher amounts for
the repairs does not of itself establish that PP ’s quotation is insufficient
Case No: 517258 Determination Page 7 of 7
I am satisfied that PP ’s scope of works in most part provides an accurate
assessment of the repairs required to address the claim-related damage, plus the
additional items outlined above.
Given PP’s quotation and scope of works, I consider it reflects the reasonable and
necessary cost of repairing the water damaged items at the property, subject to the
following comments and for the reasons outlined above. Therefore, PP’s quotation
and scope of works should be increased to allow for the following additional
repairs/costs;
application of anti - microbial treatment to the affected areas and repair ceiling,
walls plaster and cornices (FBH $3,140)
allowance for a carpenter to remove and reinstate shelves (FBH $1,100)
However, should the applicant wish to elect a cash settlement, I accept it is
appropriate fo r the FSP’s cash settlement to reflect PP’s quotation , plus the
additional amounts outlined above bringing the total settlement to $18,003.75. In
addition, the FSP is to cover 8 nights’ accommodation at $392.00 per night. The
settlement is subject to any applicable excess, in the event it has not been paid.
Lastly, should a cash settlement be elected it is necessary to take into consideration
any unforeseen costs incurred in the process of carrying out the repairs. Therefore, in
this case a 10% contingency should be added to the above cash settlement, in the
event the applicant opts to engage her own builders.
Recommendation
Case No: 517258 Recommendation Page 1 of 5
Case number: 517258 25 June 2018
3 Overview
3.1 Dispute
The applicant lodged a claim with the financial services provider (FSP) for damage to
her hallway and bedroom floorboards, following a storm. The FSP assessed the
damage and accepted the claim. The FSP offered to either cash settle or repair the
damage for $13,763.75, based on its builder’s scope of works.
The applicant is dissatisfied with this scope and says it does not include sanding and
polishing the entire wooden floor areas to achieve a match. Accordingly, the
applicant obtained her own quotes, which she believes would satisfactorily complete
necessary repairs.
3.2 Issues and key findings
Is the FSP’s settlement offer fair in all the circumstances?
Based upon the available information, I accept:
the FSP not required to pay for sanding of undamaged flooring beyond the
affected rooms
if the applicant seeks a cash settlement, given the FSP is otherwise unable to
create a uniform appearance, it is fair in the circumstances for the FSP to cash
settle the claim
the FSP is required to provide temporary accommodation during repairs
the FSP is not required to repair the ceiling and roof
the applicant has not demonstrated the FSP’s quote is inadequate .
Currently the FSP is offering the applicant the ability to eithe r allow the FSP’s
repairer to complete the work or cash settle for $13,763. 75. For the reasons set out
above, I consider the FSP’s scope of works and offer is fair in all the circumstances.
3.3 Recommendation
This recommendation is substantially in favour of the FSP.
Within 14 days of both parties’ acceptance:
the applicant is to inform the FSP whether she wishes to cash settle the claim or
allow the FSP to repair the damage.
the applicant is to advise the FSP of any special require ments for temporary
accommodation, in order for it to obtain a quote.
If cash settlement is preferred, the FSP is required to pay interest, in line with
section 57 of the Act, from 20 March 2018 (date of quote) to payment date.
Case No: 517258 Recommendation Page 2 of 5
4 Reasons for recommendation
4.1 Is the FSP’s settlement offer fair in all the circumstances?
The onus rests with the applicant to establish her loss
There is no dispute between the parties the applicant suffered a loss from a risk
insured against or that the FSP accepted the claim.
Ho wever, a dispute arose between the parties as to the FSP’s offer of settlement.
The applicant maintains the offer is insufficient to remedy the damage from the
claimed event. The applicant argues the entire flooring needs re-sanding in order to
create a uniform appearance and match throughout the property. Accordingly, the
applicant supplied three quotes from her builders:
BCG - $29,595
FBH - $25,740
FB - $22,953
The FSP says its liability is limited to the repair of the flooring in the master bedroom,
walk in wardrobe and hallway only, and is not liable for repair to non-damaged
flooring.
As the party seeking the benefit under the policy terms, the onus rests with the
applicant to establish she is entitled to the benefit she is seeking.
The FSP must settle the claim fairly
The relevant policy terms are set out in section 3 of this recommendation. I consider
the policy terms are clear and unambiguous. Pursuant to the terms of the policy, it is
clear it is at the FSP’s election whether it:
arranges the repairs to the property
pays the applicant the reasonable cost to repair to the property.
Notwithstanding the above, it is important the FSP exercises its choice to cash settle
fairly.
The FSP is willing to complete the repairs or cash settle the claim
The FSP offered to settle the applicant’s claim either by:
undertaking the repairs to the loss caused in the storm event
cash settling the claim for $13,763.75, which is the amount the FSP says is the
reasonable cost to undertake repairs.
The FSP says its builder PP can complete repairs and provided a scope of works to
the applicant in March 2018. However, its builder cannot guarantee the finishing and
colour would match non- damaged areas. On this basis, PP’s quote is for the purpose
of cash settlement. The FSP if the applicant prefers the claim be cash settled, it is
willing to do so for $13,763.75. The FSP maintains this is a reasonable cost to effect
repairs.
Case No: 517258 Recommendation Page 3 of 5
FSP not obliged to sand undamaged floorboards
Given the applicant did not accept the FSP’s remediation offer due to flooring
matching issues, it is necessary then to review the policy wording.
Where the damaged material cannot reasonably be matched to undamaged material,
the FSP will use the closest match available. However, it will only pay to create a
uniform appearance to continuously joined undamaged floor of the same material in
the same room, stairs, hallway or passage way. This is further detailed in section 3.1
In this case, when reviewing the floor plan, I am satisfied the undamaged flooring is
in a space separated by either a doorway or archway and does not meet the policy
terms.
Significantly, the FSP’s scope of works includes sanding and recoating of floorboards
in the entry, lounge and rear living area. The FSP accepted these costs despite not
being damaged in the event, which I consider more than reasonable in the
circumstances.
Given this, the FSP is not required to sand further undamaged floorboards in the
property.
FSP is to cover temporary accommodation
The applicant argues she is entitled to temporary accommodation during the
property’s repair. The FSP says it expects repairs to take six days to be complete.
Therefore, it agrees to cover temporary accommodation for this period.
Given this, the applicant is to provide details about the number of people requiring
accommodation including any other special considerations.
The FSP is than to obtain a quote which reflects specific requirements for the
temporary accommodation.
FSP is not required to repair roof and ceiling
The applicant argues the roof and ceiling sustained damage during the storm. The
applicant says the ceiling hole caused an increase in electricity. Accordingly, she
submitted utility invoices to show high electricity usage.
In response the FSP obtained a report from its plumber C. C explains the roof gutters
and valleys overflowed during heavy rain and were clogged with leaves.
Accordingly, the FSP argues there has been no storm damage to the roof and
therefore not considered an insured event.
The applicant has not provided any expert report to challenge the findings of C.
I am therefore satisfied that the applicant has not shown damage to the roof and
ceiling attribute to the storm.
FSP’s proposed scope of works and quote are fair in the circumstances
I carefully considered the documentation provided by both parties. It is my view the
FSP’s propose scope of works and quote are fair in the circumstances.
Case No: 517258 Recommendation Page 4 of 5
This is because:
the policy does not cover sanding of undamaged flooring beyond the affected
rooms
the FSP agreed to sand and recoat flooring in entry, lounge and rear living area
despite not being claim related
the FSP’s builder is otherwise still prepared to complete the repairs for the
applicants (albeit being unable to guarantee a match)
the fact the applicant sourced higher quotations for the repair does not
necessarily mean the FSP ’s repairer will complete an inadequate job or the
material used will be inferior
the scope of works provided by both parties’ builders are practically identical
(albeit the appli cant’s builder has allowed for re -sanding of the entire floor of the
property).
the scope of works includes furniture removal.
I accept the applicant has set views on how she wants the property repaired,
including its appearance. Relevantly, and significantly however, the applicant has not
established to my satisfaction the FSP’s repair method and/or materials are
insufficient in the circumstances.
For this reason, I am otherwise satisfied the FSP’s proposed scope of works are fair
in the circumstances. The FSP is entitled to either cash settle the claim or authorise
repairs based on its scope of works.
For completeness, it is worth noting the FSP provides a guarantee on the repairs it
authorises. This means if the applicant is dissatisfied with the quality of the repairs
once completed, she retain her rights against the FSP to seek rectification.
.
Case No: 517258 Recommendation Page 5 of 5
5 Supporting information.
5.1 Terms of the policy
Record Key points
How we settle building
claims
W e agree to pay a claim for loss, theft or damage to the building, we will
decide if we will:
repair damage to the building;
rebuild the building;
pay you what it would cost us to repair or rebuild the building;
When we will repair or rebuild undamaged p arts
If we cannot match the mat erials with the undamaged parts, we will pay
extra to create a uniform appearance when:
floor coverings are damaged (including tiles) we will pay extra to
replace continuously joined undamaged floor coverings of the same
ma terial in the same room, stairs, hallway or passageway* where the
damage occurred .
What we mean by same room, stairs, hallway or passageway
Same room
A room is an area starting and finis hing at:
its nearest walls;
nearest doorway, archway or similar opening of any widt h;
a change in the floor or wall covering.
A hallway next to a room is not the same room, even if it has the same
floor or wall covering as the room.
Any archway or similar opening separates a room unless it is a combined
lounge - dining r oom .