Insurer's cash settlement offer for escape of liquid water damage was insufficient and claim handling was poor
Text of the determination
Determination
Case No: 517035 Determination Page 1 of 7
Case number: 517035 26 October 2018
1 Overview
1.1 Dispute
The applicants lodged a claim under their home insurance policy with the financial
services provider (FSP) for water damage to their home. Based on advice from their
plumber, the applicants believed the damage was caused by a leaking cold water
pipe in their laundry.
The FSP initially denied the applicants’ claim on the basis that the leak was not
sudden and unexpected (as is required for cover to be provided under the policy)
and/or did not result in any damage to their property.
After the applicants provided further information, the FSP agreed to accept their
claim. However, the FSP later reversed its position and once again sought to deny
liability on the basis that the water damage had not been caused by the leaking pipe.
Following a further review, the FSP agreed to accept liability and offered to cash
settle the applicants for $42,093.70.
The applicants say the cash settlement offered by the FSP is not sufficient. They are
also dissatisfied with the manner in which the FSP has handled their claim.
1.2 Issues and key findings
Is the FSP required to increase the cash settlement amount?
The cash settlement amount offered by the FSP does not appear to be based on an
actionable quotation provided by a builder who is willing to carry out the necessary
repairs on behalf of the applicants.
The FSP is required to increase the cash settlement amount for the building repairs
to $89,651 to better reflect the cost to the applicants of undertaking the repairs . The
FSP is also required to cash settle the applicants for temporary accommodation
costs while the repairs are carried out.
Are the applicants entitled to compensation?
The applicants are entitled to compensation of $1,500 due to the manner in which the
FSP handled their claim. They are also entitled to reimbursement of professional
fees.
Case No: 517035 Determination Page 2 of 7
1.3 Determination
This determination is in favour of the applicants.
The FSP is to pay the applicants a total of $108,212.50 in full and final settlement of
their claim, comprising:
$89,651 for building repairs
$16,324 for temporary accommodation
$1,500 as compensation for non-financial loss, and
$737.50 as reimbursement of professional fees.
Case No: 517035 Determination Page 3 of 7
2 Reasons for determination
2.1 Is the FSP required to increase the cash settlement amount?
FSP initially denied claim for escape of liquid
The applicants initially lodged a claim for damage to their property caused by a storm
in December 2016. The FSP cash settled the applicants for internal damage to the
basement area.
During the assessment of the storm claim, the applicants advised the FSP of water
damage to the slate tiles in the laundry and movement of the laundry floor, which was
causing the internal and external doors to bind.
The FSP’s assessor (AB) inspected the property in April 2017 and reported that the
damage to the laundry area was not caused by the storm. However, AB noted that
there was water pooling near the washing machine, which may have contributed to
the damage observed. He advised the applicants to monitor the situation.
The FSP’s engineer (CC) attended the property in June 2017. He observed that there
was a lot of water on the slate floor tiles behind the washing machine and the timber
floor framework and floor boards were significantly water saturated.
CC considered that the water damage had been caused by a leak from the washing
machine. Based on CC’s findings , the applicants lodged a separate claim for escape
of liquid.
However, the applicants ’ repairer (EL) subsequently tested the washing machine and
confirmed it was not leaking. Following further investigations, the applicants’ plumber
(MM) identified the source of the water as a leaking cold water pipe in the wall behind
the laundry trough.
The FSP appointed a builder (AJ) to assess the escape of liquid claim.
However, despite being advised of the leaking pipe (and observing extensive water
staining in the sub-floor area), AJ concluded that the leak had not caused any
damage. AJ considered that the discolouration of the slate floor tiles had been
caused by general wear and tear.
Based on the findings of its contractors, the FSP determined it was not liable for the
water damage to the applicants’ laundry and adjacent areas.
FSP changed its position several times before finally accepting liability
The applicants disputed the FSP’s findings and provided a copy of an invoice from
their plumber (MM) which confirmed he had repaired the leaking pipe in the laundry
wall.
The applicants also provided:
a report from a builder (IH) outlining the nature and extent of the damage
caused by the leaking pipe, together with photographs of the damage, and
a scope of works and quotation from MM for $86,790 for the necessary repairs.
Case No: 517035 Determination Page 4 of 7
However, the FSP reaffirmed its decision to deny the claim.
Among other things, the FSP said that MM’ s description of the hole in the pipe as a
‘pinhole’ meant that the leak was not sudden and unexpected, but occurred gradually
over time. The FSP also said the applicants had failed to notify it of the leak within a
reasonable period of time.
During the course of this dispute, the applicants provided a supplementary report
from MM. In his report, MM confirmed that, when the leak was discovered, water was
escaping quickly from the pipe despite the opening being relatively small.
Following receipt of this information, the FSP agreed to accept the applicants’ claim.
However, the FSP advised that it considered that MM’s scope of works did not
accurately reflect the extent of the damage. Accordingly, the FSP sought to reappoint
CC to prepare a detailed scope of works for the necessary repairs.
However, rather than appointing an engineer (as agreed with the applicants), the
FSP appointed a building consultant (SB).
After inspecting the property, SB confirmed that there was extensive water damage.
However, he considered that none of this damage had been caused by the leaking
pipe in the laundry wall.
SB concluded that the damage had been caused by a ‘localised inundatio n event’
within the laundry (despite there being no record of any such event having occurred).
He also cast doubt over the nature of the leak from the pipe.
Based on SB’s findings, the FSP effectively reversed its earlier decision and advised
the applicants that it was not accepting liability for any of the damage. It also queried
whether the leak from the pipe had in fact occurred.
However, following a subsequent review, the FSP once again reversed its position
and advised the applicants that it would accept liability for the water damage to the
property. The FSP acknowledged that its initial decision to deny the claim was
incorrect.
Parties dispute scope of repairs required
As outlined above, the FSP has offered to cash settle the applicants’ claim fo r
$42,093.70, based on a scope of works for the repairs prepared by its building
consultant (SB).
The applicants say the cash settlement offered by the FSP is not sufficient to enable
them to repair all of the damage to their property caused by the leaking pipe. They
also say the scope of works provided by SB should not be relied on, given the
apparent inconsistencies in his earlier findings.
In addition to the scope of works and quotation provided by MM, the applicants have
provided a scope of works prepared by their builder (BR) for the necessary repairs,
together with a quotation for $89,651. The applicants consider their claim should be
settled based on BR’s quotation .
Case No: 517035 Determination Page 5 of 7
The FSP says the scopes of work prepared b y the applicants’ contractors are
excessive and do not accurately reflect the damage to the property caused by the
leaking pipe.
Cash settlement amount offered by FSP is not sufficient
As outlined above, the FSP has advised that its cash settlement offer is based on a
scope of works prepared by SB. However, it is not clear on what basis the amount of
$42,093.70 has been determined.
In the absence of any information to the contrary, it appears this amount reflects the
FSP’s internal estimate of the cos t of the repairs, rather than an actionable quotation
obtained from a builder who is willing to undertake the works on behalf of the
applicants.
In these circumstances, it is likely that the FSP’s offer materially underestimates the
actual cost of the repairs (even if SB’s scope of works is accepted as accurate).
Further, it is not clear to what extent the FSP’s estimate takes into account other
factors – such as a builder’s m argin and/or any discounts or rebates which may be
available to the FSP.
The FSP has advised that the cash settlement amount includes an allowance of 10%
to reflect the transfer of risk which occurs when a claim is cash settled. This is
appropriate given the applicants will not have the benefit of the life time guarantee of
provided under the policy in circumstances where repairs are undertaken by the FSP.
However, it is not clear whether the FSP’s estimate also includes an allowance for
any variations which may be required during the course of the repairs (given the FSP
would have been liable for any resulting increase in costs, if the repairs had been
carried out by its contractors).
The allowance of 10% referred to above is not sufficient to accommodate any such
variations, in addition to the risk arising from the absence of the lifetime guarantee.
Further, I am not satisfied that SB’s scope of works necessarily includes all of the
repairs required as a result of the leaking pipe.
For example, SB’s scope of works does not provide for any works required to
address possible movement of the stumps, despite the FSP’s engineer (CC) having
advised that the clay foundation soils around the stumps had been significantly
saturated by the escape of liquid event.
Such matters might have been addressed had the FSP appointed an engineer to
prepare the scope of works (as originally intended), rather than a building consultant.
FSP is required to cash settle applicants for $89,651
For the reasons outlined above, I am not satisfied that the cash settlement amount
offered by the FSP is sufficient to allow the applicants to repair all of the claim-related
damage to their property.
As outlined above, the applicants have provided two separate scopes of work and
quotations prepared by their contractors (MM and BR). While both contractors have
Case No: 517035 Determination Page 6 of 7
quoted a similar amount, there are significant differences between their scopes of
work.
The FSP has provided a report prepared by its building consultant (SB) which
identifies sever al aspects of MM’s scope of work which SB considers overstates the
extent of the repairs required. The FSP also notes that MM is not a registered
building practitioner.
However, the FSP has not provided any analysis of the scope of the work prepared
by BR, who is a registered building practitioner.
Having reviewed all of the available information, I am satisfied that the repairs set out
in BR’s scope of works generally reflect the nature and extent of the damage to the
applicants’ property (as shown in the various reports and photographs provided).
I acknowledge that in some areas, BR’s scope of works is imprecise (for example,
regarding the extent of the slate flooring to be replaced). However, there is also
information to suggest that the damage to the slate flooring is more extensive than is
reflected in SB’s scope of works.
In the absence of an actionable quotation provided by the FSP’s contractors,
I consider it is fair in all the circumstances that the FSP be required to cash settle the
applicant’s claim based on BR’s quotation.
In reaching this view, I have taken into account the significant delays experienced
during the claim process, which have been exacerbated by the FSP’s multiple
changes of position.
In these circumstances, it would be unfair to subject the applicants to the additional
delays which would necessarily be incurred in obtaining a further independent
assessment of the damage to the property.
Accordingly, the FSP is required to cash settle the applicants for $89,651 for the
repairs to the property.
FSP is required to pay applicants $16,324 for temporary accommodation
The applicants’ builder (BR) has advised that the property will be unliveable while the
repairs are carried out, which he estimates will take 54 business days.
Accordingly, the FSP is required to increase the cash settlement by an amount of
$16,324 to provide for temporary accommodation costs. This amount reflects a daily
rate of $212 for a period of 11 weeks (based on estimates provided by the applicants,
which I consider to be reasonable).
2.2 Are the applicants entitled to compensation?
Applicants are entitled to compensation for non-financial loss
Under the Terms of Reference, FOS may award compensation for non-financial loss
(capped at $3,000) where an applicant has suffered an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
applicant’s expectation of enjoyment or peace of mind.
Case No: 517035 Determination Page 7 of 7
Having reviewed the claim history (as outlined i n section 2.1 above), I consider the
FSP handled the applicants’ claim poorly.
The stress and inconvenience suffered by the applicants as a result of the initial
incorrect denial of the claim has been compounded by the FSP’s subsequent actions,
including its repeated changes of position.
In particular, the FSP’s denial of liability based on SB’s report was inconsistent with
its previous agreement to accept the claim and appoint an engineer to prepare a
scope of works for the necessary repairs.
In the circumstances, I consider the applicants are entitled to compensation of
$1,500 for non- financial loss suffered due to the FSP’s handling of their claim.
Applicants are entitled to reimbursement of professional fees
Under clause 9.4 of the Terms of Reference, FOS may require a financial services
provider to contribute to professional fees incurred by an applicant in the course of
their dispute.
In the present case, I consider the FSP should be required to reimburse the
applicants for professional fees totalling $737.50 paid to IH (for his report) and BR
(for his report, scope of works and quotation). These documents assisted in
determining the outcome of this dispute.