Determination 516791

Cash settlement for water damage to open-plan timber flooring disputed; handling of the claim

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-12
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants disputed the FSP's cash settlement for water damage to their open-plan timber floor. AFCA found the settlement unfair, ordered an independent Queensland builder to quote the whole open-plan area and the FSP to pay the resulting settlement net of the earlier $19,812.82 payment, and accepted the excess waiver as compensation for handling issues.

Under a cash settlement the FSP must act fairly and cover all repairs, and the open-plan area constitutes one room under the policy so the flooring cannot be limited to the damaged section.

Issues

Subjects and remedies

home or building damagepay claimreassess claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 516791 Determination Page 1 of 5 Case number: 516791 2 4 August 2018 1 Overview 1.1 Dispute The applicants hold a home and contents insurance policy with the financial services provider (FSP). The applicants lodged a claim after a leaking water filter resulted in damage to the kitchen area. The FSP accepted the claim and initially offered to carry out the repairs based on its builders’ quotes. T he applicants expressed concern about the extent of the proposed repairs. The FSP then said it would cash settle the applicants, who had also obtained quotes from builders, which were considerably higher than the quotes the FSP had obtained. The applicants also raised concerns about the FSP’s handling of their claim. The case manager provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the applicants. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination, with a minor amendment. Further submissions provided after the recommendation have been considered. However, these do not warrant a change in the outcome. What is the FSP required to pay to settle water damage claim? The appropriate amount to settle the water damage claim is to be achieved through the procedure outlined in the recommendation (pages 4 and 5). Are the applicants entitled to compensation for non-financial loss? The waiver of the $2,000 excess is satisfactory compensation for the applicants. 1.3 Determination This determination is in favour of the applicants. I agree with the case manager’s reasons for the recommendation and the recommended outcome, except for a minor amendment. Case No: 516791 Determination Page 2 of 5 The FSP is to take the steps outlined in the recommendation (pages 4 and 5) concerning the appointment of another builder to provide a quote. Case No: 516791 Determination Page 3 of 5 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I have decided this case on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. I have taken into account all the material submitted by the parties, both before and after the recommendation. I am satisfied the documentation I have relied on has been provided to both parties. Except for a minor amendment, I am satisfied the case manager’s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. 2.2 What is the FSP required to pay to settle water damage claim? Quotes for repairs not conclusive The FSP accepted the applicants have a valid claim for which the policy responds. The FSP obtained quotes from two builders, however the applicants believed the quotes were insufficient to cover the damage resulting from the water leak. The applicants obtained quotes which were significantly higher than the FSP’s two builders. The policy provides the FSP with the option of repairing the damage or paying the insured the cost of repairing the damage. The FSP decided it would cash settle the applicants and, given the difficulties that have arisen between the parties, a cash settlement is appropriate in the circumstances. The FSP’s builders quoted on repairing the kitchen area alone, on the basis the damage was limited to that area. The applicants contend the kitchen is part of an open plan, incorporating the living and eating areas. As such, one area of the open plan cannot be repaired on its own, even though the FSP is relying on a policy provision in support of its stance. The FSP had also obtained comment from one of its builders which said the flooring repairs can be isolated to the kitchen area alone. It was not possible to reconcile the quotes as these varied in price and information provided. The recommendation proposed a resolution through the appointment of an independent builder. Both parties have provided additional submissions The applicants rejected the recommendation that was in their favour and provided submissions in support. The FSP also said it disputed a finding within the recommendation. The applicants contend neither of the FSP’s two builders provided a ‘fair and reasonable outcome’, although the applicants’ comments are conjecture . The applicants said their builder provided a ‘reputable detailed scope and costing’ for the Case No: 516791 Determination Page 4 of 5 works to be carried out. However, that builder did not provide a detailed costing. The other quote was significantly higher and it raises the question of whether it is only addressing the necessary repairs. There is also an issue about whether the entire open plan flooring needs to be repaired, or simply the kitchen area. The applicants’ builders contend the entire area should be repaired because it is not possible to only repair one section. An FSP builder said it is possible to repair a limited area, given the type of timber used for the flooring. There is conflicting information concerning the quotes for the required repairs and whether repairs should extend to the entire flooring. The appropriate method for resolving this is outlined in the recommendation (pages 4 – 5), with the appointment of another builder. The applicants raised concerns when rejecting the recommendation about whether the appointment of an independent builder will result in a fair outcome. The applicants’ concerns are largely conjecture as to what may occur, rather than providing substantiated information in support. In this respect, the applicants are anticipating an outcome that may never eventuate. The applicants also raised concerns about the various costings the builders have provided and whether this may also occur with the appointed builder. However, the purpose of appointing an independent builder is to provide an updated market rate quote for the required repairs. The appointed builder will need to assess whether the repairs can be limited to the kitchen area (given the type of timber used) or needs to extend to the entire flooring and quote according to their assessment. The FSP is required to email the applicants a list of proposed builders within 14 days of the applicants accepting the determination. As stated above, the selected builder will assess whether the entire flooring area (kitchen, lounge and eating areas) or the kitchen area alone is to be repaired. Otherwise, the process is as outlined in the recommendation. 2.3 Are the applicants entitled to compensation for non-financial loss? Waiver of excess sufficient compensation The applicants complained about the FSP’s handling of their claim, including the length of time taken, various inconsistencies and inaccuracies in the scope of works and the conduct of a named FSP employee. FOS may decide an FSP should compensate an applicant for non-financial loss where there has been an unusual amount of:  physical inconvenience  time taken to resolve a situation  interference with the applicant’s expectation of enjoyment or peace of mind FOS takes a conservative approach to compensation for non-financial loss. FOS considers compensation should not be provided where an applicant merely suffers Case No: 516791 Determination Page 5 of 5 inconvenience that is a normal part of a claims process. FOS expects an applicant to bear the normal degree of inconvenience experienced when a problem occurs and take steps to reduce inconvenience. The FSP has waived the excess of $2,000 as an acknowledgement of issues that have arisen because of its handling of the claim. While the applicants have made serious allegations about an FSP’s employee’s conduct, they have not substantiated these allegations. Since FOS may only award a maximum of $3,000, the waiving of the excess represents a sufficient level of compensation for the applicants. Recommendation Case No: 516791 Recommendation Page 1 of 8 Case number: 516791 29 June 2018 3 Overview 3.1 Dispute The applicants lodged a claim with the financial service provider (FSP) for damage sustained to their property following an escape of liquid event. The FSP assessed the damage and subsequently offered repairs. However, following disagreement with the applicants, the FSP sought to cash settle its liability for the resultant damage totalling $19,182.82. The applicants disagree with the settlement amount. The applicants say the entire floor of the open plan area would require replacement as the new reinstated flooring section will not match the older one. 3.2 Issues and key findings Is the FSP’s cash settlement for the physical damage fair? The FSP’s cash settlement is not fair because:  the FSP failed to establish the quote on which it based its settlement is actionable by the applicant  the FSP’s quote did not factor in the entire flooring cost. Given this, the FSP is to engage an independent Queensland registered builder to:  carry out an inspection/assessment of the damaged areas  compile a scope of the works and quote as outlined in this recommendation. 3.3 Recommendation This recommendation is substantially in favour of the applicants. The FSP are liable to meet the costs of replacing the floor in the open plan area identified on the plans as including the kitchen, living and meal areas. Case No: 516791 Recommendation Page 2 of 8 4 Reasons for recommendation 4.1 Is FSP’s cash settlement for the physical damage fair? It is fair in the circumstances the FSP cash settle the claim There is no dispute between the parties on the escape of liquid event. However, the parties disagree on the extent of the resultant damage. The FSP initially sought to settle the applicants’ claim by undertaking repairs to the damage caused by the escape of liquid event. Following numerous disagreements on the proposed scope of works, the FSP decided to cash settle the claim. The FSP sought to cash settle the claim for $19,812.82 for the resultant damage. Further, the FSP agreed to add an extra $2,882.82 as a contingency for the particle boards. The applicants want the entire open plan area flooring replaced. Due to a breakdown in communication between the parties, the applicants accepted a cash settlement as a method of indemnity. However, the applicants dispute the settlement amount. The FSP’s policy states the FSP can decide whether it will repair damage to the building, or pay an insured what it would cost the FSP to repair the building. Given both parties are prepared to cash settle the claim, and given the policy provides for this, I consider it fair the FSP proceed with a cash settlement. Parties disagree on the extent of physical damage The parties engaged several building consultants to assess and quantify the resultant damage. The FSP based its liability on a building consultant quote (CC) for $19,182.82. CC further indicated its willingness to carry out the repairs on the FSP’s behalf. The applicants disagreed with CC’s quote and tendered PW’s quote totalling $54,827.74. In as sessing PW’s quote, CC says:  it does not provide any quantity of measure  the flooring allowance suggests inclusion of non-damaged areas including the subfloor  the kitchen allowance includes significant upgrades. The applicants provided the correct measurements to the FSP. CC then tendered an amended desktop assessed scope totalling $34,907.51. The applicants raised further concerns regarding the applied labour rates. Given the above concerns, the FSP engaged a building consultant (M) to assess and quantify the damage. M tendered a quote for the reinstatement totalling $14,900. Based on CC’s and M’s quotes, the FSP says the only section of the open plan floor (10-24m²) needs replacement and the remainder of the flooring can be sanded and Case No: 516791 Recommendation Page 3 of 8 polished. Both CC and M say the floor’s timber is of mixed grade and therefore no mismatching issues will arise. The applicants say the flooring is not mixed grade but rather, Australian Beech. The applicants tendered the original house construction specifications confirming t he original flooring timber was Australian beech. The applicants provided a report from their builder (CQ) confirming the floor will not match should it limit reinstatement to the damaged section. To achieve a uniform look, the entire open plan area needs replacing. The FSP did not refute such findings. Of importance, M says it will not be able to guarantee the work due to the method used in the floor installation. M says it does not prefer to install timber flooring over particleboard flooring where the sub-floor is exposed to the elements in tropical/subtropical regions. In the absence of other information, I accept the flooring is Australian Beech and not mixed grade. Further, I accept CQ’s assertion the new flooring will not match the older sections of the flooring. The policy limits cover to flooring in the damaged room(s) The policy provides, in the event the loss or damage involves floor coverings present in more than one room, the FSP will repair or replace only those floor coverings in the room(s), hall or passageway where the damage occurs. The policy further provides that if the loss or damage involves a timber floor, the FSP will pay up to a maximum of $1,000 to match undamaged floor coverings. Damaged section is an open plan which including living and meals areas The FSP relies on the policy wording to limit its liability. The FSP says the policy entitles it to limit its liability to the damaged section regardless of the type/grade of the timber. Further, the FSP says it is only liable for the damaged section and policy excludes any unmatched section of the flooring. There is no dispute the principal damage was limited to the kitchen island area of the property. Photographs of the damaged area and a copy of the floor plan of the property identifies the kitchen as part of an open plan area, which includes the living and meals area. This area is not separated by walls or partitions and leads to stairs to the second floor of the property. The question of fact in this dispute, is whether the FSP is liable for only the damaged section or the entire open plan area. The policy does not define what is considered a room for the purposes of cover. Usually a room is an area separated from other spaces or passageway by interior walls or doors. It can be described as any distinguishable space within a structure. In the current dispute, when you look at the floor plan and photographs, the area is part of one single area. The spaces are not easily distinguishable. Case No: 516791 Recommendation Page 4 of 8 In the circumstances, I am satisfied the area comprising the kitchen, family and meals area identified on the floor plan of the property should constitute one room for the purpose of the policy. Based on the information above, I consider it fair in the circumstances the FSP pays for the replacement of the entire open plan area (approximately 64m²). Parties’ quotes are inconclusive The FSP tendered three quotes, which I consider close in quantum. The initial builder, CC, indicated its willingness to carry out the repairs for the quoted amount. However, the applicants were not satisfied with CC due to the flooring issue and incorrect measurement. The FSP opted for the cash settlement discretion under the policy. By doing so, the FSP must act fairly and ensure the cash settlement covers all the repairs. A cash settlement transfers all the risk from the FSP to the applicants of any unforeseen damage and any additional work required once repairs commence. Having reviewed the three quotes which the FSP tendered, I do not consider any of the quotes actionable by the applicants. The applicants tendered two quotes which vary significantly in cost and lack details, such as measurements. Further, I am not satisfied the quotes are fair and reasonable given the extent of the damage. Whilst I do not accept the FSP’s quotes are actionable by the applicants, the scope of works in both quotes are close to each other. The FSP is required to engage a builder to tender a costed scope of works For clarity, I am unable to conclude a fair and reasonable settlement to the applicants. Most of the quotes are over a year old. Further the range greatly in their quantum. I consider it is appropriate and fair in the circumstances the FSP engage and obtain an up-to-date scope of works and quote. FSP to provide a list of qualified builders The FSP is to identify three registered Queensland repairers to undertake an assessment and provide detailed/itemised scope of works of the damaged areas. This should address the replacement of the entire open plan area, as per my findings above. The FSP is to email the applicants with details of the proposed builders within 14 days of parties accepting this recommendation. In this email, the FSP is to outline what it considers the independent repairer should review and consider when compiling the scope and providing an actionable quote. Applicants to select preferred repairer from the list Upon receipt of these details, the applicants are to advise the FSP within 14 days by return email of their preferred repairer. Case No: 516791 Recommendation Page 5 of 8 If the applicants wish the independent repairer to review and provide comment on other matters not outlined by the FSP, the applicants are to outline this in the return email. If the applicants do not outline any other matters (in addition to those outlined by the FSP), it will be assumed they are satisfied with the proposed scope or works and quote. Upon receipt of the applicants’ advice as to their preferred repairer, the FSP is to:  arrange for this expert to complete his/her inspection and assessment of the damage within 28 days  within seven days of the inspection, ensure his/her written scope of works and quote are made available to both parties  issue a settlement payment to the applicants within 7 days of the accepted scope of works and quote  this amount should be net of the previous cash settlement of $19,812.82. Case No: 516791 Recommendation Page 6 of 8 5 Supporting information 5.1 Quotes Building Consultant Amount CC - FSP $19,182.82 M – FSP $14,900.00 NB - FSP $16,300 – including 24m ² of flooring $33,519.78 – including 61m ² of flooring PW - Applicant $54,827.74 CQ – Applicant $88,524.70 PW’s quote breakdown Item Cost Electrical $1,060.00 + GST Flooring $25,288.40 + GST Painting $2,673.00 + GST Kitchen $16,572.30 + GST Plumbing $1,251.00 + GST Preliminaries $2,998.70 + GST 5.2 Policy Wordings 7.3 How we settle your claim Repair or replacing If the loss or damage:  Involves wall coverings, floor coverings or window coverings that are present in more than one room of the home, we’ll only repair or replace those wall coverings in the room or rooms, hall or passageway where the damage occurred However, if such loss or damage involves tiled or timber floor or wall coverings, we’ll only pay up to a maximum of $1,000 to match undamaged tiled or timber wall or floor coverings in the room or rooms, hall or passageway where the dam age occurred to creat e a uniform appearance. Case No: 516791 Recommendation Page 7 of 8 5.3 Key Documents Record Key points FSP’s builder (CC) 17 - 05 - 2017  During our inspection the following damage was observed: Kitchen:  Water damage to bottom shelf of kitchen cabinet.  Water damage to the floorboards around the kitchen benc h.  The resultant damage has been caused by a leaking water purifier, with the leak being small and unnoticeable the leak has managed to damage the bottom shelf of their kitchen cabinet and cause the surrounding floor boards to swell and pop from their fixing. FSP’s builder (M ) 11 - 10 - 2017  W e noted water damage to the kitchen sink carcass which will require replacement of the melamine base cabinet only .  We noted the nail fixings to the tongue and groove timber flooring to the kitchen and lounge room in front of the island bench of approximately 10.0m ² have bec ome loose causing the floor to creak when walked on. Therefore, it will require removal and replacement of approximately 10.0m ² .  As the flooring is secret nailed an d installed under the existing kitchen cabinetry, the kitchen cabinetry will need to be removed and stored onsite to facilitate the flooring replacement and the replacement of the water damaged melamine kitchen base cabinet .  The open plan kitchen/lounge ro om is approximat ely 64.0m ² .  the flooring continuously throughout the room .  We are of the belief a contingency of approximately 24.0m ² (inclusive of the 10.0m ² ) of flooring will require removal and replacement to facilitate the repair of the damaged floori ng and the remaining undamaged flooring can remain in - situ. The entire open plan area will require sanding and polishing to maintain a uniform finish.  The Insured are of the opinion they are entitled to the replacement of the entire 64.0m ² of flooring as t hey believe the flooring cannot be matched.  We informed the Insured the flooring is a natural product consisting of select grade mixed hardwood tongue and groove flooring with no consistent pattern to match.  The Insured will require temporary accommodation as the kitchen will be unusable during the works.  As all works need to be carried out in conjunction and we do not believe the kitchen warrants replacement, it will only require removal and reinstallation to facilitate flooring repairs  The Insured does no t agree that the flooring can be matched and is of the view that the entire flooring to the open plan kitchen and lounge rom should be replacement. We recommend that your office confirm the Policy wording with the Insured. Applicant’s builder ( CQ ) 14 - 11 - 2 017  This residence has damaged timber flooring and sub floor particleboard flooring, which the full extent of subfloor water damaged flooring cannot be positively confirmed until removal of Case No: 516791 Recommendation Page 8 of 8 the timber flooring has commenced. From the underside of the floor ing it appears there is approximat ely 60 - 70% damaged timber flooring in area.  When installing both the sub floor particleboard flooring and the Australian Beech Superior timber tongued and grooved flooring, both are to be installed in accordance with their appropriate Australian Standards. AS 1860. 2 – 2006 Particleboard flooring installation and AS 4786.2 – 2005 Timber flooring sanding and finishing.  The installation of flooring must be no more than 5% impurities and imperfections including height differenc es, which as there is an estimated 60 - 70% flooring to be removed and replaced of the total area of 64 Metres Squared it is very strongly considered that no match of the colouring and texture of the flooring to be replaced would match any of the remaining 3 0 - 40% of which therefore with the Australian Standards allowing only 5% therefore there is a requirement for 100% of flooring to be removed and replaced.  Zinsser is a Paint brand similar to Dulux or Taubmans etc. I always recommend the use of Zinsser Smart Prime for repairs of smoke, fire and water damage, including repainting of pre - painted surfac es which the original paint products are unknown. The Zinsser Smart Prime is the most superior product on the market in my opinion .  I confirm that the sub floor i s Structaflor® particleboard flooring and the timber tongued and grooved flooring is Australian Beech Superior, whilst the architraves, skirtings and door jambs are Tasmanian Oak.  The windows and the sliding doors are flas hed appropriat ely externally, whic h prevents any possibility of storm water ingress, hence all damaged timber flooring viewed from the underside is caused by the escape of liquids event from within the kitchen area.