Storm claim: cash settlement amount for building repairs and other items disputed
Text of the determination
Determination | Case number: 516721 Page 1 of 15
Case number: 516721 16 November 2018
1 Determination overview
1.1 Complaint
The complainant holds a home and contents insurance policy with the financial firm
(insurer). She lodged a claim for damage to her property following a storm in
December 2017.
The insurer accepted liability for the complainant‟s claim. A dispute has arisen as to
the extent of the scope of works and liability for damage identified by the insurer as
pre-existing damage or building defects. The complainant believes the scope of works
defined by the insurer is insufficient and believes most of the damage sustained to the
property was due to the storm. The complainant is also dissatisfied with delays in the
settlement of the claim.
1.2 Issues and key findings
Is the cash settlement sufficient to repair all storm-related damage?
The panel considers it fair in the circumstances that the insurer increases its cash
settlement offer as set out under section 2.1 of this determination to $84,853.20.
Is the complainant entitled to compensation?
The panel is satisfied that the insurer has acted reasonably in the circumstances
when assessing the damage.
1.3 Determination
This determination is partially in favour of the complainant.
The insurer is required to pay the complainant $84,853.20 within 14 days of the
complainant accepting this determination. Further the insurer is to pay interest
pursuant to section 57 of the Insurance Contracts Act 1984 (the Act) on the cash
settlement from 14 March 2018 to date of payment of the claim.
Determination | Case number: 516721 Page 2 of 15
2 Reasons for determination
There has been a full exchange of information between the parties and each party
has had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in this dispute has been referred directly to a panel
for determination.
The panel has based this determination on what is fair in all the circumstances,
having regard to the relevant legal principles, terms of the policy, good industry
practice including codes of practice and prior determinations where applicable.
2.1 Is the cash settlement sufficient to repair all storm-related damage?
Policy covers storm-related damage to buildings
The complainant‟s prop erty was damaged by a storm on 19 December 2017. The
policy, an insured events policy provides cover for loss or damage caused by storm.
There is no dispute between the parties that damage attributed to the storm is
covered under the policy.
The policy also includes the optional cover for accidental damage. Although the
complainant had selected this cover, cover for accidental damage does not apply if
there is another listed event applicable to the circumstances of the loss.
The insurer’s liability is limit ed to damage caused as a result of the storm
Whilst there is no dispute that damage was sustained to the building during the storm
in December 2017, there is dispute as to the extent of the damage claimed. The
policy is clear, the extent of liability under the policy is limited to damage or loss
caused by the storm subject to the exclusions.
Relevant exclusions with respect to the claim relate to:
defects, structural or design faults, faulty workmanship or faulty design
wear and tear and lack of maintenance, including rust, corrosion and deterioration
(except in some instances relating to the insured events) „escape of liquid‟ and
„legal liability claims‟.
The insurer says that part of the damage claimed was related to defects, faulty
design, wear and tear and lack of maintenance. The complainant says that nearly all
the damage was storm related and that the property was well maintained.
Determination | Case number: 516721 Page 3 of 15
Issues with defects, wear and tear and lack of maintenance
The panel accepts there are issues with existing defects, wear and tear and lack of
maintenance.
The insurer has provided a detailed report and supplementary report from its building
consultant SB. SB observed:
the garage was not compliant with Australian Standards 1684.2
the joins in the gutters on the shed overlap each other approximately 1.5m in lieu
of the industry standard of approximately 25mm
gutters on the rear verandah and pergola are secured with three roof screws,
whereas the manufacturer‟s minimum requirement is five roof screws
the roof sheets on the pergola are underlapping and overlapping in reverse,
leaving the underlapping edge exposed, which allows water to enter and does not
comply with manufacturer‟s requirements
no existing flashing on the roof sheets above the laundry and butler‟s pantry
the roof sheets above the laundry overlap the roof sheets above the attached
verandah creating a gap for wind driven rain to enter in under the overlapping joins.
Only one batten was located that had rotated and twisted upwards and detached
from the rafter of the verandah
the instability of the carport was due to the lack of lateral bracing and not because
of the storm or impact from the storm.
In response to the scope of works and scope of works inspection report provided by
SB, the complainant has provided quotations from her builders WB and LM and a
statutory declaration from her maintenance/gardener GJ.
The quote from LM is brief and does not clearly identify the damage that was
considered pre-existing or due to defects, wear and tear or lack of maintenance.
WB was not willing to warrant repairs as per the scope of works provided by SB as
the repairs would not comply with Australian standards. The panel accepts that both
WB and SB agree that the building did not comply with relevant Australian standards.
The complainant says that the standards being referred to by WB are current
standards and were not applicable when the property was built.
The property is approximately 40 years old. SB found that the spacing and span of
the rafters attached to the carports on either side of the garage were undersized and
excessively spaced. The panel accepts that these standards were in place from at
least 1975 and accepts that most likely the carports were built after that date. SB
confirmed in its supplementary report that prior to the introduction of the standards,
lateral bracing of any timber frame structure was required especially when supported
on stirrups, to resist the raking forces exerted by wind pressure on the structure.
Determination | Case number: 516721 Page 4 of 15
The roof pitch of the attached carports did n ot comply with the manufacturer‟s
minimum 5° roof pitch for corrugated roof sheets. SB notes that the minimum 5 ° roof
pitch had been applicable since 1963. The quote from WB includes the re-pitch of the
roof over the laundry to cover the verandah in the same plain to eliminate the two
separate pitches. If similar quotes relating to the carports which is to remove and
dispose of the carports and reinstate them to the same dimensions to Australian
standards. The panel does not accept that this damage was storm related.
The panel accepts that most likely parts of the building were not compliant with
relevant standards applicable at the time of the building. The insurer is not liable to
now make these areas compliant with the relevant current standards.
Property had issues with wear and tear and lack of maintenance
Based on the available information, the panel accepts that the property did have
issues with wear and tear and lack of maintenance. The insurer is not liable for
damage arising from wear and tear and lack of maintenance.
WB identified that the inside ceiling cavity showed signs of water staining to structural
timber due to the roofing nails being popped up. SB identified the issues with the
roofing nails which it considered as a maintenance related issue.
Whilst GJ has commented that he had not observed the issues with the nails prior to
the storm or the issues with the veranda or garage, the panel accepts GJ may not
have observed this damage prior to the storm. The panel however accepts that most
likely the damage was due to wear and tear and lack of maintenance. The issue with
the nails may have been contributed to by the storm.
Scope of Works by SB fair in the circumstances
Having considered the available information, the panel accepts that the scope of
works as identified by SB is preferable. The panel accepts the scope of works is
detailed and fairly allows for the repair of damage sustained in the storm. The panel
accepts however that the scope of works does not cover all the loss or damage.
Whilst WB would not be willing to warrant the repairs, the panel is satisfied that this is
based more on the pre-existing condition of the property that is the condition of the
property prior to the storm, than because of the storm related damage.
The insurer is to increase the cash settlement offer
The panel notes the quotes based on this scope of works by PB and WB are
reasonably close. The panel accepts given the insurer had offered to cash settle the
claim based on WB‟s costings that the quote from WB of $57,816 repre sents a fair
starting point.
The scope of works does not allow any margin for „unknowns or the transfer of risk to
the complainant in the repair process. It does not adequately allow for the damage
Determination | Case number: 516721 Page 5 of 15
caused by the emergency services. This should not be set aside as unquantified as
suggested by the Insurer.
The policy includes an additional benefit of damage by emergency services. The
panel accepts that such foot traffic is likely to have added to the roof damage not
included in the scope of works. The repair process is likely to identify further issues
and by cash settling the claim the insurer transfers the risk associated with the repair
process to the complainant.
The panel is of the view that any cash settlement must be reasonable, fair and
consistent with utmost good faith. It must be sufficient to restore the complainant to
the position she was in prior to the storm. It must consider the „unknowns‟ and the
transfer of the risk.
To take into account, the contingencies or unknowns, to allow for the possible
additional damage that has not been taken into account and to allow for the transfer
of risk, that it is fair in the circumstances to increase the quote by 20% or $11,563.20
to $69,379.20.
Insurer to pay for cost of tree removal
The scope of works does not provide for the cost of removing three trees at the
property. The policy provides for the removal of trees/branches where they have
fallen or caused damage.
The complainant has provided a quote from a tree services company WT. The quote
is for the removal of three trees that were damaged during the storm and is for
$3,520.
The insurer has not responded to the complainant‟s claim with respect to the cost to
remove the trees. The panel considers the quote is reasonable. In the circumstances,
the insurer should pay the complainant $3,520 with respect to the cost to remove the
trees.
Insurer is to pay for mould remediation
The panel notes that the complainant has claimed for mould damage to the property.
The scope of works provided by SB does not include the cost to remediate the mould.
The quote provided by WB does not include the cost to remediate the mould.
It is unclear from the information exchanged whether the issue relating to mould
arises from the storm or because of the defects, wear and tear or lack of
maintenance. The panel accepts however that it is likely that any mould issue would
have been contributed to by the storm.
To achieve finalisation of this aspect of the claim, the panel considers it fair in the
circumstances that the insurer pays the complainant $8,000 towards the cost of any
mould remediation at the property.
Determination | Case number: 516721 Page 6 of 15
Cost of replacement CCTV equipment covered under scope of works
The complainant has claimed a further $480 for the replacement of CCTV equipment.
In the quote provided, WB has allowed for the removal and replacement of motion
sensors and CCTV camera and replacement on a like for like basis. The panel
accepts that as this is covered under the scope of works, the insurer has no further
liability with respect to these costs.
Scope of works covers costs of replacing the fences and posts
The complainant is seeking a further $3,850 to cover the cost of replacing fencing.
The panel notes that the insurer‟s builder PB quoted $7,539 for replacement of the
fence in the quote. WB included in its quote the cost to remove and replace damaged
fencing and gate as per the scope of works. The panel is satisfied the insurer‟s liability
with respect to the cost of replacing the fences and posts is covered under the scope
of works.
Floor coverings to be included in the cash settlement
The complainant says the offer by the insurer does not include cover for floor
coverings in the laundry and butler‟s pantry. Neither quote from PB or WB refers to
the cost to replace the floor covering. The scope of works includes the following:
laundry: supply and install new lino tile flooring to entire room
There is no reference in the scope of works to the removal or replacement of flooring
in the butler‟s pantry.
To avoid confusion, the panel determines it fair in the circumstances that the insurer
contribute $1,000 by way of cash settlement to the costs of replacing the floor
coverings in the laundry.
Complainant entitled to permit cost
The complainant submits the cash settlement does not provide for building permi ts
required to complete the repairs. The complainant claims $12,000 with respect to
these permits. The panel notes that WB advised that the cost associated with permits
is $2,500. There is no reference to building permits in the quotes obtained by the
insurer.
In view of this, the panel is satisfied that the complainant is entitled to $2,500 to cover
the cost of building permits.
Complainant not entitled to accommodation costs
The complainant seeks alternative accommodation costs. There is no indication
however in the quotations provided that the complainant will require alternative
accommodation during any repair period.
Determination | Case number: 516721 Page 7 of 15
The available information shows the damage to the property is mainly in the laundry,
butler‟s pantry and roof. Other damage relates to bu ildings outside the main property.
The panel also notes that the complainant has continued to reside in the property with
the restrictions mostly associated with the external buildings. In the circumstances,
the panel is not satisfied that the complainant has established an entitlement to
alternative accommodation costs due to the storm related damage.
Curtains to be included in the cash settlement
The complainant says that the cash settlement does not include curtains and submits
the curtains require replacement. She has provided a quote of $454 for replacement
curtains.
The insurer has not provided any response with respect to the complainant‟s claim
regarding the cover for the curtains.
The panel notes that SB confirmed there was water damage in the laundry and
butler‟s pantry that could have caused damage to the curtains.
Although the curtains would normally be considered contents, the panel is satisfied in
the circumstances, it is fair that the insurer pay the complainant $454 for the curtains
as per the quote provided.
The insurer to cash settle the complainant’s building claim for $84,853.20 plus
interest
The panel determines it is fair in the circumstances that the complainant be cash
settled as it is clear there is a breakdown in relationship between the parties.
As indicated earlier, any cash settlement must consider not only the quoted cost of
repairs but also the unknowns and transfer of the risk that occurs. The panel has
calculated the cash settlement as follows:
Scope of works - $69,379.20 (including 20% allowance for transfer of risk and
unknowns)
Removal of trees - $3,520
Mould remediation - $8,000
Replacement of floor coverings in laundry - $1,000
Permit costs - $2,500
Replacement of curtains - $454
TOTAL - $84,853.20
The insurer is entitled to assess the contents items in the garage
The complainant says that contents and personal items stored in the shed are
damaged. The insurer proposed to engage a restorer to assess the damaged
Determination | Case number: 516721 Page 8 of 15
contents located in the garage. The complainant did not agree to this, as there were
personal items located in the garage. The complainant now says that the area is
unsafe and the insurer will not allow her access to the garage.
The panel is satisfied that the insurer is entitled to assess the contents items if the
complainant seeks to claim loss or damage to those items. When assessing the
items, it is fair that the complainant be present to enable her to identify to the insurer
those items damaged and her belief as to the extent of the damage.
The panel consider that the parties should work cooperatively to resolve this aspect of
the complainant‟s claim and that within 14 days of acceptance of this determination
that the insurer should arrange for an assessment of the damaged contents and
personal items to occur. Until such time such an assessment is completed, the insurer
is not liable to meet any claim for damage to the contents.
2.2 Is the complainant entitled to compensation?
We can award compensation in certain circumstances
Under paragraph 9.3(b) of the FOS Terms of Reference, we may award an amount of
compensation (capped at $3,000) for non-financial loss where a complainant has
suffered:
an unusual degree or extent of physical inconvenience
time taken to resolve the situation
interference with their expectation of enjoyment or peace of mind.
However, we expect a complainant to be moderately robust and bear the usual stress
and inconvenience associated with an insurance claim.
No award of compensation is warranted in the circumstances
The complainant is claiming compensation for the delay in the handling of the claim.
The complainant says the claim delay has caused significant stress.
In review of the information provided, the Panel does not consider the insurer has
caused delays in the assessment of the claim, or through its actions to settle the
claim.
The insurer acted promptly when notified of the complainant‟s claim. The information
shows that delays were contributed to by the actions of the complainant in disputing
the cash settlement. Although the panel acknowledges the complainant was justified
in disputing parts of the cash settlement, the panel does not consider the actions of
the insurer justify an award of non-financial compensation.
Determination | Case number: 516721 Page 9 of 15
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Relevant policy wording
Storm – page 51
What is covered
Your building and/or contents are covered for loss or damage caused by storm.
What is not covered
…
Your building and/or contents are not covered under this Insured Event for loss or
damage as described in the General Exclusions listed on pages 75 to 78.
General Exclusions – pages 75 to 78
Under this policy there is no cover provided for any loss, damage or liability
caused directly or indirectly by or in any way connected with:
1. Defects, structural or design fault, faulty workmanship or faulty design;
…
4. wear and tear and lack of maintenance, including rust, corrosion and
deterioration
Determination | Case number: 516721 Page 10 of 15
….
13. mould, toxic mould, mildew, wet or dry rot, rising damp or dampness;
…..
We will also not cover:
……
35. gradual loss or damage of any kind.
How we settled a claim – page 82
Building claims
If we agree to pay your claim, we will decide whether to:
• repair or rebuild the loss or damaged part of your building;
• ….
• Pay you the amount we determine to be the reasonable cost to repairing or
rebuilding the lost or damaged part of your building…
3.3 Reports
Record Key points
Insurer’s expert (SB)
Report
30 January 2018
The solar motion sensor, front farm gate and fencing on both
sides of the driveway have been damaged by falling tree
branches from an adjacent Gum tree.
The roof cover and wall cladding to the western side of the
northern end of the garage ha d partially detached from the
garage.
The roof and roof frame to the northern end of the attached
carport on the western side of the garage has dislodged from
its attachment to the garage and collapsed.
No storm damage was observed to the attached carpor t on the
eastern side of the garage.
The ridge capping and two roof sheets to the northern end of
the Colorbond metal clad workshop had been damaged by
flying debris.
No other storm - related damage was observed to the
Colorbond shed.
The clothesline ha d been damaged by flying debris.
The CCTV camera, stormwater gutter and a timber support
post had been damaged by flying debris.
Two polycarbonate roof sheets to the rear verandah have been
damaged by flying debris.
Two roof sheets on the rear pergola h as been damaged by
Determination | Case number: 516721 Page 11 of 15
Record Key points
flying debris.
The stormwater gutter on the western end of the northern side
of the main residenc e had been damaged by flying debris.
The garage is approximately 40 years old and displays signs of
wear and tear and ageing typical of its age.
Based on the Australian Standard 1684.2 – Residential Timber -
framed Construction – Non – Cyclonic Areas, the spacing and
span of the 90 mm x 45 mm pine rafters are undersized and
excessively spaced to support the weight of the metal roof
covers.
Based on the Australian Standard 1684.2 – Residential Timber -
framed Construction – Non – Cyclonic Areas. The 100 mm x 50
mmm hardwood beams to the attached carports either side of
the garage are undersized to support the weight of the roof
frames and metal roof covers.
There is no existing lateral bracing to the roof or the posts
supporting the carports either side of the garage.
As the posts are support on galvanized stirrups, bracing is
considered to be necessary in accordance with Australian
Standard 1 684.2 to resist lateral movement of the pergolas
from the wind pressure.
The stormwater gutters on the Colorbond shed are adequately
supported by external gutter brackets.
However. The join in the centre of the gutters overlap each
other by approximately 1.5m in lieu of the industry standard of
approximately 25 mm.
The gutters also pop reverted together without the rolled
beaded edges of the gutters interlocked. This has resulted in a
sag in the centre of the stormwater gutters.
Pedestrian traffic damage to several of the roof sheets on the
wide rear verandah.
Surface checking and splitting to the timber rafter on the
western end of the pergola.
The northern end of the same rafter is secured to the timber
post with bright steel nails in lieu of galvanis ed coach bolts or
an Australian Standard approved connector.
The northern end of the second raft er in from the western side
of the pergola has a 600 mm long existing split identifiable by
discoloration to the exposed area of the split section of the
rafte r.
The same rafter has been installed with the rafter bracket
twisted to accommodate an existing twist in the rafter at the
time of construction.
The stormwater gutter ends of the corrugated roof sheets to
both the rear verandah and pergola are secured to the roof
battens with three roof screws/nails. This does not comply with
the manufacturer‟s minimum requirement of five fixings (every
second corrugation) to secure the ends of corrugated roof
sheets.
Determination | Case number: 516721 Page 12 of 15
Record Key points
The corrugated roof sheets above the pergola are instal led with
the underlapping and overlapping sides of the roof sheets in
reverse leaving the underlapping edge exposed to the weather.
This allows water to breach the side laps of the roof sheets.
This does not comply with the manufacturer‟s installation
reco mmendations for the installation of corrugated roof sheets.
There is no storm - relat ed damage to the corrugated galvanized
roof sheets above the laundry and butler‟s pant ry.
However, there is no existing flashing at the top of the roof
sheets above the lau ndry and butler‟s pantry where they extend
under the fascia gutter and abuts the timber fascia to the main
residence.
This has allowed water overflowing the back of the fascia gutter
to the main residenc e to penetrate through int o the laundry roof
cavity and eventually deposit on the ceiling, walls and floor of
both rooms.
The corrugated roof sheets above the laundry overlap the
corrugated roof sheets above the attached verandah.
However, the roof pitch (slope) of the laundry roof is 5.5
degrees, whereas the lower verandah roof pitch is 7.4 degrees.
This is creating a gap for wind - driven rain to enter in under the
overlapping joins of the roof sheets.
Pedestrian traffic damage to the corrugated roof sheets above
the western end of the main residence.
The damage is localised to the end spans of the roof sheets of
both the northern and southern roof planes.
Occasional nail popping to the corrugated roof sheets above
the main residence caused by normal wear and tear of a
building of this age.
Insurer’s expert (SB)
Supplement ary Report
1 March 2018
The internal damage is referred to further down on page four
and six of the Scope of Works Inspection Report.
The Scope of Works allows for the replacement of all of the
storm damaged fencing including the fro nt gate post.
Please note, there is a typographical error under items 4.13
and 4. 14 of the Scope of Works.
They should read to allow for the removal and the supply and
installation of the 150mm diameter treated pine gate “post”, not
the 150mm diameter trea ted pine gate “fence”.
The particulars for the replacement of the storm damage to the
garage are detailed in the Scope of Works.
The particulars for the replacement of the storm damaged
doors are detailed in the Scope of Works.
The particulars for the repl acement of the storm damage to the
garage and piping are detailed in the Scope of Works.
The Insured did not direct attention to the water tank nor any
storm related damage to the water tank was observed.
The dot point directly above in the Scope of Works Inspection
Report refers to surface checking and splitting to the end rafter
Determination | Case number: 516721 Page 13 of 15
Record Key points
on the western side of the pergola.
Only one batten that has rotated/twisted upwards and det ached
from the rafter as a result of the inadequate connection of the
batten to the raf t er.
Use of the term “partially detached” is intended to indicate that
only part of the roof cover and wall cladding has detached from
the garage.
The Insured‟s reference to storm damage to the carport at the
time of my inspection was that it is now unstab le as a result of
the storm event.
The cause of the instability is due to the lack of lateral bracing.
The Insured made no reference to any other damage to the
carport on the eastern side of the garage.
No observation of any damage considered to be the r esult of
the storm or impact from the storm.
The only storm damage to the shed was to the ridge capping
and two roof sheets.
Any storm related damage to any of the other verandah posts
observed.
This Standard was first published as Australian Standard 1684
Supplement ary 7 tables in 1975, a second edition was
published in 1992. It was then revised and redesignat ed as
Australian Standard 1684.2 N1/ N2 Supplement ary 15 - 1999.
Further editions were published in 2006 and 2010.
The timbers used in the construction of the carport do not
predate the Standard.
Prior to the existence of and including the introduction of the
Standard, lateral bracing of any timber framed structure,
especially when supported on stirrups is structurally necessary
to resist the racking forc es exerted by wind pressure on the
structure.
The manufacturer‟s minimum 5 degree roof pitch has been
applicable since 1963.
The materials used to construct the carports are the same that
were constructed post 1963.
Except for the splits where the addition al nails were used in the
make - safe, the discolouration of the splits and surface checking
in the end rafter are typical of wear and tear ageing caused by
exposure to the weather; in particular from the hot summer sun.
The discolouration to the inner split section of the rafter and the
twist in the bracket indicate that the damage was existing.
It is physically impractical for the rafter to have t wisted and split
as a result of the storm event as the rafter is secured to the
fascia beam with a metal hanger framing bracket secured to
both the raft er and the beam with eight hex head screws.
There is no evidence to indicate that the make - safe contractors
are the cause of the non - compliance with the manufacturer‟s
installation requirements.
There are no structur al indic ations that the roof has dropped as
Determination | Case number: 516721 Page 14 of 15
Record Key points
this would include the roof frame.
The 5.5 roof pitch of the roof cover above the laundry and
butler‟s pantry is in accordance with the manufacturer‟s
installation recommendations.
Therefore this is considered to provide sufficient slope to
adequately discharge water from the roof and to prevent
ponding.
Extreme conditions producing high wind speed causes uplift on
a low - pitched roof as oppos ed to a downward pressure.
The high wind speed would not have resulted in the roof
dropping.
The nail popping is typical of that caused primarily by the
natural shrinkage of the unseas oned timber battens.
The shrinkage of unseas oned timber battens causes the
roofing nails to sit proud of the exterior surface of the roof
sheets .
Over an extended period of time, this combined with normal
wear and tear and ageing results in the roof sheets to become
loose fitting.
The major water entry has occurred above the weatherboard
clad wall on the southern side of the laundry and the butle r‟s
pantry.
This is where the stormwater gutter servicing the pitched roof
area of the residence would have overflowed and penetrated
the un - flashed roof sheets above the southern side of the
laundry and butler‟s pant ry.
The major water entry has occurred across the southern side of
the laundry and butler‟s pantry resulting in wat er depositing on
the ceiling and the internal surface of the weat herboard clad
and plasterboard lined walls.
Water from a roof above does not generally enter wall cavities
where t hey are lined both internally and externally as this
provides a sealed cavity.
It is physically impractical for the rafter to have t wisted and split
as a result of the storm event as the rafter and beam are
secured to each other with a metal hanger framing bracket and
eight hex head screws.
The pergola roof frame is also adequat ely braced with hoop
iron to resist lateral movement.
There is no evidence to indicate there is permanent twisting or
distortion of the pergola roof frame or its support posts.
Only one batten that has rotated/twisted upwards and det ached
from the rafter as a result of the inadequate connection of the
batten to the raft er.
3.4 Other material considered
Scope of works.
Complainant‟s submissions.
Determination | Case number: 516721 Page 15 of 15
Insurer‟s submissions.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.