Determination 516559

Claim declined for septic tank collapse under hydrostatic pressure exclusion

FirmFinancial Firm (Unknown - Insurer)
Decided2018-06-15
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded$7,480
Non-financial loss—
Amount claimed$10,160
SourceAFCA PDF

Summary

The applicant's septic tank collapsed after heavy rain and the FSP denied the claim under the hydrostatic pressure exclusion. AFCA found rain was the proximate cause and ordered payment of the quoted permanent repairs, but refused temporary repairs, crane hire, interest and non-financial loss.

Rain was the dominant and effective proximate cause, so the Wayne Tank principle did not allow the FSP to deny the claim.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 516559 Determination Page 1 of 6 Case number: 516559 13 June 2018 1 Overview 1.1 Dispute The applicant (and his wife) holds a building insurance policy with the financial services provider (FSP) to cover their home from certain insured events (such as rain) and accidental damage. The policy is subject to general exclusions, such as hydrostatic pressure. The applicant‟s undergroun d fibreglass septic tank partially collapsed inwards after significant rainfall, and soil fell into the tank. The applicant engaged his own plumber (DK) to determine the cause of damage and to quote for repairs. DK‟s reports are set out in section 3.1 below. DK quoted permanent repairs at a cost of $7,480 and the applicant sought a further four hours of crane hire at $250 per hour. The FSP denied the claim on the basis that the damage was caused by hydrostatic pressure as a result of rainwater absorption into the soil. The applicant says the proximate cause of the damage was the exceptional rain. He seeks repair costs, non-financial loss and exemplary damages. 1.2 Issues and key findings Is the FSP entitled to deny the claim? The FSP is not entitled to deny the claim because the proximate cause of the septic tank collapse was rain. I do not consider that the damage was caused by rain and hydrostatic pressure as equally important concurrent proximate causes. Is the applicant entitled to compensation for the FSP’s claims handling? No compensation for non-financial loss is warranted. FOS does not award exemplary damages. 1.3 Determination This determination is substantially in favour of the applicant. Within 14 days of the applicant‟s acceptance of this determination, t he FSP is required to pay for the quoted permanent repair costs, less any applicable excess. The FSP is not required to pay for temporary repairs, the claimed crane hire nor interest on the claimed amount. Case No: 516559 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP entitled to deny the claim? Rain was a cause of the septic tank collapse The policy defines rain as: Rain includes that part of the rainfall that is not absorbed by the soil but runs off as surface water. The applicant has made submissions about the inclusive nature of this description, and the effect this has on interpreting whether groundwater absorbed by soil should be considered rain. However, it is not necessary to address this point because it is not disputed that the damage to the septic tank was caused by rain. In each of its declinature letters and submissions to FOS, the FSP agrees that rain caused the septic tank to collapse. Because the FSP concedes that an insured event of rain occurred, it is also not necessary to address whether the accidental damage cover is activated. The onus then falls upon the FSP to establish that a policy exclusion or some other reason applies to defeat the applicant‟s claim. Hydrostatic pressure was another cause of the septic tank collapse The FSP did not obtain any expert reports, but relied upon those provided by the applicant‟s plumber, DK. The applicant suggests that the FSP must provide more authoritative expert opinion than that given by DK. In my view, no further opinion is necessary as DK is suitably qualified and can be relied upon to express an expert opinion. The applicant says the FSP “seized upon the term „Hydrostatic Pressure‟ used by the plumber in his first report, failed to put that in context, mis-represented the statement as indicating causation, wrongly used their flawed position to deny our claim and then maintained that denial through the review process. ” I do not consider that the FSP‟s reading of DK‟s reports could reasonably be characterised in the terms used by the applicant. While the term „hydrostatic pressure‟ is not defined in the policy, it is difficult to imagine a description of the phenomenon other than an external liquid pressure that is higher than the internal pressure causing the membrane between the two to breach. This is the very scenario described by DK. DK‟s reports were prepared contemporaneously to the event and establish that the septic tank collapse was caused by hydrostatic pressure. Rain is the proximate cause of the damage Damage can have more than one cause. The applicant says the proximate cause of damage was the exceptional rain. The FSP says the proximate cause of the septic tank collapse was hydrostatic pressure. The proximate cause is the effective, dominant or operative cause of the loss. Case No: 516559 Determination Page 3 of 6 It is not necessarily the first or last or the sole cause of the loss. Merely because rain was the first event to set off a particular chain of events, does not mean rain was the proximate cause. Similarly, just because the septic tank finally collapsed under hydrostatic pressure as a result of water absorption by its surrounding soil, does not mean hydrostatic pressure was the proximate cause. The applicant says that the rain alone caused the damage . The applicant relies upon a description by his wife to suggest that a channel of surface water might have dislodged a metal shroud (a surround or cover) to damage the septic tank. He says the water forces were „dynamic‟ rather than „static‟, and pressure could have been „hydraulic‟ or „hydrokinetic‟ rather than „hydrostatic.‟ The applicant says t here was nothing static about the circumstances but instead the water levels flowing outside the tank created external pressure on the septic tank. The applicant‟s own expert does not support the applicant‟s suggestion of dynamic water flow. DK says: There is nothing to suggest that this tank collapsed because of any other cause than the higher water level caused by the heavy rain. I do not accept the applicant‟s position that hydrostatic pressure (which he does not concede was present) played no part in causing the damage. However, I do not consider hydrostatic pressure to be the proximate cause of the damage. As a general exclusion, hydrostatic pressure would relate to normal or a gradual build-up of pressure in usual conditions and not the exceptional conditions where there is heavy rain. The usual groundwater levels would not have collapsed the septic tank if the rain had not been so heavy. I am satisfied that rain was the proximate cause of the septic tank collapse. Rain and hydrostatic pressure are not equal concurrent proximate causes Concurrent causes can occur where there are two or more events each of which without the other could not have caused the damage. I do not consider that rain and hydrostatic pressure were concurrent proximate causes to collapse the septic tank of equal importance. Where there are two concurrent causes of damage, where one cause is subject to cover and the other is not, an insurer is not liable for the loss. This is known as the Wayne Tank principle, named after the case law which first established the principle. The judicial authorities have recognised the causes must be of rough equivalence. I do not consider rain and hydrostatic pressure to be concurrent, interdependent causes of equal efficiency. The collapse would not have occurred without the heavy rain and the hydrostatic pressure would not have developed without the heavy rain. Hydrostatic pressure was a consequence of the heavy rain, and the rain was the dominant and effective cause of the damage. As rain was the proximate cause of the damage, the Wayne Tank principle does not apply to allow the FSP to deny the applicant‟s claim. Case No: 516559 Determination Page 4 of 6 The FSP must pay the applicant the cost of permanent repairs The applicant has obtained a quote for permanent repair costs at $7,480. The permanent repairs involve a substantial upgrade to the existing septic tank system by installing a 10cm thick reinforced concrete apron, 60cm concrete riser and access lids. The FSP has not made any submission that this amount or repair works was unreasonable. The FSP is required to pay the applicant $7,480 being the quoted permanent repair costs, less any applicable excess. The applicant has provided an invoice for temporary repairs at $1,680, which he says he has paid. The permanent repairs which the FSP is required to pay for does not build upon the temporary repairs performed, because the old septic tank will be removed and replaced. Given that the applicant will receive a substantial upgrade to his septic tank system, I do not consider it fair in the circumstances to also require the FSP to reimburse the applicant for temporary repairs performed. The applicant says four hours of crane hire is required at $250 per hour to install the new septic tank. No supporting documentation has been provided for crane hire. The quote provided is silent on the need for a crane, but notes that the price quoted does not allow for relocating or repositioning the shipping container next to the underground septic tank. I do not consider it reasonable to hold the FSP liable for the costs of crane hire. The applicant has not had the permanent repairs performed nor has he paid for such repairs. On this basis, no award of interest is warranted. 2.2 Is the applicant entitled to compensation for FSP’s claims handling? No compensation for non-financial loss is warranted The applicant seeks compensation for inconvenience, distress, time pursuing the claim, and delay in processing or paying the claim. While FOS has the power to award compensation for such non-financial loss, it is only in limited circumstances that compensation is considered and awards are unlikely to be substantial. FOS expects applicants to be moderately robust in the way in which they deal with a problem and to bear the ordinary and normal degree of inconvenience associated with an insurance claim. The applicant lodged the claim on 3 February 2018, which was first declined three days later. This was confirmed by letter dated 21 February 2018. The time and manner taken in considering the applicant‟s claim is not unusual and does not warrant compensation for non-financial loss. FOS does not award exemplary damages The applicant seeks exemplary damages by reason of the FSP‟s conduct. Paragraph 9.6 of FOS‟s Terms of Reference prevents FOS from awarding punitive, exemplary or aggravated damages. Case No: 516559 Determination Page 5 of 6 3 Supporting information 3.1 Summary of reports Record Key points Applicant’s plumber (GK ) Report 6 February 2018 We carried out an inspection of the damaged septic tank [on 5 February 2018] . There was a hole in the ground next to the septic tank and i could see the outside of the fibreglass skin of the tank. There is a hole in the tank and the waste water levels are visible inside the tank. It appeared to me that the external hydrostatic pressure had collapsed the tank inw ards and the surrounding soil had fallen into the tank. There has been record rainfall in the [local] area recently and this probably caused the collapse of the tank. In its current state the septic tank is a health risk, and given the saturated state of t he roads and soils in the area I don‟t think we could get the materials and equipment onto the property to do a permanent repair until the end of the wet season. We could however carry out temporary repairs to make the septic tank serviceable and eliminate the health risks. Please do not hesitate to contact me with any queries re this report. Applicant’s plumber (GK ) Report 14 February 2018 I did not say in my earlier Report that the damage to the septic system was caused by external hy dro - static pressure. I said that external hydrostatic pressure had collapsed the tank inwards, and that there has been rec ord rainfall in the [local] area rece ntly and this probably caused the collapse of the tank. I don‟t know why this situation occurred but it appears that external pressure collapsed the tank wall inwards, the heavy rain would cause the water level outside the tank to be much higher than the water level inside. When we install septic tanks, we mak e sure that we bring the water - level in the tank up at the same time as we bring up the level of the backfill to avoid having a different force on either side of the tank wall. When this occurs any fibre glass tank would collapse. There is nothing to sugg est that this tank collapsed becaus e of any other cause than the higher water level caused by the heavy rain. Please do not ask me to try and guess what happened I can only report on what I see and what I know. If you want to know about the history of the septic system please refer any questions to [the applicant] . Case No: 516559 Determination Page 6 of 6 3.2 FOS approach This dispute has been determined based on what is fair in all the circumstances, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions (which are not binding). There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All material provided by the parties has been reviewed and considered. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues which are considered directly relevant to the outcome only. The applicant has expressed concerns about FOS‟s impartiality in consideration of his dispute. FOS is independent of, and is not biased in favour of its members including the FSP. FOS staff understand their responsibility to bring an open and independent mind to their assessment of the merits of a dispute, including the merits in law. On reviewing the file, I am satisfied that the investigation of the dispute has been thorough and has been conducted without bias. The applicant has also expressed a desire to wi thdraw from the „Fast Track‟ process and seek a Determination through the „Standard‟ process because his claim is in excess of $10,000 and because of its complexity. The FOS „Fast Track‟ process commonly deals with issues considered in this dispute. There has been an open exchange of information and both parties have had every opportunity to put forward relevant information and argument i n support of their position. I am satisfied that FOS has followed its process to determine this dispute in line with paragraph 8.5 of the Terms of Reference.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.