Determination 516396
Brick archway damage denied as cause not established
Summary
The applicant said the cracked brick archway over her veranda was caused by a 2012 storm or the Moe earthquake, and sought a $15,600 repair quote. AFCA found neither insured event was established and the evidence pointed to long-term drainage-related movement, which is excluded.
Under an insured events policy the applicant must first establish damage from a listed event, and the expert evidence attributed the archway damage to drainage-related building movement rather than the earthquake or storm.
Subjects and remedies
home or building damagenatural disasterno remedy
Text of the determination
Determination
Case No: 516396 Determination Page 1 of 6
Case number: 516396 3 August 2018
1 Overview
1.1 Dispute
On 20 June 2012, the applicant lodged a claim under her home insurance policy
underwritten by the financial services provider (FSP) for structural damage sustained
to her home.
The FSP deemed the damage claimed as being related to the Moe earthquake (the
earthquake) that occurred on 19 June 2012. The FSP partially accepted the
applicant’s claim on this basis, primarily in relation to damaged plaster and cracked
brickwork faces to the rear of the property.
A dispute has since arisen regarding whether the FSP is liable for damage to a brick
archway that spans the applicant’s front veranda. The applicant says this, along with
all the other damage, was caused by a significant storm event (not the earthquake)
occurring on 18/19 June 2012.
1.2 Issue and key findings
Was the FSP entitled to deny liability for the damaged archway?
The FSP was entitled to deny liability for the damaged archway because there is
insufficient evidence to establish (on balance) the damage being caused by either the
earthquake or a storm event as required for cover under the policy.
1.3 Determination
This determination is in favour of the FSP.
The FSP was entitled to deny liability for the damaged archway and is not required to
take any further action regarding this aspect of the applicant’s claim.
Case No: 516396 Determination Page 2 of 6
2 Reasons for determination
2.1 Was the FSP entitled to deny liability for the damaged archway?
No dispute the archway has suffered damage
There is no dispute the archway spanning the applicant’s front veranda has suffered
damage in the form of cracking to the brickwork.
Upon the damage being identified, the applicant arranged for a wooden make -safe
support structure to be erected. It appears this support structure has remained in
place since 2012.
Onus on applicant to establish damage resulted from an insured event
The applicant’s policy is commonly referred to as a n ‘insured events’ policy. This
means the policy will only respond to loss or damage resulting from specific events
listed in the policy. Relevant to this dispute are the insured events of storm and
earthquake.
The initial onus lay with the applicant to establish (on balance) that the damage to the
archway resulted from one of these specified events.
If the applicant can establish this, then the onus passes to the FSP to show why it
may otherwise be entitled to deny the claim, such as the application of a policy
exclusion.
FSP accepted liability for some damage to the rear of the property
There is no dispute the FSP accepted liability for some internal and external damage
to the rear of the applicant’s property. This damage was in the form of cracking to the
internal and external faces of some brickwork and cracked/dislodged plaster.
FSP deemed accepted damage as being caused by the earthquake
The FSP deemed the damage accepted under the claim as being caused by the
earthquake. It has done so considering the claim was lodged the day after the
earthquake and on the basis of its appointed engineer’s damage assessment report.
Applicant says she lodged a claim for storm (not earthquake) damage
The applicant disagrees that any of the claimed damage was caused by the
earthquake. She says neither her nor her neighbours felt any associated tremors.
She says this was an incorrect assumption made by the FSP at the time.
She says all the damage claimed, including to the archway, was caused by
significant storm activity that occurred on 18/19 June 2012.
Case No: 516396 Determination Page 3 of 6
Insufficient evidence of storm activity causing the archway (or other) damage
The applicant has provided a copy of an annual SES report for 2012/13 and
meteorological data to support her contention that the archway was damaged during
a storm event.
However, this information does not establish (on balance) any significant storm
activity occurring on 18/19 June 2012.
With regards to the annual SES report, the storms referred to did not occur on the
days suggested by the applicant.
With regards to the meteorological data, there was only 1.6mm of rain on 18 June
and 2.8mm on 19 June. This appears inconsistent with significant storm activity ‘and
the consequen t rainwater that flowed into the house’.
Therefore, I am not satisfied the applicant has established the insured event of storm
caused the archway (or other) damage claimed.
As an aside on this point, I note the applicant also lodged a claim in June 2013
relating to water seepage and associated structural damage. It may be the case that
due to the passage of time, the applicant has confused the nature of the two claims.
I also note the claim file notes from the 2012 claim do not indicate the applicant
raising any issue with the claim being classified as relating to earthquake (as
opposed to storm) damage at that time.
Therefore, I will consider the available evidence in light of whether the damage can
be deemed a result of the earthquake occurring the day prior to claim lodgement.
Insufficient evidence archway damaged by the earthquake
Having been made aware of the applicant’s concern regarding the archway in 2017,
the FSP assigned its experts BB and MC to report on the damage.
BB deemed the damage ‘ consistent with movement of the roof rafters and fascia
pushing down on the brick archway causing it to crack ’ .
MC, whose report is significantly more comprehensive and detailed, in part
concludes;
The archway has cracked and incurred movement at two locations, with previous patching
repairs and painting observed indicating a long term pre-existing known issue.
In my opinion, the external ground surface levels graded towards the home, and the
general absence of a surface storm water drainage system, has be en allowing surface
water run-off to absorb into the underlying soils, resulting in the long term movement to
both the brickwork to the veranda, and brickwork to the home.
The movement to the brickwork has resulted in the subsequent cracking and separation to
the archway.
I note the FSP’s expert, FM, appointed in 2012 also made comment that ‘the site is
flat with very slow drainage to the street’. The photograph provided by FM in 2012
also appears to depict the rising damp (suggesting a drainage issue) in the lower
brickwork which was also identified by MC in 2017.
Neither BB or MC attribute the damage being caused by the earthquake.
Case No: 516396 Determination Page 4 of 6
I acknowledge the applicant has provided an opinion from a bricklayer as to the
cause of damage, but he appears to assume the damage resulted from a storm
event which, as discussed above, has not been evidenced.
With regards to any drainage issues, the applicant says:
the property has never experienced any flooding in the 33 years of the
applicant’s tenure
local council engineers do not support the property having any drainage issues
and the stormwater drainage in the local area is very efficient.
However, the expert reports do not suggest the drainage issues would cause actual
flooding, rather soil moisture content issues leading to movement of the building.
I have considered the fact that the FSP did accept some damage to the property as
being related to the earthquake. However, this damage is at the rear (as opposed to
the front) of the property with no signs of damage occurring in the intervening area to
establish a possible link between the two.
Further, MC appears to suggest the damage to the rear of the property was triggered
by the earthquake event due to other pre -existing issues, in part stating:
Although the MM scale suggest no damage at this level, I consider that in this
circumstance the weakness of the bond between the hard plaster & the aged brickwork
to be the unusual factor that has resulted in the damage as a direct result of the
earthquake shock.
For these reasons, I am not satisfied there is sufficient evidence to establish (on
balance) the archway damage being caused by the earthquake.
FSP entitled to deny liability for damaged archway
For all the reasons discussed above, I am not satisfied the applicant has been able to
establish (on balance) the archway was damaged by the insured events of either
storm or earthquake.
The available evidence suggests the damage is related to drainage issues leading to
building movement which is specifically excluded from cover under the policy.
Case No: 516396 Determination Page 5 of 6
3 Supporting information
3.1 Expert reports (extracts relevant to the damage in dispute)
Record Key points
FSP’s engineer (FM)
Re port
17 August 2012
The subject site is located on relatively fla t land and is
considered to have very poor drainage.
FSP’s engineer (MC)
Report
1 November 2012
The site is flat with very slow drainage to the street.
The brick work apart from the arch over the front verandah
and some fretting of lower mortar joints on the south elevation
is sound except for the crack at the SE corner (laundry).
A wooden support structure can be seen supporting the
archway over the veranda (image 1) .
With regards to cracked brickwork and collaps ed plast er at
the rear of the property, whilst the MM scale suggest s no
damage would result at this level, it appears the damage
occurred at the time of the earthquake.
FSP’s Builder (BB)
Report
26 October 2017
Applicant advised that on 6 May 2013, she noticed
movement/sagging of the front fascia and roof supports
causing cracking to the brick archway.
The resultant damage is consistent with the roof rafters and
fascia pushing down on the brick archway causing it to crack
over a number of years, and not associat ed with any recent
events.
A make safe was completed some years ago.
FSP’s engineer (MC)
Report
16 November 2017
The applicant advised she noticed the cracked brickwork
approximately four to five years ago, the make safe being
completed by a builder friend at that time.
The brickwork to the archway has incurred movement and
cracked in two locations with a make safe undertaken to
support the archway.
There is evidence of previous patching repairs and painting
(likely undertaken at some point prior to t he make safe)
indicating a long term pre - existing known issue.
The ground surface to the front of the home falls towards the
veranda (above whic h the archway is located). During periods
of rainfall, this will allow surface water run - off to flow towards
the brickwork and being abs orbed into and weaken the
underlying soils. It is this draining of water which has res ulted
in movement/rotation of the north - west pier resulting in
subsequent movement and cracking to the shallow archway.
The external ground surfac e levels do not meet the
associated Building Code of Australia requirements regarding
stormwat er run - off flowing away from the home. The lack of
stormwat er drainage system to the front garden will
exacerbate the moisture ingress into the ground soils.
Case No: 516396 Determination Page 6 of 6
Bric kwork mort ar joints to the front of the home are suffering
from rising damp indicating associated high ground moisture
and have previously been repaired indicating a long term pre -
existing issue.
Applicant’s restoration
builder
Quote
13 July 2018
Repair q uote in the amount of $15,600.
No comment on the cause of damage.
Applicant’s builder
Letter
Undated
From a bricklaying point of view, it appears the storm in 2012
damaged the brickwork bec ause it was after this date the
cracks appeared.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.