Text of the determination
Determination
Case No: 516013 Determination Page 1 of 9
Case number: 516013 4 October 2018
1 Overview
1.1 Dispute
The applicant held a home building and contents insurance policy with the financial
services provider (FSP).
On 26 May 2015 the applicant lodged a claim with the FSP as a result of movement
damage from a leaking public stormwater pipe. There had been damage to his
garage following a heave of its slab. The local council repaired the pipe after it found
a manhole had been leaking.
The applicant was told by engineers at the time to give the soil some time to dry out
before repairs were carried out. The FSP accepted the claim for repairs to the
building. The FSP subsequently cash settled the applicant the sum of $40,431.60.
The a pplicant‟s engineer ABC noted in August 2015 that the land was not drying. He
concluded this was due to the inability of an easement trench on the applicant‟s
property to deal with water seeping onto the property from the local area.
Remediation was needed, such as an improvement of drainage on the property.
Over the previous few years, cracks had been developing throughout the interior and
exterior of the insured property. The FSP says there is an ongoing long-term
hydrostatic water seepage problem within the ground on which the insured building is
situated. The FSP says the building would be repairable once the elevated soil
moisture returns to pre-leak condition.
The applicant disputes that there is an ongoing water seepage problem and is
claiming that the damage to his property be repaired.
1.2 Issues and key findings
Has the FSP adequately indemnified the applicant for the loss caused by the
leak?
The FSP has not adequately indemnified the applicant for the loss caused by the
water leak. It must increase the amount payable to the applicant to $55,000 to cover
additional damage and the inconvenience caused to the applicant.
1.3 Determination
This determination is substantially in favour of the applicant. The FSP is to pay the
applicant an additional $14,568.40, together with interest in accordance with the
Insurance Contracts Act 1984 (as amended) (the Act) from the date of the original
settlement payment until the date of payment.
Case No: 516013 Determination Page 2 of 9
2 Reasons for determination
2.1 Has the FSP adequately indemnified the applicant for the loss
caused by the leak?
Claim the subject of a former FOS dispute
The Panel notes this claim was initially brought to FOS by the applicant in January
2017 under case number 468832. That dispute was not the subject of any
recommendation and/or determination issued by FOS.
In case 468832, the FSP was prepared to increase the cash settlement to the sum of
$54,628.55. This was comprised of increased claim liability to the sum of $53,628.55
calculated as the average cost of the FSP‟s two builder quotes as wel l as the
applicant‟s verbal quote, plus $1,000 compensation for service concerns raised by
the applicant.
The applicant rejected this offer on the basis that he wanted the FSP to conduct
further testing into the cause of the leak. The FSP then retracted the offer. The
applicant then lodged this claim after discussions with the FSP stalled.
Evidence of an insured event at the property
The applicant‟s policy with the FSP covers loss or damage to building and contents
caused by insured events, including escape of liquid.
There is no dispute the applicant has established a prima facie claim following an
escape of liquid event at the insured property in 2015. The FSP accepts the resultant
damage from the event is covered under the policy (subject to the policy exclusions).
The issue is whether the FSP has adequately indemnified the applicant for the loss
caused by the water that has caused damage to his property.
FSP says there is ongoing elevated soil moisture levels
Numerous experts have been engaged to review and comment on the cause of the
damage to the property.
2015
The evidence is that repairs to the defective stormwater pipe were conducted by the
council (KC) around early June 2015 following damage to the applicant‟s garage on
the property. The applicant‟s building consultant ( ABC) conducted an inspection of
the insured property on 21 August 2015. ABC confirmed there was an upward heave
of the garage relative to the habitable areas by 55mm at the front and 60mm at the
rear of the eastern exterior garage wall line, which is adjacent to a drainage
easement along that side boundary.
ABC observed that as evidence of the upward heave the tiled roof surface of the
garage wing had risen at the eastern end, causing dislocation of ridge and hip tiles.
Roof gutters had fallen away from the downpipes at the eastern end of the garage,
Case No: 516013 Determination Page 3 of 9
together with dislocation of eaves sheets, and there was movement of the driveway
and rear concrete paths relative to the dwelling and garage.
In addition, ABC noted that ground probing revealed the easement was saturated
with water, which was causing the easeme nt to act as an “agricultural drain” for not
only that allotment, but a wide surrounding area. ABC concluded that de-watering of
the easement was the only remedy, and only once the foundation material had
stabilised should remedial work be undertaken to address the structural damage to
the property:
„ This ongoing and worsening saturation of the easement trench needs to be
remediated, in order that soil moisture levels in proximity to the easement, can return to
equilibrium with the lower surrounding area average. Once soil moisture levels in that
area diminish to levels equivalent to the rest of the allotment, differential heave should
be minimised or eliminated, and any cyclic seasonal ground heave should affect the
entire slab equally. ‟
ABC re-attended the insured property on 30 October 2015. ABC says that he took
laser level measurements at the same reference points as at the original inspection.
These indicated that there had been reduction in ground heave due to generally drier
conditions, resulting in a drop of the eastern end of the garage.
The measured drop was 15mm at the front, and 12mm at the rear. ABC stated that
the subsidence of the eastern end of the garage, together with a drop in soil moisture
content, validated the view that the ground heave was as a consequence of
saturated soil on the eastern side boundary easement strip. However, ABC stated:
„ Ground probing confirms that whilst conditions are general drier, the easement trench
is still saturated with water, and therefore the underlying problem remains. Until the
easement is dewatered, the differential heave of ground areas will remain, as will the
differential levels of sections of the structure as a consequence. ‟
2016
The FSP appointed an engineer (TG) to carry out a geotechnical investigation at the
insured property. TG attended the insured property on 24 February 2016.
Soil samples taken by TG near the garage indicated there was a higher moisture
content than soils elsewhere on the site. Notwithstanding repairs to the stormwater
pipe, TG stated the water level in the service trench was still high, being
approximately 0.9m above the base of the trench. TG was of the view that there
should be no free water in the trench.
In order to allow the soil near the garage to dry out, TG recommended the water be
collected in the bedding gravel into a slotted PVC pipe and discharged into the
manhole next to the driveway. A clay plug should also be placed around the sewer
and stormwater pipes for the purpose of forcing any water in the bedding gravel i nto
the slotted PVC pipe.
TG stated that after the water in the trench had been drained, they anticipated at
least one, possibly more, summer seasons for the soil near the garage to dry and
shrink back. However, TG was of the view the garage floor would “n ot return to its
original level, but remain slightly elevated”.
TG concluded that the swelling soil had caused the damage to the house.
Case No: 516013 Determination Page 4 of 9
In April 2016, the FSP‟s second engineer (FE) confirmed in a report that all evident
damage to the home and garage resulted from ground movement caused by the
leaking public hydraulic infrastructure, either through the easement upon the property
or outside of the property at a higher level. FE said it was unknown which of the
sewer and stormwater services were leaking, but that it was most likely the
stormwater service.
FE recommended liaison with both the water and sewage utility (TW), and the council
(KC) in the first instance to arrange for all system leaks to be repaired, and if not able
to be repaired in a timely manner, then to arrange for a clay plug to be installed as
outlined in the TG report. FE also confirmed:
„ Once the trench within the easement through this property has been isolated from
acting as a sub-soil drain, monitoring of the garage floor level should be undertaken
until it has returned to within 10 to 15mm of its original level upon its construction being
completed. ‟
FE recommended that it be engaged to monitor the garage floor levels and the crack
widths throughout the insured property to determine the most appropriate time to
undertake sustainable repairs to the dwelling.
2017
In October 2017 the applicant claimed to the FSP that there was no proof of an
ongoing moisture issue; rather, that the FSP‟s position was based on the observation
opinion of FE. Accordingly, the FSP arranged for a second round of geotechnical
testing to be undertaken by TG at the insured property. This occurred on 30 October
2017.
TG stated:
„ The groundwater level appears to have lowered from January 2016 to October 2017
from 0.7m below ground level more than 1.75m below ground level. Nevertheless, the
moisture content of the soil samples is still relatively high (50 to 55%, compared to 60%
in 2016).
…
The remediation works recommended in our previous report (viz. Installing a clay plug
around the sewer and stormwater pipes), has not been undertaken by the council.
Therefore, there is still water present into the service trench adjacent to the house, and
the clay below the house has not dried out. ‟
TG also noted it had been provided anecdotal information by KC which suggested
that springs were known to occur in the area, and that they may be responsible for
the soil remaining wet.
In November 2017 FE submitted a further report as to the cause/s of the garage slab
not returning to its original level. FE stated:
„ There is still a source of water to the service trench sufficient to maintain the soil at
depth about the garage in a moist condition, preventing it from shrinking. ‟
FE recommended the source of water entering the service trench be discovered and
then an appropriate management plan implemented to pre vent it from continuing.
Case No: 516013 Determination Page 5 of 9
FE concluded that there was no evidence of springs upon the insured property.
In December 2017 the applicant supplied an email from KC summarising its actions
to determine the source of groundwater affecting the insured property. As well as
repairing the defect in the pit, KC undertook to:
„ excavate perpendicular to the stormwater main across the trench downstream of
the manhole adjacent to the driveway.
fill excavated hole up with concrete
excavate upstream of the manhole for approximately 2 meters and install a socked
ag pipe and connect to stormwater pit.‟
However, when KC began excavating the stormwater line it could not find any
evidence of water tracking through the trench and determined that installation of the
ag-pipe was unnecessary. KC was of the view that the source of the groundwater
was from elsewhere but the stormwater trench. KC noted the following:
„ It is noted that this area is well known as having some problems with drainage due to
the nature and extent of clays and the predominance of natural springs across the
entire municipality due to its proximity to Mt Wellington and the Wellington ranges.
…
It is our opinion that the sources of groundwater are notoriously hard to find and it is
often better to simply provide a preferential pathway for the groundwater to exit where
it is not wanted. In other words given you cannot find where it is coming from you
should put in sub surface drainage to drain the affected area as quickly and effectively
as the prevailing conditions allow, i.e. put is extensive subsurface drainage around
your house and in particular the garage and connect to downstream stormwater pit. ‟
2018
In an email to the applicant on 31 January 2018, KC clarified:
„ I need to correct a couple of points I have made. I do apologise as I got this wrong in
my earlier email but I have gone onsite and confirmed with the staff who did the repairs.
Council initially had the line videoed and condition assessed and determined that there
was a minor crack in a stormwater pit in the road outside your property but the actual
line through your property was intact and in good order.
In fact, the manhole with a minor defect that we rectified was the same one that we
later attempted to modify in accordance with FE recommendations i.e. the pit within
your property boundary at the side of your driveway. The defect was a dislocation of
the mortar sealing the gap between the pipe and the pit allowing some water to enter
the trench. As I tried to explain in my previous email it is difficult to determine the exact
source of groundwater to any specific location without a very detailed and extensive
hydro-geological study. It may be that then water exiting the stormwater system
contributed to the issue with your foundations.
It is also possible that other groundwater evident in the surrounding area also
contributed to it. Hence my recommendation that improving the sub surface drainage
around your house is the only effective way of minimising the chances of any further
occurrence of the type of ground movement that has been evident within your property. ‟
Case No: 516013 Determination Page 6 of 9
The Panel notes that there is a written builder‟s quotation on file of $61,979 for
reparation works that was provided in the course of the current claim. The Panel
notes further that this quote did not include underpinning and roof repairs. The
builder said it would not undertake that work until the footings were stabilised in the
immediate area. According to the builder, they appeared to be unstable.
Applicant says there is adequate drainage at the property
The FSP says the applicant has not adequately improved subterranean drainage at
the insured property over the past several years.
The applicant says the insured property was built in 2001 and purchased by him in
2006. Prior to the broken public stormwater pipe, he had no water issues on any part
of the property.
The applicant says there have always been sub -surface drains on the insured
property, including along the driveway and across the front of the house. The
applicant has supplied photographs of the drains and says that all drains were
operating efficiently until the end of summer 2017/2018. However, as a result of the
ground dropping after drying out, they have ceased to work efficiently and the drains
need to be replaced.
Further, the applicant says he and his family have kept the area free of water to the
best of their ability for the last two years. This includes not washing cars and watering
the garden. Consequently, the ground around the house has dropped up to 10cm.
The 25m driveway is floating in places with many cracks.
Pipes have needed to be replaced on the patio because the ground has dried out so
much that it has dropped and pulled out the pipes because there is no ground
underneath to support it. The applicant has supplied photographs and an email from
a plumber (TWA) in April 2018, who was engaged to repair a broken stormwater pipe
under the concrete patio of the insured property. TWA stated:
„ Whilst working on the site, I can confirm that the ground beneath the slab was bone
dry. Pipework may have cracked due to shrinkage of the soil. ‟
In addition, the garage roof has now developed leaks through the ridge capping of
the tiles which has occurred during periods of heavy rain.
The FSP says it is not liable for any additional movement deterioration which may
have occurred due to the applicant failing to address the drainage defects. There is
no evidence the applicant has placed additional sub-surface drains that had been
recommended by engineers to provide an alternative pathwa y for the water source.
Expert evidence differs as to alleged ongoing moisture issue
The expert evidence has differed as to the alleged ongoing moisture issue at the
insured property as the reason for the garage not returning to within a serviceable
level of being repairable.
In brief, on the one hand the FSP‟s experts‟ TG and FE say that the moisture content
of the soil samples is still high. On the other hand, the council KC says the trench is
dry and the water is coming from elsewhere. It has commented that there are springs
Case No: 516013 Determination Page 7 of 9
in the applicant‟s locality which could be responsible and made relevant observations
about the applicant‟s neighbouring property. Further, in email dated 18 April 2018,
the applicant confirmed that he did illegally drill a hole thro ugh the trench and there
was no water coming through.
The applicant has suggested that he has maintained drains to the property and
undertook some repairs to a drain which was damaged as the result of the drying
process. The applicant says the ground is bone dry but has not proffered any
alternative source of the groundwater and the public stormwater pipe has been
repaired. Hence, there appears to be inconsistencies in three different versions of
events.
The Panel considered the appointment of an independent engineer to determine the
source of the water and the extent of the problem, and have a Panel member do a
site meeting with the FSP, the applicant and all experts to discuss the issues.
However, the Panel cannot be confident that another expert opinion or such a
meeting would conclusively determine the source of the leaking water, whether it was
the proximate cause of the damage to the applicant‟s property , and the extent of the
FSP‟s responsibilit y for the damage.
The FSP must further indemnify the applicant for damage to his property
This is a claim that now has been unresolved for three years. There had been
negotiations between the parties which left the claim unresolved. The Panel is
satisfied that a decision should be made based on the review of the conflicting
opinions as to the causation of the problems and the quotations provided to
remediate the damage to the property.
The Panel is satisfied it is fair in the circumstances that the FSP pay a further
$14,568.40 to the applicant to indemnify him for the damage to his property, together
with interest on this sum in accordance with the Act, from the date of the previous
settlement payment until the date of payment of this additional sum.
Case No: 516013 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to this dispute
General information
A full exchange of the relevant information has taken place between the respective
parties and each party has had the opportunity of addressing any issues raised.
This determination follows consideration of all of the information exchanged and is
based on what is fair in all the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice including codes of practice and
prior determinations, where applicable.
The parties have raised numerous issues in their submissions to FOS. For the
purpose of this determination, commentary is restricted to only those issues
considered relevant to the outcome.
As advised to the parties, FOS has considered it appropriate to expedite the dispute
in accordance with the Operational Guidelines to the FOS Terms of Reference. This
is because of the nature and complexity of the matter. This dispute has not been the
subject of a FOS recommendation and has proceeded directly to Determination.
This decision has been made by a Panel consisting of an Ombudsman, an insurance
industry representative appointed by the Financial Ombudsman Service Board, and a
consumer representative appointed by the Financial Ombudsman Service Board.
3.2 Case law
Case law establishes:
the proximate cause of the loss is the dominant or effective or operative cause
of the loss whether or not that be the last in time or the sole cause
if there are several causes operating contemporaneously, each must be
examined for the qualities of reality, predominance and efficiency as the active,
efficient cause that sets a relevant chain of events in action. If one cause would
have caused the harm in any case, and the other would not have done so in the
absence of the first, the first is the proximate cause
a common-sense approach is taken to determine proximate cause.
3.3 Relevant policy terms
Escape of liquid (page 22 of PDS)
We cover
Loss or damage to the building caused by liquid leaking, overflowing or bursting from any of
the following:
…
any drain, fixed pipes, roof gutters or guttering and rainwater downpipes, drainage
and sewage systems;
Case No: 516013 Determination Page 9 of 9
We do not cover
…
wear and tear, or loss or damage by the escape of liquid occurring as a result of a
gradual process of leaking, splashing, dripping or overflowing over a period of time
when you could reasonably be expected to be aware of this condition;
…
loss or damage caused by wear, tear, rust, fading, rising damp, mould, mildew,
corrosion, rot.
What we do not cover - general exclusions (pages 35 to 40 of PDS)
You are not covered under any section of your policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
…
Defect, structural fault or design fault
a defect, structural fault or design fault that you knew about (or should reasonably have
known about) and did not fix before the loss or damage occurred (e.g. if there are signs that
a defect previously caused damage, we will not pay a later claim for further damage from
this defect).
…
Ground movement
erosion, vibration, subsidence, landslip, landslide, mudslide, collapse, shrinkage or any
other earth movement …
…
Seepage of water
water seeping or running:
• through the earth (hydrostatic water seepage);
• down the sides of earth or earth fill that is up against the building;
• down the sides or underneath swimming pools or spas causing them to move, change
shape, lift or leak through their hydrostatic valves;
• against or through retaining walls and forcing them to move or crack;
• from agricultural pipes.