Determination 515857

Insurer refused to complete storm repairs to the scope in the bushfire development application

FirmFinancial Firm (Unknown - Insurer)
Decided2019-06-14
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant
Amount awarded—
Non-financial loss$2,000
Amount claimed—
SourceAFCA PDF

Summary

After a storm, the insurer cash settled the complainant's home claim and declined to complete repairs required by a bushfire development application. AFCA ordered the insurer to repair to that scope, have the works independently certified, and pay $2,000 compensation.

The development application was obtained on the insurer's expert advice, so the insurer must fulfil its scope and cannot place the complainant at a disadvantage.

Issues

Subjects and remedies

home or building damagenatural disasterpay non financial lossrepair or rectify

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination | Case number: 515857 Page 1 of 7 Determination Case number: 515857 16 May 2019 1 Determination overview 1.1 Complaint In December 2016, the complainant lodged a claim with a financial firm (Insurer) for damage caused to his house following a storm. After assessing the damages the insurer accepted the claim and proceeded with repairs. During the repairs the complainant raised concerns that the repairs did not comply with the relevant bushfire ratings. After having the property assessed the insurer builder increased its scope of work, and arranged a development application for the further repairs. Upon review of the new scope the insurer further reviewed the bushfire rating requirements, and be lieves it is not required to increase the scope past the damaged areas of the house, as it says the repairs would be exempt from the code. The complainant disagrees as he believes the development application is in line with the building codes. He believes the insurer should conduct the repairs outlined in the development application. 1.2 Issues and key findings Is the insurer required to carry out the additional repairs? On review of the information provided by both the complainant and insurer, the panel is satisfied the development application needs to be fulfilled. Although it is possible there may have been exemptions to these repairs, the insurer has initiated the development application and is required to process the repairs. Has the claim been handled appropriately? Throughout the claim and complaint process it is clear unnecessary stress has been placed on the complainant. As he is in a bushfire prone area the risk of losing his home is quite high. 1.3 Determination This determination is in favour of the complainant. The insurer is to: Determination | Case number: 515857 Page 2 of 7  Repair the home as per the scope outlined in the development application  Obtain an independent report which confirms the repairs completed by the insurer are to fire rated Australian standards  Upgrade any repairs which are identified as non-compliant to fire rated Australian standards and have those repairs independently assessed for compliance upon completion of the work  Pay the complainant $2,000 in compensation Determination | Case number: 515857 Page 3 of 7 2 Reasons for determination 2.1 Is the insurer required to carry out the additional repairs? Circumstances of the claim The insurer arranged a builder (AJ) to attend the property and assess the damages. AJ attended the property December 2016 and found extensive damages to the property and provided a scope of works. The quote was accepted and repairs proceeded. In January 2017 the complainant advised of further damages which had been missed during the initial assessment. AJ re-attended and provided variations which were accepted by the insurer. In February 2017 the complainant raised concerns as his home is in a bushfire zone. AJ re-attended and arranged a fire rating consultant (FF) to assess the property. FF rated the property and determined it to be at high risk. Based on this information AJ arranged a development application in August 2017, and a construction certificate in October 2017. After obtaining these, AJ provided an updated scope to the insurer for review. Upon review of the updated scope the insurer organised a consultant (BC) to review the scope and confirm if any exemptions would apply to the repairs. BC conducted a desktop review of the claim in November 2017. It noted that the repairs required could be subject to exemptions under the relevant construction codes. An internal assessor (PO) contacted the complainant’s local council to discuss the requirements of the development application. The council representative advised: After further investigation, Council’s opinion is the work could have been carried out as exempt development. However as a development application was lodged and approved, all conditions are required to be satisfied and in terms of the bushfire requirements only the replacement work requires compliance with Flame Zone Construction. From your position the insurance requirements would be limited to the damaged structure and any additional work proposed by the complainant would be at their expense. Based on this information the insurer cash settled the complainant based on the outstanding repairs which they believed to be insurance related. Determination | Case number: 515857 Page 4 of 7 The development application is still in force Following the cash settlement of the complainant the development application and construction certificate are still in force. The insurer argues the complainant benefits from this as he will not have to pay for this if he does works to his home. However, the insurer ’s expert PO states in his report: It is also my concern that if you remove the financing of repairs by an insurance company from the equation, what has been proposed in the case of this property, would mean that any home owner conducting routine maintenance to replace the roof or reglazing a window pane from a stone thrown up out of a mower would require extensive cost and expense of upgrading the entire property as listed in the development application. During the complaint process the insurer was invited to arrange a report confirming the works already completed comply with the relevant building codes, however nothing has been provided to date. The insurer is required to fulfil the development application After reviewing the information provided by the insurer and complainant, the panel is not satisfied the insurer has demonstrated on what basis it is entitled to depart from the requirements of the development application. While the discussion between the local council and the insurer ’s assessor suggests the complainant may intended to upgrade his property, the available information indicates the development application was obtained by the insurer on advice of its experts, rather than the complainant. Should the complainant be required to conduct any repairs to his home, he would be required to complete the scope of works in development application. The panel does not consider it fair in all the circumstances for the complainant to be placed in such a disadvantaged position. Accordingly, the panel determines the insurer is liable to repair the home as per the scope outlined in the development application. 2.2 Has the claim been handled appropriately? AFCA may award compensation in certain circumstances Under the rules, AFCA may award compensation for non-financial loss (capped at $3,300) where a complainant suffers an unusual degree or extent of physical inconvenience, time taken to resolve the situation or interference with the complainant’s ex pectation of enjoyment or peace of mind. Determination | Case number: 515857 Page 5 of 7 AFCA adopts a conservative approach to the award of compensation and expects complainants to be moderately robust and bear the usual inconvenience associated with an insurance claim. However, it is important to note that compensation is not awarded for punitive purposes. Instead it is to compensate the complainant for their experience, taking account of the complainant’s particular circumstances. The distinction should also be made between the upset and inconvenie nce which might reasonably be expected to arise from the events leading to the claim itself, and any additional and avoidable inconvenience, or interference with an complainant’s peace of mind, specifically arising from the actions (or inaction) of the ins urer. The complainant is in a designated fire zone The complainant’s concerns have been based on their location and the high risk of bush fire in the area. This has been affirmed through correspondence by the experts, and the local council. FF’s bushfire r isk assessment, completed in February 2017, suggests the property is a high risk. Although the development application was granted, the insurer did not engage another expert until receiving BC’s report in November 2017. The panel notes BC did not conduct a site inspection, but instead offered a desktop assessment only. Soon after, the insurer offered a cash settlement which was rejected by the complainant. The final decision letter was provided to the complainant who subsequently complained the insurer findings. The final decline letter was provided to the complainant 30 January 2018, two months after the final attendance by AJ and over five months after the development application. Complainant entitled to compensation for non-financial loss It is not in complaint the complainant’s home is in a bush fire risk area. It is also not in complaint the complaint has been ongoing through a bush fire risk period. It is not clear why the insurer delayed seeking an alternate report by some ten months. This complaint has been ongoing during a bushfire period, and the panel accepts the complainant has suffered unnecessary stress due to the actions of the insurer. As such the insurer is required to pay the complainant $2,000 compensation for non- financial loss. Determination | Case number: 515857 Page 6 of 7 3 Supporting information 3.1 Key policy terms Meeting Building regulations If a listed event causes loss or damage to your home and you need to meet current building regulations to repair or rebuild the part of your home that was damaged. Covered under Buildings Insurance The costs to meet current building regulations to repair or rebuild the part of your home that was damaged. Not covered costs to meet building regulations: - that were already in place when your home was built, renovated or altered - for undamaged parts of your home – for example, installing insulation in ceilings that were not damaged. Conditions We must agree to pay the costs before you make any arrangements. 3.2 Expert reports Record Key points financial firm ’s expert (A J ) Report 13 December 2016  Storm caused damage throughout house  Water ingress in roof  Some pre - existing damages Complainant’s expert (FF ) Report 28 February 2017  Property in fire zone  Fire rating 40 (high) financial firm ’s expert (A J ) Report  Upgrades Determination | Case number: 515857 Page 7 of 7 Record Key points 28 February 2017 needed to meet requirements  Further damages caused by storm financial firm’s expert (BC ) Report 3 November 2017  Desktop assessment completed  Property is in bushfire prone land  Legislative requirements are applicable