The applicants lodged a claim under their building and contents insurance policy with
the Financial Services Provider (FSP) for damage caused by water entering the
house during a storm event in December 2016.
The FSP accepted the applicants’ claim. Its builder strip ped out the water damaged
building fittings in preparation for its reinstatement. However, the parties are unable
to agree on the scope of works. The FSP cash settled the applicants $112,360.11,
based on its builder’s repair quotation, plus some allowances.
The applicants say the FSP’s cash settlement is not sufficient to address all the
damage to their building and contents.
1.2 Issues and key findings
Is the FSP required to increase the amount paid for the building claim?
The information available shows the FSP’s cash settlement amount was generally
adequate. The FSP is not required to reinstate the bathroom and laundry. However,
given the claim is to be cash settled, the panel considers it appropriate for the FSP’s
cash settlement be increased to $155,000, to allow for any unforeseen costs incurred
in the process of carrying out repairs.
Are the applicants entitled to additional temporary accommodation?
The applicants’ property has remained unrepaired for an extraordinary long period of
time. Having reviewed the available information, the Panel is satisfied that both
parties contributed to the delay. Given the FSP has already extended the temporary
accommodation benefit beyond the policy limit of 12 months, the Panel is not
satisfied the applicants are entitled to any additional temporary accommodation
benefit.
Is the FSP required to increase the amount paid for the contents claim?
Whilst the applicants have provided an extensive list of items they want paid, they
have not provided sufficient information to establish the full extent of the loss of
contents claimed. The FSP is entitled to settle the contents claim for $23,976.91.
Case No: 515071 Determination Page 2 of 12
1.3 Determination
This determination is substantially in favour of the FSP.
The FSP is required to increase the cash settlement amount for the building claim to
$155,000.00
The FSP is not required to pay any further amount for temporary accommodation or
contents items.
The FSP is to pay the applicants the additional amount of $1,500 compensation, for
the initial delays in claim processing.
Case No: 515071 Determination Page 3 of 12
2 Reasons for determination
2.1 Is the FSP required to increase the amount paid for the building
claim?
FSP accepted applicants’ claim for storm damage
The applicants’ policy provides cover for damage to their property caused by the
events listed in the policy. This includes the insured even t of ‘storm, rainwater or run -
off’.
The FSP accepts the applicants’ property was damaged by water entering the house
during a storm event in December 2016.
During an inspection of the applicants’ property in November 2017, one of the FSP’s
roofing contractors (RC) identified several issues with the house’s concealed gutter
system unrelated to the storm event:
extensive rusting to most of the concealed gutter system
parts of the concealed gutters were incorrectly installed. The gutters within the
bay window of the kitchen, toilet and the room to the North side of the kitchen
were positioned above the height of the ceiling within the house. This would
allow the rainwater overflow from the concealed gutter to flow directly into the
house.
The applicants have accepted to repair the gutters at their own cost. This aspect of
the building repairs is not in dispute.
However, disputes remain over:
whether the FSP is liable to reinstate the bathroom and laundry
the scope of works and quotation required to reinstate the building
whether the applicants are entitled to further temporary accommodation.
FSP not liable to reinstate the bathroom and laundry
The applicants say the bathroom and laundry were damaged during the storm. They
also say these areas were demolished b y the FSP’s builder (SL) without any
agreements. They say the FSP is liable to reinstate the bathroom and laundry.
Based on the available information, the Panel is satisfied:
the bathroom sustained only minor storm damage. The FSP’s building
consultant (AA) included some minor repairs to the plasterboard ceiling in his
scope of works. The applicant provided no other information to suggest there
was more substantive storm damage to the bathroom
the laundry did not sustain storm damage. AA did not include any repairs to the
laundry. Whilst the applicants say it was storm damaged, they provided no
evidence to support this.
The Panel is also satisfied on balance the applicants were aware and agreed for
these areas be stripped out. The information available shows:
Case No: 515071 Determination Page 4 of 12
the applicants wanted to modify the existing bathroom and laundry to better
cater the house for the female applicant’s me dical condition. The applicants’
lawyer (ML) say the female applicant suffers from a severe brain injury
sustained in an accident on 5 December 2007 and sustained further severe
injury in a further motor vehicle accident on 2 August 2017
the applicants advised the FSP’s loss assessor (CL) that they have approached
the TAC to pay for modification (including the kitchen) to make the house more
accessible for the female applicant. This is reflected in the contemporaneous
loss assessor report (CL, dated 4 July 2017)
the applicants and the FSP’s builder (SL) had met at the house to discuss re-
design of the laundry and bathroom to better suit the female app licant’s
condition. This is reflected in SL’s email to the applicant s dated 19 September
2017.
SL says it stripped out the bathroom and laundry areas whilst they had
contractors on site doing other work. It intended to finalise the bathroom and
laundry layout later with the applicants, as the applicants were going to get the
TAC to pay for these works.
Given there was minimal damage to the bathroom and no damage to the laundry, the
Panel accepts the FSP’s builder (SL) stripped out these areas only because the
applicants wanted these areas to be stripped out.
The FSP is not liable to reinstate the bathroom and laundry areas.
AA’s scope of works was reasonable
During the claim, the FSP appointed building consultant AA to prepare a scope of
works required for the storm related repairs. A copy of this was provided to the
applicants on 27 June 2017.
AA’s scope of works i ncluded repairs to numerous areas of the house.
The applicants provided a letter from an engineer (VC) in support of their view that
AA’s scope of works is inadequate. VC inspected the property on 9 September 2017
and his letter dated 4 October 2017 states:
the toilet is ‘under the minimum’ therefore the entrance must be moved
all ceiling must be removed and replaced due to a flood and roof leak
the whole roof must be checked, cleaned, repaired and repainted
the props must be checked, and additional props may be required
additional beam for toilet wall removal
all eave sheeting around the whole house must be replaced
power box in the laundry and bathroom be removed and relocated
the glass in both bathrooms be removed and replaced to comply with current
building regulations.
Whilst the applicants have not explicitly stated they wanted the above items included
the scope of works, it is fair to assume they intend this.
Having regard to the available information, the Panel does not accept the FSP is
liable for the additional works outlined by VC. This is because:
Case No: 515071 Determination Page 5 of 12
the toilet being under-sized, the need to remove a toilet wall, or the need for
additional props/beam were not issues caused by the storm event
the roof was checked by the FSP’s roofing expert RC on 24 October 2014. RC
provided a detailed report, confirming there was one broken tile to the entire
roof of the house. This broken tile was already repaired earlier with a silicon
type product. The weathering of the silicon shows this was applied some time
ago and does not related to the storm event. Photos provided by RC confirm
there was no storm damage to the roof tiles.
RC confirmed the ceiling cavity towards the southern end of the house
sustained no water damage. RC provided a photo in support. This is in contrast
with VC’s comment that all the ceiling was affected by flood and needs to be
replaced. VC did not provide information to support his opinion.
whilst VC says all the eave sheeting needs to be replaced, he provided no
information to show all the sheeting was damaged. On balance, the FSP is
entitled to rely on AA’s scope of works, which details which area of the eave
sheeting requires replacement because they were damaged in the storm event
VC provided no explanation as to why the power box in the laundry and
bathroom needs removal and relocation. If the relocation was required because
of the applicants’ intention to re -design the laundry and bathroom, then this
work is not covered by the policy. Further, even if the power boxes were
damaged in the storm, AA’s scope of works provides for the testing of all
replacement and retained electrical components. This includes providing a
certificate of electrical safety.
the glass in the bathrooms not meeting current building regulations is not an
issue caused by the storm event
In the absence of further information, the Panel is satisfied AA’s scope of works was
reasonable.
Relationship broken down between parties so cash settlement appropriate
The applicants want the FSP to reinstate the house to its pre-storm state.
The PDS allows the FSP, at its option, to repair the damaged part of the building or
pay the reasonable cost of repairing it.
Whilst there is a discretion, FOS expects the FSP to exercise this discretion
reasonably.
The email exchanges and file notes confirm the FSP and the applicants attempted
resolution on multiple occasion, however, the parties remain in dispute over various
issues.
The Panel is satisfied that it is now clear the relationship between the parties has
irretrievably broken down.
Given the extensive history of this dispute, it is appropriate for the applicants’ claim to
be cash settled.
Accordingly, this determination will consider whether the amount of the cash
settlement offered by the FSP is fair and reasonable in the circumstances.
Case No: 515071 Determination Page 6 of 12
FSP’s cash settlement based on SL’s quotation was reasonable
The FSP cash settled the building claim for $112,360.71. This amount is calculated
based on the total of:
SL quotation dated 17 July 2017 $107,200.71
additional plastering provision $2,000
plus 10% increase on provisional sum and prime cost items $3,860
less excess of $700.
The applicants say the cash settlement is insufficient. They say it would now cost
approximately $350,000 to $380,000 to re -instate the property.
During the claim, they obtained a quotation from their builder JK. JK estimated the
repairs to cost approximately $350,000 (inclusive of GST).
JK’s quotation was not cost itemised nor was it based on AA’s scope of works.
The applicants recently obtained another quotation from JK. However, this quotation
lacks detail about its proposed repairs. This updated quotation (undated) contains
alphabetic listings that do not correspond to numerical listing contained in the
previous quotation (dated 9 March 2017).
Without further information, it is difficult to exercise compare JK and SL’s quotations.
The applicants have also said they encountered difficulty in obtaining additional
quotations from other builders. They allege the FSP have influenced other builders to
prevent them from providing quotations.
The applicants have not provided any information to support their allegation. This is a
serious allegation and in the absence of any supporting information the Panel will not
consider this allegation any further.
Cash settlement amount should be increased to $155,000
The FSP confirms that its builder SL was ready and willing to undertake the repairs at
quoted price.
In this context, the Panel does not accept the quotation provided by JK should be
preferred over the quota tion by SL. There is no information provided to show SL’s
quotation is inadequate. Furthermore, it is not uncommon for there to be significant
variation between the estimates provided by different contracts for the same work.
The Panel notes that the FSP also obtained another quotation based on AA’s scope
of works. Builder AB quoted $122,351.59 for the works. This is roughly in-line with
SL’s quotation of $107,200.71.
However given the claim should be cash settled, the Panel considers it appropriate
for th e FSP’s cash settlement to be increased to allow for any unforeseen costs
incurred in the process of carrying out the repairs.
In addition, given the applicants’ personal position, the Panel is satisfied that it is
appropriate to allow an additional amount for site supervision.
Case No: 515071 Determination Page 7 of 12
On this basis, and taking into account AB’s quotation, the Panel considers it fair in all
the circumstances the FSP be required to increase the cash settlement amount for
the building repairs to $155,000.
The FSP has previously cash settled the applicants for $112,360.71. Therefore, the
FSP is required to make a further payment of $37,639.29.
2.2 Are the applicants entitled to additional temporary accommodation?
Policy provides a limited temporary accommodation benefit
The applicants’ po licy provides for the payment of temporary accommodation
benefits where an insured event causes damage to their property to the extent they
cannot live in it.
The policy also states this benefit is for the period the FSP agrees is reasonably
necessary or 12 months, whichever period is lesser.
FSP provided for 14 months of temporary accommodation
On 10 April 2017, the FSP’s loss assessor (CL) and hygienist (BM) identified a
significant mould problem as a result of water entering the building following the
storm event.
From the available information, the Panel is satisfied it was the parties’ intention for:
the applicants to be quickly moved into a serviced apartment, given the building
was no longer suitable for habitation (mould problem). The FSP to cover this
temporary accommodation cost, subject to policy terms
the applicants and the FSP were then to identify a suitable rental property for
the property repair period. The FSP to cover this rental cost, subject to policy
terms.
Information on file shows:
the applicants moved into a serviced apartment on 15 April 2017
the applicants made numerous enquiries with various real estate agents in April
& May 2018. They were unable to identify a suitable rental dwelling
some repair and mould remediation work was done by August 2017. This
includes the strip out of the kitchen and family room ceiling, removal of kitchen
cabinetry, strip out of plaster in rumpus room and skirtings along walls common
to kitchen and passage
the repair works were on hold as the parties disputed the scope of works and
other claim matters
the applicants remained in the serviced accommodation. The FSP paid the
applicants’ serviced apartment cost (temporary accommodation) for 12 months
from April 2017 to April 2018. It then extended this up to 16 June 2018.
The applicants say the FSP should be liable for further temporary accommodation
costs until the house is repaired.
The FSP says it is not liable for any further temporary accommodation costs.
Case No: 515071 Determination Page 8 of 12
FSP not liable for further temporary accommodation costs
The panel accepts the applicants’ property has remained unrepair ed for an
extraordinary long amount of time.
The Panel is not satisfied the FSP has handled this claim in a timely fashion. There
were some delays at the start of the claim process. The FSP received the claim on
30 December 2016. Its builder (PB) completed some emergency electrical make safe
on 5 January 2017. However, PB did not provide a scope of works until around 3
February 2017. When PB’s scope of works was received, the FSP found it was
insufficient, vague and incomplete. This prompted the FSP to engage a loss adjuster
(CL) to re-assess the property. CL was only able to inspect the property on 15
February 2017.
Following CL’s engagem ent, no substantive work or remediation was carried out until
21 August 2017.
The Panel accepts that the FSP has contributed to delays to this claim up to this
point. However, after this point, the Panel is satisfied the FSP was no longer solely
responsible for the delays. The information shows:
Builder SL and the applicants met to finalise the design of the bathroom,
laundry and kitchen. However, no agreement was ever reached
the applicants sought their own engineer for the bathroom/laundry upgrade and
to dispute AA’s scope of works. There appears to be some delay in obtaining
this, as a copy of this was not provided to the FSP’s loss adjuster (CL) until
around 20 November 2017
the applicants engaged a lawyer (ML) during the claim. ML wrote to the FSP on
a round 13 November 2017 about the claim. The FSP’s loss adjuster (CL) wrote
back to ML on 27 November 2017, providing a detailed response and requested
some further information from ML to confirm the applicants’ intention. ML wrote
back on 17 December 2017, saying he was obtaining the applicant’s
instructions. ML provided a short response on 17 January 2018. CL wrote back
on 18 January 2018, seeking clarification. There were some further
correspondence, but ML eventually advised on 22 February 2018, he was no
longer representing the applicant.
Having regard to the above, the Panel is satisfied that both parties have contributed
to the claim delays.
Given the policy provides for a limit of 12 months of temporary accommodation, and
that the FSP has provided for a further two of months of cover, the Panel is not
satisfied the applicants are entitled to any further period of temporary
accommodation cover.
However, given the delays by the FSP during the initial stages of the claim, the Panel
is of the view that the FSP should pay the applicants the additional amount of $1,500
for compensation.
Case No: 515071 Determination Page 9 of 12
2.3 Is the FSP required to increase the amount paid for the contents
claim?
The applicants provided a list of contents items totalling $102,451.48
The FSP’s intention was for the resolution of the building claim, then it would turn to
the assessment of the contents claim. The FSP says almost all the content items are
still stored on site at the applicants’ house. Only the windows coverings were taken
away for storage.
It is now apparent the applicants wish for the settlement of their building and contents
claim at the same time.
On 6 June 2018, the applicants provided FOS with a list of items they want the FSP
to cover. The list totals $102,451.48.
The FSP assessed this list and provided its response on 13 June 2018. The FSP’s
loss assessor (CL) says:
some of the items listed were not inspected as damaged. This includes the bar
mix 350, popcorn marker, chef mixer, knife sharpener, remote of hearing
instrument, landline phone adaptor, pedestal fan, leather furniture, etc
some of the items were covered under the building claim. This includes the
dishwasher, oven and grill, range hood
some of the electrical items are already covered under the building claim for
testing and approved. This includes the home alarm, vacuum system,
Panasonic split system
some of the items are covered, but could be obtained at a lower price from its
supplier. This includes the kettle, bar mix, slow cooker, George Forman
cookers, microwave
some of the items can be cleaned instead of replaced. This includes the towels,
lien, bedding
some of the drapes/curtains/blinds in storage can be restored and some require
replacement
it was not aware of some of items were damaged or existed. This includes the
smart power board, gas detector, roller door motor, security wire/mesh
the applicants appear to have quoted for all the carpet to be replaced, however,
only the lounge room, family room and hallway areas were damaged. The FSP
says it is entitled to limit its liability to the damaged carpet areas based on its
carpet quotation (CC, dated 19 January 2017) for $10,107.68
Based on the information it had, it agreed to pay $23,976.91 for the applicants’
contents claim.
FSP not required to increase the contents settlement
It is accepted insurance law that the applicants, as the insureds, carries the initial
onus to establish that they have suffered loss and damage which is covered by the
terms and conditions of the policy.
Case No: 515071 Determination Page 10 of 12
The appl icants’ obligation to establish the claim is covered by the policy extends to
establishing the extent of the loss and that the loss and damage occurred in
circumstances consistent with the other known and confirmed evidence.
On the basis of the evidence exchanged, the Panel is not satisfied the applicants
have established the full extent of the loss of contents claimed.
The applicants have provided limited information about the items claimed. There
were no photographs, or information to show how the items were damaged by the
storm event.
The applicants have also not provided any information to challenge CL’s opinion
about much of the contents loss. This is significant, as much of the contents listed by
the applicants were covered in the building claim.
Having regard to all the above matters, the Panel is not satisfied the FSP is required
to increase the contents claim settlement.
Case No: 515071 Determination Page 11 of 12
3 Supporting information
3.1 Key policy wording
How we will settle your buildings claim
1. At our option, we will:
a. repair or rebuild the damaged part of your building to the same condition as when it was
new; or
b. pay you the reasonable cost of repairing or rebuilding any damaged part of your building
to the same condition as when it was new; or
c. pay you up to the amount of the sum insured.
If we pay you the reasonable cost of repair or rebuilding, this means the cost of repairing or
rebuilding less any discount available to us were we to repair or rebuild.
2. When it is not possible to use original materials during the repair or r ebuilding process,
the nearest available equivalent to the original materials will be used. We will not pay to
repair or rebuild property which has not been physically damaged.
…
9. Storm, rainwater or run-off
(Applicable whether you have buildings and/or contents cover)
We will pay for loss or damage caused by storm, rainwater or run-off.
'storm' means violent wind (including cyclones and tornadoes), thunderstorms and hail
which may be accompanied by rain or snow.
'rainwater' means rain falling naturally from the sky onto the buildings and/or ground.
'run-off' means rainwater that has collected on or has flowed across normally dry ground or
has overflowed from swimming pools or spas.
…
18. Rental costs after an insured event
(Applicable only when you have buildings cover)
If the buildings are damaged by an insured event to such an extent that you or your tenant
cannot live in them, we will pay your rental costs for:
• the length of time which we agree is necessary to reinstate your buildings, or
• up to a m aximum period of 12 months,
whichever period of time is the lesser.
If you normally live in the buildings, the amount we will pay will be based on the buildings'
rentable value.
If you are the landlord, the amount we will pay will be based on the weekly re nt payable by
your tenants as at the date of damage to the buildings.
Case No: 515071 Determination Page 12 of 12
The maximum combined total amount we will pay under this benefit and 'Removal of
debris, professional fees and extra costs' on page 30 is 10% of the sum insured on the
buildings. Any payment we may make under this benefit will be in addition to any amount
we pay on buildings.