Home / Financial Firm (Unknown - Insurer) / Determination 515036
Determination 515036
Cash settlement amount for water damage building repairs
Summary
The applicant, represented by his son, disputed the FSP's building repair scope and cash settlement offer after a washing machine leak. AFCA found the relationship had broken down, ordered a cash settlement of $74,696.24 with $1,500 non-financial loss, and refused temporary accommodation costs.
The FSP's discretion to cash settle must be exercised fairly, and the settlement is increased to reflect variation risk and the absence of a lifetime guarantee once the applicant takes over repairs.
Issues
- Claim amount dispute primary · upheld
“I am satisfied it is fair in the circumstances that the FSP increase the cash settlement to $74,696.24 to reflect the likelihood of variations and additional risk.”
- Poor claim handling secondary · upheld
“The FSP's failure to provide a complete scope of works caused extended delays and resulted in the applicant having to establish what had been overlooked.”
- Product terms interpretation secondary · not upheld
“The terms of the policy do not extend to providing temporary accommodation benefits in these circumstances.”
Subjects and remedies
home or building damagepay claimpay non financial loss
Text of the determination
Determination
Case No: 515036 Determination Page 1 of 8
Case number: 515036 4 July 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents insurance policy with the financial
services provider (FSP). He lodged a claim on 12 July 2017, after a washing machine
leak damaged his building and contents.
The FSP accepted liability and settled the contents claim for the sum insured. It
arranged trades to conduct make safe works. It prepared a quotation for repairs and
offered to either cash settle the claim, or undertake repairs.
The parties remain in dispute about the amount required to complete repairs.
The FSP maintains its latest offer is sufficient to return the property to its pre-loss
condition. It is prepared to undertake the repairs or cash settle the claim for the
amount quoted by its builders.
The applicant says the initial scope of works overlooked relevant damage, and was
insufficient to complete the repairs. The applicant no longer trusts the FSP to
complete the repairs and seeks a cash settlement based on the quotations he has
provided.
1.2 Issues and key findings
Is the FSP liable to cash settle the applicant’s claim ?
I accept that the relationship between the parties has broken down and it is fair in the
circ umstances that the FSP cash settle the applicant’s claim.
Is the FSP’s offer with cash settlement fair in all the circumstances?
No. I am satisfied it is fair in the circumstances that the FSP increase the cash
settlement to $74,696.24 to reflect the likelihood of variations and additional risk
assumed by the applicant in the completion of the repairs of the property.
Is the applicant entitled to compensation for non-financial loss?
The applicant is entitled to compensation of $1,500 for non-financial loss pursuant to
paragraph 9.3 of the Terms of Reference.
Case No: 515036 Determination Page 2 of 8
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to pay the applicant the following amounts in full and final
settlement of their building claim and dispute:
$74,696.24 as a total amount for building repairs
$1,500 as compensation for non-financial loss.
The FSP is not required to pay interest on the settlement amount.
Case No: 515036 Determination Page 3 of 8
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information in
dispute.
This dispute has not been the subject of a FOS recommendation. Due to the nature
of the dispute it had been referred directly to an Ombudsman for determination in line
with the operational guidelines to the FOS Terms of Reference.
I have decided this dispute based on what is fair in all the circumstances, having
regard to the relevant law, terms of the policy, good industry practice, codes of
practice and previous determinations.
During the course of this dispute, the applicant was represented by his son. For the
purposes of this determination, submissions made by the applicant’s son have been
treated as if they have been made by the applicant himself.
2.1 Is the FSP liable to cash settle the applicant’s claim ?
The FSP has a discretion under the terms of the policy
Under the terms of the policy, the FSP has a discretion to settle a claim for damage
to the applicant ’ s property by either:
arranging for its contractors to repair the damage to the property
paying the applicant the FSP’s cost of undertaking the repairs.
Whilst the FSP has such a discretion the discretion must be exercised fairly and
consistently with the principles of reasonableness and utmost good faith.
Relationship between parties has broken down
During the initial stages of the claim, the FSP appointed its builder (AO) to undertake
make safe works, assess the damage and prepare a scope of works for the
necessary repairs.
However, after the applicant expressed dissatisfaction with the scope and settlement
offer, it advised the applicant it was willing to either:
authorize AO to undertake the repairs
cash settle for the amount of A O ’s quotation , $31,549.10.
The applicant provided quotations from his preferred trades, both of which
significantly exceeded AO’s. He sought to have the FSP’s offer increased to reflect
his trades.
The FSP obtained a further quotation from another builder, PI. PI’s quotation
included additional works, which it said were necessary. It confirmed works could be
warranted.
The FSP eventually increased its offer to cash settle the applicant’s claim to
$47,432.63 rather than complete the repairs. Again, this offer was rejected by the
applicant. By this stage it is clear that the relationship between the applicant and the
FSP and its contractors had broken down. Whilst the FSP remained prepared to
Case No: 515036 Determination Page 4 of 8
complete the works it is clear that the applicant had lost faith in his ability for the FSP
to complete the work as required.
Fair in the circumstances for the FSP to cash settle the claim.
I have had the opportunity of discussing the matter with the applicant. It is clear from
those discussions that the applicant would prefer the repairs to completed by his
chosen repairer.
In the circumstances I consider it fair that the FSP exercise its discretion to cash
settle the applicant’s claim with for the reasonable costs of carrying out the
necessary repairs.
2.2 Is the FSP ’s offer to cash settle the claim fair in all t he
circumstances?
Scope of works has been largely agreed
After it became clear that the FSP’s builder PI initial quotation was based on an
outdated and incomplete scope of works (SOW) PI provided a revised estimate,
which increased its offer by $9,038.40. A further revision of the SOW resulted in an
additional increase of $6,135.25.
During this time the FSP remained willing to authorise its builders to undertake the
necessary repairs, subject to the lifetime guarantee provided under the policy.
The FSP agreed to include additional outstanding items identified by the applicant
and requested revised quotations from AO and PI. It agreed to increase its offer to
$62,606.28, being the higher amount from PI.
The applicant, in an email of 30 April 2018, raised concerns with the extent of repairs
to the bathroom, bins, cleaning and supervision. He says the time allowed for
plumbing works is insufficient:
PI have allowed for the replacement of one tap. The Kitchen sink tap. Every tapset in the
unit has been removed and disposed of. Every tap needs replacing. Vanity taps, toilet stop,
bath taps, shower taps, shower rose, Laundry tap and washing machine taps. The toilet
pan is broken, requiring a new toilet suite. The bath is being changed. All this means tha t
the plumber is virtually going to have to do a whole new rough -in of the unit. Not just a
remove/refit like the PI quote states. This is going to take substantially more time than the
12 hrs allowed for by PI. With the fitoff of all the fixtures and fittings it will be more like the
40 hrs I have allowed. [sic]
The FSP agreed to increase the scope to include the damaged plumbing and
bathroom items, but considered 40 hours of work excessive and unnecessary. It
agreed to provide further cover for removal of rubbish, and the total quotation
increased by $965. The total offer is $63,571.38. he FSP remains willing to complete
the repairs.
The applicant says he requires a provisional sum, approximately $7,200, to account
for a future variation request which may not be accepted:
As I pointed out in my quote, if the windows are damaged by the removal/replacement of
the reveals a variation will need to be claimed. If I cant claim a variation later, I will need to
claim it now. [sic]
Case No: 515036 Determination Page 5 of 8
Other than the possible variations I accept the SOW is largely settled svae for some
additional plumbing work.
FSP not responsible for additional plumbing costs
The applicant says a further 28 hours labour for plumbing works is required. He says
this is due to the bath being changed, and ‘the plumber is virtually going to have to
do a whole new rough- in of the unit.’
The FSP says the applicant’s statement ‘describes that all the hot and cold pipework
(rough- in) has been removed’. The applicant does not dispute the FSP’s view in this
assessment.
From the available material, it is unclear why plumbing works require replacement.
There is no information indicating the inundation event damaged the plumbing works.
While the FSP accepts liability for tap wear and fixings inadvertently removed by
trades, the available information does not suggest the FSP’s trades disturbed or
removed the fixed pipework.
In the absence of any information establishing to the contrary, I accept the FSP is
entitled to limit the extent of plumbing labour as identified in PI’s scope of works.
FSP amended quotation is appropriate starting basis for settlement
The cash settlement should reflect the likely cost to an insured of completing the
repairs and being placed in the position they were in prior to the loss. It needs to take
into account the risks of any repair process, the risk of variations and loss the lifetime
guarantee on the work.
I accept that the cost of repairs and quotations provided from various builders will
vary and in some circumstances, it will vary significantly. The fact that the applicant’s
quotes are significantly higher for the same repairs than the FSP’s quotes does not of
itself establish that the quotation was inadequate.
The FSP has expressed a willingness to have either AO or PI complete the repairs
and provide a lifetime guarantee for those repairs. In these circumstances, I consider
PI’s revised quotation represents a reasonable basis for determining the cash
settlement amount, subject to any adjustments required to account for the possible
variations and risks/contingencies.
The cash settlement amount should be based on the reasonable cost of repairs
taking into consideration the quotations provided by both the FSP and the applicant.
The FSP’s offer of $63,571.28 (including GST) is based on r evised quotations
provided by PI plus additional amounts authorised by its assessor for tapware and
cleaning costs. The quotations were issued to correct errors (identified by the
applicant) which resulted in the inclusion of additional plaster works, plans and
permits as well as whitegoods and a bath.
The applicant has provided several quotations from his own builders estimating the
cost of repairs at between $84,182.40 and $107,937.50. The applicant also believes
a further contingency of $7,200 should be allowed to take into account possible
Case No: 515036 Determination Page 6 of 8
variations in the event that windows are damaged in the removal/replacement of the
reveals.
The revised quotation and offer made by the FSP represents a reasonable starting
point for determining the cash settlement amount. I am not satisfied however that the
offer is adequate for the applicant to be placed in the position he was in prior to the
loss or damage. As indicated earlier when making a cash settlement the FSP must
do what is fair in all the circumstances and take into account the risks associated with
the repair process, the likelihoods of variations and the risk assumed by the applicant
in taking over the repair process.
FSP is to cash settle building claim for $74,696.25
In my view it is fair that the FSP increase the cash settlement offer by 17.5%
($11,124.97) to take into account the following:
any variations to the scope of works which may be required during the course of
the repairs (given such variations are not uncommon where the repairs are
extensive, and the FSP would have been liable for any resulting increase in
costs, if the repairs had been carried out by its contractors)
the additional risk assumed by the applicant owing to the absence of the lifetime
guarantee
the passage of time (including any increase in costs since PI ’s revised
quotations were provided).
Rounding up the settlement to the nearest dollar brings the cash settlement to the
building repairs to $74,696.25.
2.3 Is the applicant entitled to compensation for non-financial loss?
Under the Terms of Reference, FOS may award compensation for non-financial loss
(capped at $3,300) where an applicant suffers an unusual degree or extent of
physical inconvenience, time taken to resolve the situation or interference with the
applicant’s expect ation of enjoyment or peace of mind.
FOS adopts a conservative approach to the award of compensation and expects
applicants to be moderately robust and bear the usual inconvenience associated with
an insurance claim.
In the current dispute the FSP acknowledges that the claim has not been managed
appropriately and its service was less than desirable. Human error had resulted in PI
providing an initial quotation based on an incorrect scope of works and it is clear from
the information exchanged that but for the applicant’s persistence a number of the
items for repair would not have been properly scoped.
The applicant acknowledges that the initial claims management and subsequent
settlement of the contents claim met his expectations. He maintains however that the
conduct for building scoping and quoting fell short resulting in a loss of confidence in
the FSP’s ability to repair the property. This according to the applicant is now also
affecting his health.
Case No: 515036 Determination Page 7 of 8
In addition, the applicant says that his family were unable to enjoy the Christmas
period together and whilst the unit was part of a holiday home he intended to make
the property available to his recently married granddaughter to help her family start
their lives in a positive financial position.
I accept that these issues have impacted on the applicant.
In my view the FSP’s failure to provide a complete scope of works caused extended
delays and resulted in the applicant having to establish what had been overlooked.
Whilst the FSP says the applicant did not provide an itemised quotation it has
accepted additional repairs where required based on the applicant’s information.
I am satisfied the FSP’s management of the claim has caused stress and
inconvenience to the applicant and in the circumstances, I consider compensation for
$1,500 for non-financial loss is appropriate.
Other matters
The applicant has also claimed temporary accommodation costs associated with
providing accommodation for the family over the Christmas period.
Whilst I accept the applicant would have been inconvenienced due to the delays in
having the property repaired I do not believe it is appropriate to award compensation
for the costs of temporary accommodation. In this respect I note that the property
was a holiday home and not the applica nt’s primary residence. The terms of the
policy do not extend to providing temporary accommodation benefits in these
circumstances.
Insofar as the costs were incurred due to the FSP’s poor management of the claim I
note that during this time the FSP had offered to commence the repairs.
I do not consider it appropriate in the circumstances to award compensation for the
temporary accommodation and costs.
Case No: 515036 Determination Page 8 of 8
3 Supporting information
3.1 Relevant policy terms
About your cover
Who we cover - You/Your
You/Your refers to the person or persons named as the insured on your certificate of
insurance and members of your family who normally live with you at the insured address.
Temporary accommodation
We do not cover
• temporary accommodation costs:
[ … ]
- if the building was not your principal place of residence at the time of the loss or damage
[…]
What we do not cover - general exclusions (cont’d)
You are not covered under any section of your policy for damage, loss, cost or legal liability
that is caused by, arises from or involves:
Consequential losses or extra costs following an incident covered by your policy
consequential loss (financial and non-financial loss) or extra costs following an incident
covered by your policy […]
[…]
How we settle building claims
If we agree to pay a claim for loss, theft or damage to the building, we will decide if we will:
• repair damage to the building;
• rebuild the building;
• pay you what it would cost us to repair or rebuild the building;
[…]
If we rebuild (or pay yo u what it would cost us to rebuild), we will do so on a `new for old’
basis.
If we repair (or pay you what it would cost us to repair), we will at our option do so on a
`new for old’ basis or repair to a similar condition to what the building was in befor e the loss
or damage occurred.
Unless we tell you otherwise, we will deduct any amounts you owe us from any amount we
owe you.