Building and contents settlement amounts disputed; claim progress delayed after fire
Text of the determination
Amended Determination
Case No: 514137 Determination Page 1 of 9
Case number: 514137 7 August 2018
1 Overview
1.1 Dispute
The applicant lodged a claim under his home insurance policy with the financial
services provider (FSP) after his home was extensively damaged by a fire in August
2017. The claim was accepted by the FSP.
The FSP obtained a scope of works and a quotation for the rebuilding of the home
from its builder (RB). The FSP cash settled the applicant’s contents claim for
$93,748.
The applicant is d issatisfied with the FSP’s proposed settlement of his claim. He
seeks payment of the full amount of the building sum insured ($400,000) and the
contents sum insured ($200,000).
The applicant also seeks compensation for the manner in which the FSP handled his
claim. Among other things, he says the FSP failed to progress the claim or respond
to his enquiries for a three month period.
1.2 Issues and key findings
Is the FSP required to pay the full building sum insured?
The applicant’s home is capable of being de molished and rebuilt for an amount which
is significantly less than the sum insured and the FSP has arranged for its builder to
undertake these works. Accordingly, the FSP is not required to pay the applicant the
full amount of the building sum insured.
Is the FSP required to pay the full contents sum insured?
The applicant’s damaged contents items can be replaced for an amount which is less
than the contents sum insured . Accordingly, the FSP is not required to pay the
applicant the full amount of the contents sum insured.
Is the applicant entitled to compensation?
The FSP unreasonably delayed the applicant’s claim and failed to provide him with
updates for a considerable period of time. Accordingly, the applicant is entitled to
compensation for financial and non-financial loss, as well as reimbursement of his
legal fees.
Case No: 514137 Determination Page 2 of 9
1.3 Determination
This determination is partly in favour of the applicant.
The FSP is required to:
complete the demolition and rebuilding of the applicant’s property as soon as
possible
provide the applicant with a progress update every 10 days
provide the applicant and his family with temporary accommodation until the
rebuild has been completed
pay the applicant interest on the settlement amount of $93,748, as set out in
section 2.2 below
pay the applicant the amount of $3,000 as compensation for non-financial loss
reimburse the applicant for the additional costs of petrol incurred as a result of
living in temporary accommodation (up to a maximum of $3,300), subject to him
providing a reasonable estimate of the additional costs incurred, and
reimburse the applicant for legal fees (up to a maximum of $3,000), subject to
him providing evidence of the costs incurred.
Case No: 514137 Determination Page 3 of 9
2 Reasons for determination
2.1 Is the FSP required to pay the full building sum insured?
Policy sets out how building claims will be settled
Under the terms of the applicant’s policy as set out in the Product Disclosure
Statement (PDS), the FSP may decide to settle a claim for damage to his home by:
repairing or rebuilding his home, or
paying him the reasonable cost of doing so.
It is clear from the terms of the policy that the FSP has the discretion to decide which
approach to ado pt in settling the applicant’s claim.
In the present case, the FSP’s builder (RB) assessed the applicant’s home as being
damaged beyond repair. The FSP proposes to settle the claim by completely
demolishing the house and rebuilding it with a replacement property.
The applicant says the building was a total loss and therefore the FSP should pay
him the full sum insured for the building.
Proposed settlement was based on quotations obtained
During the claim process, the FSP’s builder (RB) prepared a detail ed scope of works
for the demolition and rebuild of the applicant’s house. The FSP obtained quotations
from RB and a second builder (AJ) to undertake these works.
The amounts quoted by RB and AJ were very similar, with RB quoting $239,473.36
and AJ quotin g $239,661. The FSP accepted RB’s quotation and appointed him to
undertake the demolition and rebuild.
The applicant has not provided any information which indicates that the approved
scope of works will not be effective to rebuild his property to the same size and
standard (as the FSP is required to do, under the terms of the policy).
Nor has the applicant provided any information which suggests that the quotations
provided by the FSP’s builders do not accurately reflect the cost of completing the
necessary works (noting that in any event, the risk of cost overruns will be borne by
the FSP).
The scope of works and quotation prepared by RB include the cost of demolishing
the existing property, as well as ancillary costs such as council permits, engineer’s
drawings and builders warranty insurance
In the absence of any information to the contrary, I am satisfied that the applicant’s
home can be demolished and rebuilt for the amount of $239,473.36 quoted by RB.
This is significantly less than the building sum insured of $400,000.
In these circumstances, I am satisfied that the FSP’s proposal to settle the
applicant’s building claim by appointing RB to rebuild the property is fair and
reasonable, and complies with the FSP’s obligations under the policy.
Case No: 514137 Determination Page 4 of 9
FSP is not required to pay full amount of building sum insured
The applicant says the FSP should be required to settle him for the full amount of the
building sum insured under the policy ($400, 000) because his home was a ‘total
loss’.
The PDS states that, in the case of a building claim, the FSP will pay up to the sum
insured for the building.
The effect of this provision is to limit the maximum amount payable by the FSP to the
sum insured of $400,000. However, it does not require the FSP to pay the full sum
ins ured where the applicant’s home can be rebuilt for a lesser amount.
While the FSP’s builder (RB) described the applicant’s home as a ‘total loss’, this
merely reflected his view that the property was not capable of being repaired. It does
not alter the sc ope of the FSP’s obligations under the policy.
The applicant says the premiums he has paid entitle him to payment of the full sum
insured. However, the FSP is not required to pay the applicant an amount which
exceeds the loss he has suffered as a result of the fire.
The building sum insured of $400,000 was selected by the applicant when he took
out the policy. While it appears the applicant was over insured (given the
replacement value of his home), he has not provided any information which suggests
that the FSP was responsible for the level of cover selected.
Accordingly, the FSP is not required to pay the applicant the full amount of the
building sum insured.
FSP is required to complete repairs
As outlined in section 2.3 below, there have been significant delays in progressing
the applicant’s claim.
Accordingly, the FSP is required to ensure that the demolition and rebuilding of the
applicant’s home is compl eted as soon as possible. The FSP is required to provide
the applicant with updates every 10 days (as it has undertaken to do).
The applicant and his family have been staying in temporary accommodation (at the
FSP’s cost) for the eleven month period since the fire occurred.
The FSP is required to continue to provide the applicant with temporary
accommodation until such time as the repairs have been completed (regardless of
any policy limits which might otherwise apply).
2.2 Is the FSP required to pay the full contents sum insured?
Policy sets out how contents claims will be settled
The applicant’s policy states that the FSP may decide to settle a claim for damage to
his contents by:
repairing or replacing the damaged items, or
paying him the reasonable cost of doing so.
Case No: 514137 Determination Page 5 of 9
The policy specifies certain maximum levels of cover for particular categories of
contents items, including:
computers, computer equipment, electronic organisers, tablets and mobile
telephones, for which cover is limited to $1,000 per item and $5,000 in total
CDs, DVDs, videos, media purchased online, licensed computer games and
software, for which cover is limited to $2,500 in total.
Settlement amount is based on schedule of loss
As outlined above, the FSP settled the applicant’s conte nts claim for $93,748. The
FSP determined the settlement amount based on a schedule of loss prepared by its
internal assessor (ST).
After inspecting the fire damaged property, ST accepted that none of the contents
were salvageable. She prepared a schedule of loss which outlined the contents
contained in each room of the property and allocated approximate replacement
values.
In determining the settlement amount, ST applied the maximum limits for electronic
and media items, as specified in the policy. This reduced the amount which would
otherwise have been payable, given the applicant had many electronic items.
The FSP’s claim records reflect that, when the schedule of loss was provided to the
applicant for review, he queried the replacement values attributed to clothing and
shoes on the basis that many of these items were high end labels.
The FSP offered to review the allowances for clothing and shoes, subject to the
applicant providing further information evidencing the purchase of high end items.
However, the applicant has not provided any such information (or any other evidence
which indicates that the FSP’s settlement offe r is insufficient).
Based on the available information, I am satisfied that the FSP’s settlement offer for
the applicant’s contents items is fair and reasonable. The FSP is entitled to rely on
the maximum limits for particular categories of items, as these limits are clearly set
out in the PDS.
FSP is not required to pay full amount of contents sum insured
The applicant says that the FSP should be required to settle him for the full amount
of the contents sum insured under the policy ($200,000) because all of his contents
were completely destroyed.
The PDS states that, in the case of a contents claim, the FSP will pay up to the
contents sum insured.
As in the case of the building sum insured, the effect of this provision is to limit the
maximum amount payable for contents claims to the sum insured of $200,000.
However, it does not require the FSP to pay the full sum insured where the
applicant’s damaged contents can be replaced for a lesser amount.
The applicant says it is not a matter for the FSP to determine the value of the
contents at his property. However, I consider that it is appropriate for the FSP to do
Case No: 514137 Determination Page 6 of 9
so, in order to ensure that its settlement offer reflects the extent of the loss caused by
the fire.
For the reasons outlined above, the FSP is not required to pay the applicant the full
amount of the contents sum insured.
FSP is required to pay interest on settlement amount
The FSP paid the settlement amount on 16 July 2018, over six months after it was
first determined.
I do not consider that the delay in paying the settlement amount was reasonable.
Accordingly, the FSP is required to pay interest on the settlement amount at the rate
calculated in accordance with section 57 of the Insurance Contracts Act 1984 (Cth)
for the period from 27 October 2017 until 16 July 2018.
2.3 Is the applicant entitled to compensation?
FOS can award compensation
Under the Terms of Reference, FOS may award compensation (capped at $3,300)
for consequential financial loss suffered by an applicant in connection with thei r
claim.
FOS may also award compensation (capped at $3,000) for non-financial loss where
an applicant has suffered an unusual degree or extent of physical inconvenience,
time taken to resolve the situation or interference with their expectation of enjoyment
or peace of mind.
FSP unreasonably delayed progress of claim
The FSP’s claim records reflect that there was a period of approximately three
months during which the FSP failed to progress the claim.
During this time, the FSP did not respond to repeated enquiries by the applicant and
his solicitor. It was not until after the applicant lodged his dispute with FOS that the
FSP provided the applicant’s solicitor with any information about the status of his
claim.
The FSP’s failure to progress the claim was u nacceptable, in circumstances where
the applicant and his family had experienced a very traumatic experience and
remained in temporary accommodation. The FSP has not provided any explanation
for the delay.
The stress and inconvenience suffered by the applicant was exacerbated by the
FSP’s failure to arrange for his temporary accommodation to be extended when it
was due to expire in April 2018. This matter was not addressed until it was raised by
the applicant himself.
Case No: 514137 Determination Page 7 of 9
Applicant is entitled to compensation
I am satisfied that the applicant and his family have suffered significant stress and
inconvenience due to the FSP’s claims handling. The applicant is entitled to
compensation of $3,000 as a result. This amount has been paid to the applicant by
the FSP prior to the issue of this determination. Accordingly, no further amount is
payable.
During the claim process, the applicant’s wife advised that the family had incurred
additional expenses as a result of living in temporary accommodation for an
extended period of time – namely, increased petrol costs in taking her son to school.
In the circumstances, I consider the FSP should be required to reimburse the
applicant for the additional cost of petrol incurred as a result of his family living in
temporary accommodation, up to a maximum of $3,300 and subject to the applicant
providing a reasonable estimate of the additional costs incurred.
Applicant is entitled to partial reimbursement of legal expenses
Under section 9.4 of the Terms of Reference, FOS may require a financial services
provider to reimburse an applicant for legal costs incurred in connection with their
claim. However, FOS will not require a financial services provider to contribute more
than $3,000 to these costs, unless exceptional circumstances apply.
In the present case, the applicant engaged a solicitor after the FSP failed to respond
to his enquiries or provide him with an update as to the progress of his claim. I am
satisfied the applicant’s actions were reasonable in the circumstances.
Accordingly, the FSP is required to reimburse the applicant for his legal fees (capped
at $3,000), subject to the applicant providing reasonable evidence of the costs
incurred.
Case No: 514137 Determination Page 8 of 9
3 Supporting information
3.1 FOS approach to this dispute
This dispute has not been the subject of a Financial Ombudsman Service (FOS)
recommendation. Due to the nature of the dispute, it has been referred directly for
determination, in line with the Operational Guidelines to the FOS Terms of
Reference.
This dispute has been determined based on what is fair in all the circumstances,
having regard to the relevant law, good industry practice, codes of practice and
previous FOS decisions (which are not binding).
There has been a full exchange of all material information relied on for the purposes
of this determination and each party has had the opportunity to address any issues
raised by the other. All of the material provided by the parties has been reviewed and
considered.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues which are
considered directly relevant to the outcome only.
During the course of this dispute, the applicant has been represented by his solicitor.
For the purpose of this de termination, submissions made by the applicant’s solicitor
have been treated as if they had been made by the applicant himself.
3.2 Terms of policy
Subject Terms
Settlement of
building claims
Buildings – what we will and won’t pay
If:
your buildings are insured, and
loss or damage to your buildings occurs as a result of an insured event during
the period of insurance, and
we agree to accept your claim,
we will, at our option, choose whet her to:
repair or rebuild your buildings, or
pay the reasonable cost of repairing or rebuilding your buildings.
We will pay up to the sum insured of your buildings, or any lesser limit that
applies, less any applicable excess …
If we choose to rebuild your buildings, we will:
use new materials, and
rebuild your buildings to the same size and standard.
If we choose to pay the reasonable cost of repairing or rebuilding your buildings
…, we will pay the lesser of:
the costs you actually incur, or
the amount it would have cost us to repair or rebuild your buildings
Case No: 514137 Determination Page 9 of 9
Subject Terms
Settlement o f
contents
claims
If:
your contents are insured, and
loss or damage to your contents occurs as a result of an insured event during
the period of insurance, and
we agree to accept your claim,
we will, at our option, choose whet her to:
repair or replace your contents , or
pay the reasonable cost of repairing or replacing your contents .
We will pay up to t he sum insured of your contents , or any lesser limit that
app lies, less any applicable excess …
If we choose to replace your contents, we may pay you if unusual circumstances
exist. If we pay you, we will pay the lesser of:
the costs you actually incur, or
the amount it would have cost us to repair or replace your contents.
Replacement of your contents is on a new for old basis except for computers
which a re more than 4 years old.
New for old means materials or items of the same type, standard and
specification as when new. If the same is not available, it means mat erials or
items of a similar type, standard and specification when new. It does not mean of
a better standard, specification or quality as new, or of the same brand.
For computers which are more than 4 years old, we will pay the reasonable
market value based on their age and condition at the time of loss.
Limits on
contents cover
“Contents ” inclu des: …
computers (including portable computers), computer equipment, electronic
organisers, tablets and mobile telephones – up to $1,000 per item and up to
$5,000 in total
CDs, DVDs, videos, media purchased online, licensed computer games and
software – up to $2, 500 in total