Determination 513961
Refusal of water ingress damage claim following burst water main
Summary
The applicants claimed for water ingress damage in March 2017 after a 2016 burst main, and the FSP refused it because causation was unproven. AFCA found a prima facie claim, ordered the FSP to meet the claim unless it commissions invasive testing at its own cost with make-good, and gave no figure.
Once the applicants establish a prima facie claim the insurer must establish an exclusion, and it is unfair to require the insured to bear the cost of investigation given the uncertain cause.
Issues
- Claim denial primary · upheld
“The applicants have established a prima facie claim, and the FSP is to meet the applicants' claim as per the terms of the policy unless it investigates at its own cost.”
- Inadequate claim investigation secondary · upheld
“It is unfair in the circumstances for the applicants to bear the costs of the FSP's proposed invasive investigation, so the FSP should bear them.”
Subjects and remedies
home or building damagepay claimrepair or rectify
Text of the determination
Determination
Case No: 513961 Determination Page 1 of 8
Case number: 513961 19 June 2018
1 Overview
1.1 Dispute
The applicants hold a defined events policy of insurance with the financial services
provider (FSP) covering a residential building for $318,000.
On 13 and 14 June 2016 a main water pipe burst behind the back of the home
releasing 102,000 litres of water which caused water inundation to the building. The
FSP accepted the claim and made payment.
The applicants say this was accepted on the proviso that if additional damage was
found due to the claim the FSP would also make payment for same. Works to repair
the building were completed on 2 August 2016.
On 30-31 March 2017 300mm of rain fell over a 48-hour period inundating the ground
floor. The FSP declined the further damage on the basis the applicants have not
established the reported water leak relates to the original claim. The applicants say
this leaking membrane was damaged by the prior event in 2016 and seek payment
from the FSP for the current damage.
1.2 Issues and key findings
Is the FSP entitled to refuse the applicants’ claim?
The panel is satisfied that the applicants have established a prima facie claim under
the terms of the policy.
However, it is fair in the circumstances that the FSP be given the opportunity to
arrange an independent engineer/building consultant to conduct invasive
investigations to determine the cause of the leak. Such investigations must be at its
cost including reinstatement following the testing irrespective of the outcome.
1.3 Determination
This determination is substantially in favour of the applicants.
If the FSP seeks to investigate this claim further, then it must within 30 days of
acceptance of this determination appoint an independent engineer/building
consultant to undertake relevant invasive investigations at its cost, including the
make good of any damage incurred during those invasive investigations, irrespective
of the outcome. At that time, the FSP can make an informed decision based on the
independent engineer/building consultant’s opinion. Otherwise the FSP is to me et the
applicants ’ claim as per the terms of the policy.
Case No: 513961 Determination Page 2 of 8
Case No: 513961 Determination Page 3 of 8
2 Reasons for determination
2.1 Is the FSP entitled to refuse payment of the applicants’ claim?
The policy provides cover for escaped water subject to exclusions
The policy provides cover for water which has escaped from a water main or fixed
pipe. The cover is subject to exclusions but the FSP is not relying on these
exclusions. The FSP says the applicants have not established the damaged water
proof membrane relates to the original claim.
The parties agree that the wall had been subject to over 100,000 litres of water
The FSP and the applicants agree that in June 2016 a water main burst and released
approximately 102,000 litres of water which inundated the home.
The parties agree that the FSP settled the damage to the home arising from the
water ingress. The claim settlement was based on the scope of works provided by
builders. It appears that one of the FSP’s experts, (ASB), noted the water proof
membrane may have failed. The FSP paid the claim but it is unclear whether the
applicants were notified of this potential issue. No destructive testing was undertaken
by either the FSP or applicants during the original claim.
The parties agree that water ingress occurred after heavy rain in March 2017
The parties agree that water ingress occurred after heavy rain in March 2017 causing
damage to the insured building.
The experts do not agree on the cause of damage to the water proof membrane
The following expert opinions were provided:
ASB stated water had penetrated the waterproof membrane of the relevant wall
due to the burst pipe. However, it believed that the wall was not adequately
waterproofed as water had seeped through. The email with this report indicated
a lack of certainty and this is likely due to a lack of destructive testing to confirm.
(S) could not conclusively determine if the failure of the membrane was due to
the burst pipe or gradual deterioration. S was of the opinion that the membrane
had exceeded its life expectancy but destructive testing was required to confirm.
(Q) had the benefit of exposing the top of the existing water proof membrane
and its protective sheeting. Q deemed the membrane to be in good condition
and without weathering or deterioration. Q believes the membrane was
performing as designed but after 100,000 litres of water penetrated the rear wall
it either compromised the water proofing or structural integrity of the masonry
wall. Q also believed destructive testing was required to confirm the opinion.
Although the applicants’ expert Q considered the damage sustained in June 2016
due to the water leak may have compromised the waterproofing or structural integrity
of the retaining wall, Q considered that destructive testing would be required to
confirm this. Q provided a quote to conduct such destructive testing which included:
removal and reinstatement of a site fence
Case No: 513961 Determination Page 4 of 8
cap off all plumbing and electrical points
deconstruction and reconstruction on completion of works of the rear verandah
excavation of a trench, the entire length of the rear elevation of the home to
allow sure up of the trench and allowing for a safe work area
clean up the masonry wall to expose the waterproof membrane for inspection
purposes
engaging of expert consultants to report and
removal of all excavation material.
The quote provided was for $49,775.25.
Additional evidence indicates no water ingress or leaks existed in 2015
The pre-purchase inspection reports and pest inspections indicate that no evidence
of water ingress or pests attracted to water such as termites were discovered.
The available evidence suggests that in the 14 months prior to the damage the water
proof membrane was functioning adequately.
The evidence from the applicants is that during moderate to heavy rain that water
ingress now occurs.
It appears unlikely that the water proof membrane experienced a s udden
deterioration within 14 months without an external influence. This is particularly given
the evidence of Q who noted the uncovered membrane appeared to be in good
condition. Q believed hydrostatic pressures resulted in the damage to the water proof
membrane rather than deterioration.
S also considered it a possibility that the burst pipe could be responsible for the
failure but due to the home’s age considered it more likely it had deteriorated. S did
not have the benefit of exposing the membrane tha t Q did and accordingly the
evidence of Q is preferred.
Based on the evidence provided, the applicants have established a prima facie claim
that the water proof membrane has been damaged by the burst water pipe.
Unfair in circumstances for applicants to bear costs of investigation
The panel accepts that the applicants have established a prima facie claim under the
terms of the policy although the panel is concerned that the exact cause of the
damage has not been properly identified. The available information suggests that the
events of June 2016 have compromised the waterproof membrane or alternatively
caused structural damage due to hydrostatic pressure to the masonry wall.
Alternatively, the water proof membrane may have deteriorated over time, in
particular given the building was 50+ years old.
The panel notes that the FSP offered to arrange for invasive investigations of the
applicants’ property. It offered to undertake an invasive assessment of the wall to
determine the cause of damage to the waterproofing membrane. It did so on the
basis that if the assessment identified that waterproofing membrane has exceeded its
life expectancy, that the damage caused by the invasive testing would not be
Case No: 513961 Determination Page 5 of 8
covered by the FSP. In the circumstances of this particula r dispute, the panel does
not consider this fair.
The panel considers it is fair that if the FSP is to investigate this claim further then the
FSP should do so at its own cost. If the FSP is to investigate the claim further then it
should appoint an independent engineer/building consultant to undertake the relevant
invasive investigations at its cost. The FSP should be responsible for any damage
caused by the invasive testing and the reinstatement of the property irrespective of
the outcome.
Once the FSP has received the relevant report it must then make an informed
decision based on the observed facts. If the FSP elects not to conduct the invasive
testing then it is to meet the applicants claim for the damage sustained.
Case No: 513961 Determination Page 6 of 8
3 Supporting information
3.1 Relevant Policy provisions
“ Your building and/or contents are covered for loss or damage caused by the sudden and
unexpected escape of liquid
from any:
• water main;
• fixed water pipe (but not a garden hose);
..
What is not covered
You are not covered under this Insured Event for:
• loss or damage caused by any escape of liquid of which you were aware and failed to
notify us of within a reasonable period;
• loss or damage resulting from a leaking or faulty shower recess or shower base;
• loss or damage caused by any gradual escape of liquid;
..
• exploratory or restoration costs if we have not accepted a claim under this Insured Event.
Your building and/or contents are not covered under this Insured Event for loss or damage
as described in the General Exclusions listed on pages 75 to 78.
...
Under this policy there is no cover provided for any loss, damage or liability caused directly
or indirectly by or in any way connected with:
..
Wear and tear and lack of maintenance, including rust, corrosion and deterioration (except
in some instances relating to the Insured Events ‘Escape of liquid’ and ‘Legal liability’
claims); ”
3.2 Expert Reports
The following expert reports have been provided:
Record Key points
A pplicants’ expert (T)
Pre - purc hase report
30 April 2015
The report located no defects/safety hazards found.
There were no defects/safety hazards found in the surface
water drainage.
A pplicants’ expert (VT)
Pest inspection
30 April 2015
Landscape timbers showed some signs of fungal decay
There were no visible leaks located which might attract
termites.
All the moisture readings were normal at the time of
inspection.
Rainfall records
1 - 2 May 2015
The rainfall records indicate the property had been subject to
heavy rainfall previously.
Case No: 513961 Determination Page 7 of 8
4 - 5 June 2016
30 - 31 March 2017
23 - 24 February 2018
On 1 May 2015 the rainfall recorded was 48.8mm.
On 2 May 2015 the recorded rainfall was 165mm
On 4 June 2016 the recorded rainfall was 72.5mm
On 5 June 2016 the reco rded rainfall was 125mm
On 30 March 2017 the recorded rainfall was 125mm
On 31 March 2017 the recorded rainfall was 175mm
On 23 February 2018 the recorded rainfall was 66. 2mm
On 24 February 2018 the recorded rainfall was 138mm
Leak Detection Test
Report
29 June 2016
No leak was found to either the water supply lines or
stormwat er lines.
No agricultural drainage pipe work at the base of the retaining
wall through which we could conduct a camera inspection.
However, a small cut out at the base of the wall and large
stones in behind the wall. There may be an agricultural drain
behind that point but it could not be confirmed.
There were definite signs of water flowing from the retaining
wall through the cut out indicating the area is draining as
intended.
FSP Expert ASB
Report
30 June 2016
The burst pipe caus ed water to seep through the double brick
retaining wall of the house in the lower storage room, flooding
a section of the floor area and resulting in damages.
Water has penetrated the waterproof membr ane of this wall
due to the burst pipe, however in our opinion if this wall was
proofed adequat ely seepage would not occur.
A scope of works estimated works in the sum of $5,596.80
which excluded cover for the retaining wall.
An email dat ed 30 June 2016 sending this report to the FSP
indicates in bold and underline “As the recommendation on
this claim is UNSURE – we will await your authority prior to
proceeding with any insurance repairs at the above property”.
This may refer to the fact an engineer had n ot viewed the
property and no destructive testing was conducted to verify
the opinion.
Email from FSP expert
ASB
12 April 2017
ASB re - states a previous opinion that the retaining wall had
not been waterproofed adequately and allowed water ingress.
If this has occurred again then any other similar claims
including storm would be declined in their opinion due to the
membrane failure.
ASB were of the opinion that water ingress would continue to
occur at the brick retaining wall until a sufficient memb rane is
installed which would cost approximat ely $20,000
FSP’s expert (S)
Building Consultant Report
7 July 2017
After the storm event on 31 March 2017 moisture was
observed seeping from the Sout h facing double brick garage
and storeroom.
S discussed the prior repair work to the mains pipe and
believes that no work was done that could have damaged the
retaining wall or membrane.
S recorded elevated moisture levels considered to be
consistent with water ingress as described by the applicant s.
Case No: 513961 Determination Page 8 of 8
S noted that a leak detection report indicated no issues with
the main water supply, and that ground wat er was the likely
source of inundation.
S noted the caus e of moisture ingress through the Southern
brick wall garage and adjoining storeroom is a r esult of failed
waterproof membrane system. S could not conclusively
determine if the failure of the membrane was the result of the
burst pipe or due to gradually deterioration given the
concealed nature of the membrane. S is of the opinion that
the membr ane has exceeded its life expectancy.
A scope of works provided by S includes works to the
retaining wall including new water proof membrane. S also
considers that the condition of the retaining wall to ens ure
there is no damage to the wall or slab edge s hould be
reviewed. The scope also allows for the installation of an
agricultural drain at the base of the drainage sell.
Applicant’ s expert (Q)
Building Report
30 November 2017
The pipes originally damaged have been satisfactorily
repaired.
Repairs have been completed in accordance with the scope
of works.
Q exposed the top of the existing water proof membrane and
its protective sheeting, the membrane was in good condition
and appears to have been applied in accordanc e with
relevant codes and has not wea thered or deteriorated over
time.
Q believes that prior to the water pipe leak the membrane
was performing as designed. However, aft er 100,000 litres of
water penetrated the rear wall of the building it has
compromised the water proofing or the structural integrity of
the masonry wall, causing continued water ingress issues
during heavy rain periods.
Q notes destructive testing would be required to confirm this.
Q provided a scope of works in the sum of $49,775.25 for
exploratory works.