Home / Financial Firm (Unknown - Insurer) / Determination 513170

Determination 513170

Water and mould damage claim to flooring and cabinetry, with business interruption, denied

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-13
ProductGeneral Insurance · Business / commercial
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed$130,815
SourceAFCA PDF

Summary

A dental practice claimed $130,815 for flooring and cabinetry water damage and business interruption after repairs were completed before the claim was lodged. AFCA found the flooring damage was caused by excluded inadequate joist span and the cabinetry damage was not established, so the FSP could deny the claim.

The insured must first show a claim within the policy wording, and the applicant did not establish a covered cause, while the business interruption cover depended on a payable property claim.

Issues

Subjects and remedies

business interruptionsmall businessno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 513170 Determination Page 1 of 8 Case number: 513170 13 September 2018 1 Overview 1.1 Dispute The applicant lodged a claim for water damage to the flooring and cabinetry in two of its dental consulting rooms, as well as losses arising from business interruption to the dental practice. The applicant says the water damage was caused either by heavy storms at the start of 2017 or related to earlier water damage claims in other rooms at the premises. The financial services provider (FSP) received the claim in July 2017 and appointed an investigator to determine the extent and cause of the loss. The investigator found the applicant had already repaired the claimed damages prior to lodging the claim. The FSP denies the claim and says the applicant cannot show the need for repairs arose from an event its policy covers. The FSP also says the real cause of t he loss was faulty workmanship and further, the applicant prejudiced the FSP‟s consideration of the claim by lodging it after the repairs were already complete. The applicant maintains there is a valid claim and claims a total of $130,815 for lost income and damage to flooring and cabinets. 1.2 Issues and key findings Does the applicant have a valid claim? The applicant‟s policy responds to accidental damage to the insured property which occurs during the period of cover. However, the available information establishes on the balance of probabilities the damage to the flooring was caused by inadequate joist span which is not insured but excluded from cover. The information provided does not establish on the balance of probabilities there was water and/or mould d amage to the cabinetry. Further, the applicant‟s actions prevented the FSP from assessing its liability for this part of the claim. As the business interruption cover requires a valid claim under another policy section to respond, the FSP is entitled to de ny both parts of the applicant‟s claim. 1.3 Determination This determination is in favour of the FSP. The FSP is not required to take any further action in relation to the claim or the dispute. Case No: 513170 Determination Page 2 of 8 2 Reasons for determination 2.1 Does the applicant have a valid claim? The applicant must show the claim comes within the policy wording The applicant bears the initial responsibility to show that the claim comes within the terms and conditions of the policy. This is called a valid (or prima facie ) claim. If the applicant can do so, the burden then shifts to the FSP to show why the policy does not respond to, or otherwise excludes, the claim. The applicant claims for water damages to flooring and cabinetry as well as loss of income due to business interruption. The applicant‟s policy responds to accidental loss or damage to the insured property which occurs during the period of cover, subject to exclusions. As „accidental‟ is not defined, it takes on its ordinary meaning, „not intended or expected‟. The business interruption cover is enlivened when there is a valid claim under another policy section, such as for accidental damage to the property. Circumstances of the claim The applicant lodged the claim on 5 July 2017 for water entry to the north wall and south-east wall resulti ng in damp and mould issues in three treatment rooms. The applicant requested cover for replacing the cabinetry, floors and for business interruption. A loss adjustor for the FSP attended the property on 10 July 2017 by which time repairs were already completed. The applicant told the loss adjustor about earlier claims which had been settled. The applicant also said about three or four months earlier, staff had noticed a sponginess in the two middle consulting rooms. The applicant said there was water damage to the subfloor area and timber boards beneath the vinyl flooring. The applicant also claimed water damage to cabinetry. The loss adjustor intended to request information from the landlord but the FSP appointed an investigator to review the claim. The investigator learned there were two earlier issues with water ingress and mould which had been repaired and claims accepted either by insurance or the landlord. Mould was remedied by a specialist (JT). JT was then asked to investigate the “bouncy floors” in two consultation rooms. JT emailed the real estate agent to inform him he believed the “floor was rotting in both surgeries” and would need to be pulled up for investigation. The applicant‟s business was closed between 23 June and 10 July 2017 when the flooring was pulled up and cabinetry was replaced. Case No: 513170 Determination Page 3 of 8 Information provided does not show a covered event caused the claimed loss The FSP‟s investigator contacted persons involved with the repair of the insured property for information about the claimed loss. JT said to the investigator:  the “bouncy floors” resulted because the joist span was too great for the weight of the floor and was not moisture related  when the flooring and cabinetry were removed there were no signs of moisture damage. The real estate agent said the replacement of the cabinetry was a planned upgrade and did not believe there were water or mould damages to these fixtures. The cabinetmaker who replaced the cabinetry said the applicant first contacted him on 7 April 2017 and asked him to provide like-for-like joinery in three rooms as a planned update of the existing cabinetry. The cabinetmaker said he saw damp and mould at the bottom and backs of the cabinets when he removed them. The applicant challenges the adequacy of the material from JT. The applicant also says the “bounciness” was only in one room and as their tenancy had been lengthy, without issue, it does not accept an inadequate joist span was the cause. The applicant provided some unannotated and undated photographs to the investigator. However, in the absence of any further material, these photographs are not sufficiently persuasive. Although the applicant referred to some other material and emails, the applicant did not provide this other material or any expert reports or other i nformation to challenge JT‟s findings or confirm the extent or cause of the water/mould damages to the cabinetry. FSP can deny the claim and the business interruption claim The FSP says if the damages to the flooring were due to an inadequate joist span, this would be poor workmanship and/or error in design which is excluded from cover. In the absence of information to challenge JT‟s conclusions, the panel is satisfied the likely cause of the damage to the flooring was the inadequate joist span. The panel is satisfied this is faulty workmanship and/or error in design which the policy excludes. There is conflicting evidence from the cabinetmaker and from JT about whether there was water or mould damage to the cabinetry. The applicant could not provide any evidence in relation to the state of the cabinetry before or after they were removed. Further, as the applicant had replaced the cabinetry prior to lodging the claim, it was not possible for the FSP to assess the extent or cause of the damage and how the policy might respond. Having regard to all the information provided, the panel finds the applicant did not provide sufficient information to show the claim for damages comes within the scope of the policy wording. In the circumstances, the FSP is entitled to deny the claim. Case No: 513170 Determination Page 4 of 8 Further, the business interruption cover requires there to be a payable claim under another policy section. As the claim for damages is not payable, the business interruption cover does not respond in these circumstances. The FSP is entitled to deny the entire claim and is not required to take any further action in relation to the claim or the dispute. Case No: 513170 Determination Page 5 of 8 3 Supporting information 3.1 FOS approach As advised to the parties, FOS has considered it appropriate to expedite this dispute in accordance with the Operational Guidelines to the FOS Terms of Reference, due to the nature of the dispute. Accordingly, this dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. The determination is made by a pane l consisting of the ombudsman together with an industry representative who has extensive experience in consumer claims and an industry representative who has had extensive experience in the insurance industry. There has been a full exchange of all material information relied on for the purposes of this determination and each party has had the opportunity to address any issues raised by the other. All the material provided by the parties has been reviewed and considered for the purposes of this determination. This dispute has been decided on its merits, having regard to the relevant law, good industry practice, codes of practice and previous FOS decisions. While the parties have raised numerous issues in their submissions, for the purposes of this determination, commentary has been restricted to those issues considered directly relevant to the outcome only. It is an accepted principle of general insurance law an insured bears the onus to establish on the balance of probabilities they have suffered a loss ca used by an event to which the policy responds. This is known as a prima facie claim. Once so established, the onus shifts to the insurer to prove on the balance of probabilities an exclusion applies if it seeks to deny or limit its liability for the loss. 3.2 Policy terms The relevant policy extracts are referred to in the correspondence between the parties and in the FSP‟s Notice of Response dated 16 May 2018. Both the policy document and the Notice have been exchanged with the applicant. 3.3 Extracts from materi al from FSP’s assessor and investigator Record Key points FSP’s assessor ( CL ) First Report 21 July 2017  Inspected and photographed 10 July 2017.  Building is a single - story brick veneer commercial property with a corrugated iron roof and is estimated to be at least 90 years old. There is a concrete slab at the rear and front sections with stumps in the middle.  A business interruption claim resulting from water ingress was dealt with in mid - 2016. A hygienist identified mould spores in the rear consulting r oom and the practice was closed for 10 days. A business interruption claim was Case No: 513170 Determination Page 6 of 8 accepted  Three to four months ago staff noticed the vinyl timber floor became spongy in the two middle consulting room s.  A pplicant arranged a plumbing contractor to carry out a moisture met er test which revealed high levels of moisture in the two rooms.  Mould was also found on the plasterboard wall in front of the reception area. A contractor dealt with the mould separat ely.  Landlord arranged for a contractor to remove the floor s to access the subfloor in the two operating rooms causing the business to close between 23 June 2017 and 10 July 2017.  After removing the cabinetry in the two rooms along the north wall there was water damage noted to the internal cabinet ry.  According to the applicant there was water damage to the subfloor area and timber floorboards underneath the vinyl but the cause of the water entry is unknown.  Applicant decided to upgrade the vinyl floor sheeting and cabinetry in the rear hygienist room but found mou ld growing to the rear panel of the cabinet along the east facing wall.  Source of the water entry is unknown, as is whether it relates to a subfloor ventilation issue or the works carried out in 2016.  Applicant did not submit repair quot ations or approval from the FSP prior to commencing repairs as they thought the costs would be borne by the landlord.  Assessor to request information from landlord . FSP’s investigator (AT) Cont emporaneous Notes with builder JT 5 September 2017  In 2016 JT was engaged by the landlord‟s agent to inspect and provide a quotation for a mould problem identified in a room adjacent to the reception at the front of the risk address.  Moisture problem was identified in the lobby near the reception area which he rectified. Landlord p aid.  When works were completed, he was approached by staff to inspect floors in two consult ancy rooms which were “bouncy”.  Inspected the floors and reported there was a problem but to assess the problem it was agreed floors would have to come up. This was not urgent.  Applicant told him the practice was going to close for a scheduled refurbishment anyway and the existing cabinetry in the consultation rooms was to be replaced.  Inspected the cabinets in both cons ultancy rooms before the floors were pulled up and observed no mould or water damage.  Once he pulled up the floors, he identified the problem was not moisture related but was because the joist span was too great for the weight of the floor which he fixed by adding several joists to reinforc e the floor to make the floor compliant with current building codes. Landlord paid for repairs.  JT added sub floor ventilation vents to ensure the ongoing health of the subfloor through adequate ventilation  JT identified the cause of the bouncing floors to be a Case No: 513170 Determination Page 7 of 8 work manship issue a s the floor failed to comply with provided flooring standards. AT Cont emporaneous Notes with the landlord‟s agent 5 September 2017  Risk address operates as a dental practice and has a long - term tenant and was maint enance free for a long period.  Aware the tenant planned a gradual re - fit of the property, during which several issues arose following the discovery of mould and associated water leaks.  Landlord paid $30,000 for floor and mould issues  As far as he was aware there were no mould or water issues with the cabinetry and the replacement of the cabinetry fitted in well with the flooring repairs. AT Cont emporaneous Notes with 2016 builder 6 September 2017  In later 2016 he was engaged to replace a vanity unit in the hygienist‟s room at the risk address.  A pipe leading to the basin was split causing a substantial water leak. The leak compromised the nearby joists and bearers in the floor and caused mould.  Room was shut down. He commenced repairs.  He engaged contractor to complete mould e radication work (at the cost of around $25,000).  Water leak professionally repaired also.  No water damage to any other part of the risk premises. AT Cont emporaneous Notes with landlord 7 September 2017  Confirms long - term tenancy and maint enance free st atus of building until recently.  In the last 18 months, three separate issues involving the discovery of mould in the front reception area, wat er leak and mould in the back room, and the 2017 issues with the floor in the middle rooms.  Applicant didn‟t di scuss the closure of the business with him.  Builder and tradesmen were organised through his agent.  Landlord made no insurance claims but paid for all repairs. AT Cont emporaneous Notes with dentist. 21 August 2017  In 2016 the practice had several problems with moisture and leaks which led to the discovery of mould.  A water leak was discovered which led to extensive repairs and the discovery of mould.  A cracked wall and a leaking roof were repaired which were causing a moisture and mould problem.  He was rep resented by broker who claimed for repairs and business interruption.  JT was engaged to look at issues at the front of the risk premises relating to a cracked wall and leaking roof. Not concerned with specifics as landlord paid.  JT then asked to investiga te bouncy floors in two dental consulting rooms. Insured says there was a moisture problem and because of this the floorboards were pulled up and extensive work done and because of which the dental practice was closed.  Cabinetry in thes e rooms was removed to affect the repairs to Case No: 513170 Determination Page 8 of 8 the floor. Some form of damage (mould and/or water damage) was discovered on the cabinetry. AT Cont emporaneous Notes with insurance advis or 15 August 2017  2016 business interruption claim accepted and settled in February 2017.  8 May 2017, insured said practice had an ongoing problem with wat er that was affecting the flooring and cabinetry in two consulting rooms.  Advised submit a claim for consideration.  Did not discuss business closure or repairs.  21 June 2017 forwarded claim forms.  Expectation the landlord would pay for repairs. 3.4 Other material reviewed and considered  Parties‟ submissions, emails, photographs and all attachments to all submissions.  Correspondence between the parties.  Records of interview.  Applicant‟s corresp ondence with various parties.  Applicant‟s quotes and invoices.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.