Text of the determination
Determination
Case No: 513095 Determination Page 1 of 5
Case number: 513095 9 August 2018
1 Overview
1.1 Dispute
The applicants lodged a claim against their home and contents policy with the
financial services provider (FSP). A fire had severely damaged their home on 20 April
2017. The FSP accepted the claim and concluded the home could be rebuilt. The
applicants’ preference is to be cash settled.
There are other issues involved: insurance cover for their property; there was an
extension to the emergency accommodation payments; compensation for items
allegedly taken by a contractor’s staff.
The case manager provided the parties with a recommendation on the issues in
dispute. The recommendation was partly in favour of the applicant and partially in
favour of the FSP. A copy of the recommendation is attached to this determination.
1.2 Issues and key findings
Were the findings of the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. Further submissions provided after the recommendation have been
considered.
Are the applicants entitled to further payments?
The FSP is required to make the additional payments identified in the
recommendation and it is also required to pay the applicants $750 compensation for
non-financial loss.
1.3 Determination
This determination is partially in favour of the FSP and partially in favour of the
applicant.
I agree with the case manager’s reasons for the recommendation and the
recommended outcome.
The FSP is required to pay to the applicants: an additional $5,000 (landscaping);
interest on $276,321.00 from 13 December 2017 to 25 May 2018; $750
compensation for non-financial loss. The policy remains in force. Otherwise, the FSP
is not required to take any further action.
Case No: 513095 Determination Page 2 of 5
2 Reasons for determination
2.1 Were the findings in the recommendation correct?
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have taken into
account all the material submitted by the parties, both before and after the
recommendation. I am satisfied the documentation I have relied on has been
provided to both parties.
I am satisfied the case manager’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
2.2 Are the applicants entitled to further payments?
Applicants seeking various payments
The applicants suffered a loss when a fire severely damaged their home on 20 April
2017. The FSP accepted the claim and assessed the extent of damage. The FSP
treated the contents as a total loss and cash settled the applicants as provided by the
terms of the policy. The applicants said there is no issue with this part of their claim.
However, there are issues in relation to the balance of the claim. The applicants
sought a cash settlement on the basis the home is a total loss. They also referred to
the FSP’s letter (dated 6 November 2017) in support of their position, with the letter
stating their home is a total loss and their policy was cancelled.
They are also seeking the payment of the sum insured safety net, in addition to cover
for demolition costs, landscaping, unsecured renovation material and emergency
accommodation.
FSP has accepted most items
Despite the FSP’s letter to the applicants on 6 November 2017, the FSP’s experts
concluded the house could be repaired. The policy allows the FSP to select the
method of settling the claim. The sum insured safety net is only payable if the cost to
repair or replace the building is more than the sum insured.
The sum insured was $428,900, whereas the FSP accepted a repair quote of
$402,246.38. The FSP accepted the builder’s comments that the L-shaped patio did
not require replacement and could be cleaned, since it had only suffered smoke
damage instead of structural damage.
In the absence of information to the contrary, both the accepted quote and the
decision to clean (rather than replace) the L-shaped patio is fair in all the
circumstances.
The FSP accepted the applicants required payment for emergency accommodation.
The policy provides for up to 10% of the sum insured or the cost of accommodation
Case No: 513095 Determination Page 3 of 5
for up to 12 months from the date of the event. The event occurred on 20 April 2017
and the FSP paid $525 per week from 12 May 2017 for the following 12 months.
The available information does not show the FSP unnecessarily delayed the claims
process. The time lines show the FSP responded within a reasonable period to the
applicants’ enquiries about items to be included in the scope of wor ks.
The information indicates the work could have been completed within 30 weeks. This
means the repairs could have been completed by May 2018. This means there is no
reason to extend the period for the emergency accommodation benefit.
The FSP also paid $1,069.20 for the pool pump, as quoted by a supplier. The FSP
also paid the full settlement amount of $2,000 in relation to the unsecured
renovations benefit (floorboards).
FSP required to make further payments
The applicants raised the issue of damage to the front yard : lawn; roses; sprinklers.
The FSP was only prepared to pay $1,650 for the damage based on the quote it
obtained. The applicant obtained a quote for $17,110.
One of the photographs showed two heavy skips in the front yard. The damage from
those alone would be more than the suggested ‘watering, fertilising and weeding of
the garden’, as suggested by the FSP’s contractor. H owever, there is no information
that indicates the fire or the FSP’s contractors caused damage to the back yard.
As such, the recommended additional payment of $5,000 (the policy limit is $10,000)
to the applicants is fair in all the circumstances.
The FSP’s letter (dated 13 December 2017) indicated only $125,925.38 would be
paid to the applicants, as the applicants’ bank required $276,321.00. This issue has
been resolved with the full amount being paid to the applicants (they indicated they
received payment on 25 May 2018).
The FSP is required to pay interest on $276,321.00 from 13 December 2017 until 25
May 2018, in accordance with section 57 of the Insurance Contracts Act 1984.
FSP had incorrectly cancelled the policy
The FSP purported to cancel the policy (letter dated 6 November 2017) because the
house was a total loss. However, this proved to be incorrect as its experts concluded
the building was repairable. The applicants said they have unsuccessfully sought
alternative insurance because of that letter and this led to them lodging a dispute.
The FSP learnt the applicants had demolished their house, leaving only a fenced off
swimming pool. The FSP said the applicants had a duty to notify it about having
demolished the building.
The FSP provided a statutory declaration from its underwriting section indicating the
FSP would not cover a building that is subject to a demolition order or similar
statutory order. However, the applicants decided to demolish the building, rather than
the building having been the subject of a demolition order.
Case No: 513095 Determination Page 4 of 5
The FSP’s purported cancellation had failed to comply with the Insurance Contracts
Act 1984 (Act). The reasons are fully outlined in the recommendation.
FSP’s contractor paid applicants compensation
The applicants raised allegations of theft of contents by a contractor’s when clearing
debris from the house. The contractor opted to pay the applicants $7,044.00 on a
without prejudice basis for the sake of its own reputation and that of the FSP. That
amount was to cover those items the applicants alleged had been taken, although
they provided no information in support of their allegations. As such, the payment is
fair in all the circumstances.
Applicant provided further submissions
The applicants rejected the recommendation whilst the FSP accepted it. The
applicants provided further submissions after the recommendation. The applicants
said the main reason for lodging a dispute was due to their inability to obtain
insurance for the swimming pool area while their house, which they had demolished,
was being rebuilt.
The applicants referred to the FSP’s cancellation letter (6 November 2017) and said
they had been unable to obtain insurance cover from any other source. They
indicated they had never hidden their intention of demolishing the house.
The applicants said the FSP has never reinstated their policy and it should make full
payment in relation to their claim. The applicants outlined the issues associated with
having no insurance cover for the swimming pool, such as potential public liability
concerns.
The applicants said they disagreed with the time frame used in relation to the
emergency accommodation benefit. The applicants believe they should be entitled to
a further period of cover, until the beginning of August 2018. They said they were not
the reason for the delay, referring to the FSP’s final decision (letter dated 13
December 2017) and funds only being made available on 25 May 2018.
The applicants also raised the issue of the $7 ,044 compensation an FSP contractor
paid to them, as they do not believe the amount is sufficient.
Outcome largely remains unchanged
The recommendation, which the FSP accepted, concluded the policy remained in
force until cancelled in accordance with the Act and, since the purported cancellation
was void, the policy remains in force.
The FSP had confirmed the house could be repaired and, given the policy allows the
FSP to decide how it is to settle a claim, the FSP was entitled to opt for repairing the
house. The repairs could have commenced around the time when P provided a quote
(27 October 2017). Further, the FSP promptly responded when the applicants raised
issues about the scope of works. There is no reason that suggests the emergency
accommodation benefit should be extended beyond the 12 months maximum
payment period.
Case No: 513095 Determination Page 5 of 5
The $7,044 compensation paid to the applicants is fair in the circumstances in the
absence of more detailed information. The applicants made serious allegations about
a contractor’s staff stealing their contents. However, the applicants have provided no
information in support of these allegations.
Compensation for non-financial loss
The recommendation concluded there was no information that supported an award of
compensation to the applicants for non-financial loss.
FOS takes a conservative approach to awarding compensation for non-financial
circumstances. The applicants said the cancellation of the policy caused an unusual
degree of interference with their expectation of peace of mind. The finding
themselves uninsured would be disturbing.
The applicants also expressed concern about a lack of public liability cover in relation
to the swimming pool. I am satisfied that the applicants were caused inconvenience
and concerns by the FSP. I find because of this an award of $750 is an appropriate
amount of compensation that should be paid for non-financial loss. However, apart
from that, the outcome in the recommendation remains unchanged.
Recommendation
Case No: 513095 Recommendation Page 1 of 14
Case number: 513095 24 May 2018
3 Overview
3.1 Dispute
The applicants’ home was damaged by fire on 19 April 2017 and the financial
services provider (FSP) accepted the building and contents claim.
The FSP settled the claim for contents and for specified and unspecified personal
items.
The applicants worked with the FSP to correct and update the scopes of works and
quotation for the building repairs. However, some items remain in dispute.
The FSP says the building was not a total loss, and could have been repaired. The
applicants dispute this assessment, saying that the items still in dispute would
increase the total cost of repair to at least the sum insured amount of the policy. They
say this means they should also have access to the safety net feature of the policy.
The applicants also question the FSP’s dec ision to cancel the policy. Although they
decided to demolish the main home building, they are concerned about the public
liability risks associated with the partly fenced swimming pool.
Further, the applicants seek an extension to the 12 months of emerge ncy
accommodation provided by the FSP.
3.2 Issues and key findings
Is the FSP required to pay any additional amount with respect to the building
damage claim?
The FSP is required to pay an additional amount of $5,000 with respect to the
building damage claim to allow for damage to the garden and landscaping caused
during claim processing.
However, no further adjustment to the claim settlement amount needs to be made
because:
There is no evidence that the front and L-shaped patios could not be restored to
pre-e vent condition by cleaning, as included in the FSP’s scope of works
The FSP’s settlement is based on the higher of two quotations it received from
building consultants, and is considered fair in all the circumstances.
Was the FSP’s cancellation of the building policy valid?
The FSP’s cancellation of the building policy was not valid because:
Case No: 513095 Recommendation Page 2 of 14
the applicants decided to demolish the building
the policy requires applicants to notify FSP if circumstances about the risk
change
the FSP say had it been advised of the demolition of the building, it would have
cancelled the policy
the FSP has not shown it cancelled the policy as required by the Insurance
Contracts Act 1984 (the Act).
Is the FSP required to pay more than the policy limit for emergency
accommodation?
The FSP is not required to pay more than the policy limit for emergency
accommodation because:
the repair of the building, as specified in FSP’s scope of works, likely would have
been completed within the 12 month policy limit for emergency accommodation
there is no evidence the FSP caused unreasonable or significant delays in the
processing of the claim.
Is the FSP required to pay compensation for non-financial loss?
The FSP is not required to pay compensation for non-financial loss because there
are insufficient grounds for such a payment.
3.3 Recommendation
This recommendation is partly in favour of the applicants, and partly in favour of the
FSP.
The FSP is required to pay an additional $5,000 with respect to damage caused to
the garden and landscaping during the processing of the claim.
The FSP is required to pay interest, at the statutory rate, pursuant to section 57 of
the Act on the $276,321 (the amount of the claim settlement which was not paid at
the time the of the claim decision letter was issued). This should be calculated from
13 December 2017 (the date of the claim decision letter) until the date these funds
were paid to the applicants.
The FSP is not required to pay:
Any additional amount with respect to the claim for the building damage.
Any additional amount for emergency accommodation.
Any compensation for non-financial loss.
The purported cancellation of the building policy was not valid, and the policy
remains in force until cancelled in accordance with the requirements of the Act.
Case No: 513095 Recommendation Page 3 of 14
4 Reasons for recommendation
4.1 Is the FSP required to pay any additional amount with respect to the
building damage claim?
Front and L-shaped patios could be restored to pre-event condition by
cleaning
The FSP says the claim settlement allowed for the cleaning of the front and L-shaped
patios. It says these components of the building were smoke damaged but did not
suffer structural damage.
A report from the FSP’s building consultant P, dated 8 November 2017, states that:
the powder coated steel tubing of the fro nt patio has no visible smoke staining,
just surface grime from usual airborne dirt.
the front patio structure would respond to a general clean and be returned to an
improved pre-loss condition.
The rear L-shaped patio had minor smoke residual staining to the top of the
vertical support posts, and that this would more than likely respond well to a
general clean and also be returned to an improved pre -loss condition.
Should a clean not be successful, a variation (to the scope of works) could be
processed, detailing the specific parts which did not respond to the cleaning.
The applicants have indicated that the struts of the patio were affected by the fire ,
and the roof was destroyed beyond repair. However, no expert evidence has been
provided to support this contention.
The applicants feel the amount offered by the FSP is not sufficient, saying an amount
of $20,000 is an appropriate amount for the cost to fix this damage and the damage
to the surrounding paving.
However, in light of the information provided by P, and in the absence of any expert
report or evidence to the contrary, I am unable to find that the FSP’s assessment
(that the patios will, on the balance of probabilities, respond to cleaning) is incorrect.
Landscaping amount provided by FSP needs allow for damage to lawns and
roses
The applicants have provided a quotation for the removal of all plant material and
lawn from both the front and rear yards, and the installation of new turf, new lawn
edging, replacement plants and new reticulation. The amount of the quotation is
$17,110.
The FSP has provided a report and quotation from a property maintenance
contractor, PB, based on an inspection on 11 November 2017, which indicates the
garden needs weeding, fertilising and watering. PB noted that the reticulation could
not be inspected as there was no power, but said that the reticulation wiring was
intact.
PB’s quotation for the work it says is required is $1,650, including an amount $550
(including GST) for the replacement of any sprinklers which might need replacement.
Case No: 513095 Recommendation Page 4 of 14
The applicants say skip-bins used by the FSP damaged the lawn, and covered the
roses in the garden. They say the roses were of sentimental value, as they were a
gift from a relative.
The policy allows for up to $10,000 for gardening and landscaping. This provides for
the costs of replacing landscaping and garden features of the same or similar variety
and of a size suitable to commence the re -establishment of the garden. It is
conditional on the trees, plants or shrubs being totally destroyed by the event, or
having been totally destroyed by the work required to repair the home after an event.
I accept that the process of repairing a seriously damaged home building often
involves disruption to the garden, and that any such damage should be rectified by
the party which caused the damage.
Any such rectification should be performed or paid for regardless of any policy
provisions which might allow for or seek to impose limits for this type of damage.
In this case, the quotations provided by the parties are extremely polarised, which the
FSP’s quotation be on the low end of the scale, and the applicants’ quotation being
on the high end of the scale.
I also note that the FSP says the back garden suffered no damage at all, so the
component allowed for this area on the applicants’ quotation is not valid, however the
applicant says the FSP’s contractor did not look at the back yard.
While I am unable to factor in any sentimental value for the roses the applicants say
have been damaged during the claim process, I accept that the damage needing
rectification is likely to be more extensive than simply watering, fertilising and
weeding of the garden, as the replacement of some of the sprinklers.
After considering the material pro vided, and noting the FSP has already paid $1,650
for this item, I am of the view that it is fair in all the circumstances that the FSP
contribute an additional amount of $5,000 for the damage to the landscaping at the
applicant’s property.
FSP’s settleme nt for building damage fair in all the circumstances
The FSP’s settlement for the building damage is based on the higher of two
quotations it obtained from building consultants (SBC, and P) for the repairs.
SBC provided a cost of $321,487.10, while P provided a cost of $402,246.38
It is generally accepted that an insurer is entitled to settle a claim based on the cost
they would incur to perform the repairs.
In this case, I consider the settlement amount paid by the FSP to be fair in all the
circumstances.
However, the claim decision letter of 13 December 2017 advised the applicants that
only $125,925.38 was to be paid to the applicants at that time. The letter indicated
that $276,321 was required by the applicants’ bank.
In the circumstances, it is appropriate that interest at the statutory rate be paid on the
funds which were not paid to the applicants at the time of the claim decision letter.
Case No: 513095 Recommendation Page 5 of 14
The interest should be calculated from 13 December 2017, until the payment
settlement is (or was) made.
4.2 Was the FSP’s cancellation of the building policy valid ?
Applicants decided to demolish the building
The applicants did not want to move back into the building, even if it was repaired.
There is no doubt that the damage to the home was severe, and that the event was
traumatic for the applicants and their family. It is accepted that they might have
difficulty moving back to the home.
In the circumstances, the applica nts’ decision to demolish the building, with a view to
rebuilding afresh, is understandable.
Policy requires applicants to notify FSP if circumstances change
The policy provides that:
the applicants were required to notify the FSP of changes to circumstances which
might affect their cover.
Once the FSP receives such notification, it will discuss specific changes to the
cover, including (but not limited to) when cover will stop.
The policy lists certain events which must be notified to the FSP as soon as the
applicants became aware of them. These include when any insured plans to
demolish the main building.
If FSP were advised of demolition of building, it say it would have cease cover
The FSP wrote to the applicants on 6 November 2017, advising the building (and
contents) had been assessed as a total loss, and advised that future cover under the
policy had ceased.
The FSP has since conceded that information in this letter was incorrect, as the
building was not a total loss.
The FSP says that the applicants should have advised of their plans to demolish the
building, as the property with no main building and with only an unfenced pool would
have represented an unacceptable risk.
The information the FSP has provided in support of this position indicates it wo uld not
offer cover for a building which is subject to a demolition order or similar statutory
order.
In this matter, however, the building is not subject to a demolition order. The main
home building no longer stands as it has already been demolished, and the only part
of the building (as defined in the policy) which is still in place is the swimming pool.
However, in the circumstances, the FSP cannot rely on the policy provisions with
respect to what happens in the event of a total loss. This means that the cover under
the policy did not cease, as suggested by the FSP in its 6 November 2017 letter, and
the policy remains in force until it is cancelled in accordance with the Act.
Case No: 513095 Recommendation Page 6 of 14
Section 59 of the Act provides that an insurer who wishes to exercise a right to
cancel a contract of insurance shall give notice in writing of the proposed cancellation
to the insured. It also specifies that any such cancellation notice needs to contain
certain information, including the time at which the cancellation will take effect.
Even if I were to accept that pursuant to section 60(1)(d) of the Act, the FSP accrued
the right to cancel the policy, based on the information provided I am not satisfied
that the FSP has properly exercised any such accrued right. That is because the FSP
has not complied with the requirements of section 59 of the Act.
Accordingly, pursuant to section 63 of the Act, the FSP’s purported cancellation of
the policy is void.
4.3 Is the FSP required to pay more than the policy limit for emergency
accommodation?
Repair of building likely to have been completed within 12 month policy limit
The policy provides cover for emergency accommodation, in similar alternative
accommodation, for up to 12 months from the date of the event (or 10% of the sum
insured, whichever is the lesser) where the home is unliveable as a result of an event
covered.
The fire event was on or around 19 April 2017, so arguably this is the start date for
calculation of the 12 month period for emergency accommodation.
However, it is understood that the applicants initially found accommodation with their
daughter. The FSP subsequently paid emergency accommodation costs of the
applicants, at a rate of $525 per week from 12 May 2017, for 12 months.
According to the material provided, the repairs to the home, as specified in FSP’s
scope of works, could have been completed within 30 weeks.
The quotation provided by P, upon which the FSP based its settlement, was provided
on 27 October 2017. Arguably, had the repair work begun on or around that date,
they would have been completed by around 11 May 2018. This is based on a repair
timeframe of approximately 28 weeks (although it is possible that the repairs may
have taken longer than noted in the documentation provided.)
I accept that from early in the claim, the applicants had concerns about repairing the
home, and wanted a cash settlement.
However, the home was not a total loss, and could have been repaired had the
applicants not sought an alternative method of remedy.
I have considered the timeline of the claim, and do not accept that the FSP was
responsible for any significant or unreasonable delays which might otherwise mean
that it is not able to rely on the 12 month limit of the policy for emergency
accommodation.
I am therefore unable to find that the FSP should be required to pay any additional
amount for emergency accommodation.
Case No: 513095 Recommendation Page 7 of 14
4.4 Is the FSP required to pay compensation for non-financial loss?
No grounds for a payment of compensation for non-financial loss
Under its Terms of Reference, FOS may decide that the FSP compensate the
applicants for non-financial loss (up to a maximum of $3,000) where an unusual
degree or extent of physical inconvenience, time taken to resolve the situation or
interference with the applicants’ expectation of enjoyment or peace of mind has
occurred.
However, FOS takes a conservative approach to compe nsation for non-financial loss.
In this matter, the applicants were understandably keen to ensure the scope of works
for the repairs included the correct items, and to the correct specification.
The process required for this involved several iterations of the scope of works, with
the applicants reviewing each iteration and seeking adjustments along the way. This
process necessarily took time.
However, after reviewing the exchanged material, I am unable to conclude that the
FSP was responsible for any unreasonable or significant delays to the process.
I am therefore unable to require the FSP to pay compensation for any non-financial
loss suffered by the applicants in this matter.
Case No: 513095 Recommendation Page 8 of 14
5 Supporting information
5.1 Other issues
Safety net
The applicants want the building claim to be treated as a total loss, as they believe
that would give them access to the safety net feature of the policy.
However, the policy clearly states that the safety net does not increase the sum
insured. This indicates it does not operate to provide an automatic boost to any cash
settlement which may be provided.
I also note that the repair costs, outlined in the quotations from the building
consultants used by the FSP, include demolition costs. The policy states that cost for
necessary demolition of any parts of the building are additional to the sum insured.
This means that in assessing whether the sum insured amount has been reached,
the demolition costs should be excluded from consideration.
Based on the information available, I am satisfied that the cost to repair the building
does not exceed the sum insured.
Accordingly, the safety net for the building cover is not triggered.
Resolved issues
When the dispute was lodged, there were some issues relating to the swimming pool
at the property.
It is understood that these issues are now resolved.
In addition, it is understood that an issue relating to the alleged theft of some
contents items, by a representative of one of the FSP’s contractors, has been settled
by a payment of $7,044 to the applicant, made on a without prejudice basis.
Neither of these issues are addressed within this recommendation.
5.2 Relevant law
Insurance Contracts Act 1984
59 Cancellation procedure
(1) An insurer who wishes to exercise a right to cancel a contract of ins urance shall give notice
in writing of the proposed cancellation to the insured.
(2) The notice has effect to cancel the contract at whichever is the earlier of the following times:
(a) the time when another contract of insurance between the insured and the insurer or some
other ins urer, being a contract that is intended by the insured to replace the first -mentioned
contract, is entered into;
(b) whichever is the latest of the following times:
Case No: 513095 Recommendation Page 9 of 14
(i) 4 pm on the applicable business day;
(ii) if a time is specified for the purpose in the contract — that time;
(iii) if a time is specified in the notice — that time.
…
60 Cancellation of contracts of general insurance
1) Where, in relation to a contract of general insuranc e:
…
(d) a person who is or was at any time the insured failed to comply with a provision of the
contract…
the insurer may cancel the contract.
5.3 Policy provisions
Certificate of Insurance – 27 May 2016 to 27 May 2017
Details Sum insured Exce ss
1. Home Building Insurance
Cover Selected: [highest level of cover]
Property: [address] $428,900 $500
Product Disclosure Statement
2.9 Noti fy us about any change s
You must notify us before or as soon as you become aware of any of the circumstances in this
section 2.9 as they may affect your cover.
We’ll then discuss specific changes to your cover, for example changes in premium, conditions,
limits, exclusions or when cover will stop. We’ll confirm the agreed changes in writing, if
applicable.
You must notify us before or as soon as you become aware that:
…
any insured plans to demolish or relocate a building,
…
2.11 Cancelling your cover
…
When can we cancel your policy?
We can cancel your policy (including any renewed policy) for any of the reasons described in
the Insurance Contracts Act, including if you breach your duty of disclosure when initially
entering into the insurance, do not comply with the terms of your polic y (including non-payment
of premium), or make a fraudulent claim.
We will give you prior written notice of the cancellation and, if you ask us, give reasons for
cancelling the policy. The policy will be cancelled with effect from the earlier of:
when you enter into anot her contract of ins urance that is intended to replace this policy,
and
Case No: 513095 Recommendation Page 10 of 14
the time specified in the notice.
…
4. Home and Contents cover
…
Insured events
Depending on whether you have Building cover or Contents cover, we will insure your buildin g
and/or contents at the site against loss or damage caused by the following events if they occur
during your period of ins urance.
…
Fire
Covered
Loss or damage caused by fire where there was a flame.
Loss or damage caused by smoke from:
a bushfire,
a fire on your property, or
a fire originating from your neighbour’s property.
…
4.4 Additional benefits
This summary of additional benefits is a reference tool only. For furt her details of the relevant
terms and conditions, limits and exclusions on cover, refer to the page numbers shown.
Building additional benefits
If we agree to pay a claim for loss or damage to your building, we will also pay for the additional
benefits listed below that are directly related to that loss or damage.
Some additional benefits are paid in addition to the sum insured and some are paid as part of
the sum insured.
…
Benefits paid in addition to your building sum insured
Sum insured safety net [Highe st level of cover]
If the cost to repair or replac e your building is more than your
sum insured, we will pay the extra cost to:
• repair the damage, or
• replace your building.
The sum insured safety net does not increase your sum
insured or any other additional benefit.
If you increase your building’s value (by renovating or
extending fo r example), you need to let us know and increase
your sum insured appropriat ely to avoid being underinsured.
Up to 30% of sum insured
Demolition and removal of debris
We will cover the cost of any necessary demolition of your
home or parts of it, and the removal of resulting debris from
the site (including any trees or branches that have caused
damage to your building and need to be cut down).
Up to 10% of sum insured
Case No: 513095 Recommendation Page 11 of 14
Not covered
the cost of removing or lopping trees or branches that haven’t caused damage to your
building, or
the cost of removing tree stumps still in the ground.
Emergency accommodation
If your home is unliveable, we will cover the cost of similar
alternative accommodation for you and any other insureds.
This expense will only be pa id if you actually incur costs for
emergency accommodation, and only while your home
remains unliveable.
Up to 10% of sum insured or
the cost of accommodation
for up to 12 months from the
date of the event, whichever
is less
…
Gardens and landscaping
If we agree to pay a claim for loss or damage caused by any
of the following insured events – fire, explosion, lightning,
earthquake, malicious acts, riot or civil commotion, impact or
storm (not including rain), we will cover the costs of replacing
lands caping and garden features of the same or similar
variety and of a size suitable to commence the re -
establishment of your garden.
We will only pay this benefit if your trees, plants and
shrubs:
are totally destroyed by the event or have been totally
destro yed by the work required to repair your home after
an event,
were living specimens before the event, and
were not being produced for commercial purposes.
Up to $10,000
…
7. Lodging a claim
…
7.3 How we settle your claim
Repairing or replacing
When we agree to pay a claim for loss or damage:
We may choose to pay:
the reasonable cost of repair, or
the reasonable costs of replacement to new condition with property of the same size
and specification or with items as near to original as is currently possible, or
a cash amount. If we agree to pay cash, we’ll pay the amount it would reasonably cost
to repair or replace the property.
Where a building is not being replac ed, the amount we’ll pay will be less a reasonable deduction
for depreciation due to wear and tear and age of the property.
We will pay:
Case No: 513095 Recommendation Page 12 of 14
to match materials, items or construction with those that existed before the loss or
damage occurred or, where that is not possible, with the nearest similar materials, items
or construction, and
only those costs that directly apply to the part of your property that has suffered the loss
or damage.
How your claim will affect your sum insured
…
• Total loss: If we pay a claim under part of the policy for the total sum insured, then your
insurance cover under the relevant part of the policy will end, and no refund will be given. If you
were paying by mont hly instalments, the balance of your annual premium will be deducted from
your claim.
You’ll need to take out new insurance cover for any replacement property.
We’ll continue to cover your legal liability as the owner or occupier of the site until the end of
your period of insurance, unless cancelled earlier. However this cover will cease immediat ely if:
construction, alterations, additions or demolition commences on your home,
you sell the land, or
you take out a new policy for either building or liability insurance at the site.
Partial loss: If your claim is deemed to be a partial loss (that’s anything less than the total sum
insured), onc e your claim has been paid w e’ll continue to cover you up to the full sum insured
until your policy expires.
…
Glossary of defined terms
…
partial loss when the value of the loss or damage is less than the full sum insured
under the policy.
…
total loss when the property insured is damaged or destroyed to such an extent it cannot be
rebuilt or repaired and/or the total sum insured under the policy has been exhausted.
5.4 Information considered
Record Key points
FSP’s builder (MC)
Quotation
4 Aug 2017
Total estimate for repairs – as per SBC Scope of Work - $278,933.72
incl GST
Includes $13,904.65 for demolition
FSP’s builder (MC)
Quotation
31 August 2017
Quotation based on Scope of Works
Total includes:
o demolition $13,904.65 - excl GST ($15,295.11 incl GST)
o P. Sum Landscaping on comple tion $1, 000 - excl GST ($1,100 incl
GST )
Total $274,193.11 (excl GST)
o Without demolition & landscaping - $ 259 , 288.46 (excl GST)
o Without demolition & landscaping - $ 285,217.31 (incl GST)
Case No: 513095 Recommendation Page 13 of 14
FSP’s builder (MC)
Quotation
4 Sep 2017
Quotation based on Scope of Works
Total includes:
o demolition $13,904.65 - excl GST ($15,295.11 incl GST)
o P. Sum Landscaping on completion $1, 000 - excl GST ($1,100 incl
GST )
Total $276,348.00 (excl GST) - $303,982. 80 (incl GST)
FSP’s building
consultant (P)
Quotation
Undated (sent to FSP on
27 Oct 2017)
Based on Scope of Works provided by SBC (and completed on Scope
of Works template)
Total cost of repair $402,246.38 (incl GST)
o includes an allowanc e for demolition $13,500 (excl GST) $14,850
(incl GST)
FSP’s building
consultant (P)
Report
Undated (b as ed on
inspection 8 Nov 2017 )
Report specifically addresses the issue of the colorbond steel patios
attached to the front, side and partial rear sections of the premises.
Structural engineer’s scope of works included recommendation to
clean the patios to remove soot staining
This report provides an opinion, from a builder’s perspective
Patios examined and no structural damage was noted to raise
concerns about structural integrity of each patio
Steel tubing of patio to front door entry area, and the L - shaped patio
to the rear of the premises, was examined.
Front patio powder:
o coated steel tubing has no visible smoke staining – just surface
grime from usual airborne dirt
o Patio structure would respond to a general clean and be returned
to an improved pre - loss condition.
L - shaped patio:
o had minor smoke residual staining to top of vertical support posts
where it met a horizontal member and roof sheeting.
o Extent of staining was light, and would more than likely respon d
well to the general clean and be returned to improved pre - loss
condition
Should cleaning not be successful, a variation will follow detailing the
specific parts of the patio that did not respond, and the cost to remove
and replace these.
FSP’s building
consultant (SBC)
Quantity Surveyor Detailed
cost estimate
18 Jan 2018
Report based on SBC Scopes of Works 11 Jan 2018 & 4 Jul 2017,
and SBC Causation Inspection report 4 Jul 2017
TOTAL incl GST $378,570
o Includes Contingency allowanc e (2.5% )
o Builders margin (12%)
o Demolition $48,394.00 excl GST ($ 53 , 233. 4 0 incl GST)
o Professional fees $3,500 excl GST ($3, 850 incl GST)
Based on constru ction period of 20 - 24 weeks
Rectification cost without demolition/prof fees - $ 292 , 261 excl GST
($321,487.10 incl GST)
FSP’s building
consultant (SBC)
Documents
Fire damage partial loss
Scope of works and Specification
4 Jul 2017
Partial loss fire reinstatement Inspection Report
Case No: 513095 Recommendation Page 14 of 14
4 Jul 2017
Applicant’s
landscaper
Quotation
31 Oct 2017
Front – removal of old existing lawn (approx. 80sqm) and all plant
vegetation; new lawn edging, new reticulation, new turf, new plants to
be installed - $9,200
Rear - removal of old existing lawn (approx. 60sqm) and all plant
vegetation; new lawn edging, new reticulation, new turf, new plants to
be installed - $6,900
TOTAL - $16,100 (excl GST) $17, 110 (incl GST)
FSP’s Property
Maintenance firm (PB)
Report/Quotation
Inspection date 11 Nov
2017
Inspected gardens to front and rear of property
Garden beds need to be weeded, fertilised and watered.
Reticulation inspected not complet ed as there was no power – but
wiring still complete. Likely some pop - up sprinkler will need
replacement
Cost to: weed gardens, fertilise and tidy gardens; check/test
reticulation - $1,500 (excl GST) allowing $500 for new sprinklers
$1,650 (incl GST)
FSP’s assessor (CL )
Reports
9 & 25 May 2017
4 & 25 Jun 2017
13 Jul 2017
5 , 15, 18 Aug 2017
15 Sep 2017
31 Oct 2017
15 & 23 Nov 2017.
FSP’s claim decision
letter to applicants
13 December 2017
Claim accept ed
P building consultants prepared a scope of works totaling $402,246.38
– a copy was previously forwarded to you.
[name of bank] advis ed us that they require $276,321 of the
settlement money.
The balance remaining $125,925.38