Determination 512486

claim_denial

FirmFinancial Firm (Unknown - Insurer)
Decided2018-07-06
ProductGeneral Insurance · Home building and contents
OutcomeFor the firm
Amount awarded—
Non-financial loss—
Amount claimed—
SourceAFCA PDF

Summary

The applicants claimed for cracked floor tiles after a storm, and the FSP denied the claim as caused by faulty workmanship. AFCA accepted the FSP's expert evidence, found the faulty workmanship exclusion applied, and ordered nothing.

On the balance of probabilities the damage was caused by faulty workmanship, which the policy expressly excludes, and section 46 of the Insurance Contracts Act does not apply to an exclusion based on workmanship.

Issues

Subjects and remedies

home or building damagenatural disasterno remedy

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 512486 Determination Page 1 of 2 Case number: 512486 6 July 2018 1 Overview 1.1 Dispute The applicants, who hold a home and contents insurance policy with the financial services provider (FSP), lodged a claim for damaged tiles in their home. The applicants said the tiles cracked two days after lightning and thunder on 19 October 2017. They consider that event caused the cracking. The FSP denied the claim on the basis the tiles had been incorrectly installed. The case analyst provided the parties with a recommendation on the issues in dispute. The recommendation was in favour of the FSP. A copy of the recommendation is attached to this determination. 1.2 Issues and key findings Were the findings of the recommendation correct? The findings contained in the recommendation were correct and are adopted in this determination. Further submissions provided after the recommendation have been considered. However, these submissions do not warrant a change in the outcome. Was the FSP entitled to deny the claim? The FSP was entitled to deny the claim because:  the evidence shows the tiles were incorrectly installed  the cause of damage was the incorrect installation of the tiles – this falls within a policy exclusion 1.3 Determination This determination is in favour of the FSP. I agree with the case analyst ‟s reasons for the recommendation and the recommended outcome. The FSP is not required to undertake any further action in relation to the claim. Case No: 512486 Determination Page 2 of 2 2 Reasons for determination 2.1 Were the findings in the recommendation correct? I am satisfied the case analyst ‟s recommendation contains an accurate summary of the dispute, the issues to be determined, any applicable paragraphs of the Terms of Reference and any relevant law. Further, I agree with the case analyst ‟s findings for the following reasons. 2.2 Was the FSP entitled to deny the claim? FSP’s experts are preferred Both parties obtained reports from experts. Having carefully reviewed all of the reports, the FSP‟s experts are preferred for the following reasons. First, and of particular significance, if the storm was strong enough to affect the home, it is not explained why substantive damage is isolated to the tiles. The FSP‟s experts make significant reference to this in challenging the applicants‟ experts. This argument has substance. It is reasonably expected that this type of damage would not be limited to tiles to a particular area of the home. The applicants‟ experts do not address this anomaly. Second, the experts do agree that is an element of faulty work manship. The FSP‟s experts say this is due to the contractor failing to provide movement joints both to the perimeter and in the main body of the tiles. The applicants‟ ex pert say there are movement joints at the perimeter. This is not persuasive. They ha ve provided no photographs in support. In contrast, the FSP‟s experts have provided numerous photographs showing the tiles “hard grouted” against their perimeter. This supports their conclusion that movement joints were not installed in areas they were required to be. Third, the FSP‟s experts‟ reasoning is plausible, logical and consistent with the above factors. In contrast, the applicants‟ experts do not explain how it was possible the storm damage could be isolated to the tiles. I am not persuaded by their conclusion there were movement joints to the perimeter. Therefore, I accept the evidence shows the damage was caused by faulty workmanship. As this falls within a policy exclusion, the FSP can deny liability for the claim. Recommendation Case No: 512486 Recommendation Page 1 of 4 Case number: 512486 27 April 2018 3 Overview 3.1 Dispute The applicants hold a home and contents policy with the financial service provider (FSP) over their principal residence. On 24 October 2017, the applicants lodged a claim for cracked floor tiles due to a storm. The FSP declined the claim, saying the proximate cause was not the storm. Rather, the FSP says the cause of the cracked tiles was faulty workmanship, which the policy expressly excludes. The applicants dispute the decision and seeks the FSP pay their claim in full. 3.2 Issues and key findings Is the FSP entitled to decline the applicants’ claim ? The FSP is entitled to decline the applicants‟ claim. This is because, on the balance of probabilities, the:  cracked tiles were not the result of an insured event  the weight of the information indicates the damage was the result of faulty workmanship  the policy expressly excludes damage as a result of faulty workmanship. Additionally, while the applicants raise Section 46 of the Insurance Contracts Act 1984 (Act), it does not assist them. 3.3 Recommendation This recommendation is in favour of the FSP. The FSP was entitled to decline the applicants‟ claim. Case No: 512486 Recommendation Page 2 of 4 4 Reasons for recommendation 4.1 Is the FSP entitled to decline the applicants’ claim ? The applicants established a valid claim The applicant is required to show that, on the balance of probabilities, they suffered a loss caused by a risk insured under the policy. This is known as a valid ( prima facie ) claim. If the applicants are able to establish a valid claim, then the onus shifts to the FSP. In such a case, the FSP needs to show, on the balance of probabilities, it is entitled to:  rely on an exclusion under the policy, and/or  it is otherwise entitled to deny the claim. The applicants‟ policy provides for damage caused by the events listed in the policy. Relevant to this dispute, the policy covers loss or damage as the result of storm. The policy defines a „storm‟ to be: Loss or damage as a result of: storm (including named cyclone), rainwater, flood, or wind The applicants says in October 2017, they identified damage caused to their property as the result of a storm. The FSP assessed the damage and identified damage had occurred. Given this, I am satisfied the applicants have established a valid claim. The FSP however says the cause of the cracked tiles is due to faulty workmanship. Given this, the FSP bears the onus to establish, on the balance of probabilities, this was the cause of the damage. Parties differ on the cause of damage The applicants says a severe thunderstorm in October 2017 was the cause of the tiles cracking internally within their home. The applicants says the tiles cracked two days after the storm event. The FSP engaged a loss adjustor (CL) to complete a site inspection. Upon completion, CL recommended a building consultant attend the premises to ascertain the cause of the cracked tiles. The FSP engaged two building consultants (SBC and MBC) to attend the property and assess the damage in question. SBC produced a causation report on 14 December 2017. SBC:  identified 90% of the total floor area was drummy (detached from the concrete substrate)  movement joints has not been installed to the main body of the tiled floors  tiles had been grouted to the perimeter of all of the rooms and floor mounted fixtures  the above method of installation does not accommodate for lateral movement Case No: 512486 Recommendation Page 3 of 4  considers the damage to the tiled floor to be the result of defective building work The applicants says their tiler (CHT) determined the tiles were installed correctly and no amount of expansion joints would have made any difference to the failures. On balance, the damage was due to poor workmanship I have carefully considered the available information. Whilst CHT assumes the storm event would have been enough to cause the damage, CHT provides no reason(s) why he holds this view. At best CHT „assumes‟ the storm event „would be enough to cause‟ the tiles cracking. On the other hand, SBC and MBC provides logical and rational reasons as to why the cause of the damage was faulty workmanship. Additionally, MBC‟s report provides analysis and explanation as to why the storm event did not attribute to the tile cracking. FSP entitled to deny the claim I accept, on the balance of probabilities, the cause of the damage was faulty workmanship. The policy clearly and unambiguously says: We will not pay for any loss of damage which is caused directly or indirectly by a defect in an item, structural defects, faulty or poor workmanship or design Given the available material, it follows the FSP is entitled to deny the claim. Section 46 of the Act does not assist the applicants The applicants say that as they were unaware of the defect when they entered into the contract, Section 46 of the Act should apply. Section 46 precludes an insurer from relying on a provision relating to a defect or imperfection in a thing where at the time the contract was entered into, an insured was not aware of and a reasonable person in the circumstances could not be expected to be aware of the defect or imperfection. Case law establishes Section 46 does not assist the applicant in this case because the FSP‟s exclusion simply provides that it will not provi de cover for any loss or damage which is caused directly or indirectly by a defect in an item, structural defects, faulty or poor workmanship or design. The exclusion does not operate by reference to the condition of the tiles at the time the contract was entered into. Case No: 512486 Recommendation Page 4 of 4 5 Supporting information 5.1 Reports Record Key points FSP’s expert (CL ) Assessor Report 19 - 12 - 2017  Site inspection 13 - 11 - 2017  Engaged SBC to determine cause of cracked tiles FSP expert (SBC ) Report 14 - 12 - 2017  Damage to the tiled floor is the res ult of defective building work FSP expert (MBC ) Caus ation Report 14 - 02 - 2018  Tiles are installed non - compliantly  Non - compliant issues are the cause of the cracked tiles  There are no visible signs of any movement related damage to the dwelling which would have been expected had the dwelling been shaken so badly that the slab vibrat ed during the event  Cracked tiles were not the result of the storm event on 19 October 2017 Applicant’s expert (CHT ) Report 18 - 02 - 2018  Whole perimeter of the floor is actual expansion control  I fell that no amount of expansion joints throughout floor would of made any difference to the failures here  All tiling had been done correctly as the glue was firm to the floor and firm on the back of the tile  The tiles were laid with a rubber modified glue which allows for sufficient floor movement without decoupling tiles  The owners informed there was a severe weather event in October last year and I would have to assume that this would be enough to cause the failure