Home / Financial Firm (Unknown - Insurer) / Determination 512360

Determination 512360

Cash settlement offer for cyclone storm damage to elevated home; sub-floor excluded

FirmFinancial Firm (Unknown - Insurer)
Decided2018-09-13
ProductGeneral Insurance · Home building and contents
OutcomeFor the complainant in part
Amount awarded$157,894
Non-financial loss—
Amount claimed$175,000
SourceAFCA PDF

Summary

The applicant sought about $175,000 to repair his storm-damaged elderly home after Tropical Cyclone Debbie, while the FSP offered a cash settlement of $153,693.68 excluding the sub-floor. AFCA excluded the sub-floor and ordered a total further payment of $157,893.68 including temporary accommodation, plus asbestos removal if found.

Expert evidence showed no storm damage to the sub-floor, so it was excluded, but the cash settlement was increased to a fair figure based on a local builder's quote, a 10% buffer and the electrical works.

Issues

Subjects and remedies

home or building damagenatural disasterpay claim

Related

All Financial Firm (Unknown - Insurer) determinations · Find similar determinations

Text of the determination

Determination Case No: 512360 Determination Page 1 of 6 Case number: 512360 27 August 2018 1 Overview 1.1 Dispute The applicant lodged a claim with the financial services provider (FSP) for storm damage to his elevated insured home, caused by Tropical Cyclone Debbie. Accepting there was storm damage to the home, the FSP prepared a scope of works to repair the damage. In reviewing the state of the home, the FSP insisted it would not cover the foundations or the sub-floor as the damage to these areas was not caused by the storm. 1.2 Issues and key findings Is the FSP’s offer for settlement fair in all the circumstances ? There is no persuasive evidence of damage to the sub -floor being caused by the insured event. 1.3 Determination This determination is partially in favour of the applicant. The FSP should cash settle the applicant for an additional $157,893.68 to resolve the matter. This is predicated on repairer AB being prepared to undertake the work in accordance with its quote. Should asbestos be discovered on site at any time during works, the FSP will be responsible for its removal. On the basis AB is prepared to conduct the work, there is no need for payment of interest. Case No: 512360 Determination Page 2 of 6 2 Reasons for determination 2.1 Is the FSP’s offer for settlement fair in all the circu mstances? The home was subject to heavy storm damage It is not in dispute the applicant’s home was severely damaged and left unliveable as a result of the storms which accompanied Tropical Cyclone Debbie on or about 28 March 2017. It is similarly not in dispute this policy responds to the damage caused. Contents damage attributable to this event has been settled between the parties and the majority of damage to the home is agreed (at least in scope). The issue of concern primarily relates to the extent of damage which is directly attributable to the storm and for which the FSP is therefore liable. Given the home is significantly aged (more than 80 years old), the applicant accepts it was not in ideal condition. Whilst the applicant accepts the foundations of the home were also in less than ideal condition (he was conducting work on this area prior to the loss), he disputes the FSP should be entitled to exclude the sub-floor. In essence, the applicant considers the home was functional prior to the loss and damaged as a result of the heavy winds and rains from the tropical cyclone. Expert evidence in relation to the damage at the home Loss adjusted CR was the first to inspect the damage on 1 April 2017. CR confirmed there was extensive damage and reported on likely asbestos contamination, which required testing. On the issue of maintenance, the report further noted there appeared to be: deteriorated conditions present [at the home] prior to the event… it is unknown [if] those conditions have contributed to the pres ent damage. On 28 April 2017, engineer NC visited the home to review the extent of damage for the FSP. NC reported the sub-floor was ‘ in a state of disrepair ’ and noted the structure is clad in asbestos based material. The sub-floor was ‘ very poorly maintained ’ with some of the stumps missing, some rusted at the base and/or visibly compromised by termites. Internally, NC reported the floor had ‘ significant bounce and [a] severe lack of support in the walk-in-robe ’ . NC blamed this on the poor quality of the sub-floor and said the issue with the stumps was due to a lack of maintenance and not the cyclone. Much of the rest of the damage at the home can be attributed to flying debris and water ingress through the event. Evidence of roof uplift was also noted. Given the state of damage, NC recommended the building be demolished. Case No: 512360 Determination Page 3 of 6 Assessor DC attended the site on 8 November 2017, to reconsider the sub-floor, after the applicant agreed to bear responsibility for the stumps. DC suggested the sub-floor was not to code and this would affect the repairs conducted on top of the sub-floor. Builder AB visited the site on 3 May 2018. This builder suggested the home had been maintained in a ‘ poor condition ’ and was constructed of cement sheeting (not asbestos). AB conducted tests at the property and found no evidence of asbestos. The hot water system was inspected but no storm-related damage was identified. AB suggested it was aged and rusted but not event damaged. The stove in the kitchen ‘ appeared undamaged ’ but an electrician would need to confirm this. A subsequent electrical report from RA dated 14 June 2018, confirmed water damage to the main switchboard of the home, the hot water system, the stove, the air conditioners and all light fittings. No scope was prepared to review this damage. No persuasive evidence the sub-floor was damaged in the event The predominant area of concern for the applicant is the sub-floor. This damage (along with the foundations) was not accepted by the FSP on the basis it was not caused by the storm conditions. The FSP considered this damage was caused by ‘ wear, tear and deterioration over a long period of time ’ . Based on the view of some of its experts, the FSP also considered the floor was not built to an acceptable state under the building code. The exact code being referred to was not specified. I am not satisfied there is evidence the sub-floor was not to code. Current standards are irrelevant, particularly noting the FSP was aware of the age of the property. If it did not want to cover it, it did not have to offer insurance. The applicant says the building was fit for purpose and liveable prior to the loss. There is no evidence to contradict this. Of more importance is the consistent evidence of there being no specific event damage caused to any area of the sub -floor. The applicant has supplied nothing to suggest evidence to the contrary. In these circumstances, I am satisfied the evidence of the FSP’s experts should be accepted and the issues with the sub-floor were not event related. Therefore, this damage is not covered under the terms of the policy. No persuasive evidence of asbestos being present The applicant raised concerns over the possible presence of asbestos at the site and the likely cost of removing such materials in the repair process. Included in this (according to the applicant) is a shed at the back of the property which was damaged and needs to be removed. Case No: 512360 Determination Page 4 of 6 The original assessment by loss adjuster CR on 5 April 2017 noted ‘ internal wall linings are highly likely to include asbestos (sheeting) ’ . Further descriptions of what CR thought were damaged asbestos sheeting were provided. Reference was also made to the home being ‘contaminated by asbestos and mould and… [it was] a high risk environment ’ . CR further suggested the rear shed was a ‘ combination of asbestos sheet and iron sheet ’ . A later inspection and testing by AB suggested there was no asbestos anywhere on the property. According to the FSP, AB is prepared to undertake the work at the property. It appears the original considerations were speculative as to the presence of asbestos and the age of the property certainly meant it was possible such materials were present. The applicant provided no evidence to confirm asbestos is present. As it stands, I am satisfied the FSP is not required to make an allowance for asbestos damage in its repair quote. Should the applicant (at any stage of the repair or rebuild) identify evidence of asbestos, I am satisfied the FSP should be liable for the cost of its safe removal. Temporary accommodation costs The loss occurred on or about 28 March 2017. At the time of the report of the matter to FOS, the FSP had paid temporary accommodation costs of $14,000. The policy provides temporary accommodation cover for up to 10% of the sum insured for the building ($311,400). This means the FSP is potentially liable for no more than $31,140 for such costs under the policy. Such cover is further limited to no more than 52 weeks under the policy. It is not in dispute the applicant obtained alternate accommodation at a cost of $350 per week. Based on this, the FSP says its maximum exposure under the policy is no more than $18,200 (52 weeks at $350 per week). As it has paid $14,000 already, the FSP restricts its further offer for settlement to $4,200. The applicant has not disputed the calculation and I confirm it is consistent with the policy terms and conditions. Further I am satisfied the additional proposed payment is fair to discharge the FSP’s liability under the policy. Ongoing settlement negotiations The FSP made several offers for settlement to the applicant but the parties have been unable to resolve the matter. To effectively repair the damage attributable to the storm, the applicant originally estimated it would cost about $170,000. He later revised this to $175,000. WC compiled the first scope of works for the repair of areas the FSP agreed to cover. The quotation was in the amount of $134,349.76 and dated 26 September 2017. Case No: 512360 Determination Page 5 of 6 Initial estimates for the damage to the home were not sourced from a local tradesman and the FOS case manager requested the FSP obtain a quote from a local prepared to undertake the work (assuming the sub-floor and stumps were repairable). This was done. AB was reportedly prepared to conduct and warrant the work, providing a quote for $128,573.17, dated 3 May 2016. For the applicant’s part, he is generally satisfied with the FSP’s approach and offer for settlement, with the exception of it not covering the sub-floor and the other minor issues. He also remains concerned about possible asbestos contamination. A later variation quote to account for the electrical work recommended by RA was submitted from builder AB for $4,552.10. The FSP’s offer Within correspondence of 1 March 2018, the FSP confirmed it was prepared to offer $149,141.58 for building works initially based on the abovementioned quotation from WC in the amount of $134,349.76. The assessor’s reinspection report dated 8 November 2017 , says that they offered the applicant a cash settlement of $149,141.58, as their repairers have advised that they cannot warrant repairs due to the condition of the sub-floor and stumps. In subsequent correspondence, the FSP has confirmed that the assessor increased the abovementioned WC quotation to $149,141.58, to provide a 10% buffer for any unforeseen damage or additional costs due to the cash settlement. I agree that this is an appropriate step. The final offer from the FSP, made 29 June 2018, is for the amount of $153,693.68, which accounts for the previous offer of $149,141.58, plus the electrical quotation in the amount of $4,552.10. I am satisfied that it is fair that the FSP should settle the applicant for the all-in amount of $157,893.68 to resolve this matter. This settlement amount is made up of $153,693.68 for repairs and $4,200 as an additional amount for temporary accommodation expenses, as detailed within this determination. The only additional consideration relates to the possible discovery (and need to dispose of) asbestos contaminations at the property, for which the FSP would be additionally liable should the need for the expense arise. The offer of settlement is also dependent upon AB being prepared to undertake the work for the original quoted price. The balance of the settlement will then assist the applicant to cover additional costs as they may arise. If AB is not prepared to do the work, the FSP must engage another repairer, obtain a quotation and settle based on the principles for resolution established above. Given the repairs will be based upon an agreed amount, there is no need for a payment of interest. Case No: 512360 Determination Page 6 of 6 3 Supporting information 3.1 FOS approach to this dispute General information As advised to the parties, FOS has considered it appropriate to expedite the dispute in accordance with the Operational Guidelines to the FOS Terms of Reference. This is because of the nature and complexity of the matter. This dispute has not been the subject of a FOS recommendation and has proceeded directly to determination. A full exchange of the relevant information has taken place between the respective parties and each party has had the opportunity of addressing any issues raised. All of the provided material has been read and considered. The parties have raised numerous issues in their submissions to FOS. For the purpose of this determination, commentary is restricted to only those issues considered relevant to the outcome.

Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.