Text of the determination
Determination | Case number: 512183 Page 1 of 11
Determination
Case number: 512183 18 January 2019
1 Determination overview
1.1 Complaint
The complainant lodged a claim on 17 February 2017 on his Home Insurance Policy
held with the financial firm (insurer) for damage sustained because of a leaking
stormwater pipe.
The insurer accepted liability for damage caused by the leaking stormwater pipe. It
considered other damage to be caused by wear and tear and deterioration.
Dispute arises as to the extent of the liability. The insurer cash settled the
complainant’s claim for $25,793.67 based on a quote obtained from JL. The
complainant disputes the settlement and the way the insurer has handled the claim.
The complainant says the insurer is liable for all damage based on his builder’s quote
for $168,850.
1.2 Issues and key findings
Is the insurer entitled to limit its liability for the claimed damage?
The panel is satisfied the insurer is entitled to limit its liability to cover only the new
damage caused by the leaking stormwater pipe. The panel is satisfied the property
had experienced significant differential ground movement resulting in damage over a
long period of time.
Is the insurer ’s cash settlement reasonable?
The panel is of the view that the insurer should increase its cash settlement from
$25,739.67 to $36,000 to cover repairs as identified by JL including any contingencies
as set out under section 2.2 of this determination.
Is the complainant entitled to compensation for non-financial loss?
The complainant is not entitled to compensation for non-financial loss. The panel is
satisfied that the insurer has handled the claim fairly and reasonably and consistent
with the relevant codes of practice.
Determination | Case number: 512183 Page 2 of 11
1.3 Determination
This determination is substantially in favour of the insurer.
Within fourteen days of the complainant’s acceptance of this determination, the
insurer is to pay the complainant the balance of the cash settlement of $36,000 in
accordance with section 2.2 of this determination. The insurer is otherwise entitled to
refuse liability with respect to the balance of the complainant’s claim.
Determination | Case number: 512183 Page 3 of 11
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the information
exchanged.
Due to the complexities involved in this dispute, it has been referred to the panel for
determination. The panel has decided this complaint based on what is fair in all the
circumstances, having regard to the relevant legal principles, terms of the policy, good
industry practice including codes of practice and prior determinations where
applicable.
2.1 Is the insurer entitled to limit its liability for the claimed damage?
Policy covers loss or damage caused by escape of water
The policy provides cover for several insured events including loss or damage caused
by stormwater, rainwater or run off and water damage resulting directly from the
bursting, leaking, discharging or overflowing of fixed pipes.
The complainant says that in February 2017 he noticed floor tiles that were lifting and
cracking to the walls. The front door and security door were binding to the door jam
and there was also damage to the internal walls and cornices. The complainant
identified a stormwater pipe on an adjacent property had been leaking and he
believed that this had caused the damage.
The insurer accepted partial liability for the damage
Based on a report from its engineer CR the insurer accepted partial liability for the
damage claimed.
CR considered the property had experienced movement for a prolonged period due to
seasonal differential ground movement. CR also found evidence of more recent
movement and considered that water seepage escaping from the leaking stormwater
pipe was the likely cause of the relatively new damage to the interior of the property.
CR prepared a scope of works for the insurer noting the accepted repairs included the
relevelling of the timber flooring, realigning the front door and completing various
interior tiling, plaster and painting works. Several quotes were obtained by the insurer
and the insurer agreed to cash settle the claim for $25,793.67 based on a quote from
its builder JL.
The policy does not cover all damage
The policy includes several exclusions and in particular excludes cover for gradual
deterioration, wear and tear and loss or damage not caused directly by one of the
insured events.
Determination | Case number: 512183 Page 4 of 11
Expert evidence indicates property had pre-existing damage
The panel is of the view that the reports provided establish that the property had
suffered pre-existing damage.
CR found that there were several contributing factors that caused differential ground
movement overtime and prior to the leaking stormwater pipe that has caused damage
to the property including the brick walls.
The complainant relied upon a report from ZA to argue that all the damage to the
property was caused by the insured event. ZA notes that there is evidence of previous
repairs to the rear wall, back wall, driveway and side walls.
The complainant says that the substantial cracking inside the house had not existed
prior to the insured event and that the cracking to the front fence was aggravated by
the insured event. ZA did not inspect the sub-floor or the leak. These conclusions
were not supported by his observations or testing.
The complainant also provided a report form a building expert TB. Again, TB accepts
that the movement was largely due to differential settlement of the property, although
he considered the settlement was a result of the stormwater leakage affecting the
building foundation.
The panel is not persuaded by view of either TB or ZA. In the panel’s view, the
insurer’s engineer CR has pr ovided the more compelling reports.
CR’s reports have recorded her observations and reasons for supporting her
conclusions. She has concluded that the foundations moved over a long period of
time due to varying factors including the soil typical movements over time and the
building type including, as noted by ZA and TB, the construction style of its
foundations. CR accepted that the stormwater leak exacerbated the existing
movement but did not cause it.
The panel notes the following:
Exterior masonry and sunroom wall gap
The p anel accepts CR’s view that the following occurred gradually:
external masonry moving and cracking gradually, with foundation movements
gap between door and wall in the sunroom
gap between window and outside sunroom wall.
The panel accepts that the stormwater leak only contributed to, and was not the
proximate cause of, this damage.
Determination | Case number: 512183 Page 5 of 11
Driveway
CR acknowledged a driveway crack appeared to have recently widened, but noted
the crack’s weathered appearance and the presence of vegetation. She explained
any rain falling into the crack would increase pressure below the driveway and
exacerbate the crack.
ZA noted a crack in the driveway, caused by ground movement, and signs of repairs.
He stated in November 2017 the crack appeared about three months old.
The panel accepts the driveway damage was due to gradual deterioration and wear
and tear. The leaking stormwater pipe was not the proximate cause of the driveway
damage although it may have contributed to more recent movement.
Fence
ZA reported the fence as damaged and stated ‘large amounts of water [were]
discharged near [its] footings’, causing noticeable rotation. TB and SD also
considered the stormwater leak as the primary cause of damage, stating it increased
hydrostatic pressure in the soil at its northern section.
CR agreed the leak contributed to the recent damage but stated the major cause to
be ongoing ground movement over a prolonged period. CR identified numerous
weathered cracks showing moss, round edges, prior filling repairs and dilapidated or
missing filling material. CR concluded:
this indicated the cracks existed for over five years
a lack of significant cracking to the fence’s brick pillars indicated gradual damage.
On balance, the p anel finds CR’s views more convincing , especially given their
detailed supporting explanations. It accepts the proximate cause was ongoing
movement, over time.
Timber flooring
TB suggests discolouration in the timber flooring is from direct contact with water. CR
observed the water leaking into the subfloor had no direct contact with the timber
flooring. ZA viewed excess moisture, from the slope of the land and improper
ventilation in the subfloor, caused the discolouration. ZA did not specify the
stormwater leak as the primary source of excess moisture.
CR explained increased moisture from high humidity would have caused buckling,
warping, cupping and tenting damage instead of discolouration.
The p anel is persuaded by CR’s view the leak was not the proximate cause of the
discoloured timber flooring.
Determination | Case number: 512183 Page 6 of 11
Bedroom 1 and various ceilings
TB’s quote specified a crack behind the cupboard and general ceiling cracks. The
cupboard crack was confirmed in ZA’s inspection and the ceiling cracks in CR’s
reports.
The panel is satisfied the reports confirm CR considered the leak contributed to the
‘relatively new’ damage to:
interior wall behind the cupboard in bedroom 1
plaster/cornice damage to the ceilings in the northern rooms.
The insurer has agreed to indemnify the complainant for this damage. I n CR’s scope
of works ‘2’ the insurer agrees to:
repair a wall crack in bedroom 1 as part of item 1.25: ‘suitably patch repair crack to
the western wall’
repair interior ceiling cracks with a ‘relatively new appearance’ in the interior,
including cornices and ceiling repair items 1.30, 1.35, 1.33.
TB also states the door is misaligned ‘due to movement of the building’. The p anel
notes engineers’ reports do not mention this damage or specify a cause.
However, the insurer agreed the complainant established a claim for recent damage
CR viewed as exacerbated by the leak. Unlike all other claimed damage, CR did not
provide reasons excluding the claim for the misaligned bedroom door.
The insurer is therefore to accept the complainant ’s claim for removal and
rei nstallation of the ‘bedroom 1’ door.
Bathroom
CR detailed the width and length of a bathroom crack in April 2017 and observed it in
a weathered condition with evidence of aged discolouration.
ZA observed a crack in the bathroom wall tile and stated in No vember 2017 it ‘looks
fresh due to noticeable dust’ and occurred when the ‘footing has dropped’. The
complainant claims (in TB’s scope of works) a full tile replacement, waterproofing,
sealing and bonding is required due to ‘moisture and cracks caused from structural
movement’.
On balance, these observations and views on the cause of damage do not sufficiently
refut e CR’s more detailed and specific views the:
proximate cause of the wall tile cracking was not the stormwater leak
proximate cause of ground and building movement was not the leak.
Determination | Case number: 512183 Page 7 of 11
Insurer is entitled to limit its liability for the claimed damage
The panel is satisfied that the stormwater leak was not the proximate cause, that is
the dominant or effective cause, of the ground or building movement.
The panel is satisfied that the insurer is entitled to limit its liability under the terms of
the policy to the damage identified by CR and its scope of works save for the further
damage to the door in bedroom 1. The panel accepts based on the available
information that the insurer is also liable for the cost of the removal and reinstatement
of the door in bedroom 1.
2.2 Is the insurer’s offer of settlement r easonable?
The insurer ’s offer to pay the complainant is based on the quote obtained from JL that
was based on the scope of works prepared by CR. The insurer has cash settled the
complainant’s claim for $25,793.67 based on this cash settlement.
The panel notes the complainant’s builder’s quotes and scope of works provided as
follows:
$168,850 – TB
$93,940 – SD
$98,780 – NM
The panel accepts that the scope of works provided by TB, SD and NM go beyond
the scope of works provided by CR. The insurer has also argued that these quotes
are above the fair market rates as identified by CR.
The complainant was offered the opportunity of providing an itemised quote for
comparison but did not do so. The complainant has relied upon TB’s quote which he
believes is sufficiently itemised and includes matters that have been incorrectly
omitted by CR.
JL’s quote to be preferred
In contrast with all the complainant’s quotes, JL’s quote is based on CR’s scope of
works ‘2’ and itemises the price of each work item.
The panel accepts the quote provided by JL identifies the work that would be required
to rectify the insured damage. The panel however does not accept that the offer of
$25,793.67 is sufficient to adequately compensate the complainant for the damage
sustained by the insured event.
The panel notes that JL refers to an allowance of up to $2,500 (for an engineer to
monitor the stabilisation once the neighbouring property has completed the
stormwater pipe repairs). This does not appear to have been allowed for in the offer
made by the insurer. The quote also includes possible additional tile works may be
Determination | Case number: 512183 Page 8 of 11
required if damage to more tiles occur when the floor is relevelled and/or individual
tiles are replaced.
In the panel’s view, it is fair that a further allowance be made by the insurer to cover
not only the cost of an engineer monitoring the stabilisation of the neighbouring
property but also to cover the potential contingencies associated with the risks for
accompanying the repair process, including the possibility of additional tile works
being required. In the panel’s view, in the circumstances, it would be fair for the
insurer to increase the cash settlement to a total of $36,000.
As the insurer has already paid the complainant $25,793.67 then the insurer should
pay the balance being of $10,306.33.
2.3 Is the complainant entitled to compensation for non-financial loss?
We take a conservative approach to non-financial loss compensation
Under the Financial Ombudsman Service (FOS) Terms of Reference, we allow the
payment of compensation (capped at $3,000) for non-financial loss. We may decide
an insurer should compensate a complainant for such loss only where there has been
an unusual amount of physical inconvenience, time taken to resolve a situation, or
interference with the complainant ’s expectation of enjoyment or peace of mind.
The complainant is dissatisfied with claims handling
The complainant says the insurer did not respond adequately and efficiently to his
queries, and erroneously omitted damage caused by the leak. Further, he says the
insurer breached his privacy by paying the cash settlement amount into his bank
account without telling him. The complainant says the insurer ’ s incompetent claims
handling has caused him significant inconvenience.
Insurer did not unreasonably delay the resolution of the claim
The complainant lodged the claim in February 2017. The insurer engaged loss
assessors in February 2017 and attended in March 2017. CR first attended in April
2017. The insurer responded to the complainant’s ongoing concerns by:
engaging leak location contractors in June 2017
arranging further opinion from its engineering between July and November 2017,
including review of the co mplainant’s engineer’s report
arranging its experts to complete quote comparisons in August 2017 and January
2018.
Given the conflicting expert opinions, the panel considers it reasonable for the insurer
to have obtained appropriate advice. The panel accepts that this can cause some
delays.
Determination | Case number: 512183 Page 9 of 11
The panel is of the view that the insurer did not unreasonably delay a resolution of the
complainant’s claim.
Insurer did not breach its privacy obligations
Further, the panel is satisfied that the insurer has not breach ed the complainant’s
privacy obligations by making payment of the lump sum into his nominated bank
account. The complainant had previously provided these details to the insurer for this
purpose.
In the circumstances, the panel is satisfied the complainant is not entitled to
compensation for non-financial loss.
Determination | Case number: 512183 Page 10 of 11
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS definitions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Policy
Types of loss or damage your buildings are covered for
We will cover your buildings against loss or damage caused by one or more of the
insured events …
Insured events we will pay
11. Water or other liquid damage. We will pay for loss or damage which results
directly from the bursting, leaking, discharging or overflowing of … fixed pipes.
When we will not pay a claim under your policy
This policy does not cover loss, liability, injury or damage:
f. wear and tear: arising out of depreciation, gradual deterioration wear and tear;
Unless we state differently in your policy, we will not pay for:
b. any loss or damage which is not caused directly by one of the insured events.
Determination | Case number: 512183 Page 11 of 11
3.3 Submissions by the complainant and the insurer, including:
Repair scope and costs
CR’s scope of works ‘2’ dated 24 July 2017.
JL’s repair quote dated 2 Aug ust 2017 ($25,739.67).
TB’s repair quote and scope of works dated 3 October 2017 ($168,850).
SD’s repair quote and scope of works dated 11 August 2017 ($93,940).
NM’s repair quote dated 10 August 2017 ($98,780).
CR’s quote review dated 4 January 2018.
JL email dated 6 March 2018.
Council letter dated 14 July 2017.
Export reports
CR’s reports dated 19 April 2017, 21 July 2017, 16 October 2017.
ZA’s report dated 3 October 2017.
ZA’s e mail to financial firm dated 6 November 2017.
CR’s email s to financial firm dated 16 November 2017 and 21 November 2017.
AS leak report dated 29 June 2017.
From above list: TB’s and SD’s documents.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.