Home / Financial Firm (Unknown - Insurer) / Determination 511892
Determination 511892
Limit of water damage cash settlement to bathroom flooring
Summary
The applicant's water damage claim from a leaking pipe was settled by the FSP at $2,368. AFCA found the FSP must cover 50% of the bathroom flooring replacement to current standards and the plumber costs with interest, but not the vanity unit.
The policy covers water escaping from a fixed pipe, including costs to comply with current building standards, but damage to the vanity from long-term moisture exposure is not covered.
Issues
- Claim amount dispute primary · upheld
“the FSP is not entitled to settle the claim by way of the cash settlement of $2,368 (net of the excess) only”
- Claim denial secondary · not upheld
“The FSP is not obliged to cover the vanity unit and associated wall tiling”
Subjects and remedies
home or building damagepay claimpay interest
Text of the determination
Determination
Case No: 511892 Determination Page 1 of 5
Case number: 511892 28 May 2018
1 Overview
1.1 Dispute
The applicant holds a home building and contents insurance policy (the policy) with
the financial services provider (FSP), including the replacement benefit. On 23
October 2017, the applicant lodged a claim for water damage caused by a leak
discovered whilst renovating a bathroom.
The FSP accepted the claim however is seeking to limit its liability under the claim to
only that damage it accepts to be the result of the insured event. The applicant
remains dissatisfied with the FSP’s assessment of its liability and is seeking a higher
settlement under the claim.
1.2 Issues and key findings
Has the applicant established a valid claim?
The available information establishes the insured building has suffered damage due
to an event (escape of liquid) for which the policy extends cover. Accordingly, the
applicant has established a valid claim.
Is the applicant entitled to a higher degree of cover under the claim?
The policy covers damage caused by water escaping from a leaking pipe, as is the
case in this instance, however such cover is subject to the policy limitations and
exclusions specified in the product disclosure statement (PDS).
Although the FSP has shown it is not obliged to cover all the damage claimed. The
FSP is to increase the level of cover authorised under the applicant’s claim in line
with this determination.
1.3 Determination
This determination is substantially in favour of the applicant.
In addition to the damage which has already been accepted under the claim, the FSP
is to cover the applicant for 50% of the cost to replace all of the bathroom flooring to
meet the current building standards and requirements.
The FSP is not obliged to cover the applicant for the costs associated with the
removal and replacement of the vanity unit and associated tiles fitted in the area of
the vanity unit.
Case No: 511892 Determination Page 2 of 5
2 Reasons for determination
2.1 Has the applicant established a valid claim?
Escape of liquid from a fixed pipe is an insured event under the policy
The applicant’s policy provides cover for loss or damage arising from the listed
insured events and additional benefits subject to the policy exclusion specified in the
PDS.
Loss or damage to the insured property arising from an event where water escapes
from a fixed pipe is considered and insured event under the policy.
The applicant lodged a claim seeking cover for water damage to the insured building
which was caused by a leaking copper pipe found in the shower wall cavity of a
bathroom at the property.
In line with the policy, this is an insured event and therefore loss or damage arising
from this event is covered. Accordingly, the applicant has on the balance of
probabilities been successful in establishing a valid claim.
The onus rests with the FSP to establish on balance an entitlement to limit its liability
or decline cover for the loss or damage claimed in line with the policy exclusions and
limitations.
2.2 Is the FSP entitled to reduce its liability under the claim?
Cover is subject to the limitations and exclusions noted in the PDS
Having considered the available information, I am satisfied on balance it establishes
the following:
the insured building was originally constructed in or around the late 1800’s with
some further extension works completed in the 1990’s
the applicant had engaged the services of consultan t ‘AJ’ to undertake
significant restoration works to the bathroom which was subject to deterioration
and wear and tear over the years
AJ, whilst stripping down the shower cubicle area of the bathroom as part of
these restorations, found a leaking copper pipe in the shower wall cavity
further stripping of the area in question identified significant water damage to
the flooring under the shower base
the applicant contacted the FSP to lodge a claim for the cost to repair the
bathroom
the FSP appointed its asse ssor ‘M’ to complete an assessment of the damaged
bathroom
M notes he did not have the opportunity to complete a proper assessment of the
area as AJ had already stripped the area in question before M attended the
insured property
Case No: 511892 Determination Page 3 of 5
there is no dispute the applicant has established a valid claim as there exists
water damage which is covered under the policy. It is the extent of damage the
FSP is liable for under the claim that remains in dispute between the parties.
The FSP is obliged to cover 50% of the cost to replace the bathroom flooring
I have considered the policy and note amongst other benefits the policy, under the
replacement benefit, commits to cover the applicant for:
loss or damage to the insured building as a result of water or liquid escaping
from a fixed pipe
the cost of locating where the liquid is escaping from including damage caused
in locating where the liquid is escaping from
the cost the applicant may need to incur to ensure the repair/rebuilding of the
insured building complies with government legislation, buildings standards and
local authority bylaws.
In saying that, the FSP in line with the policy will only repair, rebuild or pay the
applicant for the part or parts of the building that actually sustained loss or damage,
limiting it to the room, hall or passage where the damage occurred.
Further, the policy excludes from cover loss or damage that arises from faulty
workmanship/design, defects, gradual deterioration and wear and tear.
I note in accepting the claim the FSP has sought to cash settle the applicant in the
amount of $2,368 (net of the policy excess) which it says represents the cost to
repair the water damaged flooring under the base of the shower cubicle.
I am satisfied the available information establishes even before the leak was located,
arising from the aged condition of the bathroom, the applicant had intended and
indeed begun significant renovation works in the bathroom.
AJ, as part of these restoration works, had already begun damaging and stripping the
shower cubical installation and it was at this time the leak was located. I also accept,
considering the leak was within the shower wall cavity, the applicant was not
reasonably aware of the leak until such time that the restoration works has
commenced.
Policy commits to repair/rebuild the insured building to current standards
It is not in dispute the insured building is of an old construction. It is not unreasonable
to accept the building standards and requirements at the time of its construction were
different to today’s standards.
I acknowledge the FSP’s reference to defective workmanship and design in the
construction of the bathroom flooring. However, I am not satisfied the FSP has
established on balance the construction of the flooring was defective and/or faulty in
line with the building standards in place at the time of its construction.
Having considered the available information, I am satisfied this establishes in order to
complete the repairs to water damaged section of the bathroom flooring, there are
additional works that need to done to ensure it complies with current building codes
and standards. These works include repairs to the floor joists and the waterproofing
system.
Case No: 511892 Determination Page 4 of 5
I accept these costs, are reasonably considered to be additional costs under the
claim. However, as noted above they do arise from works required to ensure the
bathroom complies with government legislation, buildings standards and local
authority bylaws. The policy does commit to cover the applicant for such additional
costs under a claim.
In saying that, I acknowledge and accept the FSP’s position that the bathroom, even
before the leak was located, was in an aged and worn condition which reasonably
was the reason behind the applicant’s decision to commence the significant
renovation works.
Therefore, having considered the available information, the commercial intention of
the policy and what is considered fair in all the circumstances, I determine:
the FSP is not entitled to settle the claim by way of the cash settlement of
$2,368 (net of the excess) only
the applicant has not established an entitlement to nor would it be reasonable
under the circumstances to require the FSP to cover all the costs claimed
both parties are to equally contribute towards the reasonable cost to
repair/rebuild the bathroom floor (including works relating to the floor joists and
waterproofing of the bathroom flooring).
The applicant has provided a quote from AJ to undertake these works and in the
interest of finality and an absence of any information showing the quote is excessive,
the FSP is to base its settlement of the claim on this quote. To be clear, the FSP is to
cover the applicant for 50% only of the total cost to replace the complete bat hroom
flooring to current standards.
The FSP is not obliged to cover the vanity unit and associated wall tiling
I acknowledge the applicant’s strong view the vanity unit installed in the bathroom
was also water damaged due to the leaking copper pipe. However, I am not satisfied
the available information on balance establishes this to be the case.
Rather, on balance, I accept M’s assessment in this regard to be the more
compelling. Any damage to the vanity unit was not the result of the insured event
rather it is because of an exposure to moisture over a long period of time due to
normal use of the wet area.
I acknowledge AJ’s comments that due to its method of construction, the vanity unit
was not salvageable. However, I am not satisfied in this instance, this establishes a
reasonable cause to require the FSP to cover the vanity unit when the damage is not
due to the insured event giving rise to the claim.
Accordingly, I determine the FSP is not required to cover the applicant for the costs
associated with the removal and replacement of the vanity unit or wall tiles
damaged/removed in the process
The FSP, on being provided with evidence of costs being incurred by the applicant, is
to cover the applicant for the costs associated with appointing the plumber to the
claim. Further, the FSP is to pay interest on the final total settlement amount in line
with section 57 of the Insurance Contracts Act 1984 from 29 December 2017 to the
date payment is issued to the applicant under the claim.