Home / Financial Firm (Unknown - Insurer) / Determination 511839
Determination 511839
Water damage claim to bathrooms declined as pre-existing
Summary
The applicants discovered bathroom water damage shortly after buying a home and insuring it, and the FSP declined the claim. AFCA found the long-term leak predated the policy, so the FSP is entitled to deny the claim.
The policy responds only to insured events occurring during the period of insurance, and the applicants bore the onus to show the damage occurred within it.
Issues
- Claim denial primary · not upheld“The available material establishes the insured event occurred before the policy commenced.”
Subjects and remedies
home or building damageno remedy
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 511839 Determination Page 1 of 3
Case number: 511839 27 June 2018
1 Overview
1.1 Dispute
The applicants purchased a home and contents insurance policy with the financial
services provided (FSP) on 5 October 2017.
On 20 October 2017, the applicants discovered invisible cracks in the shower base.
They lodged claims with the FSP for water damage to their bathrooms.
The FSP declined the claims. It says:
the bathroom damage occurred before the policy started
the applicants prejudiced its ability to assess the claim as the evidence of the
damage was removed before it could assess it.
The case officer provided the parties with a recommendation on the issues in
dispute. The recommendation was in favour of the FSP. A copy of the
recommendation is attached to this determination.
As the applicants did not accept the recommendation, the dispute has been referred
to me for determination.
1.2 Issues and key findings
Were the findings in the recommendation correct?
The findings contained in the recommendation were correct and are adopted in this
determination. No further material or submissions have been provided after the
recommendation which affect the outcome.
1.3 Determination
This determination is in favour of the FSP.
I agree with the case officer’s reasons for the recommendation and the
recommended outcome.
The FSP is entitled to deny the claim.
The FSP need take no further action in relation to the claim or the dispute.
Case No: 511839 Determination Page 2 of 3
2 Reasons for decision
2.1 Were the findings in the recommendation correct?
The findings in the recommendation were correct
I have decided this case on its merits, having regard to the relevant law, good
industry practice, codes of practice and previous FOS decisions. I have considered
all the material submitted by the parties, both before and after the recommendation. I
am satisfied the documentation I have relied on has been provided to both parties.
I am satisfied the case officer’s recommendation contains an accurate summary of
the dispute, the issues to be determined, any applicable paragraphs of the Terms of
Reference and any relevant law.
While the parties have raised numerous issues in their submissions, for the purposes
of this determination, commentary has been restricted to those issues considered
directly relevant to the outcome only.
No new material provided after recommendation
The applicant rejected the recommendation but made no further submissions and
provided no new material. In these circumstances, there are no further submissions
or new material for me to consider which may have advanced the applicants’ case o r
affected the outcome.
Applicants must establish a prima facie claim
The applicants must establish on the balance of probabilities they have suffered a
loss caused by an event to which the policy responds. This is known as a prima facie
claim.
The FSP’s policy with the applicants is an insured event policy. The available
material establishes damage was caused by escape of liquid. This is an insured
event. However, the FSP’s policy is clear and unambiguous. The FSP will only
provide cover if the insured event occurred during the period of insurance.
Material establishes insured event occurred before policy commenced
The insurance cover commenced on 5 October 2017 not long after the applicant
completed the purchase of the property. Not long thereafter, the damage was
discovered in the bathroom.
Once the claim was made, the FSP arranged for an inspection by a building
consultant on 26 October 2017. I am satisfied the building consultant has the
requisite expertise to comment.
I have carefully considered his report and the photographs provided. Having
considered that material, I agree with the building con sultant’s estimate that the leak
has been occurring for a period of 12 months. This is because the builder says and
the photographs show the chipboard is heavily deteriorated and rusting is evident to
Case No: 511839 Determination Page 3 of 3
the metal angling in the internal wall junction. Furthe r, the applicants’ plumber noted
extensive mould which is also indicative of long-term damage.
The FSP is entitled to deny the claim
The applicant says he thought he was covered for any claim made after the policy
commenced. He said he didn’t know there w ere leaks in the bathroom. Had he
known, he says he would not have purchased the house.
I accept the applicant was unaware of the condition of the house before he
purchased it. However, this is not determinative of the outcome.
To successfully establish a claim, the applicants must establish on the balance of
probabilities the insured event occurred during the period of insurance. The available
material establishes the insured event occurred before the policy commenced.
The FSP also says it is not obliged to pay the claim because it was prejudiced by the
applicants’ conduct dismantling and demolishing the bathrooms before the FSP’s
builder could assess the damage. However, in view of the findings the FSP’s policy
does not respond at all, it is not necessary to decide about this issue as well.
For the reasons stated, the available material establishes the FSP is entitled to deny
the claim.
Recommendation
Case No: 511839 Recommendation Page 1 of 4
Case number: 511839 19 April 2018
3 Overview
3.1 Dispute
The applicants purchased a home and contents insurance policy with the financial
services provided (FSP) on 5 October 2017.
On 20 October 2017, the applicants discovered invisible cracks in the shower base.
They lodged claims with the FSP for water damage to their bathrooms.
The FSP declined the claims. It says:
the bathroom damage occurred before the policy started
the applicants prejudiced its ability to assess the c laim as the evidence of the
damage was removed before it could assess it.
3.2 Issues and key findings
Have the applicants established a valid claim?
The applicants have not established a valid claim under the policy. The available
information, on balance, show the bathroom damage did not occur during the period
of insurance.
The FSP is entitled to decline the claim.
3.3 Recommendation
This recommendation is in favour of the FSP.
The FSP is entitled to decline the claim.
Case No: 511839 Recommendation Page 2 of 4
4 Reasons for recommendation
4.1 Have the applicants established a valid claim?
Policy covers specific events, subject to terms
The applicants are required to show, on the balance of probabilities, the damage was
caused by an event insured against under the policy. This is known as a valid claim.
The applicants also need to establish the loss occurred within the period of cover of
the insurance. This is distinguished from when the loss is discovered.
In this case, the applicants incepted the policy with the FSP on the 5 October 2017
and lodged the claim on 20 October 2017.
The applicants have the onus to establish, on balance of probabilities, the damage
occurred within the period of cover.
Available information shows damage occurred before to the policy started
The FSP engaged a building consultant (LS) to assess the damage.
LS’ found rust has formed to the metal angle of the internal wall junction and a
heavily deteriorated chipboard flooring. LS provided photographs in support of his
findings.
LS have advised these damages has likely been occurring for a period of
approximately 12 months prior to the discovery of the leak.
The applicants’ plumber (CP) noted there were excessive mould damage under the
tiles when he inspected the bathrooms.
The applicant purchased the policy 15 days prior to when the claim was lodged.
Having regard to all the information exchanged, I am satisfied the bathroom damage
was, more likely than not, to have occurred over an extended period of time. It is
unlikely the damage occurred after the policy started.
FSP entitled to decline claim
The applicants submit their claim should be accepted as they were unaware of the
leak. Whilst I understand the applicants’ argument, I do not accept this assists them.
The policy only responds to damage that have occurred in the period of insurance.
This is distinguished from when the damaged is discovered.
I am satisfied based on the information exchanged the damage predates the start of
the policy. Given this, the applicants have not established a valid claim. The FSP is
entitled to decline the claim.
Case No: 511839 Recommendation Page 3 of 4
5 Supporting information
5.1 Relevant policy provisions
2.4 About your cover
When does cover start?
If we accept your application for insurance,
your cover commences at the start of the
period of insurance shown in your policy
schedule, subject to us receiving the
required premium payments.
…
7 Lodging a claim
What you must not do
Under no circumstances should you do
any of the following without our consent
or we may refuse or reduce a claim:
…
• dispose of damaged goods.
5.2 Key reports
Rec ord Key points
FSP’s building
consultant (LS)
Report
30 October 2017
I asked our customer whether he had taken images of the damage
sustained to polymarble shower base prior to its removal or
whet her he had in fact retained the base as evidence of his claim,
however he confirmed it had been disposed of at the time of its
removal a number of weeks ago.
The chipboard in this small section is heavily deteriorated, with
chunks having fallen through to the plaster lining below (fig. 10)
and rusting evident to the metal angling in the internal wall junction,
which is all conducive to a long - term escape of liq uid event having
occurred here.
I would guestimate the leak has been occurring for a period of
approximately 12 months, which predat es the inception of this
policy.
I was unable to adequately assess the nature of this escape of
liquid event, nor could I c orroborate our customer’s version of
events in so far as the crack seen to polymarble shower base give
the ensuite had been dismantled/demolished prior to my
attendance
Applicant’s plumber
report ( CP )
There was a bit of water leakage around the shower area of the
bathroom, but the rest of the bathroom floor had also been water
Case No: 511839 Recommendation Page 4 of 4
Report
Undated
damaged causing excessive mould under the tiles.
I advised the customer order a skip bin and get rid of the rubbish
asap as there was excessive mould under the tiles.