Home / Financial Firm (Unknown - Insurer) / Determination 511688
Determination 511688
Reimbursement for replacement window coverings after skylight claim
Summary
The applicant claimed $5,300 for replacement window coverings after the insurer's skylight replacement left his blinds unusable. AFCA ordered $1,650 for the study blinds on an indemnity basis, rejecting the upgraded plantation shutters and the unrelated master bedroom work.
The insurer must restore the insured to the pre-loss position on an indemnity basis, not pay for upgrades or unrelated work.
Issues
- Claim amount dispute primary · upheld“The FSP is to reimburse the applicant the amount of $1,650 for the window coverings.”
Subjects and remedies
home or building damagepay claim
Related
All Financial Firm (Unknown - Insurer) determinations · Find similar determinations
Text of the determination
Determination
Case No: 511688 Determination Page 1 of 4
Case number: 511688 7 June 2018
1 Overview
1.1 Dispute
The applicant is a beneficiary of a strata insurance policy held by the owners’
corporation (OC) and underwritten by the financial services provider (FSP), covering
his home address.
On 17 February 2017, a skylight at the property was damaged during a storm and a
claim lodged on the policy. The FSP accepted the claim and authorised the
replacement of the skylight by building firm ‘JL’. During the removal of the skylight, JL
was required to remove the blinds covering it. JL was unable to reinstate the blinds
as their placement would have voided the warranty for the new skylight.
The applicant says due to the condition the blinds were left in, he had no alternative
but to purchase new window coverings, for an amount of $5,300. He seeks
reimbursement of this amount from the FSP.
1.2 Issue and key findings
Is the FSP liable to reimburse the applicant $5,300 for new window coverings?
The FSP is not liable to reimburse the applicant $5,300 because:
one of the sets of blinds was covering a skylight not subject to this claim
therefore, the FSP has no liability to replace it
the applicant has significantly upgraded the window coverings, which is not the
FSP ’s responsibility
the principle of indemnity is to place the insured back in the position they were
in prior to the loss occurring
this does not mean ‘new for old’ replacement, but goods of similar value and
quality.
In the circumstances, it is fair the FSP reimburse the applicant $1,650 for the window
coverings.
1.3 Determination
This determination is partially in favour of the applicant.
The FSP is to reimburse the applicant the amount of $1,650 for the window
coverings. However, that it is the extent of its liability in this matter. The FSP is to
remit this payment to the applicant within 14 days of the date of the applicant’s
acceptance of this determination.
Case No: 511688 Determination Page 2 of 4
2 Reasons for determination
2.1 Is the FSP required to reimburse the applicant for new window
coverings?
FSP required to reinstate the applicant to the position he enjoyed prior to the
loss
It is not disputed between the parties that in order to facilitate the replacement of the
applicant’s skylight, the blinds covering it required removal.
It also does not appear to be disputed that the blinds could not be re -fitted to the new
skylight, as their application would have interfered with the skylight and potentially
voided its warranty.
Regardless of the condition the blinds were left in by JL, they could not be re-fitted to
the new skylight. Accordingly, the applicant did not and could not enjoy a similar
position to that he enjoyed prior to the repairs, which was with a skylight in which he
could draw the blinds on in order to control the light flow into the area. The FSP is
therefore required to restore the applicant to his original position.
Only one skylight the subject of this claim
The applicant has presented an invoice for replacement window furnishings, which
shows he replaced the window coverings in both the study area and the master
bedroom.
The FSP has presented sufficient material showing that only the skylight in the study
was the subject of this claim. Whilst the skylight in the master bedroom was replaced
at the same time, and by JL, JL was engaged privately by the OC to undertake those
works.
Accordingly, the FSP is not responsible for the work done by JL that was not claim
related. The applicant or the OC will need to pursue this aspect privately.
FSP only required to restore the applicant to his previously enjoyed position
The applicant has chosen to upgrade the window furnishings from manual slimline
venetian blinds to remote controlled plantation shutters. This is a significant upgrade
in quality, feature and amenity and I do not accept the FSP is liable for this.
Common law principles do not require ‘new for old’ replacement but rather indemnity
value. That is, the value of the goods or chattels damaged at the time of the loss
occurring.
In this instance, I am satisfied i t is not reasonably practical to settle the applicant’s
loss on this basis as it is clear any blinds would need to be custom measured and
installed. Therefore, the loss must be calculated on an ‘ as new ’ cost.
Case No: 511688 Determination Page 3 of 4
No comparative estimates available
Neither party has made any submissions as to the likely cost for the supply and fitting
of a slimline venetian blind for the study window. This has not assisted in determining
what the FSP’s liability should reasonably be limited to. On this basis, I have little
alternative but to rely on the invoice presented by the applicant for the plantation
shutters, even though I do not accept this as a ‘like for like’ replacement.
The breakdown of the invoice for the new shutters is not exact, as the individual
amounts do not match the total. A proper itemised invoice would also have assisted
in determining this dispute. The invoice is re-created as follows:
Item cost
Shutter – master bedroom $2480 (less 25% discount)
Shutter – study $1800 (less 25% discount)
Flat framing $300
Motor $1400
Remote control $100
GST $350
Grand total paid $5,300
Accordingly, of the amounts charged I consider that only the amount of $1,350 (being
the study shutter) is payable to the applicant. It is fair in the circumstances that 50%
of the framing costs (being $150) are also payable to the applicant, as I accept half
(or thereabouts) of this cost would relate to the study skylight. Adding GST, the total
settlement payable to the applicant for the study shutter is $1,650.
In the circumstances, an award of interest is not appropriate. However, the FSP to
remit this amount to the applicant within 14 days of the date of the applicant
accepting this determination.
Case No: 511688 Determination Page 4 of 4
3 Supporting information
3.1 FOS approach to this dispute
A full exchange of the relevant information has taken place between the respective
parties. Each party has had the opportunity of addressing any issues raised.
All of the provided material has been reviewed and considered. The parties have
raised numerous issues in their submissions to the Service. However, commentary in
this determination is restricted only to those issues considered relevant to the
outcome.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.