Text of the determination
Determination | Case number: 511394 Page 1 of 14
Determination
Case number: 511394 14 November 2018
1 Determination overview
1.1 Complaint
This complaint concerns a claim for vibration damages to the complainant s’ property
caused by construction activity on their neighbour’s property.
While the financial firm (insurer) accepted the claim, a complaint arose concerning the
extent of the policy response and if policy benefits were enlivened.
The insurer paid $173,380 to settle the claim, covering what the insurer says is the
cost of repairs attributable to the construction. The complainants seek a further
$287,209.38.
1.2 Issues and key findings
Are the complainants entitled to further coverage?
For the reasons set out in this determination, the complainants are entitled to
additional policy coverage for their loss.
Are the complainants entitled to more temporary accommodation?
The policy provides a temporary accommodation benefit when, following a covered
event, the property becomes uninhabitable.
The panel is satisfied, having regard to the information provided, the property is
presently habitable and will remain so during repairs.
Are the complainants entitled to reimbursement of their expert costs?
The complainants are entitled to further reimbursement of $8,702.90 of their
engineering costs. The complainants are not entitled to any reimbursement of their
legal costs.
Determination | Case number: 511394 Page 2 of 14
Are the complainants entitled to compensation?
The insurer is required to pay the complainants the amount of $3,000 compensation,
in accordance with the terms of this determination.
1.3 Determination
This determination is substantially in favour of the complainants.
Within 14 days of the complainants accepting this determination, the insurer is to pay
the complainants:
$60,000 as an additional payment towards the cost of repairs
$8,702.90 reimbursement towards engineer reports
$3,000 compensation for their claim experience.
Once the payment is made, the insurer is not required to take any further action.
If the complainants do not accept this determination within 30 days, then the insurer is
not required to take any further action.
Determination | Case number: 511394 Page 3 of 14
2 Reasons for determination
There has been a full exchange of material between the parties and each party has
had the opportunity of addressing the issues that arise from the material exchanged.
This determination is made by a panel consisting of the Panel Chair Ombudsman, a
representative with extensive experience in the insurance industry and a
representative with extensive experience in consumer claims.
Whilst all of the information exchanged has been considered, only the information
relevant to the final outcome will be referred to within this determination.
This determination follows consideration of all of the information exchanged and is
based on what is fair in the circumstances, having regard to the relevant legal
principles, terms of the policy, good industry practice and where applicable, prior
determinations.
2.1 Are the complainants entitled to further coverage?
Circumstances of the loss
Between November 2013 and January 2016 renovations were completed on the
property next door to the complainants. Prior to these renovations, two dilapidation
reports were taken of the complainant s’ property, in preparat ion for the damages
expected to follow. One report was prepared for the complainants by HHM and the
other prepared for the neighbours by TC (who also carried out the renovations).
While these renovations were ongoing, the complainants carried out maintenance
inside their own property. Between March and April 2014, the property interior
(excluding the garage and lower foyer) was repainted. In September 2014, the kitchen
was painted and in November 2014 other sections of the house were painted.
When the renovations were completed the complainants obtained a further two
dilapidation reports, one by DWA (an engineer) and the other by HHM. The
complainants lodged a claim for damages to their property caused by the renovations.
The panel understands the complainants also lodged three claims for water damages
and one claim for rust damage. As the parties have now agreed on the outcomes for
these claims the panel will focus on the damages caused by the renovations and
other issues arising from or connected to that claim.
The policy covers loss or damage to the complainant s’ property
The complainants held a Comprehensive Home and Contents Policy. Relevant
excerpts of policy wording are set out in section 3 of this determination.
Determination | Case number: 511394 Page 4 of 14
When making a claim it is an accepted principle of insurance law the initial burden of
proof is with the complainants to show, on the balance of probabilities, a covered
event caused the claimed loss. This is called a prima facie or valid claim. If the
complainants can establish a valid claim, the burden of proof shifts to the insurer to
show, on the balance of probabilities, the policy does not cover, or otherwise
excludes, the claim.
The complainant s’ initial burden extends to showing the full extent of the claimed loss
and linking it to the event or events giving rise to claim. It is only after the
complainants have done so, the burden shifts to the insurer after which it must show
its proposed offer is fair in the circumstances and accords with policy obligations.
The complainants say their house was damaged by heavy construction activities on
the neighbouring property. Specifically, they say damage was :
Due to vibration through the Caprock, which would have occurred during the
whole period of construction (26 months).
The complainants say all the damages they have claimed for were caused by the
renovations. The complainants have provided reports, photographs and other
submissions to support of their position.
The insurer accepts some damage was caused by the excavation and compaction
activities, but denies these activities caused all the damages. The insurer maintains
much of the damage is a consequence of wear, tear and gradual deterioration.
The insurer previously paid the complainants the amount of $173,380 for the
construction damage claim, the three water damage clams and the rust claim. The
complainants ask for an additional $97,321.00 for building repairs and associated
costs.
Due to the number of issues raised, the panel will limit its findings to only the items in
contention between the parties. The panel will not comment on items where the
complainants and insurer agree on the amount to be paid.
External blockwork
The complainants claim $29,814.40 to repoint and repair mortar cracks and replace
blockwork to the property exterior, door and window surrounds and the garden bed
walls. MCD also quoted to replace limestone blocks to the exterior and tower area.
This figure comes from the full cost of external repairs set out in the MCD quotation.
The complainants accept some cracking was present before the renovations but say
this became exacerbated and pervasive throughout the mortar, limestone and render
following the renovations. The complainants note the limestone was intact for 16
years prior to the excavation works but was afterwards pockmarked.
Determination | Case number: 511394 Page 5 of 14
The insurer offered $3,384 towards these costs. DB concluded, when comparing the
earlier reports prepared by TC and HHM to the later reports prepared by DWA and
HHM the damages were ‘no worse’, ‘marginally worse’ or ‘wear and tear’. The insurer
does not accept the cost to repair any damages to the exterior, door and window
surrounds, garden bed walls or limestone blocks would exceed this amount.
The insurer says most of the external damage was picked up in the pre-construction
reports. The insurer says no information was provided to show either significant new
cracking or the existing damage becoming much worse due to the renovations. The
insurer says there would not have been a tangible inc rease in the cost to undertake
repairs prior to the renovations when compared to the cost to undertake repairs after
the renovations.
For this reason, the insurer says most of the claim external damages are excluded as
general wear and tear or pre-existing damage.
DB did observe a crack in the top of the parapet wall above the front door which was
not observed in the earlier reports prepared by TC or HHM.
The insurer denied cover for some damages which, while missed in the earlier report
prepared by HHM, DB decided would have nevertheless been pre -existing.
The panel closely reviewed the reports and photographs submitted by both parties
and is satisfied there are new damages to the external blockwork, as captured in the
HHM, DWA and ATC (an engineer for the complainants) reports.
The panel does not accept the insurer ’s liability can be limited because the cost to
repair would not be so different to the cost prior to the renovation activity. This is
because the policy responds to ‘physical loss or damage’ and provides for ‘the
amount required to repair or rebuild the loss’.
The panel is satisfied the insurer must make a greater contribution for this item.
Boundary wall
The complainants claim $17,036.80 to re-render the boundary wall in its entirety due
to cracks, drumminess, and run-off staining. This figure is derived from the MCD
quotation for the full cost of re-rendering the boundary wall.
The insurer offered $3,500 towards this item and says ‘dirty, discoloured, water -
stained and crazed plaster’ is a ‘gene ral maintenance item’ and was recorded in the
earlier TC and HHM reports. DB broadly concluded the cracking was ‘no worse’. DB
acknowledged the craze cracking had worsened along the western boundary wall but
concluded this was due to the weather and theref ore a ‘general maintenance item’.
The complainants say the insurer ’s offer to re -render selected areas does not accord
with the policy wording, which they say requires reinstating all contiguous areas. The
Determination | Case number: 511394 Page 6 of 14
complainants also say stormwater run-off from the neighbouring property caused the
staining, breakage and flaking of render on the boundary walls in a few locations.
The insurer says the damage present now is not significantly worse than what was
captured in the pre-construction dilapidation reports. While the panel agrees much of
the deterioration is general wear and tear. Nevertheless , it is appropriate for the
insurer to make a further contribution for this item.
Timber garage door, front door and balcony timber
The complainant s claim $4,658.50 to ‘sand and refinish as original the timber garage
door, front door, rear exposed timber balcony’.
The insurer denies coverage for this portion of the claim and says:
the discoloration of the first- floor timber balcony appears in HHM’s earlier report
the breakdown of the finish to the garage doors and double front entrance doors is
consistent with wear and tear only
there is no evidence the warping of the second-floor timber balcony is due to
anything other than wear, tear and gradual deterioration.
The ATC report concludes the defects observed on the balconies cannot be attributed
to the construction.
Having reviewed the information provided the panel is not satisfied there is sufficient
information available to attribute any deterioration to the renovations rather than
general wear and tear.
Scaffolding and work on elevated platforms
The complainants claim $30,613 for scaffolding and elevated work platforms to carry
out external repair works. The insurer offers $1,590 towards the same and says the
effort required to repair the external damages caused by the renovations is minimal.
For the reasons set out above, the panel finds the insurer is required to make a
substantial contribution towards repairing the external blockwork. The insurer ’s
contribution towards scaffolding and related costs should be increased accordingly.
Internal cracked walls, ceilings and skirtings
The complainants claim $14,108.60 to repair cracks to wall, ceilings and skirtings due
to the renovations, as well as repainting as required. The insurer offers $9,625
towards this item, an estimate of the damages it accepts as attributable to the
renovations.
The February 2016 HHM report identified numerous cracks to the first and second
floor walls, cornices, ceilings, window frames and skirting boards. HHM further noted
cracking in the study room, chipped paint in the master bedroom and numerous
cracks in the wall and ceiling of the garage.
Determination | Case number: 511394 Page 7 of 14
The insurer says the complainants carried out extensive internal painting between
March and April 2017 including to the tower room, stairs and hallway; pantry; living
room; office; powder room; hallway with walk-in robe; hallway with linen closet and
hallway with shoe closet; laundry room and laundry room closet and guest bedroom.
The insurer says, based on DB’s findings, it is unlikely there would have been any
heavy construction activity after March or April 2014 capable of causing vibrations
strong enough to damage the complainant s’ property further.
The complainants say vibrations caused by excavation works with hydraulic picks,
roller excavator and jackhammer; compaction, vibration of concrete between bricks,
vibration from a diesel fuelled generator and general truck and crane deliveries
caused further damage after the heavy construction activity ceased.
DB acknowledged rock breaking activity could cause damage to the western-face of
the complainant s’ property but otherwise says none of these activities after March or
April 2014 would generate vibrations capable of causing further loss or damage.
The insurer says it has not been provided evidence of heavy earthworks or rock
breaking activity after March 2014 and, given the complainants re-painting in 2017,
any damages observed are now general wear, tear and gradual deterioration.
The complainants say the internal cracking arose after excavation or rock breaking
work was carried out next door and the subsequent internal maintenance, but still
while the renovations were continuing.
In the view of the panel, there are new cracks present now which were not
documented in the 2013 pre-construction dilapidation reports prepared by TC or
HHM. For example, along the walls, skirting boards, window frames and between the
wall and desk in the study. However, it is clear there were some cracks present prior
to the renovation works too.
The panel is satisfied, having regard to the information provided, the insurer ’s
estimate of its liability was fair and reasonable in the circumstances.
Cleaning costs
The complainants claim $10,053.60 to clean their property, broken down as follows:
$2,000 for carpet cleaning (denied in full, invoice does not specify ‘cleaning’)
$3,073.80 to clean curtains and bedspreads (covered in full)
$750 to clean handmade rugs (accepted in full)
$870 to for carpet cleaning (denied in full, invoice does not specify ‘cleaning’)
$286 to replace the master ensuite roll blind (accepted in full)
Determination | Case number: 511394 Page 8 of 14
$3,073.80 for items which were subject to damage from November 2013 to
December 2015 (denied in full as the insurer says this invoice is a duplicate of the
earlier invoice for the same amount).
The insurer offered $4,109.80 towards the complainant s’ cleaning costs.
The complainants also request a further $4,000 towards a generic ‘builder’s clean’ at
the end of the upcoming repairs.
In the circumstances it is fair and reasonable the insurer make a further contribution
towards these costs.
Temporary relocation of contents
The complainants claim $4,798.69 for the packing up and partial removal of items in
rooms where repairs will be carried out.
The insurer does not accept any pack out of contents is required but acknowledges
moving some contents from the areas to be repaired to elsewhere in the property
would be required. The insurer offers $676.22 for this item based on receipts provided
by the complainants for reimbursement.
Other than a wheelie bin ($62), the difference in the parties’ position arises from the
complainants moving furniture offsite to furnish an apartment. The insurer says this
was unnecessary and maintains the property would not be uninhabitable for more
than five days.
For the reasons set out below, the panel accepts the insurer ’s conclusion and shares
the view the property is presently habitable and will remain so. It follows there is no
need for the insurer to cover the cost of relocating the complainant s’ contents
elsewhere.
No cover for the complainant s’ mortgage payments
The complainants claim for contributions towards the mortgage on their property. The
complainants say they are entitled to this because are paying for the mortgage but
have been unable to live in the property.
As set out above, the policy is intended to cover loss or damage to the complainant s’
property and the reconstruction costs for the same. While there are other benefits
payable under the policy, there is no provision to contribute towards the complainant s’
mortgage in these circumstances.
The panel is satisfied the insurer is not required to contribute towards the
complainant s’ mortgage.
Determination | Case number: 511394 Page 9 of 14
No cover for metal planters on the neighbouring property
In a quote prepared by MCD and submitted by the complainants, there is a request
for $266.20 to refinish metal planters on the neighbouring property. The intention is to
prevent further rusting on the complainant s’ property.
The panel notes the policy covers loss or damage to the complainant s’ property only.
Given the metal planters belong to the neighbour, there is no policy response for this
item.
Fair in all the circumstances the insurer pay a further $60,000 to settle the claim
Given the circumstances, events and age of the claims, the panel is satisfied an
award of an additional single sum is appropriate.
Although the policy allows the insurer to pay what it would cost it to provide the
repairs, any decision to cash settle and the amount of the cash settlement must be
exercised fairly. Once a cash settlement is made, the risk in relation to repairs and
unforeseen consequences of repairs are transferred from the insurer to the insured.
Further, if the determination is accepted by the complainants, the determination
finalises the claim for vibration damage to the building. As the complainants are
bearing all the risk in relation to repairs, the panel is satisfied it is fair a cash
settlement includes provisional sums sufficient to account for unknown contingencies
and variations once repairs commence.
For these reasons and the reasons set out above, the panel is not satisfied the final
figure offered by the insurer is fair in all the circumstances.
Having regard to all the available material, a nd for the reasons stated, the panel is
satisfied it is fair in all the circumstances the insurer pay the complainants the amount
of $60,000 in full and final settlement of all issues arising out of the claim and
complaint.
2.2 Are the complainants entitled to more temporary accommodation?
No further temporary accommodation payment is necessary
The complainants claim $65,000 (for 52 weeks at $1,250 per week) for
accommodation elsewhere while the repairs are carried out at their property.
The policy provides cover for temporary accommodation (including for pets) when the
property is uninhabitable due to a covered event. The insurer maintains the property
is presently habitable and will remain so while the internal repairs are completed.
The insurer offers $4,000 for the time it estimates is required to replace and/or repair
the front entrance steps and stone flooring which might take up to 5 nights.
Determination | Case number: 511394 Page 10 of 14
The panel notes a property is generally considered uninhabitable if there are safety
risks present (for example, loose electrical wires or missing roof segments) or if
essential features of the property, such as the kitchen or bedroom, are unusable.
Having regard to the information provided, the panel is satisfied no further award of
temporary accommodation costs is required. The property is presently habitable (per
DWA’s report from 2016) and the panel is satisfied, except for the front steps and
stone flooring noted above, that the property will remain habitable while repairs occur.
2.3 Are the complainants entitled to reimbursement of their expert costs?
Under paragraph 9.4 of the FOS Terms of Reference, we may decide the insurer
contribute to legal or professional costs incurred by complainants. Unless exceptional
circumstances apply, we would not require an insurer to contribute more than $3,000
per report submitted by the complainants.
In deciding whether the insurer will make a contribution to these costs, it is
appropriate to consider what is fair in all the circumstances. We take into account the
complexity of the complaint and whether the complainants reasonably required the
information.
Insurer to contribute further $2,702.90 towards ATC reports
The complainants request reimbursement of $12,594.19 to cover the cost of three
engineer’s reports prepared by ATC dated 18 October 2016, 3 November 2016 and 8
February 2017.
The policy relevantly provides:
We will not pay for any fees incurred in preparing or furthering any claim under
this policy.
The insurer says the purpose of the ATC reports was to further the complainant s’
claim by assessing whether the defects present were likely to have been caused by
the renovations. The insurer concludes the purpose of the reports was to further the
Construction Damage Claim and so their cost is not covered under the policy.
DB previously offered $6,297.10, half the amount requested, as a contribution
towards the ATC reports. While the insurer maintains none of the ATC costs are
claimable it will honour DB’s offer.
The complaint raises complex questions of causation and policy application. The
panel found the ATC reports helpful to understanding the events in the complaint.
Applying the approach set out above, the insurer is to reimburse the complainants a
further $2,702.90, up to the maximum of $3,000 per report.
Determination | Case number: 511394 Page 11 of 14
Insurer to contribute $6,000 towards the DWA reports
The complainant s request reimbursement of $6,851.68 to cover the cost of DWA’s
invoices dated 19 May 2016 and 31 August 2017.
Relying on the exclusion set out above, the insurer says these two reports were
obtained to prepare or further the complainant s’ claim. The insurer goes on to say the
reports prepared by DWA are, to an extent, duplicated by ATC.
The panel accepts the insurer ’s application of the policy wording is correct. However,
these reports were relevant to the pan el’s findings in this complaint. It follows the
insurer is to reimburse the complainants $6,000 towards these costs ($3,000 per
report).
The complainants are not entitled to further reimbursement for legal fees
The complainants request the insurer reimburse them the $15,080.51 charged by
their lawyers. The complainants have provided invoices confirming the amounts
sought and copies of correspondences prepared by the lawyers as examples of their
work.
The panel notes some of these charges relate to separate litigation involving the
complainants, their neighbour and TC.
The policy covers costs ‘necessarily incurred to repair, replace or rebuild your house’
but not ‘incurred in preparing or furthering any claim under this Policy’. On these
terms the insurer offers $1,877.68 towards the complainant s’ legal costs, in respect of
the lawyers assisting DB to contact ATC for information relating to the claim.
The panel reviewed the documents prepared by the lawyers and is satisfied they
relate either to ‘preparing or furthering any claim’ or the separate litigation. It follows
the complainants are not entitled to any further reimbursement for legal fees.
2.4 Are the complainants entitled to compensation?
The complainants are entitled to $3,000 compensation for their experience
Under paragraph 9.3 of the FOS Terms of Reference, we may decide an insurer
should compensate a complainant for their non-financial loss, where a complainant
experiences an unusual degree of stress, physical inconvenience or time taken to
resolve a claim. payment is limited to $3,000 per claim.
The panel finds the events of this complaint have been extremely challenging and
upsetting for the complainants. The complainants have lived surrounded by daily
reminders of the events and circumstances of the claim. The level of involvement
required of the complainants to facilitate the insurer ’s investigations and assessments
exceeded what is expected during an ordinary claim.
Determination | Case number: 511394 Page 12 of 14
The panel is satisfied it is appropriate for the insurer to compensate the complainants
$3,000 in respect of the time taken by the insurer to investigate the claim and the
resultant impact on the complainant s’ enjoyment of their property.
Determination | Case number: 511394 Page 13 of 14
3 Supporting information
3.1 The determination is made under FOS Terms of Reference
The Australian Financial Complaints Authority ( AFCA) has commenced managing
disputes previously lodged with F inancial O mbudsman S ervice (FOS) .
This determination is made under FOS Terms of Reference but has adopted the
following terminology for consistency with AFCA. In this determination the AFCA
terms have the same meaning as the FOS terms defined in paragraph 20.1 and
Schedule 1, 2 & 3 of the FOS Terms of Reference.
FOS def initions AFCA term
applicant complainant
financial services provider financial firm
dispute complaint
claim claim
3.2 Policy terms
Occurrence means a loss or accident or series of losses, accidents or damages arising
out of any one event to which this insurance applies occurring within the Policy Period,
irrespective of the number of claims. Continuous or repeated exposure to substantially
the same general condition unless excluded is considered to be one Occurrence.
Covered Loss means the physical loss or damage to your house or other property
covered under this part of your policy wording subject to the terms, conditions and
exclusions in this policy…
House means the main dwelling and attached buildings including underground services
supplying the main dwelling and attached buildings, at each location named in your
coverage summary.
Reconstruction costs means the amount required at the time of loss to repair or
rebuild the house, whichever is less, at the same location with the same design, quality
of materials and workmanship which existed before the loss. This includes fees and
associated costs.
We will not pay for any fees incurred in preparing or furthering any claim under this
policy.
Fees and associated costs means architects’, surveyors and legal fees necessarily
incurred to repair, replace or rebuild your house.
Deductible means the amount you are required to pay towards the cost of your claim,
as shown on your coverage summary. In some circumstances we may impose a special
deductible and, if we do so, we will tell you.
The deductible applies in respect of each occurrence. No deductible applies to a
covered loss of more than $50,000 except when the vacant house deductible applies…
If the payment basis shown in your coverage summary is Extended Replacement Cost,
we will pay the Reconstruction Cost even if this amount is greater than the sum insured
for your house shown in your coverage summa ry…
Determination | Case number: 511394 Page 14 of 14
Additional living expense
If a covered loss makes your house or other permanent structure uninhabitable, we
cover certain expenses below. There is no deductible for this coverage.
Extra living expenses
We cover the reasonable increase in your normal living expenses that is necessary to
maintain your household’s usual standard of living. We cover this increase for the
reasonable amount of time it should take to restore your house or other permanent
structure to a habitable condition or if you or members of your household permanently
relocate, the shortest amount of time required to settle elsewhere… This period of time
is not limited by the expiry of this policy.
Extra boarding expenses for pets
If you are entitled to a benefit payable under the extra living expenses section and you
have pets that are not permitted to stay with you under the terms and conditions of your
temporary accommodation, we will pay for the reasonable expenses incurred to board
your pets in alternative accommodation for the time you are receiving the extra living
expenses up to a maximum of $30,000.
Exclusions
The words “caused by” mean any loss that is contributed to, made worse by or in any
way results from that peril.
Wear and tear
We do not cover any loss caused by wear and tear, graduation deterioration, fading,
rust, corrosion, bacteria, dry or wet rot, warping, insects or vermin. We do insured
subsequent Covered Losses unless another exclusion applies…
Failure to protect
We do not cover any loss or damage caused by your failure to use all reasonable
means to protect before, at, or after the time of loss.
3.3 Other key documents considered
Written submissions by the complainants and the insurer.
Photographs and other correspondences prepared by the complainants.
Reports and submissions prepared by DB.
Dilapidation reports prepared by TC and HHM.
Engineer reports prepared by DWA (2016) and ATC (2016).
Invoices and quotes prepared by MCD.
Coded fields were extracted from the text by a language model and may contain errors. The published PDF is the authoritative record.