Adequacy of final cash settlement for storm water damage claim
Summary
The applicant disputed the insurer's $1,265 cash settlement after a storm water claim and alleged its representatives gave inaccurate information. AFCA found the information was ambiguous but no financial prejudice was shown, and ordered the FSP to honour its $1,265 offer as an allowance for stress and anxiety.
A claimant must show financial prejudice from misleading claim information, and the box gutter works fell outside cover so the settlement offer was reasonable.
Subjects and remedies
home or building damagepay non financial loss
Text of the determination
Determination
Case No: 511363 Determination Page 1 of 4
Case number: 511363 8 June 2018
1 Overview
1.1 Dispute
The applicant held a home building insurance policy (the policy) with the financial
services provider (FSP). On 26 October 2017, the applicant contacted the FSP and
advised there was a leak in an external box gutter which has resulted in internal
stormwater damage to her home.
A claim was lodged with and accepted by the FSP. The applicant however remains
dissatis fied with the FSP’s settlement of the claim. The applicant strongly believes
she has been financially prejudiced because of the information given to her by the
FSP representatives over the course of the claim.
1.2 Issues and key findings
What does the policy cover?
The policy provides cover for loss or damage due to the listed insured events subject
to the policy exclusions and limitations. The policy also covers, as an additional
benefit, reasonable exploratory costs incurred in locating a leak causing damage to
the insured property.
Did the applicant receive inaccurate information from the FSP?
The available information establishes the applicant was provided with inaccurate
information by the FSP representatives under the claim.
Is the FSP’s settlement off er reasonable under the circumstances?
The available information establishes the FSP’s final settlement offer to the applicant
is reasonable under the circumstances.
1.3 Determination
This determination is in favour of the FSP.
The FSP is not obliged to increase its final settlement offer put to the applicant under
the claim.
Case No: 511363 Determination Page 2 of 4
2 Reasons for determination
2.1 What does the policy cover?
The policy is an insured events contract of insurance
The applicant’s policy covers the insured building for loss or damage caused by the
listed insured events subject to the policy exclusions and limitations specified in the
product disclosure statement (PDS).
It is not in dispute the FSP provided and the applicant received the policy
documentation including the policy schedule and PDS prior to the loss.
It an accepted insurance legal principle that the onus first rests with the claimant to
establish on the balance of probabilities the loss claimed is covered under the policy.
Only if this onus is satisfied does it then fall to the insurer to establish on balance an
entitlement to decline cover for the loss claimed in line with the policy.
There is no dispute the insured building did suffer storm damage whic h does trigger
cover under the policy, which means a prima facie claim has been established.
2.2 Did the applicant receive inaccurate information from the FSP?
The applicant was provided with ambiguous information by the FSP
The applicant says she was given inaccurate information regarding her entitlements
and obligations under the policy by the FSP representatives she communicated with
at the beginning of the claim.
I have considered the information made available by the parties including the
relevant telephone call recordings of the conversations between the parties. I am
satisfied on balance this information establishes the following:
the applicant contacted the FSP and advised there was a leak in the external
box gutters which has resulted in building damage and the box gutter needed to
be replaced
the applicant advised the FSP representative that the box gutter needed to be
accessed which would require removal of the installed terrace pavers
the applicant asked the FSP representatives of what she needed to do, whether
she could use her own preferred builders and if she could authorise repairs to
the building including replacement of the pavers
one of the FSP representatives did during their conversation refer to the
applicant’s responsibility to send in an y assessment reports and quotes for the
FSP’s consideration before authorising the repairs. However, the advice lacked
clarity and the overall conversation reasonably left the applicant with the
impression she could authorise the repairs to her chosen builder
the applicant authorised the repairs to her appointed consultants which included
complete replacement of all the pavers installed on the terrace
the available information establishes on balance the damage to the insured
property was not the result of a leak or damage to the box gutters. Rather, the
Case No: 511363 Determination Page 3 of 4
problem was due to the box gutters needing to be upsized as could not cope
with heavy rainfall events
the need to remove and upsize the box getter and associated removal of the
pavers was not the result of an insured event. Rather, it would reasonably be
considered defective installation and /or maintenance related works.
In line with the matters discussed above, I accept the applicant was provided with
ambiguous informati on by the FSP’s representatives . The information provided
should have been clearer and consistent with the policy terms and conditions.
Further, the applicant arising from her understanding of the conversations, authorised
the repairs to her appointed builder without submitting the scope of works or allowing
the FSP to arrange an assessment of the damage claimed.
I note the FSP’s reference to the applicant not allowing it to assess the cause and
extent of the damage claimed. However, arising from the ambiguous information
provided to the applicant. I am not satisfied the FSP is in a position to assert
prejudice because the applicant authorised repairs.
In line with the matters discussed above, I am satisfied the applicant was provided
with inaccurate and ambiguous information from the FSP. Therefore, the issue to
consider is whether the applicant has suffered any financial prejudice as a result of
the information from the FSP.
2.3 Is the FSP’s settlement offer reasonable ?
The FSP ’s final settlement offer to the applicant is reasonable
The FSP has accepted the claim and offered to cover the applicant for the resultant
internal storm water damage. However, the FSP says there is no evidence of
damage to the box gutter caused by an insured event and as such the costs to
replace it would not be covered under the policy.
The available information, as discussed previously does establish the applicant was
given ambiguous and inaccurate information by the FSP at the beginning of the
claim. In saying that, I am satisfied the applicant was aware of the fact the box gutter
needed replacement and would involve lifting of the pavers even before receiving the
ambiguous advice from the FSP.
I acknowledge the applicant’s view that if she were aware she would not be covered
for these repairs under the policy she would have given more thought to cost
effectiveness and instructed her builder to work with more care. I note the applicant
did approach her builder to confirm if there was a more cost-effective way to
complete these works as opposed to what she had authorised.
The builder in response provided a quote in the amount of $1,265 which he said
represents the cost to replace only one row of tiles as opposed to replacement of all
the tiles at a much higher cost. The FSP accepted this being reasonable and
consistent with the applicant’s obligations to mitigate her loss and offered to pay her
on the basis of this quote.
Case No: 511363 Determination Page 4 of 4
The applicant rejected the offer and provided further comment from her builder. In his
letter, the builder clarified it would be near impossible to remove only one row without
causing damage to other tiles as well as their waterproofing. Accordingly, in the
absence of information to the contrary, I accept the applicant has on balance
established only way the box gutters could be replaced would require replacement of
all the pavers installed on the terrace.
I am satisfied as discussed previously, the applicant was aware of the fact the box
gutters needed to be replaced before she received any ambiguous information from
the FSP. This reasonably means, regardless of the information received from the
FSP, the applicant in order to replace the box gutter would have had to replace all
the pavers as well.
It is not in dispute replacement of the box gutters was never going to be covered
under the claim and as such at all times was the responsibility of the applicant. The
fact the applicant authorised these repairs after contacting the FSP does not alter the
fact the extent of the repairs needed remained the same.
Accordingly, the extent of financial prejudice suffered by the applicant arising from
the FSP’s ambiguous information is nil. The applicant, as the home owner and to
prevent similar damage in the future, would have had to undertake these repairs
regardless of the advice received from the FSP.
In the interest of completeness, I acknowledge the applicant’s view the FSP, in order
to fulfil its obligations under the claim, should cover her for the cost to replace all of
the pavers. However, in line with the matters discussed above, as the works do not
relate to loss or damage caused by an insured e vent, the FSP in reality has no
obligations towards the cost associated with replacing the box gutter at all.
I do acknowledge the applicant will have suffered a certain level of stress and anxiety
under the claim arising from the ambiguous information. Accordingly, considering
what is fair in all the circumstances, despite the fact no financial prejudice has been
established, I determine the FSP is to honour its offer to cash settle the applicant in
the amount of $1,265 under the claim.